• 1-800-526-8630U.S. (TOLL FREE)
  • 1-917-300-0470EAST COAST U.S.
  • +353-1-416-8900REST OF WORLD
Tokyo Electric Power Company Inc. -Overview, Contact Details, locations, Key executives, Power Plant Information, Business Description and SWOT Analysis - Product Image

Tokyo Electric Power Company Inc. -Overview, Contact Details, locations, Key executives, Power Plant Information, Business Description and SWOT Analysis

  • ID: 1441499
  • November 2010
  • 139 pages
  • GlobalData

Tokyo Electric Power Company Inc. -Overview, Contact Details, locations, Key executives, Power Plant Information, Business Description and SWOT Analysis

Summary

The report” Tokyo Electric Power Company Inc.- Company Overview, Contact Details, Locations, Key Executives, Power Plant Information, Business Description and SWOT" contains the profile of the company that is involved in the field of power generation from thermal sources (coal, oil and gas).It contains a detailed description of the company’s business operations (power plants, installed capacity, and generation), history, corporate strategy, and business structure. This report contains a detailed SWOT analysis, information on key employees (executives), key competitors, and major products and services.

Scope

- Major Power Plants (assets) – summarized and detailed information about the power plants (assets)
- Operational Metrics (capacity, generation, revenue, sales, number of consumers)
- Business description – A detailed description of the company’s operations and business divisions
- Corporate strategy – Our summarization of the company’s business READ MORE >

Note: Product cover images may vary from those shown

1
1.1 List of Tables
2 Company Snapshot
2.1 Key Information
2.2 Company Overview
2.3 Industry Outlook – Hydro
2.4 Industry Outlook – Nuclear
2.5 Industry Outlook – Biomass
2.6 Industry Outlook – Solar PV
2.7 Industry Outlook – Wind
2.8 Industry Outlook – Power Generation
2.9 SWOT Snapshot
3 Operational Metrics
3.1 Tokyo Electric Power Company, Inc., Operational Metrics, By Capacity
3.2 Tokyo Electric Power Company, Inc., Operational Metrics, By Generation
3.3 Tokyo Electric Power Company, Inc., Operational Metrics, By Transmission
3.4 Tokyo Electric Power Company, Inc., Operational Metrics, By Customers
3.5 Tokyo Electric Power Company, Inc., Operational Metrics, By Sales
4 Tokyo Electric Power Company, Inc., Wind Farms
4.1 Tokyo Electric Power Company, Inc., Wind Farms, Japan
4.2 Tokyo Electric Power Company, Inc., Wind Farms, Norway
4.3 Tokyo Electric Power Company, Inc., Wind Farms, Republic of Korea
4.4 Tokyo Electric Power Company, Inc., Wind Farms, Spain
4.5 Tokyo Electric Power Company, Inc., Wind Farms, United Kingdom
4.6 Tokyo Electric Power Company, Inc., Wind Farms, United States
5 Tokyo Electric Power Company, Inc., Solar PV Parks
5.1 Tokyo Electric Power Company, Inc., Solar PV Parks, Japan
5.2 Tokyo Electric Power Company, Inc., Solar PV Parks, Republic of Korea
5.3 Tokyo Electric Power Company, Inc., Solar PV Parks, United States
6 Tokyo Electric Power Company, Inc., Hydro Power Plants
6.1 Tokyo Electric Power Company, Inc., Hydro Power Plants, Japan
6.2 Tokyo Electric Power Company, Inc., Hydro Power Plants, Philippines
7 Tokyo Electric Power Company, Inc., Biomass Power Plants
7.1 Tokyo Electric Power Company, Inc., Biomass Power Plants, Japan
8 Tokyo Electric Power Company, Inc., Thermal Power Plants
8.1 Tokyo Electric Power Company, Inc., Thermal Power Plants, Japan
8.2 Tokyo Electric Power Company, Inc., Thermal Power Plants, Vietnam
9 Tokyo Electric Power Company, Inc., Commercial Reactors
9.1 Tokyo Electric Power Company, Inc., Commercial Reactors, Japan
10 Business Description
10.1 Business Overview
11 Major Products and Services
12 History
13 SWOT Analysis
13.1 Overview
13.2 Tokyo Electric Power Company, Inc. Strengths
13.2.1 Diversified Business Operations
13.2.2 Strong Focus on Research and Development
13.2.3 Strong Generation Portfolio
13.3 Tokyo Electric Power Company, Inc. Weaknesses
13.3.1 Declining Financial Performance
13.3.2 Limited Liquidity Position
13.3.3 Low Return on Equity
13.3.4 Dependence on Thermal Fuel Source
13.3.5 Decline in Electricity Sales Volume
13.4 Tokyo Electric Power Company, Inc. Opportunities
13.4.1 New Business Development Efforts
13.4.2 Increasing Demand for Electricity
13.4.3 Developing Renewable Resources
13.5 Tokyo Electric Power Company, Inc. Threats
13.5.1 Increasing Fuel Costs
13.5.2 Increasing Competition
13.5.3 Legal and Political Framework
13.5.4 Adverse Weather Conditions
13.6 Financial Ratios - Capital Market Ratios
13.7 Financial Ratios - Annual Ratios
13.8 Financial Ratios - Interim Ratios
14 Key Employees
15 Company Statement
16 Locations And Subsidiaries
16.1 Head Office
16.2 Other Locations & Subsidiaries
17 Recent Developments
17.1 License Awards
17.1.1 Aug 27, 2010: Recyclable-Fuel Storage Receives Approval To Construct Facility For Storing Spent Nuclear Fuel
17.1.2 Aug 25, 2009: TEPCO Wins Local Approval To Restart No.6 Reactor At Kashiwazaki Kariwa Nuclear Power Plant
17.1.3 Jul 22, 2009: TEPCO Receives Final Approval To Operate Kashiwazaki Kariwa Nuclear Station
17.1.4 Jul 03, 2009: TEPCO Seeks Local Governments Permission To Restart No. 6 Generator At Khiwazaki-Kariwa Nuclear Plant
17.1.5 Jun 29, 2009: TEPCO Receives Approval To Restart No. 6 Reactor At Kashiwazaki Kariwa Nuclear Plant
17.1.6 May 07, 2009: TEPCO Wins Approval To Restart No. 7 Reactor At Kashiwazaki-Kariwa Nuclear Power Plant
17.1.7 Feb 08, 2009: TEPCO Receives Approval From NISA To Restart No. 7 Reactor At Kashiwazaki Kariwa Plant
17.2 Strategy and Business Expansion
17.2.1 Aug 09, 2010: TEPCO, Toshiba And JBIC Redefine Relationship With Uranium One
17.2.2 Aug 06, 2010: Fukushima Government Approves TEPCO's Pluthermal Power Generation Plan
17.2.3 Jul 21, 2010: Toshiba Evinces Interest In Reviving Bataan Nuclear Power Plant
17.2.4 Jul 06, 2010: Japanese Consortium Establishes New Office For International Nuclear Energy Development of Japan
17.2.5 Jun 22, 2010: TEPCO Signs MOU With Petrovietnam To Explore Possibility For Joint Development Of Coal-Fired Power Stations In Vietnam
17.2.6 May 24, 2010: TEPCO To Begin Offshore Wind Power Test In June 2012
17.2.7 Dec 18, 2009: TEPCO Agrees To Work With Hokkaido On Wind Power Project In Japan
17.2.8 Oct 14, 2009: TEPCO Studies Plan To Raise Nuclear Reactors Capacity To Increase Output
17.2.9 Aug 18, 2009: TEPCO, University Of Tokyo To Launch Field Study For Oceanic Wind Power Generation
17.2.10 Jun 01, 2009: TEPCO Receives Approval To Increase Output For 1,356 MW No.7 Nuclear Reactor At Kashiwazaki-Kariwa Plant
17.2.11 Feb 23, 2009: Tokyo Electric Power To Construct 1000 kW Solar Power Plant In California
17.2.12 Jan 27, 2009: TEPCO Plans To Build 10-MW Solar Plant In Japan To Cut CO2 Emissions
17.2.13 Dec 17, 2008: TEPCO To Construct Nuclear Power Plants Overseas
17.2.14 Oct 20, 2008: TEPCO To Build Two Solar Plants In Kawasaki, Japan
17.2.15 Sep 24, 2008: TEPCO And Mitsui To Build 2 MW Solar System To Power Tokyo Airport
17.2.16 Aug 04, 2008: Mitsui Announces Execution Of PPA For Paiton 3 Coal-Fired Power Plant Expansion Project In Indonesia
17.2.17 May 15, 2008: TEPCO To Construct Wind Farm In Japan
17.2.18 Feb 17, 2008: Tokyo Electric, Tohoku Electric, Electric Power Plan Joint Inspection Of Nuclear Plants In Aomori
17.3 Drilling and Production Updates
17.3.1 Jun 04, 2009: TEPCO Plans To Raise Output At Kashiwazaki-Kariwa Nuclear Plant
17.4 Financial Announcements
17.4.1 Apr 30, 2010: TEPCO Reports Net Income Of JPY133.7 Billion In Fiscal 2009
17.4.2 Jan 29, 2010: TEPCO Reports Net Profit Of JPY157.7 Billion For Nine Months Ended Fiscal 2010
17.4.3 Jul 31, 2009: TEPCO Reports Net Income Of JPY59.1 Billion In Q1 Fiscal 2010
17.4.4 Apr 30, 2009: TEPCO Reports Operating Revenues Of JPY5,887.5 Billion In Fiscal 2008
17.4.5 Jan 30, 2009: TEPCO Reports Nine Months Fiscal 2008 Results
17.4.6 Oct 31, 2008: TEPCO Reports 1H Fiscal 2008 Results
17.4.7 Jul 28, 2008: TEPCO Reports 1Q Fiscal 2008 Results
17.4.8 Apr 30, 2008: TEPCO Reports Fiscal 2007 Results
17.4.9 Jan 30, 2008: TEPCO Reports Q3 Fiscal 2007 Results
17.4.10 Oct 31, 2007: TEPCO Declares H1 Fiscal 2007 Results
17.4.11 Jul 31, 2007: TEPCO Declares Q1 Fiscal 2007 Results
17.4.12 Apr 27, 2007: TEPCO Declares Fiscal 2006 Results
17.4.13 Jan 31, 2007: TEPCO Reports Nine Months Fiscal 2006 Results
17.5 Other Significant Developments
17.5.1 Oct 11, 2010: Apache Signs Agreement With Chevron And TEPCO Regarding LNG Sales From Wheatstone Project In Western Australia
17.5.2 Sep 27, 2010: Sumitomo Electric, TEPCO, And Mayekawa Develop New Type Of High-Temperature Superconducting Cable For Power Transmission
17.5.3 Sep 24, 2010: TEPCO Begins Power Generation With MOX Fuel At Fukushima-Daiichi Plant's No. 3 Reactor
17.5.4 Sep 22, 2010: TEPCO To Restart 460MW No.1 Reactor At Fukushima-Daiichi Nuclear Plant
17.5.5 Sep 19, 2010: TEPCO Begins Pluthermal Power Generation At Fukushima-Daiichi Nuclear Power Plant
17.5.6 Sep 17, 2010: TEPCO Detects Radiation Leak At Kashiwazaki-Kariwa Nuclear Power Plant In Niigata
17.5.7 Sep 17, 2010: Tokyo Electric And Tohoku Electric Joint Venture Announces Closure Of 1,000MW Coal-Fueled Power Plant In North Of Japan
17.5.8 Sep 16, 2010: TEPCO Decreases Output At Kashiwazaki-Kariwa Plant's No.7 Reactor For Inspection
17.5.9 Sep 15, 2010: Eurus Energy Japan To Develop 8MW Solar Power Plant In Osaka Prefecture
17.5.10 Sep 14, 2010: TEPCO To Restart 784MW No.3 Reactor At Fukushima-Daiichi NPP Using MOX Fuel
17.5.11 Sep 06, 2010: Recyclable-Fuel Storage Begins Construction Of Spent Nuclear Fuel Storage Facility In Mutsu, Japan
17.5.12 Sep 02, 2010: JNFL May Receive Funds From Utilities For Repairs At Reprocessing Plant
17.5.13 Aug 23, 2010: TEPCO Feeds MOX Fuel At Fukushima Daiichi Nuclear Plant's No. 3 Reactor
17.5.14 Aug 20, 2010: TEPCO To Shut 460MW No.1 Reactor At Fukushima-Daiichi Plant For Unplanned Repair Work
17.5.15 Aug 13, 2010: TEPCO To Shut 460MW No.1 Reactor At Fukushima-Daiichi Nuclear Power Plant
17.5.16 Aug 09, 2010: Japan To Introduce New Initiative For Gaining Carbon Credits
17.5.17 Aug 06, 2010: TEPCO Resumes Commercial Operations At Unit 1 Of Kashiwazaki-Kariwa Nuclear Power Plant
17.5.18 Jul 06, 2010: TEPCO To Restart 784MW No.2 Reactor At Fukushima-Daiichi Nuclear Power Plant In July 2010
17.5.19 Jun 17, 2010: TEPCO's 784MW No.2 Reactor At Fukushima-Daiichi Nuclear Plant Shut Down Manually
17.5.20 Jun 09, 2010: TEPCO To Restart Fukushima-Daini Nuclear Plant's 1,100MW No.1 Reactor After Unplanned Inspection
17.5.21 Jun 03, 2010: TEPCO Updates On Inspection And Restoration Works On Kashiwazaki-Kariwa Nuclear Power Station
17.5.22 Jun 02, 2010: TEPCO To Shut Fukushima-Daini No.1 Reactor For Inspection
17.5.23 May 24, 2010: TEPCO Delays Kashiwazaki-Kariwa NPP's Unit 1 Restart Plan
17.5.24 May 21, 2010: TEPCO Plans To Start Preparations For Restarting Kashiwazaki-Kariwa NPP's 1,100MW Unit 1
17.5.25 Apr 08, 2010: TEPCO Permitted To Restart 1,100MW Unit 1 At Kashiwazaki-Kariwa Nuclear Power Station
17.5.26 Mar 31, 2010: Tokyo Electric To Increase Its Oil Consumption For Power Generation By 57% During 2010-11
17.5.27 Mar 08, 2010: International Power To Finance 815MW Coal-Fired Power Project In Indonesia
17.5.28 Jan 29, 2010: TEPCO To Use Less Oil For Power Generation In Fiscal 2010
17.5.29 Jan 27, 2010: TEPCO Receives Approval For Photovoltaic Generation Surcharge Application
17.5.30 Jan 25, 2010: TEPCO Plans To Install MACC System At Its 1,886 MW LNG-Fired Goi Thermal Power Plant In Chiba, Near Tokyo
17.5.31 Jan 23, 2010: Ifugao LGU, E8 To Inaugurate Ambangal Mini-Hydro Project In Philippines
17.5.32 Jan 22, 2010: e8 Donates $1 Million Hydro-Electric Project To Save Philippines' Ifugao Rice Terraces
17.5.33 Jan 19, 2010: TEPCO Resumes Commercial Operation Of Kashiwazaki-Kariwa Nuclear Plant's Unit 6
17.5.34 Jan 05, 2010: TEPCO To Restart Its 1,365 MW Kashiwazaki-Kariwa Nuclear Plant After Unplanned Inspection On January 6, 2009
17.5.35 Dec 25, 2009: TEPCO To Shut 1,356 MW Unit 6 Of Kashiwazaki-Kariwa Plant For Unplanned Inspection
17.5.36 Dec 22, 2009: AECL Enters Market In Japan With Sale Of Two Pumps To TEPCO
17.5.37 Dec 18, 2009: EirGrid Submits Planning Application For Meath-Tyrone 400 kV Interconnection Development
17.5.38 Dec 08, 2009: TEPCO's Kashiwazaki-Kariwa Nuclear Reactor Receives Approval From Technical Committee
17.5.39 Dec 01, 2009: Japan's Nuclear Utilization Rate Increases To 66.6% In November 2009: METI
17.5.40 Nov 19, 2009: Smoke Found At TEPCO's Kashiwazaki-Kariwa Nuclear Power Plant In Japan
17.5.41 Nov 10, 2009: TEPCO Restarts Its Unit No.7 At Kashiwazaki-Kariwa Nuclear Power Plant
17.5.42 Nov 05, 2009: TEPCO To Restart Its 1,356 MW No.7 Reactor At Kashiwazaki-Kariwa Nuclear Power Plant
17.5.43 Nov 02, 2009: Japan's Nuclear Power Plant Utilization Rate Increases To 63.5%: METI
17.5.44 Oct 22, 2009: TEPCO To Increase Power Capacity At No.4 Reactor Of Fukushima-Daini Nuclear Plant
17.5.45 Oct 15, 2009: TEPCO's 1,100 MW No.4 Reactor At Fukushima-Daini Nuclear Plant Decreases To 30% Capacity
17.5.46 Sep 24, 2009: TEPCO Announces Planned Shutdown Of Kashiwazaki-Kariwa Nuclear Power Station Unit No.7 For Refueling
17.5.47 Sep 02, 2009: TEPCO Performs Functional Tests On Entire Plant Of Kashiwazaki-Kariwa Nuclear Power Station Unit No.6
17.5.48 Aug 28, 2009: TEPCO's 1,356 MW Unit No.6 At Kashiwazaki-Kariwa Nuclear Power Station Restarted
17.5.49 Aug 21, 2009: TEPCO To Shut 1,356 MW No.7 Reactor At Kashiwazaki-Kariwa Nuclear Power Plant For Repairs
17.5.50 Aug 13, 2009: TEPCO's Restart Of Second Reactor At Kashiwazaki-Kariwa Nuclear Power Plant Supported by Japanese Panel
17.5.51 Aug 06, 2009: TEPCO To Shut Its Fukushima-Daiichi No. 3 Nuclear Generator For Unplanned Inspection
17.5.52 Aug 03, 2009: Japan's Nuclear Plant Usage Rises To 67.6% In July 2009
17.5.53 Jul 28, 2009: TEPCO's Commercial Operation Of Unit 7 At Kashiwazaki-Kariwa Nuclear Plant Postponed
17.5.54 Jun 30, 2009: Star Buck Thermal Power Plant Commences Operations
17.5.55 Jun 22, 2009: TEPCO Moves Closer To Restart 1,356 MW No.6 Generator At Kashiwazaki-Kariwa Nuclear Power Plant
17.5.56 Jun 22, 2009: TeaM Energy Looks For Geothermal And Other Renewable Energy Development
17.5.57 Jun 12, 2009: Japan Has 29,667 MW Nuclear Capacity Online As Of June 12, 2009
17.5.58 Jun 07, 2009: Steam Leak In Pump At TEPCO’s 1,356 MW No. 7 Nuclear Reactor Of Kashiwazaki-Kariwa Nuclear Plant
17.5.59 Jun 04, 2009: TEPCO Updates On Inspections And Restoration Works At Kashiwazaki-Kariwa Nuclear Power Station
17.5.60 May 29, 2009: TEPCO Performs Functional Tests At Kashiwazaki-Kariwa Nuclear Power Station Unit No.7
17.5.61 May 28, 2009: TEPCO Updates On Inspections And Restoration Works At Kashiwazaki-Kariwa Nuclear Power Station
17.5.62 May 25, 2009: TEPCO’s 1,356 MW No.7 Nuclear Reactor At Kashiwazaki-Kariwa Plant Increases To 50% Capacity
17.5.63 May 21, 2009: TEPCO Updates On Inspections And Restoration Works At Kashiwazaki-Kariwa Nuclear Power Station
17.5.64 May 14, 2009: TEPCO Announces Update On Inspections And Restoration Works At Kashiwazaki-Kariwa Nuclear Power Station
17.5.65 May 05, 2009: TEPCO To Commence Trial Run Of No. 7 Reactor At Kashiwazaki-Kariwa Nuclear Power Plant
17.5.66 Apr 30, 2009: TEPCO Reports Update On Inspections And Restoration Works At Kashiwazaki-Kariwa Nuclear Power Station
17.5.67 Apr 28, 2009: TEPCO Nears Restart Of Kashiwazaki-Kariwa Nuclear Power Plant
17.5.68 Apr 24, 2009: Kazatomprom Starts Khorasan-1 Uranium Deposit In Kazakhstan
17.5.69 Apr 23, 2009: TEPCO Announces Update On Inspections And Restoration Works At Kashiwazaki-Kariwa Nuclear Power Station
17.5.70 Apr 23, 2009: TEPCO To Restart Kashiwazaki Kariwa Nuclear Power Plant In May 2009
17.5.71 Apr 16, 2009: TEPCO Reports Update On Inspections And Restoration Works At Kashiwazaki-Kariwa Nuclear Power Station
17.5.72 Apr 13, 2009: Niigata Prefecture Urges TEPCO To Prevent Repeat Of Nuclear Plant Fire
17.5.73 Apr 12, 2009: TEPCO Provides Update On Kashiwazaki-Kariwa Nuclear Plant
17.5.74 Apr 09, 2009: TEPCO Provides Update On Inspections And Restoration Works At Kashiwazaki-Kariwa Nuclear Power Station
17.5.75 Apr 08, 2009: Niigata Governor Supports Restart of Tepco's Kashiwazaki Kariwa Nuclear Plant
17.5.76 Apr 06, 2009: First Shipment Of Sakhalin-2 LNG Arrives Japan
17.5.77 Apr 02, 2009: TEPCO Provides Update On Inspections And Restoration Works At Kashiwazaki-Kariwa Nuclear Power Station
17.5.78 Mar 31, 2009: TEPCO To Postpone Commercial Operations At Four New Nuclear Power Generators By One Year
17.5.79 Mar 29, 2009: Russia's Sakhalin II Project Announces Commencement Of LNG Delivery
17.5.80 Mar 26, 2009: TEPCO Reports Update On Inspections And Restoration Works At Kashiwazaki-Kariwa Nuclear Power Station
17.5.81 Mar 19, 2009: TEPCO Provides Update On Inspections And Restoration Works At Kashiwazaki-Kariwa Nuclear Power Station
17.5.82 Mar 17, 2009: Japan To Increase Solar Cell Production To One Third By 2020
17.5.83 Mar 12, 2009: TEPCO Reports Update On Inspections And Restoration Works At Kashiwazaki-Kariwa Nuclear Power Station
17.5.84 Mar 05, 2009: TEPCO Kashiwazaki-Kariwa Nuclear Plant Catches Fire
17.5.85 Mar 05, 2009: TEPCO Provides Update On Inspections And Restoration Works At Kashiwazaki-Kariwa Nuclear Power Station
17.5.86 Mar 02, 2009: Japan Updates On Nuclear Plant Usage In February 2009
17.5.87 Feb 26, 2009: TEPCO Announces Update On Inspections And Restoration Works At Kashiwazaki-Kariwa Nuclear Power Station
17.5.88 Feb 25, 2009: TEPCO Shuts Its Fukushima-Daiichi No.1 Nuclear Generator For Unplanned Inspection
17.5.89 Feb 20, 2009: Japan Updates On Electricity Production In January 2009
17.5.90 Feb 19, 2009: TEPCO Receives Evaluation For Restarting Unit No. 7 At Kashiwazaki-Kariwa Nuclear Power Station
17.5.91 Feb 16, 2009: TEPCO To Shut Its 1,100 MW Fukushima-Daini No.1 Nuclear Generator
17.5.92 Feb 13, 2009: TEPCO Reduces Usage Of Crude And Fuel Oil As Power Demand Decreases
17.5.93 Feb 12, 2009: TEPCO Provides Update On Restoration Works At Kashiwazaki-Kariwa Nuclear Power Station
17.5.94 Feb 05, 2009: TEPCO Reports Update On Restoration Works At Kashiwazaki-Kariwa Nuclear Power Station
17.5.95 Feb 03, 2009: TEPCO To Complete Repair Works At Kashiwazaki Kariwa Nuclear Plant
17.5.96 Jan 29, 2009: TEPCO Provides Update On Restoration Works At Kashiwazaki-Kariwa Nuclear Power Station
17.5.97 Jan 29, 2009: IAEA Issues Report On Kashiwazaki-Kariwa Nuclear Power Plant
17.5.98 Jan 23, 2009: TEPCO To Restart Kashiwazaki-Kariwa Nuclear Plant
17.5.99 Jan 22, 2009: TEPCO Provides Update On Inspections And Restoration Works At Kashiwazaki-Kariwa Nuclear Power Station
17.5.100 Jan 08, 2009: TEPCO Provides Status Of Inspections And Restoration Works At Kashiwazaki-Kariwa Nuclear Power Station
17.5.101 Jan 05, 2009: TEPCO To Seek Approval For Test Running Its Kashiwazaki-Kariwa Unit 7 Nuclear Generator
17.5.102 Dec 08, 2008: TEPCO's Kashiwazaki-Kariwa Nuclear Plant Catches Fire
17.5.103 Nov 04, 2008: IAEA To Review Safety Assessment At Kashiwazaki-Kariwa Nuclear Power Plant
17.5.104 Oct 31, 2008: TEPCO Expects To Operate Its Nuclear Power Plants At 44% Capacity
17.5.105 Jul 03, 2008: TEPCO Signs MoU With Petrobras
17.5.106 May 29, 2008: Mitsui Engineering’s Commences Operations At Its Biomass Waste-Fueled Power Plant
17.5.107 May 16, 2008: TEPCO Signs Agreement With VLCE To Purchase Carbon Credits
17.5.108 Jan 04, 2008: TEPCO Announces Delay In Nuclear Reactor Construction By One Year
17.5.109 Dec 14, 2007: TEPCO Updates On Kashiwazaki-Kariwa Nuclear Power Station
17.5.110 Dec 06, 2007: TEPCO Updates On Unit 7 Turbine Internal Inspections At Kashiwazaki-Kariwa Nuclear Power Station
17.5.111 Nov 29, 2007: TEPCO Updates On Unit 3 Turbine Internal Inspections Status At Kashiwazaki-Kariwa Nuclear Power Station
17.5.112 Nov 20, 2007: TEPCO Updates On Unit 4 Turbine Internal Inspections Status At Kashiwazaki-Kariwa Nuclear Power Station
17.5.113 Nov 14, 2007: TEPCO Reports Misalignment Of Fuel Assembly At Unit 5 On Kashiwazaki-Kariwa Nuclear Power Station
17.5.114 Oct 01, 2007: TEPCO Reports In-Core Inspection Results On Unit 1 At Kashiwazaki-Kariwa Nuclear Power Station
17.5.115 Aug 22, 2007: TEPCO Starts Power Generating At Shiobara Power Station
17.5.116 May 10, 2007: Brunei LNG To Extend Sales Contract For Japan And South Korea
17.6 New Contracts Announcements
17.6.1 Sep 07, 2010: Solar Frontier To Supply CIS Solar Panels For Miyazaki Solar Way Solar Power Plant
17.6.2 Dec 15, 2009: Kyocera To Provide 13 MW Solar Modules For Ohgishima Solar Power Plant
17.6.3 Dec 04, 2009: Chevron, TEPCO Sign HOA For Wheatstone LNG
17.6.4 Nov 30, 2009: Toshiba Wins 7 MW PV Order For Mega Solar Power Generation Project From TEPCO
17.6.5 Nov 30, 2009: Hitachi Receives Order From TEPCO For Solar PV System In Japan
17.6.6 Oct 19, 2009: TEPCO Extends LNG Purchase Contract With ConocoPhillips And Marathon Oil
17.6.7 May 20, 2009: Alstom To Supply, Install And Commission Wind Farm’s Eleven Eco 74 Wind Turbines
18 Appendix
18.1 Methodology
18.1.1 Coverage
18.1.2 Secondary Research
18.1.3 Primary Research
18.1.4 Expert Panel Validation
18.2 Contact Us
18.3 Disclaimer

Note: Product cover images may vary from those shown
Note: Product cover images may vary from those shown

RELATED PRODUCTS