• 1-800-526-8630U.S. (TOLL FREE)
  • 1-917-300-0470EAST COAST U.S.
  • +353-1-416-8900REST OF WORLD
Aboitiz Power Corporation -Overview, Contact Details, locations, Key executives, Power Plant Information, Business Description and SWOT Analysis - Product Image

Aboitiz Power Corporation -Overview, Contact Details, locations, Key executives, Power Plant Information, Business Description and SWOT Analysis

  • ID: 1441665
  • November 2010
  • 112 pages
  • GlobalData

Aboitiz Power Corporation -Overview, Contact Details, locations, Key executives, Power Plant Information, Business Description and SWOT Analysis

Summary

The report” Aboitiz Power Corporation- Company Overview, Contact Details, Locations, Key Executives, Power Plant Information, Business Description and SWOT" contains the profile of the company that is involved in the field of power generation from thermal sources (coal, oil and gas).It contains a detailed description of the company’s business operations (power plants, installed capacity, and generation), history, corporate strategy, and business structure. This report contains a detailed SWOT analysis, information on key employees (executives), key competitors, and major products and services.

Scope

- Major Power Plants (assets) – summarized and detailed information about the power plants (assets)
- Operational Metrics (capacity, generation, revenue, sales, number of consumers)
- Business description – A detailed description of the company’s operations and business divisions
- Corporate strategy – Our summarization of the company’s business strategy.
- READ MORE >

Note: Product cover images may vary from those shown

1
1.1 List of Tables
1.2 List Of Figures
2 Company Snapshot
2.1 Key Information
2.2 Company Overview
2.3 Industry Outlook – Hydro
2.4 Industry Outlook – Power Generation
2.5 SWOT Snapshot
3 Operational Metrics
3.1 Aboitiz Power Corporation, Operational Metrics, By Capacity
3.2 Aboitiz Power Corporation, Operational Metrics, By Generation
3.3 Aboitiz Power Corporation, Operational Metrics, By Customers
3.4 Aboitiz Power Corporation, Operational Metrics, By Sales
4 Aboitiz Power Corporation, Geothermal Power Plants
4.1 Aboitiz Power Corporation, Geothermal Power Plants, Philippines
5 Aboitiz Power Corporation, Hydro Power Plants
5.1 Aboitiz Power Corporation, Hydro Power Plants, Philippines
6 Aboitiz Power Corporation, Thermal Power Plants
6.1 Aboitiz Power Corporation, Thermal Power Plants, Philippines
7 Business Description
7.1 Business Overview
8 Major Products and Services
9 History
10 SWOT Analysis
10.1 Overview
10.2 Aboitiz Power Corporation Strengths
10.2.1 Strong Foothold in the Market
10.2.2 Increasing Revenues and Market Share
10.2.3 Strong Position of the Parent Company
10.2.4 Expanding Operating Margin
10.3 Aboitiz Power Corporation Weaknesses
10.3.1 Loss in Transport Business
10.3.2 Limited Liquidity Position
10.4 Aboitiz Power Corporation Opportunities
10.4.1 Strategic Collaborations
10.4.2 Focus on Renewable Generation
10.4.3 Increasing Electricity Demand
10.4.4 Strategic Acquisitions and Collaborations
10.5 Aboitiz Power Corporation Threats
10.5.1 Legal and Regulatory Proceedings
10.5.2 Intense Competition
10.5.3 Volatility in Price Level
10.6 Financial Ratios - Capital Market Ratios
10.7 Financial Ratios - Annual Ratios
10.8 Financial Ratios - Interim Ratios
11 Key Employees
12 Company Statement
13 Locations And Subsidiaries
13.1 Head Office
13.2 Other Locations & Subsidiaries
14 Financial Deals Landscape
14.1 Aboitiz Power Corporation, Deals Volume Summary, 2004 to YTD 2010
14.2 Aboitiz Power Corporation, Deals Summary By Region, 2004 to YTD 2010
14.3 Aboitiz Power Corporation, Deals Summary, 2004 to YTD 2010
14.4 Aboitiz Power Corporation Detailed Deal Summary
14.4.1 Asset Purchase
14.4.2 Acquisition
14.4.3 Equity Offerings
14.4.4 Debt Offerings
14.4.5 Partnerships
15 Recent Developments
15.1 New Contracts
15.1.1 Oct 21, 2010: Therma Marine Signs Power Supply Contract With DDNEC To Provide 10MW Of Power
15.1.2 Sep 09, 2010: Aboitiz Power To Provide Additional 95MW Of Capacity To MEC
15.1.3 Dec 16, 2009: Aboitiz Power Signs Three Year Supply Agreement With SteelAsia Manufacturing
15.1.4 Nov 12, 2009: Aboitiz Power Signs Cleanergy Supply Deal With SFELAPCO
15.1.5 Sep 30, 2009: ABB To Upgrade Hydropower Plants In Philippines
15.1.6 Jul 05, 2007: Hedcor Signs PMS Contract With EDCOP-T&TI To Manage Construction Of Hydro Power Plants
15.1.7 Mar 29, 2007: Hedcor Consortium And DLPC Sign 12-Year Power Deal
15.2 Operations Updates
15.2.1 Sep 16, 2010: Aboitiz Power Launches Sibulan Hydroelectric Power Plant In Philippines
15.2.2 Jun 30, 2010: STEAG State Power To Expand 232MW Coal-Fired Power Plant By 150MW
15.2.3 May 25, 2010: VECO Implements Oracle Utilities Customer Care And Billing
15.2.4 Dec 15, 2009: Aboitiz Power To Bid For Hydro Power Contracts In Philippines
15.2.5 May 25, 2009: Aboitiz Power’s Proposed 300 MW Coal-Fired Plant In Philippines Remains Suspended
15.2.6 Mar 01, 2009: Hedcor To Start Operations On PHP5.1 Billion Sibulan Hydropower Project In Davao
15.2.7 Feb 24, 2009: Aboitiz Equity Ventures Expects Its Coal Fired Plant To Be Operational By 2010
15.2.8 Jul 10, 2008: SNAP Starts Rehabilitation Of Ambuklao, Binga Hydroelectric Power Plants
15.3 Financial Announcements
15.3.1 May 07, 2010: Aboitiz Power Reports Net Income Of PHP7.4 Billion In Q1 2010
15.3.2 Mar 04, 2010: Aboitiz Power's Net Income Up 60% In Q4 2009
15.3.3 Nov 03, 2009: Aboitiz Power Reports Total Net Income Of PHP2.2 Billion In Q3 2009
15.3.4 Aug 11, 2009: Aboitiz Power Reports Total Net Income Of PHP1.9 Billion In H1 2009
15.3.5 May 07, 2009: Aboitiz Power Reports Net Income Of PHP381 Million In Q1 2009
15.3.6 Mar 10, 2009: Aboitiz Power Reports 2008 Results
15.3.7 Feb 17, 2009: Aboitiz Equity Ventures And Aboitiz Power Declare Cash Dividends
15.3.8 Nov 05, 2008: Aboitiz Reports Nine Months 2008 Results
15.3.9 Apr 28, 2008: Aboitiz Declares Q1 2008 Results
15.3.10 Mar 05, 2008: Aboitiz Reports 2007 Results
15.3.11 Oct 30, 2007: Aboitiz Reports Nine Months 2007 Results
15.3.12 Aug 07, 2007: Aboitiz Declares H1 2007 Results
15.4 Strategy and Business Planning
15.4.1 Oct 07, 2010: Aboitiz Power To Build 200MW Circulating Fluidized-Bed Coal Power Plant In Davao City, Philippines
15.4.2 Aug 03, 2010: RP Energy To Pursue 300MW Subic Coal-Fired Power Plant Project In Subic Bay Freeport Zone, Philippines
15.4.3 Jun 24, 2010: Aboitiz Power’s Hedcor Plans To Build Two Run-Of-River Plants In Davao del Sur Province Of Philippines
15.4.4 Apr 16, 2009: Aboitiz Power To Double Its Generating Capacity By 2011
15.4.5 Feb 23, 2009: Aboitiz Power To Bid For Hydropower Plants In Agusan del Norte And Compostela Valley
15.4.6 Aug 15, 2008: Hedcor Decides To Abandon The Construction Of 7 MW Suawan Hydropower Plant
15.4.7 Jul 31, 2008: Aboitiz Wins Bid For Tiwi-Makban Geothermal Complex
15.4.8 Sep 07, 2007: Hedcor Breaks Ground On 42.5 MW SHP In Barangay Sibulan, Santa Cruz
15.4.9 Jul 09, 2007: Hedcor’s Sibulan Hydropower Project Construction To start In July 2007
15.5 Other Significant Developments
15.5.1 May 18, 2010: Aboitiz Power To Spend PHP17.4 Billion On Expansion Of Power Plants And To Develop New Greenfield Projects
15.5.2 May 19, 2009: Aboitiz Announces Capital Expenditure Of PHP44 Billion For Power Projects
15.5.3 May 26, 2008: Hedcor Signs PHP3.57 Billion Loan Facility With Banks For Hydropower Project
15.5.4 May 23, 2008: Aboitiz To Invest PHP27.4 Billion For New Power Projects In 2008
15.5.5 Apr 23, 2008: Hedcor Signs Transmission Line Contract With RD Square
15.5.6 Apr 18, 2008: Aboitiz To Invest PHP10 Billion For Two Hydro Power Projects In Mindanao
15.5.7 Apr 05, 2008: Aboitiz Issues Award Letter To Formosa For Subic Power Plant
15.5.8 Jan 18, 2008: Hedcor Signs MoA With DENR-EMB To Form MMT For Hydro Project
15.5.9 Sep 28, 2007: Hedcor Invests In Water Monitor And Rain Gauge Equipment For Hydropower Projects In Davao
15.5.10 Aug 10, 2007: Hedcor Awards SOCOIN With Sibulan’s Electrical-Mechanical Contract
15.5.11 Aug 02, 2007: Hedcor Awards Civil Works Packages Contract To JVACC For Sibulan Hydropower Project
15.5.12 Jul 05, 2007: Aboitiz Subsidiary Signs PMS Contract With EDCOP-T&TI
16 Appendix
16.1 Methodology
16.1.1 Coverage
16.1.2 Secondary Research
16.1.3 Primary Research
16.1.4 Expert Panel Validation
16.2 Contact Us
16.3 Disclaimer

Note: Product cover images may vary from those shown
Note: Product cover images may vary from those shown

RELATED PRODUCTS