|
|
 |
|
Viewing report
|
|
 |
 |
IABSE Report Vol. 87 Antwerp, 2003
International Association for Bridge and Structural Engineering (IABSE), Aug 2003, Pages: 339
The Symposium 'Structures for High-Speed Railway Transportation', Antwerp, Belgium, August 27-29, 2003, was jointly organised by the Belgium and Dutch Groups of IABSE. This specialised theme attracted 450 participants from 38 countries. The Symposium addressed the structural engineering aspects of the infrastructure works for railway transport networks including bridges, tunnels, buildings and track formation. The contributions were presented in concurrent sessions under following topics:
Bridges (General; Dynamic Interaction; Special Topics and Cases) / Tunnels / Buildings and Stations / Geotechnics / Structural Solutions for Track Building / Structures for Railless Systems / Environmental Issues / Monitoring
There were eight Keynote Lectures and 158 oral and poster presentations.
Customers who bought this item also bought
Health Monitoring of Bridges
Fatigue in Railway Infrastructure
Design of Highway Bridges: An LRFD Approach, 2nd Edition
Bridge & Tunnel Construction in the US
Integral and Semi-Integral Bridges
SED 9: Cable Vibrations in Cable-Stayed Bridges
How Structures Work: Design and Behaviour from Bridges to Buildings
Taiwan High Speed Rail Corporation
The World Market for Iron or Steel Bridges and Bridge Sections: A 2009 Global Trade Perspective
China's Railway Construction Market Report , 2006
The 2009 World Forecasts of Iron or Steel Bridges and Bridge Sections Export Supplies
Analysis of China's Railway Equipment Industry 2008
|
 |
|
|