• +353-1-415-1241(GMT OFFICE HOURS)
  • 1-800-526-8630(US/CAN TOLL FREE)
  • 1-917-300-0470(EST OFFICE HOURS)
Bulgaria Power Market Outlook to 2030 - Business Propensity Indicator, Market Trends, Regulation and Competitive Landscape - Product Image

Bulgaria Power Market Outlook to 2030 - Business Propensity Indicator, Market Trends, Regulation and Competitive Landscape

  • Published: February 2012
  • Region: Bulgaria
  • 74 pages
  • GlobalData

FEATURED COMPANIES

  • CEZ, a.s.
  • Enel SpA (Enel)
  • MORE

Bulgaria Power Market Outlook to 2030 - Business Propensity Indicator, Market Trends, Regulation and Competitive Landscape

Summary

This report gives detailed information on the Bulgaria power market and assesses the investment opportunities in the country’s power sector. This includes a detailed analysis of the current investment climate in the country’s power sector and over the next decade across 6 broad parameters. Each parameter has a weight assigned, and a weighted average score is calculated to obtain the final country ranking in that region. The study also maps the relative ranking of the key countries in the region according to the current investment opportunities in the country and that by 2020.

This report also examines the country’s power market structure and provides historical and forecast numbers for generation, capacity and consumption up to 2030. Detailed analysis of the market’s regulatory structure, supply and demand balance, import and export trends, competitive landscape and power projects at various stages of the supply chain is provided.

Scope

- Analysis of the current investment climate in the country’s READ MORE >

1
1

1.1 List of Tables
1.2 List of Figures
2 Introduction
2.1 GlobalData Report Guidance
3 Business Propensity Indicator Methodology
3.1 Methodology Adopted For Evaluating the Business Propensity Indicator for Bulgaria
3.1.1 Capacity and Reserve Potential
3.1.2 Regulatory Scenario
3.1.3 Investment Scenario
3.1.4 Transmission and Distribution Infrastructure
3.1.5 Macro Economic Scenario
3.1.6 Competitive Scenario
3.2 Methodology Adopted to Arrive at a Final Rank
4 Bulgaria, Power Market, Business Propensity Indicator
4.1 Bulgaria, Power Market, Capacity and Reserve Potential
4.2 Bulgaria, Power Market, Regulatory Scenario
4.3 Bulgaria, Power Market, Investment Scenario
4.4 Bulgaria, Power Market, Transmission and Distribution Infrastructure
4.5 Bulgaria, Power Market, Macroeconomic Factors
4.6 Bulgaria, Power Market, Competitive Scenario
4.7 Bulgaria, Power Market, Conclusion
4.8 Bulgaria, Power Market, Business Propensity Indicator Ranking
4.8.1 Present Ranking
4.8.2 Future Ranking
5 Bulgaria Power Market Analysis, 2000-2030
5.1 Bulgaria, Power Market, Demand and Consumption Scenario
5.2 Bulgaria, Power Market, Import and Export Scenario
5.3 Bulgaria, Power Market, Annual Power Consumption, 2000-2030
5.4 Bulgaria, Power Market, Cumulative Installed Capacity, 2000-2030
5.4.1 Cumulative Installed Capacity: Breakup by Type of Power Plant
5.4.2 Cumulative Installed Capacity: Total Value
5.4.3 Cumulative Thermal Installed Capacity, 2000-2030
5.4.4 Cumulative Hydro Installed Capacity, 2000-2030
5.4.5 Cumulative Renewable Power Installed Capacity, 2000-2030
5.4.6 Cumulative Nuclear Installed Capacity, 2000-2030
5.5 Bulgaria, Power Market, Total Annual Power Generation, 2000-2030
5.5.1 Annual Thermal Power Generation, 2000-2030
5.5.2 Annual Hydro Power Generation, 2000-2030
5.5.3 Annual Renewable Power Generation, 2000-2030
5.5.4 Nuclear Power Generation, 2000-2030
6 Bulgaria, Power Market, Leading Active and Upcoming Projects
6.1 Bulgaria, Power Market, Active Power Projects
6.1.1 Leading Thermal Power Projects
6.1.2 Leading Hydropower Projects
6.1.3 Leading Renewable Power Projects
6.1.4 Leading Nuclear Power Projects
6.2 Upcoming Power Projects
6.2.1 Leading Thermal Power Projects
6.2.2 Leading Hydropower Projects
6.2.3 Leading Renewable Power Projects
6.2.4 Leading Nuclear Power Projects
7 Bulgaria, Power Market, Regulatory Structure
7.1 Bulgaria, Power Market, Regulatory Structure Overview
7.2 Bulgaria, Power Market, Reforms Aim at Increasing Competition
7.3 Bulgaria, Power Market, Privatization of the Bulgarian Electricity Sector
7.4 Bulgaria, Power Market, Renewable Energy, Policies for the Future
8 Bulgaria, Power Market, Infrastructure
8.1 Bulgaria, Power Market, Infrastructure Overview
8.1.1 Grid Interconnection
8.2 Bulgaria, Power Market, Developments for Transmission Systems
9 Bulgaria, Power Market, Competitive Landscape
9.1 Bulgaria, Power Market, Market Share of Major Power Companies
9.2 Bulgaria, Power Market, Key Company: Bulgarian Energy Holding EAD
9.2.1 Bulgarian Energy Holding EAD, Company Overview
9.2.2 Bulgarian Energy Holding EAD, Business Description
9.2.3 Bulgarian Energy Holding EAD, SWOT Analysis
9.3 Bulgaria, Power Market, Key Company: Enel SpA (Enel)
9.3.1 Enel SpA (Enel), Company Overview
9.3.2 Enel SpA (Enel), Business Description
9.3.3 Enel SpA (Enel), SWOT Analysis
9.4 Bulgaria, Power Market, Key Company: CEZ, a.s.
9.4.1 CEZ, a.s., Company Overview
9.4.2 CEZ, a.s., Business Description
9.4.3 CEZ, a.s., SWOT Analysis
10 Appendix
10.1 Market Definitions
10.1.1 Power
10.1.2 Installed Capacity
10.1.3 Active Installed Capacity
10.1.4 Electricity Generation
10.1.5 Thermal Power
10.1.6 Hydro Power
10.1.7 Nuclear Power
10.1.8 Renewable Power
10.1.9 Market Size
10.1.10 Renewable Energy Resources
10.1.11 Generation Company
10.1.12 Electricity consumption
10.1.13 Transmission network
10.1.14 Interconnector
10.1.15 Transmission and distribution loss
10.1.16 Interconnector
10.1.17 Transmission and distribution loss
10.2 Abbreviations
10.3 GlobalData’s Methodology
10.3.1 Coverage
10.3.2 Secondary Research
10.3.3 Primary Research
10.3.4 Modeling and Forecasting
10.4 Contact Us
10.5 Disclaimer

1.1 List of Tables
Table 1: Ease of Doing Business-Categories and Definitions
Table 2: Best Score for Present and Future Scenario
Table 3: Power Market, Bulgaria, Breakdown of Electricity Consumption By Sector (%), 2011 (Estimated)
Table 4: Power Market, Bulgaria, Total Annual Imports and Exports (GWh), 2000-2010
Table 5: Power Market, Bulgaria, Annual Power Consumption (GWh), 2000-2030
Table 6: Power Market, Bulgaria, Cumulative Installed Capacity by Type of Power Plant (%), 2011
Table 7: Power Market, Bulgaria, Cumulative Installed Capacity (MW), 2000-2030
Table 8: Power Market, Bulgaria, Cumulative Thermal Installed Capacity (MW), 2000-2030
Table 9: Power Market, Bulgaria, Cumulative Hydro Installed Capacity (MW), 2000-2030
Table 10: Power Market, Bulgaria, Cumulative Renewable Installed Capacity (MW), 2000-2030
Table 11: Power Market, Bulgaria, Cumulative Nuclear Installed Capacity (MW), 2000-2030
Table 12: Power Market, Bulgaria, Total Annual Power Generation (GWh), 2000-2030
Table 13: Power Market, Bulgaria, Annual Thermal Power Generation (GWh), 2000-2030
Table 14: Power Market, Bulgaria, Annual Hydro Power Generation (GWh), 2000-2030
Table 15: Power Market, Bulgaria, Annual Renewable Power Generation (GWh), 2000-2030
Table 16: Power Market, Bulgaria, Nuclear Power Generation (GWh), 2000-2030
Table 17: Power Market, Bulgaria, Leading Thermal Power Plants, 2011
Table 18: Power Market, Bulgaria, Leading Active Hydro Power Projects (MW), 2011
Table 19: Power Market, Bulgaria, Leading Active Renewable Power Projects (MW), 2011
Table 20: Power Market, Bulgaria, Leading Upcoming Thermal Power Projects (MW), 2011
Table 21: Power Market, Bulgaria, Leading Upcoming Hydro Power Projects (MW), 2011
Table 22: Power Market, Bulgaria, Leading Upcoming Renewable Power Projects (MW), 2011
Table 23: Power Market Bulgaria, Grid Interconnections of Bulgaria with other countries, 2009
Table 24: Power Market, Bulgaria, Transmission Line Length (Ckm), 2000- 2020
Table 25: CEZ, a.s., SWOT Analysis
Table 26: Abbreviations

1.2 List of Figures
Figure 1: Weights Assigned to the Six Factors (%), 2000-2020
Figure 2: Power Market, Bulgaria, Business Propensity Indicator
Figure 3: Power Market, Bulgaria, Business Propensity Indicator Ranking
Figure 4: Power Market, Bulgaria, Breakdown of Electricity Consumption By Sector (%), 2011 (Estimated)
Figure 5: Power Market, Bulgaria, Total Annual Imports and Exports (GWh), 2000-2010
Figure 6: Power Market, Bulgaria, Annual Power Consumption (GWh), 2000-2030
Figure 7: Power Market, Bulgaria, Cumulative Installed Capacity by Type of Power Plant (%), 2011
Figure 8: Power Market, Bulgaria, Cumulative Installed Capacity (MW), 2000-2030
Figure 9: Power Market, Bulgaria, Cumulative Thermal Installed Capacity (MW), 2000-2030
Figure 10: Power Market, Bulgaria, Cumulative Hydro Installed Capacity (MW), 2000-2030
Figure 11: Power Market, Bulgaria, Cumulative Renewable Installed Capacity (MW), 2000-2030
Figure 12: Power Market, Bulgaria, Cumulative Nuclear Installed Capacity (MW), 2000-2030
Figure 13: Power Market, Bulgaria, Total Annual Power Generation (GWh), 2000-2030
Figure 14: Power Market, Bulgaria, Annual Thermal Power Generation (GWh), 2000-2030
Figure 15: Power Market, Bulgaria, Annual Hydro Power Generation (GWh), 2000-2030
Figure 16: Power Market, Bulgaria, Annual Renewable Power Generation (GWh), 2000-2030
Figure 17: Power Market, Bulgaria, Nuclear Power Generation (GWh), 2000-2030
Figure 18: Power Market, Bulgaria, Installed Capacity Share of Major Power Companies (%), 2010

Enel SpA (Enel)
CEZ, a.s.
Bulgarian Energy Holding EAD

Note: Product cover images may vary from those shown

RELATED PRODUCTS

Our Clients

Our clients' logos