• 1-800-526-8630U.S. (TOLL FREE)
  • 1-917-300-0470EAST COAST U.S.
  • +353-1-416-8900REST OF WORLD

This product is currently not available for purchase.

RELATED PRODUCTS

Optimizing Production Line of IBS. Edition No. 1 - Product Image

Optimizing Production Line of IBS. Edition No. 1

  • ID: 1919018
  • September 2010
  • 104 Pages
  • VDM Publishing House

Optimizing production-line layout of IBS plant enhances production time and improves resources' utilization. Recently, simulation has begun to be applied in construction industry sector. In this book, "Witness 2001" program used to build a simulation model for the production line of pre-cast concrete columns and beams. This simulation model offers the alternatives to modify the production line attributes as the capacity of elements treatment area, number of re-useable moulds and labor, and breakdown of activities. In fact, that imitates a real plant production line. The model provides an opportunity to identify the optimum production line of the suggested layout. This research presents the results of two simulation models; the first is a column model and the second is a beam model. The results involve selection of the appropriate production layout and the required time to produce the assumed amount of columns and beams. Finally, the effect of machineries breakdown and the required resources has been determined in this research.

Note: Product cover images may vary from those shown

Ali Mohammed, Alashwal.
Ali Alashwal is a PhD student at the Faculty of Built Environment, University of Malaya. He has a Master Degree from UTM in construction management. Since 2008, he works as a research assistance in the area of project management. His earlier profession is an architect. His research interests include project management, KM, and IT.

Note: Product cover images may vary from those shown
Note: Product cover images may vary from those shown

Our Clients

Our clients' logos