0 CHECKOUT

Botswana Infrastructure Report Q2 2016

  • ID: 3625611
  • February 2016
  • Region: Botswana
  • 31 pages
  • Business Monitor International
1 of 3

Botswana's infrastructure and construction sector is heading into a period of sustained growth on the back of continued investment in the mining sector and the development of associated transport and power infrastructure. However, we highlight challenges to sector development resulting from electricity and water shortages.

Latest Updates

- The timeframe for National Development Plan (NDP) 10 has been extended until the end of March 2017. It will be followed by NDP 11, starting in April 2017. The reason for the delay is to enable new parliamentarians to participate in drafting NDP 11.

Note: Product cover images may vary from those shown
2 of 3

- Table: Infrastructure - Construction Industry Forecasts (Botswana 2015-2021)

- Table: Infrastructure Risk/Reward Index (Botswana 2016)

- SWOT

- Infrastructure SWOT

- Industry Forecast

- Construction And Infrastructure Forecast

- Table: Construction And Infrastructure Industry Data (Botswana 2015-2025)

- Industry Risk Reward Ratings

- Botswana - Infrastructure Risk/Reward Index

- Rewards

- Risks

- Sub-Saharan Africa Risk/Reward Index - Stabilisation, But Tough Year In 2016

- Table: Sub-Saharan Africa - Infrastructure Risk/Reward Index, Q216

- Methodology

- Industry Forecast Methodology

- Sector-Specific Methodology

- Risk/Reward Index Methodology

- Sector-Specific Methodology

- Table: Infrastructure Risk/Reward Index Indicators

- Table: Weighting Of Indicators

Note: Product cover images may vary from those shown
3 of 3
Note: Product cover images may vary from those shown

PURCHASING OPTIONS

HAVE A QUESTION?

EMAIL US VIEW FAQs

RELATED PRODUCTS from Db

Our Clients

  • Owens Corning Corporation
  • LaFarge Group
  • Turner Construction Company
  • Holcim Ltd.
  • Boston Consulting Group
  • Caterpillar Inc.
  • Somfy SA