+353-1-416-8900REST OF WORLD
+44-20-3973-8888REST OF WORLD
1-917-300-0470EAST COAST U.S
1-800-526-8630U.S. (TOLL FREE)

Europe Data Center Construction Market - Industry Outlook & Forecast 2023-2028

  • PDF Icon

    Report

  • 527 Pages
  • July 2023
  • Region: Europe
  • Arizton
  • ID: 5820207
1h Free Analyst Time
1h Free Analyst Time

Speak directly to the analyst to clarify any post sales queries you may have.

The Europe data center construction market is expected to grow at a CAGR of 5.23% from 2022 to 2028.

KEY HIGHLIGHTS

  • There is a high demand for retail colocation services in developing countries, driven by organizations with limited budgets and demanding geographical distribution capacities. Additionally, there is increasing demand for wholesale colocation services from cloud providers, enterprises, IoT, and big data organizations.
  • The UK, Germany, and France are among the top contributors to the Europe data center construction market in terms of investment, area, and power capacity. Western Europe led the way with a cumulative growth of over USD 57 billion during the forecast period. The presence of FLAP cities such as Frankfurt and Paris has attracted significant regional data center investments.
  • Germany leads the Europe data center construction market with an overall investment of more than USD 1.8 billion in 2022 and a cumulative growth of more than USD 12 billion expected during the forecast period.
  • The growth in data center development has led to increased competition among data center contractors implementing new sustainable methods. Operators are opting for these contractors to enhance their green credentials.
  • Labor shortages, budget constraints, and construction delays in certain regions drive significant greenfield and modular data center development growth. This has increased the revenue of modular data center solutions providers such as Vertiv, Dell, and HPE.
  • The government's interest in promoting data center investments through the land for development and renewable energy procurement, and reducing electricity tariffs, will drive the colocation market in Europe during the forecast period. The trend of procuring renewable energy to power data center facilities will likely continue, with several operators signing power purchase agreements with renewable energy companies.

KEY TRENDS & DRIVERS

5G Deployments Fuelling Data Center Investments

  • The rapid deployment of 5G networks in European countries drives investments in data centers, particularly edge data centers.
  • In May 2022, Three UK, a UK-based operator, covered over 54% of the population with a 5G network available at 400 locations in over 3,000 sites. Vodafone UK also selected Oracle Communications in February 2022 to accelerate its standalone 5G network with the help of Oracle's cloud-native network policy management solution.
  • Orange Poland opened its 5G lab in Warsaw in April 2022, enabling businesses to develop advanced technologies for their growth.
  • In November 2021, the Hungary Innovation and Technology Ministry partnered with Huawei Technologies to develop 5G and fixed networks.

Increasing Cloud Services Adoption

  • European companies are mainly opting for a hybrid cloud approach by enjoying benefits offered by both public and private clouds, such as enhanced security. They are shifting their workloads to the cloud to strengthen their digitalization goals and enjoy cloud advantages. For instance, a Swedish bank migrated its services to the AWS cloud to analyze customer behavior and make data-driven decisions effectively.
  • Hyperscale cloud services providers such as AWS, Google, Microsoft, Oracle, and Meta are increasing their service capabilities for supporting businesses. For instance, in March 2022, the global cloud service provider, AWS, announced plans to invest over USD 2.3 billion in its data centers in the UK over the next two years.
  • In May 2022, the France Competition Authority announced the launch of a sector inquiry for the cloud computing market to determine the impact of the cloud on the competition.

Rising Awareness of Carbon-Neutrality

  • Europe has abundant renewable energy sources such as wind, geothermal, and hydro. Operators are aligning their goals to the carbon-neutral goals of the respective countries. For instance, Green Mountain, a colocation operator, uses 100% of renewable energy in its data center operations.
  • In April 2022, AWS announced renewable energy projects in France and other locations with a power capacity of around 3.5 GW. This renewable project is the second one from AWS in France, including one established earlier, with the total power capacity from the two projects being around 38 MW.
  • Denmark is setting up energy islands to harness the resources in the Baltics and will be the first in the world. They will have the capacity to not only supply Denmark but also supply neighboring countries.
  • European governments are releasing policies relating to sustainability and energy reuse. For instance, the Swedish government released energy policies such as the Electricity Certificate System to ensure energy is used through renewable energy sources such as solar, wind, hydro, or geothermal.
  • The Switzerland government's energy strategy and it expected to add 39 TWh of renewable energy by 2050. the government plans to provide tax incentives to support solar power expansion.

Growing Adoption of Artificial Intelligence

  • The growing adoption of artificial intelligence drives significant data generation and technology market expansion, creating an increased demand for data center construction.
  • Eurostat's report highlights Ireland as the leading country in Europe for businesses and enterprises utilizing AI/ML technologies in their infrastructure and applications.
  • Across Europe, several AI initiatives have been launched, including global partnerships, national strategies, and mission initiatives. For example, the French government invested USD 1.7 billion into its National Strategy for Artificial Intelligence.
  • Spain's National Artificial Intelligence Strategy is also part of the country's economic recovery and transformation plan, with an investment of approximately USD 720 million from 2021-2023.
  • The high adoption of AI/ML solutions drives the need for highly efficient cooling infrastructure, such as liquid cooling for supporting AI/ML workloads in High-Performance Computing (HPC). As a result, direct-to-chip and liquid-immersion cooling markets are forming strong partnerships through OEM.

Tax Incentives Boosting Data Center Construction

  • Several countries are offering tax incentives to local and global investors to facilitate the construction of data centers.
  • The government of Spain invests heavily in digitalization, with plans to invest around USD 720 million toward strengthening artificial intelligence. France has reduced taxes on electricity to attract data center investments, while the UK government has established a low % corporate tax rate of 20% - the lowest among G20 countries.
  • In Switzerland, the Federal Act on Data Protection (FADP) includes adaptations to GDPR, making it an attractive destination for data center investments. Meanwhile, France offers tax incentives of up to 30% for research and development, with a limit of USD 97.48 million.
  • The Dutch government is also actively working to position the country at the forefront of the European data center market, despite a sales and VAT rate of over 20%.

COMPETITIVE ANALYSIS

  • Several prominent companies, including Arup, AECOM, Ariatta, Caverion, Cowi, DPR Construction, Designer Group, Exyte, Kirby Group Engineering, Mercury, RED, Granlund Group, Turner & Townsend, and others, are major players in the Europe data center construction market. To provide reliable construction solutions, these vendors collaborate with data center operators. For example, Keysource provided planning, engineering, and construction services for edge data center construction at Namsos Datacenter (NDS).

Major Vendors

Prominent Support Infrastructure Providers

  • 3M
  • ABB
  • Airedale International Air Conditioning
  • Aermec
  • Alfa Laval
  • Aksa Power Generation
  • Carrier
  • Caterpillar
  • Condair
  • Climaveneta
  • Cummins
  • D’HONDT THERMAL SOLUTIONS
  • Daikin Applied
  • Delta Electronics
  • Eaton
  • ebm-papst
  • EMICON INNOVATION AND COMFORT
  • Enrogen
  • FlaktGroup
  • Grundfos
  • Güntner
  • GESAB
  • HiRef
  • HITEC Power Protection
  • Honeywell International
  • Johnson Controls
  • KOHLER-SDMO
  • KyotoCooling
  • Legrand
  • Mitsubishi Electric
  • Munters
  • NetNordic
  • Nlyte Software (Carrier Global Corporation)
  • Perkins Engines
  • Piller Power Systems
  • Riello Elettronica (Riello UPS)
  • Rittal
  • Rolls-Royce
  • Schneider Electric
  • Siemens
  • Socomec
  • STULZ
  • Trane (Ingersoll Rand)
  • Vertiv
  • ZIEHL-ABEGG

Prominent Construction Contractors

  • AECOM
  • Altron
  • AODC
  • AEON Engineering
  • APL Data Center
  • ARC:MC
  • Ariatta
  • ARSMAGNA
  • Artelia
  • Arup
  • Aurora Group
  • Atkins
  • Basler & Hofmann
  • BENTHEM CROUWEL ARCHITECTS
  • Bouygues Construction
  • Callaghan Engineering
  • Cap Ingelec
  • Caverion
  • Coromatic
  • Collen
  • COWI
  • DataDome
  • Deerns
  • Designer Group
  • Dipl.-Ing. H. C. Hollige
  • Dornan
  • Etop
  • Exyte
  • DPR Construction
  • Eiffage
  • EYP MCF
  • Fluor Corporation
  • Ferrovial
  • Free Technologies Engineering
  • Future-tech
  • Granlund Group
  • GreenMDC
  • Gottlieb Paludan Architects
  • Haka Moscow
  • ICT Facilities
  • IDOM
  • IMOS
  • ISG
  • JCA Engineering
  • JERLAURE
  • Kirby Group Engineering
  • KKCG Group
  • Linesight
  • LPI Group
  • M+W Group (EXYTE)
  • Mace
  • Mercury
  • Metnor Construction
  • MT Hojgaard
  • Nicholas Webb Architects (NWA)
  • NORMA Engineering
  • Oakmont Construction
  • PM Group
  • PORR Group
  • PQC
  • Quark
  • Ramboll Group
  • RED
  • Reid Brewin Architects
  • Royal HaskoningDHV
  • Skanska
  • SPIE UK
  • Starching
  • STO Building Group
  • STRABAG
  • STS Group
  • Sweco
  • TECHKO
  • Tetra Tech
  • TPF Ingénierie
  • TTSP
  • Turner & Townsend
  • Warbud
  • Winthrop Engineering and Contracting
  • YIT
  • ZAUNERGROUP

Prominent Data Center Investors

  • 3data
  • 3S Group
  • Amazon Web Services
  • Artnet
  • Atman
  • Apple
  • Aruba
  • AtlasEdge
  • AQ Compute
  • atNorth
  • Bahnhof
  • Beyond.pl
  • China Mobile
  • Colt Data Centre Services (COLT DCS)
  • CyrusOne
  • DATA4
  • DigiPlex (IPI Partners)
  • Digital Realty
  • Echelon Data Centres
  • EcoDataCenter
  • EdgeConneX
  • Equinix
  • Euclyde Data Centers
  • Facebook (Meta)
  • Global Switch
  • Google
  • Green Mountain
  • Hyperco
  • Iron Mountain
  • IXcellerate
  • KDDI
  • Liberty Global
  • Magenta Telekom
  • Microsoft
  • MTS
  • Nautilus Data Technologies
  • NDC-GARBE Data Centers Europe
  • Neterra
  • Netia
  • NTT Global Data Centers
  • Orange Business Services
  • Proximity Data Centres
  • Pure Data Centres
  • Rostelecom Data Centers
  • Stadtwerke Feldkirch
  • T-Mobile
  • T5 Data Centers
  • Telecom Italia Sparkle
  • Vantage Data Centers
  • Verne Global
  • Virtus Data centers (ST Telemedia Global Data Centres)
  • VK Cloud Solutions
  • Yandex
  • Yondr

New Entrants

  • ClusterPower
  • Global Technical Realty
  • Stratus DC Management

The report includes the investment in the following areas:

Facility Type

  • Colocation Data Centers
  • Hyperscale Data Centers
  • Enterprise Data Centers

Infrastructure

  • Electrical Infrastructure
  • Mechanical Infrastructure
  • General Construction

Electrical Infrastructure

  • UPS Systems
  • Generators
  • Transfer Switches & Switchgears
  • PDUs
  • Other Electrical Infrastructure

Mechanical Infrastructure

  • Cooling Systems
  • Racks
  • Other Mechanical Infrastructure

Cooling Systems

  • CRAC & CRAH Units
  • Chiller Units
  • Cooling Towers, Condensers & Dry Coolers
  • Economizers & Evaporative Coolers
  • Other Cooling Units

Cooling Technique

  • Air-based Cooling Technique
  • Liquid-based Cooling Technique

General Construction

  • Core & Shell Development
  • Installation & Commissioning Services
  • Engineering & Building Design
  • Fire Detection & Suppression
  • Physical Security
  • DCIM/BMS Solutions

Tier Standards

  • Tier I & Tier II
  • Tier III
  • Tier IV

Geography

  • Western Europe
  • Netherlands
  • U.K.
  • Germany
  • France
  • Netherlands
  • Ireland
  • Switzerland
  • Italy
  • Spain
  • Belgium
  • Portugal
  • Other Western European Countries
  • Nordics
  • Denmark
  • Sweden
  • Norway
  • Finland &Iceland
  • Central and Eastern European Countries
  • Russia
  • Poland
  • Austria
  • Czech Republic
  • Other Central & Eastern European Countries

KEY QUESTIONS ANSWERED:

1. How big is the Europe data center construction market?
2. What is the growth rate of the Europe data center construction market?
3. What is the estimated market size in terms of area in the Europe data center construction market by 2028?
4. What factors drive the Europe data center construction market growth?
5. How much MW of power capacity is expected to reach the Europe data center construction market by 2028?

Table of Contents

1. Market at a Glance
2. Premium Insights
2.1. Key Market Highlights
2.1.1. Key Trends
3. Market Opportunities & Trends
3.1. High Adoption of Artificial Intelligence
3.2. Increase in 5G Deployments Aiding in Growth of Edge Data Centers
3.3. Sustainability Initiatives Attracting Data Center Operators
3.4. Rise in District Heating Concept
3.5. Innovative Construction Techniques for Data Centers
4. Market Growth Enablers
4.1. Adoption of Cloud-Based Services to Drive Data Cen
4.2. Shift from On-Premises to Cloud and Colocation
4.3. Advent of IoT & Big Data Technologies
4.4. Government Support for Data Center Developments
4.5. Growing Submarine and Inland Connectivity
4.6. Adoption of Ocp and Hyperscale Infrastructure
5. Market Restraints
5.1. Supply Chain Disruptions Hampering the Growth
5.2. Concerns Over Carbon Emissions from Data Centers
5.3. Lack of Skilled Workforce Hampering Data Center Construction
5.4. Security Challenges Impacting Growth of Data Centers
6. Market Landscape
6.1. Market Overview
6.2. Investment: Market Size & Forecast
6.3. Area: Market Size & Forecast
6.4. Power Capacity: Market Size & Forecast
7. Facility Type
7.1. Colocation Data Center
7.1.1. Market Overview
7.1.2. Investment: Market Size & Forecast
7.1.3. Area: Market Size & Forecast
7.1.4. Power Capacity: Market Size & Forecast
7.2. Hyperscale Data Center
7.2.1. Market Overview
7.2.2. Investment: Market Size & Forecast
7.2.3. Area: Market Size & Forecast
7.2.4. Power Capacity: Market Size & Forecast
7.3. Enterprise Data Center
7.3.1. Market Overview
7.3.2. Investment: Market Size & Forecast
7.3.3. Area: Market Size & Forecast
7.3.4. Power Capacity: Market Size & Forecast
8. Infrastructure
8.1. Market Snapshot
8.2. Key Highlights
8.3. Electrical Infrastructure
8.3.1. Market Overview
8.3.2. Market Size & Forecast
8.4. Mechanical Infrastructure
8.4.1. Market Overview
8.4.2. Market Size & Forecast
8.5. General Construction
8.5.1. Market Overview
8.5.2. Market Size & Forecast
9. Electrical Infrastructure
9.1. Market Snapshot
9.2. Ups Systems
9.2.1. Market Overview
9.2.2. Market Size & Forecast
9.3. Generators
9.3.1. Market Overview
9.3.2. Market Size & Forecast
9.4. Transfer Switches & Switchgear
9.4.1. Market Overview
9.4.2. Market Size & Forecast
9.5. Pdus
9.5.1. Market Overview
9.5.2. Market Size & Forecast
9.6. Other Electrical Infrastructure
9.6.1. Market Overview
9.6.2. Market Size & Forecast
10. Mechanical Infrastructure
10.1. Market Snapshot
10.2. Cooling Systems
10.2.1. Market Overview
10.2.2. Market Size & Forecast
10.3. Racks
10.3.1. Market Overview
10.3.2. Market Size & Forecast
10.4. Other Mechanical Infrastructure
10.4.1. Market Overview
10.4.2. Market Size & Forecast
11. Cooling Systems
11.1. Crac & Crah Units
11.1.1. Market Overview
11.1.2. Market Size & Forecast
11.2. Chiller Units
11.2.1. Market Overview
11.2.2. Market Size & Forecast
11.3. Cooling Towers, Condensers & Dry Coolers
11.3.1. Market Overview
11.3.2. Market Size & Forecast
11.4. Economizers & Evaporative Coolers
11.4.1. Market Overview
11.4.2. Market Size & Forecast
11.5. Other Cooling Units
11.5.1. Market Overview
11.5.2. Market Size & Forecast
12. Cooling Techniques
12.1. Air-Based Cooling Techniques
12.1.1. Market Overview
12.1.2. Market Size & Forecast
12.2. Liquid-Based Cooling Techniques
12.2.1. Market Overview
12.2.2. Market Size & Forecast
13. General Construction
13.1. Market Snapshot
13.2. Core & Shell Development
13.2.1. Market Overview
13.2.2. Market Size & Forecast
13.3. Installation & Commissioning Services
13.3.1. Market Overview
13.3.2. Market Size & Forecast
13.4. Engineering & Building Design
13.4.1. Market Overview
13.4.2. Market Size & Forecast
13.5. Fire Detection & Suppression
13.5.1. Market Overview
13.5.2. Market Size & Forecast
13.6. Physical Security
13.6.1. Market Overview
13.6.2. Market Size & Forecast
13.7. Dcim/Bms Solutions
13.7.1. Market Overview
13.7.2. Market Size & Forecast
14. Tier Standards
14.1. Tier I & Ii
14.1.1. Market Overview
14.1.2. Market Size & Forecast
14.2. Tier Iii
14.2.1. Market Overview
14.2.2. Market Size & Forecast
14.3. Tier Iv
14.3.1. Market Overview
14.3.2. Market Size & Forecast
15. Western Europe
15.1. Market Overview
15.2. Investment: Market Snapshot & Growth Engine
15.3. Area: Market Snapshot & Growth Engine
15.4. Power Capacity: Market Snapshot & Growth Engine
15.5. Support Infrastructure: Market Size & Forecast
15.6. UK
15.6.1. Market Overview
15.6.2. Investment: Market Size & Forecast
15.6.3. Area: Market Size & Forecast
15.6.4. Power Capacity: Market Size & Forecast
15.6.5. Support Infrastructure: Market Size & Forecast
15.7. Germany
15.7.1. Market Overview
15.7.2. Investment: Market Size & Forecast
15.7.3. Area: Market Size & Forecast
15.7.4. Power Capacity: Market Size & Forecast
15.7.5. Support Infrastructure: Market Size & Forecast
15.8. France
15.8.1. Market Overview
15.8.2. Investment: Market Size & Forecast
15.8.3. Area: Market Size & Forecast
15.8.4. Power Capacity: Market Size & Forecast
15.8.5. Support Infrastructure: Market Size & Forecast
15.9. Netherlands
15.9.1. Market Overview
15.9.2. Investment: Market Size & Forecast
15.9.3. Area: Market Size & Forecast
15.9.4. Power Capacity: Market Size & Forecast
15.9.5. Support Infrastructure: Market Size & Forecast
15.10. Ireland
15.10.1. Market Overview
15.10.2. Investment: Market Size & Forecast
15.10.3. Area: Market Size & Forecast
15.10.4. Power Capacity: Market Size & Forecast
15.10.5. Support Infrastructure: Market Size & Forecast
15.11. Switzerland
15.11.1. Market Overview
15.11.2. Investment: Market Size & Forecast
15.11.3. Area: Market Size & Forecast
15.11.4. Power Capacity: Market Size & Forecast
15.11.5. Support Infrastructure: Market Size & Forecast
15.12. Italy
15.12.1. Market Overview
15.12.2. Investment: Market Size & Forecast
15.12.3. Area: Market Size & Forecast
15.12.4. Power Capacity: Market Size & Forecast
15.12.5. Support Infrastructure: Market Size & Forecast
15.13. Spain
15.13.1. Market Overview
15.13.2. Investment: Market Size & Forecast
15.13.3. Area: Market Size & Forecast
15.13.4. Power Capacity: Market Size & Forecast
15.13.5. Support Infrastructure: Market Size & Forecast
15.14. Belgium
15.14.1. Market Overview
15.14.2. Investment: Market Size & Forecast
15.14.3. Area: Market Size & Forecast
15.14.4. Power Capacity: Market Size & Forecast
15.14.5. Support Infrastructure: Market Size & Forecast
15.15. Portugal
15.15.1. Market Overview
15.15.2. Investment: Market Size & Forecast
15.15.3. Area: Market Size & Forecast
15.15.4. Power Capacity: Market Size & Forecast
15.15.5. Support Infrastructure: Market Size & Forecast
15.16. Other Western European Countries
15.16.1. Market Overview
15.16.2. Investment: Market Size & Forecast
15.16.3. Area: Market Size & Forecast
15.16.4. Power Capacity: Market Size & Forecast
15.16.5. Support Infrastructure: Market Size & Forecast
16. Nordic
16.1. Market Overview
16.2. Investment: Market Snapshot & Growth Engine
16.3. Area: Market Snapshot & Growth Engine
16.4. Power Capacity: Market Snapshot & Growth Engine
16.5. Support Infrastructure: Market Size & Forecast
16.6. Denmark
16.6.1. Market Overview
16.6.2. Investment: Market Size & Forecast
16.6.3. Area: Market Size & Forecast
16.6.4. Power Capacity: Market Size & Forecast
16.6.5. Support Infrastructure: Market Size & Forecast
16.7. Sweden
16.7.1. Market Overview
16.7.2. Investment: Market Size & Forecast
16.7.3. Area: Market Size & Forecast
16.7.4. Power Capacity: Market Size & Forecast
16.7.5. Support Infrastructure: Market Size & Forecast
16.8. Norway
16.8.1. Market Overview
16.8.2. Investment: Market Size & Forecast
16.8.3. Area: Market Size & Forecast
16.8.4. Power Capacity: Market Size & Forecast
16.8.5. Support Infrastructure: Market Size & Forecast
16.9. Finland & Iceland
16.9.1. Market Overview
16.9.2. Investment: Market Size & Forecast
16.9.3. Area: Market Size & Forecast
16.9.4. Power Capacity: Market Size & Forecast
16.9.5. Support Infrastructure: Market Size & Forecast
17. Central & Eastern European Countries
17.1. Market Overview
17.2. Investment: Market Snapshot & Growth Engine
17.3. Area: Market Snapshot & Growth Engine
17.4. Power Capacity: Market Snapshot & Growth Engine
17.5. Support Infrastructure: Market Size & Forecast
17.6. Russia
17.6.1. Market Overview
17.6.2. Investment: Market Size & Forecast
17.6.3. Area: Market Size & Forecast
17.6.4. Power Capacity: Market Size & Forecast
17.6.5. Support Infrastructure: Market Size & Forecast
17.7. Poland
17.7.1. Market Overview
17.7.2. Investment: Market Size & Forecast
17.7.3. Area: Market Size & Forecast
17.7.4. Power Capacity: Market Size & Forecast
17.7.5. Support Infrastructure: Market Size & Forecast
17.8. Austria
17.8.1. Market Overview
17.8.2. Investment: Market Size & Forecast
17.8.3. Area: Market Size & Forecast
17.8.4. Power Capacity: Market Size & Forecast
17.8.5. Support Infrastructure: Market Size & Forecast
17.9. Czech Republic
17.9.1. Market Overview
17.9.2. Investment: Market Size & Forecast
17.9.3. Area: Market Size & Forecast
17.9.4. Power Capacity: Market Size & Forecast
17.9.5. Support Infrastructure: Market Size & Forecast
17.10. Other Central & Eastern European Countries
17.10.1. Market Overview
17.10.2. Investment: Market Size & Forecast
17.10.3. Area: Market Size & Forecast
17.10.4. Power Capacity: Market Size & Forecast
17.10.5. Support Infrastructure: Market Size & Forecast
18. Competitive Landscape
18.1. Electrical Infrastructure
18.2. Mechanical Infrastructure
18.3. General Construction
18.4. Data Center Investors
19. Key Data Center Support Infrastructure Providers
19.1. 3M
19.1.1. Business Overview
19.1.2. Product Offerings
19.2. Abb
19.2.1. Business Overview
19.2.2. Product Offerings
19.3. Airedale International Air Conditioning
19.3.1. Business Overview
19.3.2. Product Offerings
19.4. Aermec
19.4.1. Business Overview
19.4.2. Product Offerings
19.5. Alfa Laval
19.5.1. Business Overview
19.5.2. Product Offerings
19.6. Aksa Power Generation
19.6.1. Business Overview
19.6.2. Product Offerings
19.7. Carrier
19.7.1. Business Overview
19.7.2. Product Offerings
19.8. Caterpillar
19.8.1. Business Overview
19.8.2. Product Offerings
19.9. Condair
19.9.1. Business Overview
19.9.2. Product Offerings
19.10. Climaveneta
19.10.1. Business Overview
19.10.2. Product Offerings
19.11. Cummins
19.11.1. Business Overview
19.11.2. Product Offerings
19.12. D’Hondt Thermal Solutions
19.12.1. Business Overview
19.12.2. Product Offerings
19.13. Daikin Applied
19.13.1. Business Overview
19.13.2. Product Offerings
19.14. Delta Electronics
19.14.1. Business Overview
19.14.2. Product Offerings
19.15. Eaton
19.15.1. Business Overview
19.15.2. Product Offerings
19.16. Ebm-Papst
19.16.1. Business Overview
19.16.2. Product Offerings
19.17. Emicon Innovation and Comfort
19.17.1. Business Overview
19.17.2. Product Offerings
19.18. Enrogen
19.18.1. Business Overview
19.18.2. Product Offerings
19.19. Flaktgroup
19.19.1. Business Overview
19.19.2. Product Offerings
19.20. Grundfos
19.20.1. Business Overview
19.20.2. Product Offerings
19.21. Güntner
19.21.1. Business Overview
19.21.2. Product Offerings
19.22. Gesab
19.22.1. Business Overview
19.22.2. Product Offerings
19.23. Hiref
19.23.1. Business Overview
19.23.2. Product Offerings
19.24. Hitec Power Protection
19.24.1. Business Overview
19.24.2. Product Offerings
19.25. Honeywell International
19.25.1. Business Overview
19.25.2. Product Offerings
19.26. Johnson Controls
19.26.1. Business Overview
19.26.2. Product Offerings
19.27. Kohler-Sdmo
19.27.1. Business Overview
19.27.2. Product Offerings
19.28. Kyotocooling
19.28.1. Business Overview
19.28.2. Product Offerings
19.29. Legrand
19.29.1. Business Overview
19.29.2. Product Offerings
19.30. Mitsubishi Electric
19.30.1. Business Overview
19.30.2. Product Offerings
19.31. Munters
19.31.1. Business Overview
19.31.2. Product Offerings
19.32. Netnordic
19.32.1. Business Overview
19.32.2. Product Offerings
19.33. Nlyte Software (Carrier Global Corporation)
19.33.1. Business Overview
19.33.2. Product Offerings
19.34. Perkins Engines
19.34.1. Business Overview
19.34.2. Product Offerings
19.35. Piller Power Systems
19.35.1. Business Overview
19.35.2. Product Offerings
19.36. Riello Elettronica (Riello Ups)
19.36.1. Business Overview
19.36.2. Product Offerings
19.37. Rittal
19.37.1. Business Overview
19.37.2. Product Offerings
19.38. Rolls Royce
19.38.1. Business Overview
19.38.2. Product Offerings
19.39. Schneider Electric
19.39.1. Business Overview
19.39.2. Product Offerings
19.40. Siemens
19.40.1. Business Overview
19.40.2. Product Offerings
19.41. Socomec
19.41.1. Business Overview
19.41.2. Product Offerings
19.42. Stulz
19.42.1. Business Overview
19.42.2. Product Offerings
19.43. Trane (Ingersoll Rand)
19.43.1. Business Overview
19.43.2. Product Offerings
19.44. Vertiv
19.44.1. Business Overview
19.44.2. Product Offerings
19.45. Ziehl-Abegg
19.45.1. Business Overview
19.45.2. Product Offerings
20. Prominent Construction Contractors
20.1. Aecom
20.1.1. Business Overview
20.1.2. Service Offerings
20.2. Altron
20.2.1. Business Overview
20.2.2. Service Offerings
20.3. Aodc
20.3.1. Business Overview
20.3.2. Service Offerings
20.4. Aeon Engineering
20.4.1. Business Overview
20.4.2. Service Offerings
20.5. Apl Data Center
20.5.1. Business Overview
20.5.2. Service Offerings
20.6. Arc: Mc
20.6.1. Business Overview
20.6.2. Service Offerings
20.7. Ariatta
20.7.1. Business Overview
20.7.2. Service Offerings
20.8. Arsmagna
20.8.1. Business Overview
20.8.2. Service Offerings
20.9. Artelia
20.9.1. Business Overview
20.9.2. Service Offerings
20.10. Arup
20.10.1. Business Overview
20.10.2. Service Offerings
20.11. Aurora Group
20.11.1. Business Overview
20.11.2. Service Offerings
20.12. Atkins
20.12.1. Business Overview
20.12.2. Service Offerings
20.13. Basler & Hoffman
20.13.1. Business Overview
20.13.2. Service Offerings
20.14. Benthem Crouwel Architects
20.14.1. Business Overview
20.14.2. Service Offerings
20.15. Bouygues Construction
20.15.1. Business Overview
20.15.2. Service Offerings
20.16. Callaghan Engineering
20.16.1. Business Overview
20.16.2. Service Offerings
20.17. Cap Ingelec
20.17.1. Business Overview
20.17.2. Service Offerings
20.18. Caverion
20.18.1. Business Overview
20.18.2. Service Offerings
20.19. Coromatic (E.On)
20.19.1. Business Overview
20.19.2. Service Offerings
20.20. Collen
20.20.1. Business Overview
20.20.2. Service Offerings
20.21. Cowi
20.21.1. Business Overview
20.21.2. Service Offerings
20.22. Datadome
20.22.1. Business Overview
20.22.2. Service Offerings
20.23. Deerns
20.23.1. Business Overview
20.23.2. Service Offerings
20.24. Designer Group
20.24.1. Business Overview
20.24.2. Service Offerings
20.25. Dipl.-Ing. H. C. Hollige
20.25.1. Business Overview
20.25.2. Service Offerings
20.26. Dornan
20.26.1. Business Overview
20.26.2. Service Offerings
20.27. Etop
20.27.1. Business Overview
20.27.2. Service Offerings
20.28. Exyte (M+W Group)
20.28.1. Business Overview
20.28.2. Service Offerings
20.29. Dpr Construction
20.29.1. Business Overview
20.29.2. Service Offerings
20.30. Eiffage
20.30.1. Business Overview
20.30.2. Service Offerings
20.31. Eyp Mcf
20.31.1. Business Overview
20.31.2. Service Offerings
20.32. Ferrovial
20.32.1. Business Overview
20.32.2. Service Offerings
20.33. Fluor Corporation
20.33.1. Business Overview
20.33.2. Service Offerings
20.34. Free Technologies Engineering
20.34.1. Business Overview
20.34.2. Service Offerings
20.35. Future Tech
20.35.1. Business Overview
20.35.2. Service Offerings
20.36. Granlund Group
20.36.1. Business Overview
20.36.2. Service Offerings
20.37. Green Mdc
20.37.1. Business Overview
20.37.2. Service Offerings
20.38. Gottlieb Paludan Architects
20.38.1. Business Overview
20.38.2. Service Offerings
20.39. Haka Moscow
20.39.1. Business Overview
20.39.2. Service Offerings
20.40. Ict Facilities
20.40.1. Business Overview
20.40.2. Service Offerings
20.41. Idom
20.41.1. Business Overview
20.41.2. Service Offerings
20.42. Imos
20.42.1. Business Overview
20.42.2. Service Offerings
20.43. Isg
20.43.1. Business Overview
20.43.2. Service Offerings
20.44. Jca Engineering
20.44.1. Business Overview
20.44.2. Service Offerings
20.45. Jerlaure
20.45.1. Business Overview
20.45.2. Service Offerings
20.46. Kirby Group Engineering
20.46.1. Business Overview
20.46.2. Service Offerings
20.47. Kkcg Group
20.47.1. Business Overview
20.47.2. Service Offerings
20.48. Linesight
20.48.1. Business Overview
20.48.2. Service Offerings
20.49. Lpi Group
20.49.1. Business Overview
20.49.2. Service Offerings
20.50. M+W Group (Exyte)
20.50.1. Business Overview
20.50.2. Service Offerings
20.51. Mace
20.51.1. Business Overview
20.51.2. Service Offerings
20.52. Mercury
20.52.1. Business Overview
20.52.2. Service Offerings
20.53. Metnor Construction
20.53.1. Business Overview
20.53.2. Service Offerings
20.54. Mt Hojgaard
20.54.1. Business Overview
20.54.2. Service Offerings
20.55. Nicholas Webb Architects (Nwa)
20.55.1. Business Overview
20.55.2. Service Offerings
20.56. Norma Engineering
20.56.1. Business Overview
20.56.2. Service Offerings
20.57. Oakmont Construction
20.57.1. Business Overview
20.57.2. Service Offerings
20.58. Pm Group
20.58.1. Business Overview
20.58.2. Service Offerings
20.59. Porr Group
20.59.1. Business Overview
20.59.2. Service Offerings
20.60. Pqc
20.60.1. Business Overview
20.60.2. Service Offerings
20.61. Quark
20.61.1. Business Overview
20.61.2. Service Offerings
20.62. Ramboll Group
20.62.1. Business Overview
20.62.2. Service Offerings
20.63. Red
20.63.1. Business Overview
20.63.2. Service Offerings
20.64. Reid Brewin Architects
20.64.1. Business Overview
20.64.2. Service Offerings
20.65. Royal Haskoningdhv
20.65.1. Business Overview
20.65.2. Service Offerings
20.66. Skanska
20.66.1. Business Overview
20.66.2. Service Offerings
20.67. Spie UK
20.67.1. Business Overview
20.67.2. Service Offerings
20.68. Starching
20.68.1. Business Overview
20.68.2. Service Offerings
20.69. Sto Building Group
20.69.1. Business Overview
20.69.2. Service Offerings
20.70. Strabag
20.70.1. Business Overview
20.70.2. Service Offerings
20.71. Sts Group
20.71.1. Business Overview
20.71.2. Service Offerings
20.72. Sweco
20.72.1. Business Overview
20.72.2. Service Offerings
20.73. Techko
20.73.1. Business Overview
20.73.2. Service Offerings
20.74. Tetra Tech
20.74.1. Business Overview
20.74.2. Service Offerings
20.75. Tpf Ingénierie
20.75.1. Business Overview
20.75.2. Service Offerings
20.76. Ttsp
20.76.1. Business Overview
20.76.2. Service Offerings
20.77. Turner & Townsend
20.77.1. Business Overview
20.77.2. Service Offerings
20.78. Warbud
20.78.1. Business Overview
20.78.2. Service Offerings
20.79. Winthrop Engineering and Contracting
20.79.1. Business Overview
20.79.2. Service Offerings
20.80. Yit
20.80.1. Business Overview
20.80.2. Service Offerings
20.81. Zaunergroup
20.81.1. Business Overview
20.81.2. Service Offerings
21. Prominent Data Center Investors
21.1. 3Data
21.1.1. Business Overview
21.1.2. Service Offerings
21.2. 3S Group
21.2.1. Business Overview
21.2.2. Service Offerings
21.3. Amazon Web Services
21.3.1. Business Overview
21.3.2. Service Offerings
21.4. Artnet
21.4.1. Business Overview
21.4.2. Service Offerings
21.5. Atman
21.5.1. Business Overview
21.5.2. Service Offerings
21.6. Apple
21.6.1. Business Overview
21.6.2. Service Offerings
21.7. Aruba
21.7.1. Business Overview
21.7.2. Service Offerings
21.8. Atlasedge
21.8.1. Business Overview
21.8.2. Service Offerings
21.9. Aq Compute
21.9.1. Business Overview
21.9.2. Service Offerings
21.10. Atnorth (Partners Group)
21.10.1. Business Overview
21.10.2. Service Offerings
21.11. Bahnhof
21.11.1. Business Overview
21.11.2. Service Offerings
21.12. Beyond.Pl
21.12.1. Business Overview
21.12.2. Service Offerings
21.13. China Mobile
21.13.1. Business Overview
21.13.2. Service Offerings
21.14. Colt Data Centre Services (Colt Dcs)
21.14.1. Business Overview
21.14.2. Service Offerings
21.15. Cyrusone
21.15.1. Business Overview
21.15.2. Service Offerings
21.16. Data4
21.16.1. Business Overview
21.16.2. Service Offerings
21.17. Digiplex (Ipi Partners)
21.17.1. Business Overview
21.17.2. Service Offerings
21.18. Digital Realty
21.18.1. Business Overview
21.18.2. Service Offerings
21.19. Echelon Data Centres
21.19.1. Business Overview
21.19.2. Service Offerings
21.20. Ecodatacenter
21.20.1. Business Overview
21.20.2. Service Offerings
21.21. Edgeconnex (Eqt Infrastructure)
21.21.1. Business Overview
21.21.2. Service Offerings
21.22. Equinix
21.22.1. Business Overview
21.22.2. Service Offerings
21.23. Euclyde Data Centers
21.23.1. Business Overview
21.23.2. Service Offerings
21.24. Facebook (Meta)
21.24.1. Business Overview
21.24.2. Service Offerings
21.25. Global Switch
21.25.1. Business Overview
21.25.2. Service Offerings
21.26. Google
21.26.1. Business Overview
21.26.2. Service Offerings
21.27. Green Mountain
21.27.1. Business Overview
21.27.2. Service Offerings
21.28. Hyperco
21.28.1. Business Overview
21.28.2. Service Offerings
21.29. Iron Mountain (Io)
21.29.1. Business Overview
21.29.2. Service Offerings
21.30. Ixcellerate
21.30.1. Business Overview
21.30.2. Service Offerings
21.31. Kddi
21.31.1. Business Overview
21.31.2. Service Offerings
21.32. Liberty Global
21.32.1. Business Overview
21.32.2. Service Offerings
21.33. Magenta Telecom
21.33.1. Business Overview
21.33.2. Service Offerings
21.34. Microsoft
21.34.1. Business Overview
21.34.2. Service Offerings
21.35. Mts
21.35.1. Business Overview
21.35.2. Service Offerings
21.36. Nautilus Data Technologies
21.36.1. Business Overview
21.36.2. Service Offerings
21.37. Ndc-Garbe Data Centers Europe
21.37.1. Business Overview
21.37.2. Service Offerings
21.38. Neterra
21.38.1. Business Overview
21.38.2. Service Offerings
21.39. Netia
21.39.1. Business Overview
21.39.2. Service Offerings
21.40. Ntt Global Data Centers
21.40.1. Business Overview
21.40.2. Service Offerings
21.41. Orange Business Services
21.41.1. Business Overview
21.41.2. Service Offerings
21.42. Proximity Data Centres
21.42.1. Business Overview
21.42.2. Service Offerings
21.43. Pure Data Centres
21.43.1. Business Overview
21.43.2. Service Offerings
21.44. Rostelecom Data Centers
21.44.1. Business Overview
21.44.2. Service Offerings
21.45. Stadtwerke Feldkirch
21.45.1. Business Overview
21.45.2. Service Offerings
21.46. T-Mobile
21.46.1. Business Overview
21.46.2. Service Offerings
21.47. T5 Data Centers
21.47.1. Business Overview
21.47.2. Service Offerings
21.48. Telecom Italia Sparkle
21.48.1. Business Overview
21.48.2. Service Offerings
21.49. Vantage Data Centers
21.49.1. Business Overview
21.49.2. Service Offerings
21.50. Verne Global
21.50.1. Business Overview
21.50.2. Service Offerings
21.51. Virtus Data Centres (St Telemedia Global Data Centres)
21.51.1. Business Overview
21.51.2. Service Offerings
21.52. Vk Cloud Solutions
21.52.1. Business Overview
21.52.2. Service Offerings
21.53. Yandex
21.53.1. Business Overview
21.53.2. Service Offerings
21.54. Yondr
21.54.1. Business Overview
21.54.2. Service Offerings
22. New Entrants
22.1. Clusterpower
22.1.1. Business Overview
22.1.2. Service Offerings
22.1.3. Key News
22.2. Global Technical Realty
22.2.1. Business Overview
22.2.2. Service Offerings
22.3. Stratus Dc Management
22.3.1. Business Overview
22.3.2. Service Offerings
23. Quantitative Summary
23.1. Europe Data Center Construction Market
23.1.1. Investment: Market Size & Forecast
23.1.2. Infrastructure: Market Size & Forecast
23.2. Market Segmentation
23.2.1. Electrical Infrastructure: Market Size & Forecast
23.2.2. Mechanical Infrastructure: Market Size & Forecast
23.2.3. Cooling Systems: Market Size & Forecast
23.2.4. Cooling Techniques: Market Size & Forecast
23.2.5. General Construction: Market Size & Forecast
23.2.6. Tier Standards: Market Size & Forecast
23.2.7. Facility Type: Market Size & Forecast by Investment
23.2.8. Facility Type: Market Size & Forecast by Area
23.2.9. Facility Type: Market Size & Forecast by Power Capacity
23.3. Geography
23.3.1. Investment by Region
23.3.2. Area by Region
23.3.3. Power Capacity by Region
23.4. Western Europe
23.4.1. Investment: Market Size & Forecast
23.4.2. Infrastructure: Market Size & Forecast
23.5. UK
23.5.1. Investment: Market Size & Forecast
23.5.2. Infrastructure: Market Size & Forecast
23.6. Germany
23.6.1. Investment: Market Size & Forecast
23.6.2. Infrastructure: Market Size & Forecast
23.7. France
23.7.1. Investment: Market Size & Forecast
23.7.2. Infrastructure: Market Size & Forecast
23.8. Netherlands
23.8.1. Investment: Market Size & Forecast
23.8.2. Infrastructure: Market Size & Forecast
23.9. Ireland
23.9.1. Investment: Market Size & Forecast
23.9.2. Infrastructure: Market Size & Forecast
23.10. Switzerland
23.10.1. Investment: Market Size & Forecast
23.10.2. Infrastructure: Market Size & Forecast
23.11. Italy
23.11.1. Investment: Market Size & Forecast
23.11.2. Infrastructure: Market Size & Forecast
23.12. Spain
23.12.1. Investment: Market Size & Forecast
23.12.2. Infrastructure: Market Size & Forecast
23.13. Belgium
23.13.1. Investment: Market Size & Forecast
23.13.2. Infrastructure: Market Size & Forecast
23.14. Portugal
23.14.1. Investment: Market Size & Forecast
23.14.2. Infrastructure: Market Size & Forecast
23.15. Other Western European Countries
23.15.1. Investment: Market Size & Forecast
23.15.2. Infrastructure: Market Size & Forecast
23.16. Nordics
23.16.1. Investment: Market Size & Forecast
23.16.2. Infrastructure: Market Size & Forecast
23.17. Denmark
23.17.1. Investment: Market Size & Forecast
23.17.2. Infrastructure: Market Size & Forecast
23.18. Sweden
23.18.1. Investment: Market Size & Forecast
23.18.2. Infrastructure: Market Size & Forecast
23.19. Norway
23.19.1. Investment: Market Size & Forecast
23.19.2. Infrastructure: Market Size & Forecast
23.20. Finland & Iceland
23.20.1. Investment: Market Size & Forecast
23.20.2. Infrastructure: Market Size & Forecast
23.21. Central & Eastern European Countries
23.21.1. Investment: Market Size & Forecast
23.21.2. Infrastructure: Market Size & Forecast
23.22. Russia
23.22.1. Investment: Market Size & Forecast
23.22.2. Infrastructure: Market Size & Forecast
23.23. Poland
23.23.1. Investment: Market Size & Forecast
23.23.2. Infrastructure: Market Size & Forecast
23.24. Austria
23.24.1. Investment: Market Size & Forecast
23.24.2. Infrastructure: Market Size & Forecast
23.25. Czech Republic
23.25.1. Investment: Market Size & Forecast
23.25.2. Infrastructure: Market Size & Forecast
23.26. Other Central & Eastern European Countries
23.26.1. Investment: Market Size & Forecast
23.26.2. Infrastructure: Market Size & Forecast
24. Appendix
24.1. List of Abbreviations
24.2. Definitions
24.3. Segmental Coverage
24.3.1. Market Segmentation by Facility Type
24.3.2. Market Segmentation by Infrastructure
24.3.3. Market Segmentation by Electrical Infrastructure
24.3.4. Market Segmentation by Mechanical Infrastructure
24.3.5. Market Segmentation by Cooling System
24.3.6. Market Segmentation by Cooling Techniques
24.3.7. Market Segmentation by General Construction
24.3.8. Market Segmentation by Tier Standards
24.4. Site Selection Criteria
24.5. Currency Conversion

Companies Mentioned

  • 3M
  • ABB
  • Airedale International Air Conditioning
  • Aermec
  • Alfa Laval
  • Aksa Power Generation
  • Carrier
  • Caterpillar
  • Condair
  • Climaveneta
  • Cummins
  • D’HONDT THERMAL SOLUTIONS
  • Daikin Applied
  • Delta Electronics
  • Eaton
  • ebm-papst
  • EMICON INNOVATION AND COMFORT
  • Enrogen
  • FlaktGroup
  • Grundfos
  • Güntner
  • GESAB
  • HiRef
  • HITEC Power Protection
  • Honeywell International
  • Johnson Controls
  • KOHLER-SDMO
  • KyotoCooling
  • Legrand
  • Mitsubishi Electric
  • Munters
  • NetNordic
  • Nlyte Software (Carrier Global Corporation)
  • Perkins Engines
  • Piller Power Systems
  • Riello Elettronica (Riello UPS)
  • Rittal
  • Rolls-Royce
  • Schneider Electric
  • Siemens
  • Socomec
  • STULZ
  • Trane (Ingersoll Rand)
  • Vertiv
  • ZIEHL-ABEGG
  • AECOM
  • Altron
  • AODC
  • AEON Engineering
  • APL Data Center
  • ARC:MC
  • Ariatta
  • ARSMAGNA
  • Artelia
  • Arup
  • Aurora Group
  • Atkins
  • Basler & Hofmann
  • BENTHEM CROUWEL ARCHITECTS
  • Bouygues Construction
  • Callaghan Engineering
  • Cap Ingelec
  • Caverion
  • Coromatic
  • Collen
  • COWI
  • DataDome
  • Deerns
  • Designer Group
  • Dipl.-Ing. H. C. Hollige
  • Dornan
  • Etop
  • Exyte
  • DPR Construction
  • Eiffage
  • EYP MCF
  • Fluor Corporation
  • Ferrovial
  • Free Technologies Engineering
  • Future-tech
  • Granlund Group
  • GreenMDC
  • Gottlieb Paludan Architects
  • Haka Moscow
  • ICT Facilities
  • IDOM
  • IMOS
  • ISG
  • JCA Engineering
  • JERLAURE
  • Kirby Group Engineering
  • KKCG Group
  • Linesight
  • LPI Group
  • M+W Group (EXYTE)
  • Mace
  • Mercury
  • Metnor Construction
  • MT Hojgaard
  • Nicholas Webb Architects (NWA)
  • NORMA Engineering
  • Oakmont Construction
  • PM Group
  • PORR Group
  • PQC
  • Quark
  • Ramboll Group
  • RED
  • Reid Brewin Architects
  • Royal HaskoningDHV
  • Skanska
  • SPIE UK
  • Starching
  • STO Building Group
  • STRABAG
  • STS Group
  • Sweco
  • TECHKO
  • Tetra Tech
  • TPF Ingénierie
  • TTSP
  • Turner & Townsend
  • Warbud
  • Winthrop Engineering and Contracting
  • YIT
  • ZAUNERGROUP
  • 3data
  • 3S Group
  • Amazon Web Services
  • Artnet
  • Atman
  • Apple
  • Aruba
  • AtlasEdge
  • AQ Compute
  • atNorth
  • Bahnhof
  • Beyond.pl
  • China Mobile
  • Colt Data Centre Services (COLT DCS)
  • CyrusOne
  • DATA4
  • DigiPlex (IPI Partners)
  • Digital Realty
  • Echelon Data Centres
  • EcoDataCenter
  • EdgeConneX
  • Equinix
  • Euclyde Data Centers
  • Facebook (Meta)
  • Global Switch
  • Google
  • Green Mountain
  • Hyperco
  • Iron Mountain
  • IXcellerate
  • KDDI
  • Liberty Global
  • Magenta Telekom
  • Microsoft
  • MTS
  • Nautilus Data Technologies
  • NDC-GARBE Data Centers Europe
  • Neterra
  • Netia
  • NTT Global Data Centers
  • Orange Business Services
  • Proximity Data Centres
  • Pure Data Centres
  • Rostelecom Data Centers
  • Stadtwerke Feldkirch
  • T-Mobile
  • T5 Data Centers
  • Telecom Italia Sparkle
  • Vantage Data Centers
  • Verne Global
  • Virtus Data centers (ST Telemedia Global Data Centres)
  • VK Cloud Solutions
  • Yandex
  • Yondr
  • ClusterPower
  • Global Technical Realty
  • Stratus DC Management

Methodology


Our research comprises a mix of primary and secondary research. The secondary research sources that are typically referred to include, but are not limited to, company websites, annual reports, financial reports, company pipeline charts, broker reports, investor presentations and SEC filings, journals and conferences, internal proprietary databases, news articles, press releases, and webcasts specific to the companies operating in any given market.

Primary research involves email interactions with the industry participants across major geographies. The participants who typically take part in such a process include, but are not limited to, CEOs, VPs, business development managers, market intelligence managers, and national sales managers. We primarily rely on internal research work and internal databases that we have populated over the years. We cross-verify our secondary research findings with the primary respondents participating in the study.



 

Loading
LOADING...

Table Information