• 1-800-526-8630U.S. (TOLL FREE)
  • 1-917-300-0470EAST COAST U.S.
  • +353-1-416-8900REST OF WORLD
NTPC Limited - Overview, Contact Details, Locations, Key executives, Power Plant Information, Business Description and SWOT Analysis - Product Image

NTPC Limited - Overview, Contact Details, Locations, Key executives, Power Plant Information, Business Description and SWOT Analysis

  • ID: 1421111
  • November 2010
  • 184 pages
  • GlobalData

NTPC Limited - Overview, Contact Details, Locations, Key executives, Power Plant Information, Business Description and SWOT Analysis

Summary

The report” NTPC Limited- Company Overview, Contact Details, Locations, Key Executives, Power Plant Information, Business Description and SWOT" contains the profile of the company that is involved in the field of power generation from thermal sources (coal, oil and gas).It contains a detailed description of the company’s business operations (power plants, installed capacity, and generation), history, corporate strategy, and business structure. This report contains a detailed SWOT analysis, information on key employees (executives), key competitors, and major products and services.

Scope

- Major Power Plants (assets) – summarized and detailed information about the power plants (assets)
- Operational Metrics (capacity, generation, revenue, sales, number of consumers)
- Business description – A detailed description of the company’s operations and business divisions
- Corporate strategy – Our summarization of the company’s business strategy.
- SWOT analysis – A READ MORE >

Note: Product cover images may vary from those shown

1
1.1 List of Tables
2 Company Snapshot
2.1 Key Information
2.2 Company Overview
2.3 Industry Outlook – Hydro
2.4 Industry Outlook – Solar PV
2.5 Industry Outlook – Wind
2.6 Industry Outlook – Power Generation
2.7 SWOT Snapshot
3 Operational Metrics
3.1 NTPC Limited, Operational Metrics, By Capacity
3.2 NTPC Limited, Operational Metrics, By Generation
3.3 NTPC Limited, Operational Metrics, By Sales
4 NTPC Limited, Wind Farms
4.1 NTPC Limited, Wind Farms, India
5 NTPC Limited, Solar PV Parks
5.1 NTPC Limited, Solar PV Parks, India
6 NTPC Limited, Hydro Power Plants
6.1 NTPC Limited, Hydro Power Plants, Bhutan
6.2 NTPC Limited, Hydro Power Plants, India
7 NTPC Limited, Thermal Power Plants
7.1 NTPC Limited, Thermal Power Plants, Bangladesh
7.2 NTPC Limited, Thermal Power Plants, India
7.3 NTPC Limited, Thermal Power Plants, Sri Lanka
8 Business Description
8.1 Business Overview
9 Major Products and Services
10 History
11 SWOT Analysis
11.1 Overview
11.2 NTPC Limited Strengths
11.2.1 Expanding Operating Margin
11.2.2 Strong Liquidity Position
11.2.3 Efficient Use of Resources
11.2.4 Strong Focus on Research and Development
11.2.5 Diversified Business Operations
11.2.6 Strong Market Position
11.3 NTPC Limited Weaknesses
11.3.1 Dependence on Fossil Fuels
11.3.2 Increasing Operating Expenses
11.3.3 Slow Fuel Diversification Process
11.4 NTPC Limited Opportunities
11.4.1 Increasing Demand of Electricity
11.4.2 Focus on Diversification of Fuel Mix
11.4.3 Diversification into Coal Mining & Other Business
11.4.4 Expansion into the International Markets
11.4.5 Developmental Projects
11.5 NTPC Limited Threats
11.5.1 Power Theft
11.5.2 Legal and Political Framework
11.5.3 Increasing Raw Material Costs
11.5.4 Intense Competition
11.6 Financial Ratios - Capital Market Ratios
11.7 Financial Ratios - Annual Ratios
12 Key Employees
13 Key Employee Biographies
14 Company Statement
15 Locations And Subsidiaries
15.1 Head Office
15.2 Other Locations & Subsidiaries
16 Recent Developments
16.1 License Awards
16.1.1 Jul 06, 2010: NTPC Signs PSCs For Exploration Blocks In India
16.1.2 Jun 30, 2010: India Signs 31 Production Sharing Contracts Under NELP-VIII
16.1.3 Jun 29, 2010: ONGC To Sign 17 Oil And Gas Block Contracts
16.1.4 Jun 25, 2010: NTPC Seeks Approval To Build 260MW Hydro Power Project In Uttarakhand, India
16.1.5 May 30, 2010: NTPC Plans To Invite Fresh Bids For 171MW Lata Tapovan Hydroelectric Project In Uttrakhand, India
16.1.6 Mar 19, 2010: ONGC, Partners Win 17 Blocks In NELP-VIII Bidding Round
16.1.7 Mar 11, 2010: NTPC Seeks Indian Power Ministry's Approval For Issuing Tender On Supercritical Equipment
16.1.8 Oct 14, 2009: ONGC Wins 17 Oil And Gas Blocks In NELP-VIII Bid Round
16.2 Strategy and Business Expansion
16.2.1 Sep 06, 2010: IGCAR Inks MoU With BHEL And NTPC To Develop Advanced Ultra Super-Critical Boiler For Coal-Fueled Power Plants
16.2.2 Aug 30, 2010: NTPC And BPDB Sign MoU To Cooperate For Development Of Power Sector In Bangladesh
16.2.3 Aug 27, 2010: NTPC To Begin Site Selection Process For Nuclear Plants
16.2.4 Aug 18, 2010: NBPPL Seeks Partner Technological Tie-Ups
16.2.5 Aug 09, 2010: NTPC To Add 500MW Unit At Talcher Super Thermal Power Station In Orissa State, India
16.2.6 Jul 13, 2010: NTPC To Set Up 4,000MW Power Project In Lara Village, India
16.2.7 Jul 08, 2010: NTPC To Set Up 1,320MW Thermal Power Plant In Gujarat, India
16.2.8 May 08, 2010: NTPC To Set Up 4,000MW Coal-Fired Power Plant In Madhya Pradesh State, India
16.2.9 May 01, 2010: NTPC, BHEL And NBPPL Sign MoU For 2010-11
16.2.10 Apr 28, 2010: NTPC To Implement Over 7,500MW-Capacity Projects In Madhya Pradesh State, India
16.2.11 Apr 23, 2010: NTPC May Establish Two Coal-Fired Power Plants In Kazakhstan
16.2.12 Apr 06, 2010: NTPC Intends To Add 4,000-4,500MW Of Generation Capacity
16.2.13 Mar 27, 2010: NTPC To Develop 500MW Renewable Energy Projects In Orissa, India
16.2.14 Mar 21, 2010: NTPC Intends To Establish 1,000MW Coal-Fired Power Plant In Gujarat State, India
16.2.15 Mar 20, 2010: NTPC Signs MoU With GPCL To Develop 500MW Renewable Energy Projects In Gujarat, India
16.2.16 Mar 15, 2010: NTPC Intends To Achieve 8,000MW Gas-Fired Generation Capacity By 2017
16.2.17 Mar 14, 2010: Bharat Forge, NTPC starts construction on manufacturing facility in India
16.2.18 Feb 16, 2010: NTPC Plans To Develop Four Solar Thermal Power Projects In India
16.2.19 Feb 10, 2010: NTPC And IOC Sign MoU For Collaborative Research On Energy Sector
16.2.20 Jan 29, 2010: NTPC to build 17 construction projects in India
16.2.21 Jan 22, 2010: NTPC to build gas-based power plant in Maharashtra, India
16.2.22 Jan 19, 2010: NTPC To Enter Power Distribution Business
16.2.23 Dec 30, 2009: NTPC Announces Its Plans To Foray Into Solar Power
16.2.24 Dec 28, 2009: NTPC Enters Into Preliminary Agreement With Bhutan For Amochhu Hydel Project
16.2.25 Dec 20, 2009: NTPC Plans Power Project In Ghana In Return For LNG
16.2.26 Nov 22, 2009: NTPC Sets Target Of 9,000 MW Hydro Power Capacity By 2017
16.2.27 Nov 19, 2009: Government Of India To Bring In NTPC For Solar Mission
16.2.28 Nov 12, 2009: NTPC Looks At 1,000 MW Renewable Energy Projects By 2017 In India
16.2.29 Nov 10, 2009: NTPC To Set Up 2,640MW Thermal Power Plant In Central India
16.2.30 Nov 06, 2009: NTPC Plans To Set Up Two Solar Thermal Units Of 50 MW Each In Gujarat, India
16.2.31 Oct 07, 2009: Three Indian Public Sector Companies Invests $12 Billion To Set Up 60-80 MW Solar Plants
16.2.32 Oct 07, 2009: NTPC To Build Small Hydropower Projects
16.2.33 Aug 31, 2009: NTPC Seeks Partners To Bid For NELP VIII Blocks
16.2.34 Aug 10, 2009: NTPC To Build Renewable Energy Power Plants In India
16.2.35 Aug 04, 2009: NTPC Plans To Put Up Solar Plants Totaling 41 MW In India
16.2.36 Jun 01, 2009: NTPC Eyeing Operations of 4,000 MW GRES-1 Coal-Based Thermal Power Plant In Kazakhstan
16.2.37 May 31, 2009: NTPC To Set Up 620 MW Amocho Hydro Power Project In Bhutan
16.2.38 May 19, 2009: NTPC Considering To Set Up Subsidiary To Tap Global Opportunities
16.2.39 May 03, 2009: NTPC Likely To Set Up 600 MW Hydel Project In Bhutan
16.2.40 Apr 09, 2009: NTPC To Increase Coal Imports To 15 Million Tons By 2012
16.2.41 Apr 02, 2009: NTPC To Start 4,000 MW Power Project In Tamil Nadu, India
16.2.42 Mar 17, 2009: NTPC Approves Coal Fired Power Plant In Karnataka, India
16.2.43 Mar 15, 2009: NTPC To Build Power Projects In Kazakhstan
16.2.44 Mar 12, 2009: NTPC's Rihand Project To Expand In Next Fiscal
16.2.45 Feb 22, 2009: NTPC Starts Construction On Its 1,000 MW Thermal Power Project In Maharashtra
16.2.46 Feb 15, 2009: NTPC Plans To Bid For Imported Fuel Based 4,000 MW UMPP
16.2.47 Feb 13, 2009: GAIL And NTPC Plan To Lease LNG Import Terminal In India
16.2.48 Feb 05, 2009: NTPC Plans To Set Up Power Plant In Jharkhand
16.2.49 Jan 25, 2009: NTPC Board Approves Stage-III Of Rihand Super Thermal Power Project
16.2.50 Jan 21, 2009: NTPC To Set Up Two Power Projects In Orissa
16.2.51 Jan 12, 2009: Karnataka Signs MoUs With BHEL, NTPC For Setting Up Thermal Power Plants
16.2.52 Jan 12, 2009: NTPC To Build 460 MW Kolodyne Stage II Hydro Power Project In Mizoram
16.2.53 Jul 28, 2008: NTPC Plans To Set Up 2,000 MW Nuclear Plant
16.2.54 May 17, 2008: NTPC May Align With Neepco For INR75 Billion Hydel Project
16.2.55 Apr 10, 2008: NTPC In Talks With Oil Companies To Bid For Blocks
16.2.56 Apr 04, 2008: NTPC Plans To Enter Renewable Energy Sector
16.2.57 Jan 19, 2008: NTPC To Generate 600 MW Using Renewable Energy In Tamil Nadu
16.2.58 Nov 22, 2007: NTPC Forms New Subsidiary
16.3 Drilling and Production Updates
16.3.1 Aug 12, 2009: NTPC Targets 2,000 MW Hydro Power Generation Capacity By 2012
16.3.2 Jul 13, 2009: NSPCL's Bhilai Expansion Power Project Achieves Capacity Of 500 MW
16.3.3 Feb 09, 2009: NTPC Provides Production Update For January 2009
16.4 Financial Announcements
16.4.1 Jul 26, 2010: NTPC Reports Net Sales Of INR129.44 Billion In Q1 Fiscal 2011
16.4.2 Jan 29, 2010: NTPC Reports Net Profit Of INR23.65 Billion In Q3 Fiscal 2009
16.4.3 Oct 23, 2009: NTPC Reports Net Profit Of INR43.4 Billion In H1 2009-10
16.4.4 Jul 28, 2009: NTPC Reports Total Income Of INR127.7 Billion In Q1 2009-10
16.4.5 May 22, 2009: NTPC Reports Net Profit Of INR21.1 Billion In Q4 Fiscal 2008-09
16.4.6 Jan 24, 2009: NTPC Declares Q3 Fiscal 2008/09 Results
16.4.7 Oct 24, 2008: NTPC Declares Q2 Fiscal 2008/09 Results
16.4.8 Jul 29, 2008: NTPC Declares Q1 Fiscal 2008/09 Results
16.4.9 May 29, 2008: NTPC Reports Q4 Fiscal 2007/2008 Results
16.4.10 Apr 10, 2008: NTPC Reports Financial Year 2007-08 Results
16.4.11 Jan 30, 2008: NTPC Declares Q3 Fiscal 2007/2008 Results
16.4.12 Oct 27, 2007: NTPC Reports Q2 Fiscal 2007/2008 Results
16.4.13 Jul 30, 2007: NTPC Declares Q1 Fiscal 2007/2008 Results
16.4.14 May 30, 2007: NTPC Reports Fiscal 2006/2007 Results
16.4.15 Jan 31, 2007: NTPC Reports Q3 Fiscal 2006/2007 Results
16.5 Other Significant Developments
16.5.1 Oct 11, 2010: NTPC Synchronizes 500MW Unit Of Indira Gandhi Super Thermal Power Project To Grid In India
16.5.2 Oct 09, 2010: NTPC's 660MW First Phase Of 1,980MW Power Project To Come Online In December 2010 At Sipat, India
16.5.3 Oct 06, 2010: NTPC Announces Update On Talcher Thermal Power Station In Orissa, India
16.5.4 Sep 23, 2010: NTPC Says Company On High Growth Curve
16.5.5 Sep 16, 2010: MMTC Seeks Bids For 1.3 Million Metric Tons Of Coal For Indian Power Utilities
16.5.6 Sep 13, 2010: Sri Lanka Awards Customs Duty Concessions And Tax Waiver For Establishment Of Sampur Coal-Fired Power Plant In Trincomalee
16.5.7 Sep 04, 2010: Punjab State Government In India To Award Thermal Power Plant At Gidderbaha To PSPCL Or NTPC
16.5.8 Sep 01, 2010: NTPC Appoints Arup Roy Choudhury As Chairman And Managing Director
16.5.9 Aug 26, 2010: NTPC Holds Discussions With Madhya Pradesh State On Various Aspects Of Proposed Gadarwara Thermal Power Project In India
16.5.10 Aug 25, 2010: NTPC Provides Web Access Of Environmental Data From 20 Power Stations In India To CPCB
16.5.11 Aug 14, 2010: Uttarakhand State In India Seeks 2,000MW Of Free Power, Calls On Central Government To Reject Loharinag Pala Hydropower Project
16.5.12 Aug 08, 2010: Indian Power Ministry To Allot New Site To NTPC For Planned 1,980MW Power Project In Jharkhand State
16.5.13 Aug 02, 2010: NTPC Announces Resignation Of Chandan Roy From Director Of Operations Role
16.5.14 Aug 02, 2010: NTPC To Generate 128GW Of Power By 2032
16.5.15 Jul 30, 2010: NTPC Commissions Unit No. 6 Of 490MW Dadri Thermal Power Project In Uttar Pradesh State, India
16.5.16 Jul 29, 2010: NTPC Extends Tenure Of A. K. Singhal As Finance Director
16.5.17 Jul 17, 2010: NTPC's Dadri Thermal Power Project To Start Operations
16.5.18 Jul 13, 2010: Indian Power Ministry Denies Issuing Directive To NTPC On Gas Allocation
16.5.19 Jul 05, 2010: PFC Postpones RFQ Bidding Deadline For 4,000MW Chhattisgarh UMPP In India
16.5.20 Jun 23, 2010: Union Minister Reviews NTPC's Dadri Project
16.5.21 Jun 23, 2010: Indian Power Ministry Reviews Progress Of NTPC’s Dadri Power Station
16.5.22 Jun 22, 2010: L&T Disqualifies From NTPC’s Tender For Supercritical Boilers
16.5.23 Jun 15, 2010: NTPC Mulls Over Restructuring Measures
16.5.24 Jun 14, 2010: NTPC May Reissue INR250 Billion Tender
16.5.25 Jun 10, 2010: NBPPL Gives DPR To Indian Ministry For Heavy Industry And Public Enterprises
16.5.26 Jun 04, 2010: Delhi State In India Gives Approval To Change Coal-Fired Power Plant To Gas-Fired Plant
16.5.27 Jun 02, 2010: NTPC’s Kaniha Super Thermal Power Plant To Import Over 1.3 Million Tonnes Of Coal
16.5.28 May 25, 2010: DVC And NTPC Give Expressions Of Interest To CIL For Import Of About Five Million Tonnes Of Coal
16.5.29 May 24, 2010: NTPC Requests Indian Government For Immediate Convening Of Ministerial Meeting On Gas Allocation
16.5.30 May 19, 2010: NTPC Receives Approval From Indian Government For Continuation Of Contract With Technopromexport
16.5.31 May 18, 2010: NTPC Intends To Issue $4.2 Billion Tender To Procure Indian-Made Super Critical Equipment
16.5.32 May 16, 2010: NTPC Receives Notice To Stop Construction Work At 1,000MW Super-Thermal Power Project
16.5.33 May 14, 2010: NTPC Looks For Alternate Location To Planned 1,980MW Coal-Fired Power Project
16.5.34 May 13, 2010: NTPC Appoints D.K. Jain As Director (Technical)
16.5.35 May 12, 2010: NTPC To Commission 660MW New Unit At Coal-Based Power Plant In Sipat, India
16.5.36 May 10, 2010: NTPC And NPTI To Run ITI For Power Sector In Jharkhand State, India
16.5.37 May 09, 2010: NTPC To Commission 800MW Koldam Hydroelectric Project By 2012
16.5.38 May 06, 2010: NTPC To Completely Stop Leakages At Tapovan Vishnugad Hydropower Project In Two Or Three Months
16.5.39 May 04, 2010: Bangladesh Constitutes Committee For Review Of MoU On Power Import From India
16.5.40 May 03, 2010: NTPC Proposes To Secure INR128.18 Billion In Loans For Increase Of Generation Capacity
16.5.41 Apr 30, 2010: Uttar Pradesh State In India Wants To Receive 75% Of Power Generated From Proposed Thermal Power Project In Dhundwa Jamauli
16.5.42 Apr 25, 2010: NTPC To Increase Capacity Of 750MW Bongaigaon Power Plant By 250MW
16.5.43 Apr 18, 2010: NTPC And BPDB Select Chalna In Bangladesh To Establish Coal-Fired Power Plant
16.5.44 Apr 11, 2010: NTPC's Korba Thermal Project Attains 97.61% Plant Load Factor
16.5.45 Apr 07, 2010: NTPC To Set Up Coal-Fired Power Project In Bangladesh
16.5.46 Apr 06, 2010: NPCIL-NTPC Joint Venture To Build Two 700MW Nuclear Power Plants In India
16.5.47 Mar 24, 2010: NTPC Commissions Operation Monitoring Center
16.5.48 Mar 22, 2010: NTPC's 500MW Unit-3 Of Kahalgaon Power Project Starts Commercial Operation
16.5.49 Mar 15, 2010: NTPC Energy Systems Begins Construction Work On Manufacturing Facility In Maharashtra, India
16.5.50 Mar 15, 2010: NTPC Starts Site Leveling Work At 1,320MW Solapur Super Thermal Power Project In India
16.5.51 Mar 12, 2010: NTPC Triples Natural Gas Procurement From RIL
16.5.52 Mar 11, 2010: Indian Government May Clear Technoprom's NTPC Contract
16.5.53 Mar 05, 2010: Indian Coal Ministry Approves Coal Linkage For Five Super Critical Thermal Power Projects
16.5.54 Mar 05, 2010: Indian railways in joint venture with NTPC to set up power plant in Bihar, India
16.5.55 Feb 20, 2010: India, Bangladesh Sign Agreement To Set Up 1,320MW Coal-Fired Power Plant And Lay 130km Cross-Border Power Transmission Line
16.5.56 Feb 19, 2010: NTPC Signs GSPA With RIL For Additional Gas From KG-D6 Fields In India
16.5.57 Feb 18, 2010: BPDB, NTPC to construct power plant in Bangladesh
16.5.58 Feb 16, 2010: NTPC To Complete USC-Based Coal-Fired Power Plant By 2016 Or 2017
16.5.59 Feb 16, 2010: BHEL Synchronizes 490MW Unit At Dadri Thermal Power Plant
16.5.60 Feb 16, 2010: NTPC To Conduct Ground-Breaking Ceremony Of 4,000MW Thermal Power Project In March 2010
16.5.61 Feb 01, 2010: NTPC To Commission Projects Totaling 4,150 MW During 2010-11
16.5.62 Jan 29, 2010: NTPC Initiates 17 Projects To Add 17,930 MW Of Electricity To Its Generation Capacity
16.5.63 Jan 29, 2010: NTPC Commissions Coal-Fired, 490 MW Unit 5 At Thermal Power Project In Dadri, India
16.5.64 Jan 28, 2010: Orissa government approves 11 construction projects
16.5.65 Jan 23, 2010: BSEB Enters Into PPA With NTPC For Purchase Of 1900 MW Additional Power Per Day
16.5.66 Jan 20, 2010: NTPC's 2,000 MW Gas-Fired Power Plant Might Come Up At Dabhol In Maharashtra, India
16.5.67 Jan 19, 2010: NTPC's Insufficient Coal Import Leads To Generation Loss
16.5.68 Jan 19, 2010: NTPC To Open INR250 Billion Worth Global Tender
16.5.69 Jan 18, 2010: NTPC, NPCIL Joint Venture Expects DAE Approval In Coming Months
16.5.70 Dec 30, 2009: NTPC's New Coal-Fired Unit At Dadri, India Starts Generating Electricity
16.5.71 Dec 28, 2009: NTPC to build Bhutan’s hydro electric project
16.5.72 Dec 22, 2009: NPCIL Estimates INR1,000 Billion In Investment For 10,000 MW Capacity By 2020
16.5.73 Dec 08, 2009: NTPC To Purchase Gas At $11 Per MBtu For Its Kayamkulam Plant In Kerala, India
16.5.74 Dec 04, 2009: NTPC Signs Gas Sale Agreements With GAIL, IOCL, BPCL
16.5.75 Nov 29, 2009: NTPC signs MoU with A&N administration for setting up solar power plants
16.5.76 Nov 29, 2009: NTPC And A&N Administration Sign MOU For Feasibility Study And DPR Preparation For Solar Plant In Andaman, India
16.5.77 Nov 24, 2009: NTPC to set up power plant in MP, India
16.5.78 Nov 16, 2009: India's EGoM Decides On Commercial Utilization Of Gas Produced Under NELP
16.5.79 Nov 09, 2009: NTPC to set up thermal power plant in MP, India
16.5.80 Nov 09, 2009: India's Power Minister Inaugurates NTPC's Tapovan Vishnugad Hydro Power Project's Power House Pressure Shaft In Uttarakhand
16.5.81 Nov 01, 2009: NTPC Starts Receiving RIL's KG D-6 Gas At $4.2 Per mmBtu Price
16.5.82 Oct 13, 2009: APGIC, Partners To Invest INR16 Billion In Four KG Basin Blocks, India
16.5.83 Oct 11, 2009: RIL Asks Petroleum Ministry To Re-Allocate KG-D6 Gas Refused By NTPC
16.5.84 Sep 23, 2009: NTPC Signs GSPA With RIL For Gas At $4.2 Per MmBtu
16.5.85 Sep 22, 2009: NTPC To Sign GSPA With RIL For Gas At $4.2 Per MmBtu
16.5.86 Sep 22, 2009: Geopetrol Launches Site Preparation Work At Block AA-ONN-2003/2 In Arunachal, India
16.5.87 Sep 18, 2009: NTPC Plans INR177 Billion Capex For Current Fiscal Year 2009/10
16.5.88 Sep 10, 2009: NTPC To Sign GSPA With RIL By End-September 2009
16.5.89 Aug 27, 2009: GOI Nods For INR400 Billion Power Equipment Order For NTPC, Damodar Valley
16.5.90 Aug 23, 2009: India Plans $10 Billion 6,000MW Gas-Fired Power Plant In Iran
16.5.91 Aug 22, 2009: NTPC Plans Wind Power Installations Across Karnataka, Gujarat And Andhra Pradesh In India
16.5.92 Aug 21, 2009: NTPC May Lose INR10 Billion On Buying Imported LNG
16.5.93 Aug 20, 2009: NTPC Signs Contract With GAIL For Supply Of R-LNG
16.5.94 Aug 17, 2009: GEDA Awards 365 MW Solar PV, 351 MW Solar Thermal Projects In Gujarat, India
16.5.95 Aug 17, 2009: NTPC May Move To Supreme Court On RIL's Gas Supply Contract
16.5.96 Aug 09, 2009: NTPC Plans To Construct Coal, Gas Fired Power Plants In Srilanka, Nigeria
16.5.97 Jul 12, 2009: NTPC to construct coal-fired power plant in Chhattisgarh, India
16.5.98 Jun 30, 2009: NTPC Commissions 500 MW Unit #7 Of Kahalgaon Super Thermal Power Project In India
16.5.99 Jun 26, 2009: RIL To Sign Gas Supply Agreements With NTPC
16.5.100 Jun 23, 2009: NTPC To Buy Gas From RIL At $4.2 Per MMBtu
16.5.101 Jun 09, 2009: NTPC To Buy Gas From RIL’s KG-D6 Fields In India
16.5.102 May 30, 2009: NTPC Signs Agreement With CIL For Brahmani Coal Block In Jharkhand
16.5.103 May 30, 2009: NTPC Plans To Invest INR550 Billion To Increase Its Power Generation Capacity
16.5.104 May 29, 2009: NTPC Announces Capital Expenditure Of INR550 Billion Over Next 3 Years
16.5.105 May 28, 2009: NTPC Signs Long Term Fuel Supply Agreement With CIL
16.5.106 May 25, 2009: NBPPL Receives Land To Construct Power Plant At Chittoor District
16.5.107 May 25, 2009: NTPC BHEL gets land for power plant equipment facility
16.5.108 May 19, 2009: NTPC Receives Ultimatum From Government To Sign Gas Deal With RIL
16.5.109 May 15, 2009: NTPC Signs Loan Agreement With SBI
16.5.110 May 12, 2009: Six Firms Eager To Lease Ratnagiri Gas and Power’s LNG Terminal
16.5.111 May 05, 2009: NTPC Awards Contract To AUMA To Deliver Actuators To Indian Coal-Fired Power Plant
16.5.112 May 01, 2009: NTPC’s Coal-Fired Power Plants Face Crisis Due To Coal Shortage In India
16.5.113 Apr 24, 2009: NTPC Appoints B.P. Singh As Director (Projects) NTPC
16.5.114 Apr 23, 2009: NHPC’s Subsidiary Approaches Coal Ministry For Fuel Linkage Of Thermal Project In Khandwa, Madhya Pradesh
16.5.115 Apr 11, 2009: NTPC to construct nuclear power plants independently
16.5.116 Apr 11, 2009: NTPC To Construct Nuclear Power Plants Independently
16.5.117 Apr 01, 2009: NTPC, SAIL JV Starts Second 250 MW Unit At Bhilai, India
16.5.118 Apr 01, 2009: NTPC To Invest INR60 Billion To Build Two Wind Power Projects
16.5.119 Apr 01, 2009: NTPC Signs MOU With Indian Government To Add 217 Billion Electricity Units
16.5.120 Feb 24, 2009: Union Minister Of Power Resolves Dispute Between CIL And Power Generation Companies In India
16.5.121 Feb 24, 2009: RLEK Files Lawsuit Against Suspension Of Hydropower Projects In Uttarakhand
16.5.122 Feb 22, 2009: Maharashtra To Over Come Power Crisis In Four Years
16.5.123 Feb 20, 2009: RIL Accepts LoI Placed By NTPC To Supply Gas To Power Plants
16.5.124 Feb 18, 2009: NTPC And Other PSUs To Sign Agreement On Fuel Supply With CIL
16.5.125 Feb 06, 2009: UP Power Projects Delayed
16.5.126 Feb 02, 2009: NTPC's 1,000 MW Ennore Thermal Power Plant Getting Delayed
16.5.127 Jan 30, 2009: India One Grid Plan To Become Reality In 2012
16.5.128 Jan 30, 2009: NTPC May Have To Close Its Thermal Plant Temporarily
16.5.129 Jan 28, 2009: NTPC To Invest INR180 Billion In Fiscal 2010
16.5.130 Jan 28, 2009: Orissa To Sign MoUs With 10 More IPPs
16.5.131 Jan 15, 2009: MNRE To Set Up Renewable Energy Company In India
16.5.132 Jan 13, 2009: NTPC To Invest INR60 Billion In STPP
16.5.133 Jan 09, 2009: NTPC's Power Plant Face Crisis In Wake Of Oil Strike
16.5.134 Dec 30, 2008: NTPC Appoints New Director Commercial
16.5.135 Dec 29, 2008: NTPC To Start Operations On Kahalgaon Super Thermal Power Project-Stage II In India
16.5.136 Dec 19, 2008: India Not To Separate Dabhol LNG Terminal
16.5.137 Nov 13, 2008: NTPC Sends Programme Draft To Atomic Energy Department
16.5.138 Oct 07, 2008: RIL Offers Out-Of-Court Settlement To NTPC Over Gas Supply Dispute
16.5.139 Aug 13, 2008: NTPC Synchronizes A 500 MW Unit Of Sipat Super Thermal Power Project-Stage II
16.5.140 Jun 22, 2008: NTPC To Add 3,000 MW Power For Commercial Use In Fiscal 2009
16.5.141 Mar 31, 2008: NTPC Signs MoU With Government Of India
16.5.142 Mar 31, 2008: NTPC Signs MoU With NGRI To Set-Up Geothermal Projects In India
16.5.143 Mar 17, 2008: NTPC Updates On Kahalgaon Thermal Power Project
16.5.144 Feb 29, 2008: NTPC Approves Investment For Barh Super Thermal Power Project
16.5.145 Feb 20, 2008: NTPC Plans To Invest $1.5 Billion In Renewable Energy
16.5.146 Jan 30, 2008: NTPC Approves Investment For Bongaigaon Thermal Power Project
16.5.147 Jul 27, 2007: NTPC Signs MoU With BARC
16.5.148 May 28, 2007: NTPC Updates On Sipat Super Thermal Power Project-Stage II
16.5.149 May 24, 2007: NTPC Signs MoU With FGN
16.5.150 Mar 15, 2007: NTPC Signs MoU With Coal India
16.5.151 Mar 09, 2007: NTPC Updates On Vindhyachal Super Thermal Power Project Stage III
16.5.152 Feb 20, 2007: NTPC Signs MoU With KYUSHU
16.5.153 Jan 12, 2007: NTPC Appoints Director Of Projects
16.6 New Contracts Announcements
16.6.1 Oct 08, 2010: NTPC Executes MOU With Punjab And PSPCL To Set Up 2,640MW (4x660MW) Coal-Fired Power Project At Gidarbaha In India
16.6.2 Sep 29, 2010: SPX Heat Transfer Secures Contract Worth $18 Million From BHEL To Design And Manufacture 20 New Feedwater Heaters
16.6.3 Sep 23, 2010: NTPC Inks 400MW PPA With APCPDCL, APEPDCL, APSPDCL And APNPDCL
16.6.4 Jul 28, 2010: Petron Engineering Secures INR586.3 Million Order From NTPC For Thermal Power Projects In India
16.6.5 Jul 09, 2010: McNally Bharat Receives Orders From NTPC For Vindhyachal Super Thermal Power Project
16.6.6 May 30, 2010: NBPPL Expects To Receive INR65 Billion Contracts For Implementation Of Thermal Power Projects
16.6.7 May 18, 2010: MHI And BHEL Jointly Receive Order For 18 Pumps
16.6.8 Apr 01, 2010: ABB Wins Order From NTPC For Supply Of Control And Instrumentation Solution
16.6.9 Mar 15, 2010: NTPC Signs MoU With Government Of India For 2010-11
16.6.10 Jan 28, 2010: NTPC To Establish Gas-Fired Power Plant In North East Of India
16.6.11 Jan 27, 2010: NTPC selects TRF to set up coal handling plants
16.6.12 Jan 25, 2010: TRF Receives Two Orders Valued At INR6.11 Billion From NTPC
16.6.13 Jan 25, 2010: McNally Bharat Receives INR4.38 Billion Order From NTPC For Bongaigaon Thermal Power Project
16.6.14 Dec 28, 2009: NTPC Receives Invitation From Egyptian Government To Construct Gas-Based Power Projects
16.6.15 Aug 30, 2009: GAIL Signs GSPA With RIL For Purchase Of Gas From KG-D6 Fields In India
16.6.16 Aug 26, 2009: NTPC Signs PPA With CSPDCL For Supply Of Power From Its Korba Thermal Power Station Stage III
16.6.17 Jul 11, 2009: NTPC To Construct 4,000MW Coal-Fired Power Project In Chhattisgarh
16.6.18 Jun 17, 2009: Ducon Bags Order For FGD System For Thermal Power Plant From BHEL
16.6.19 Feb 09, 2009: BHEL Receives INR70 Billion Contracts
16.6.20 Feb 05, 2009: Era Infra Receives INR2.23 Billion Contract From NTPC For Mauda Super Thermal Power Project
16.6.21 Feb 03, 2009: Ion Exchange Wins INR1.26 Billion Contract From NTECL
16.6.22 Jan 29, 2009: RPL Wins 4,300 MW Tilaiya UMPP In Jharkhand
16.6.23 Jan 13, 2009: Siemens To Supply Components For NTPC's Steam Power Plant In Barh
16.6.24 Oct 23, 2008: BHEL Wins Order From NTPC For 2x660 MW Steam Turbine Generator At Barh Power Project
16.6.25 Mar 17, 2008: BHEL To Install Four Thermal Sets Of 250 MW Each At Nabinagar
16.6.26 Jan 25, 2008: AREVA Wins Contracts From NTPC And POWERGRID In India
16.6.27 Aug 30, 2007: BHEL Receives INR19.9 Billion Contract From NTECL To Install Two 500 MW Each
16.6.28 Aug 09, 2007: BHEL To Supply And Install Three 500 MW Sets At APCPL’s Jhajjar Super Thermal Power Project
16.6.29 Jun 18, 2007: BHEL Receives INR1.39 Billion Contract From NTPC To Supply Transformers
16.6.30 Aug 01, 2006: BHEL To Set Up 490MW Power Plant For NTPC At Dadri, Uttar Pradesh
16.6.31 Jul 27, 2006: BHEL Commissions 500MW Thermal Set At Vindhyachal STPS
16.6.32 Apr 11, 2005: ABB To Help Build India’s First 765kV Power Transmission Network
16.6.33 Jan 27, 2005: ABB Wins $38 Million Transformer Order In India
17 Appendix
17.1 Methodology
17.1.1 Coverage
17.1.2 Secondary Research
17.1.3 Primary Research
17.1.4 Expert Panel Validation
17.2 Contact Us
17.3 Disclaimer

Note: Product cover images may vary from those shown
Note: Product cover images may vary from those shown

RELATED PRODUCTS