 |
Printer Friendly
Printed from http://www.researchandmarkets.com/reports/480978
2007-2008 Report on the Survey & Forecast of Investment Prospect of Hydropower Industry in China
|
Description: |
In 2006, the gross generated energy in China has reached 2755.7 billion KWH, which has increased by 13.67% as compared with 2005, while the generated energy of hydropower has reached 378.3 billion KWH, which has increased by 3.5 0% as compared with the same period last year. The proportion of hydropower in the gross generated energy was 13.7% in 2006, which has dropped by 1.5% than 2005. The pace of construction of hydropower station is evidently behind with the average progress of power construction all over the country. The total amount of new generating sets put into service in 2006 was 101,170 MW, which has exceeded the generally prospected amount of 90,000 MW. The gross installed generating capacity at the end of 2006 has reached 622,000 MW that has increased by 20.3% as compared with the same period of last year, which has hit an all-time high in the annual growth. As for the composition of power source, the percentage of thermal power was 77.8% that has increased by 2.1 percentage points; the percentage of hydropower was 20.7%, which has dropped by 2.0 percentage points, and this was the result of pursuing the improvement of supply capability steadily and fast in a short time under the condition of electric power shortage. The average exploitation level of hydropower in developed countries is above 60%. Among the countries, the percentage of exploited hydroelectric resource is about 82% in the USA, 84% in Japan and 65% in Canada. Comparing with these countries, the hydroelectric development in our country is still at a comparatively low level, and still has great development potential.
At present, the installed generation capacity of hydropower all over the world is about 800 million KW, which meets 20% of the global electricity requirement. The development and utilization of hydro energy resource has made significant contributions for the human civilization and social progress. China is relatively rich in Hydro energy resource, of which the installed generation capacity available for exploitation exceeds 400 million KW, and the annual energy output is more than 1700 billion KWH, so hydro energy resource is an important energy resource in China. The potential hydropower resource in our country comes first in the world. In accordance with the re-check result of hydropower resource in 2003, the amount of rivers of which the potential hydro energy is above 1,000 KW was 33,886 in our country (mainland). The theoretical potential hydropower resource was 6080 billion KWH of annual quantity of electricity with an average power of 694 million KW, which makes up about 1/6 of the quantity of electricity all over the world. The 542 million KW of technical development capacity available has made up 78.1% of the average power, and the 2470 billion KWH of annual energy output has made up 40.6% of theoretical potential quantity of electricity. Therefore, the development of hydropower industry in our country has a great geographical advantage.
Emphasize on the exploitation of resources in the west part of China. According to the relevant information, the amount of hydropower resource available for development and utilization in our country can reach 37.8 billion KW, which come first in the world. Southwest China is very rich in hydropower resource, and 68% of the total amount of hydropower resource available for exploitation concentrates in this region, of which the ratio of resource developed and used is less than 10% now. The exploitation of hydropower resource in the southwest may promote the development of the relevant industries of communication, cement, steel product, electromechanical etc. The positive and steady implementation of the plan of "Transport the Electricity from the West to the East" may optimize the power utilization structure in the East and improve the regional ecological environment, while offering the electricity required by the development of the East.
In accordance with the preliminary planning, by the year of 2020, the a mount of installed generation capacity of hydropower all over the country will reach 270 million KW, which accounts for 29% of the installed gross capacity of electric power, and the hydroelectric development level will reach 68%. The the direct benefit of power generation is equivalent to the saving of 420 million ton of standard coal equivalent. The reduction is 1.17 billion ton of CO2, 7.5 million ton of sulfur dioxide and other kinds of harmful gas. It will play an important role in the reduction of global air pollution and greenhouse effect and makes great environmental benefit. Hydropower construction may also take account of the comprehensive benefit of flood prevention, irrigation and transportation etc., and at the same time, it also will make the social benefit of the promotion of economic growth and social development, and the poverty alleviation. Therefore, the hydropower industry has a great long-term potential and is favored by lots of investment institutions. |
|
Contents: |
Section 1 Situation of China Hydropower Resources 1.1 General Situation of China Hydro-energy Resources 1.1.1 Reserves & Distribution of China Hydro-energy resources 1.1.2 Characteristics of China Hydro-energy resources 1.2 Utilization Status of China Hydro-energy Resources 1.2.1 General Application 1.2.2 Twelve Hydropower Bases 1.2.3 Hot spot Area Analysis on Current China Hydropower Resources Development 1.2.4 The principal problems
Section 2 Hydro-Energy Resources & Application of China Main Rivers 2.1 Changjiang River Basin 2.1.1 General Situation 2.1.2 Analysis on upper hydro-energy resource & development 2.1.3 Analysis on middle hydro-energy resource & development 2.2 Rivers in Southwest 2.2.1 Analysis on hydro-energy resource & utilization of Nujiang River 2.2.2 Analysis on hydro-energy resource & utilization Lancangjiang River 2.2.3 Analysis on hydro-energy resource & utilization of Dulong River 2.2.4 Analysis on hydro-energy resource & utilization of Yarlung Zangbo River 2.3 Yellow River Basin 2.3.1 General Situation 2.3.2 Analysis on hydro-energy resource & development of Yellow River upstream 2.3.3 Main Problems & Measure during the development of hydro-power in the upstream of Yellow River 2.3.4 Analysis on hydro-energy resource & development of middle stream of Yellow River 2.3.5 Hydropower development plan of Yellow River upper & middle stream 2.3.6 Forecast of development of Yellow River hydropower 2.4 Pearl River Basin 2.4.1 General Situation 2.4.2 Analysis on hydro-energy resource & development of main branches of Pearl River 2.4.3 Hydropower Development Plan 2.5 Rivers along Southeast Coast 2.5.1 General Situation 2.5.2 Analysis on hydro-energy resource & development of Main Branches 2.6 Development & Utilization of Hailuan River Hydro-energy Resources 2.7 Development & Utilization of Huai River Basin Hydro-energy Resources 2.8 Rivers in Northeast China 2.8.1 Analysis on hydropower resource & development of Heilongjiang river system 2.8.2 Analysis on hydropower resource & development of Tumen River system 2.8.3 Analysis on hydropower resource & development of Yalu river system 2.8.4 Analysis on hydropower resource & development of Liaohe river system
Section 3 Status & Trend of Global Hydropower Industry 3.1 Distribution & Utilization of Global Hydropower Resources 3.1.1 General Development 3.1.2 Europe 3.1.3 North America 3.1.4 Asia 3.2 Analysis on Global Hydropower Development 3.3 Successful Experience & Revelation of Global Hydropower Industry 3.4 Main Problems in the Development of Global Hydropower Industry 3.5 Forecast of Development Trend of Global Hydropower Industry
Section 4 Analysis on Development Environment of China Hydropower Industry, 2007-2008 4.1 Influence of Power Industry Policy on its Development 4.1.1 Development Plan of Power Industry during the period of "Eleventh Five-year Plan" 4.1.2 Analysis on the development of hydropower industry affected by "Transport the Electricity from the West to the East" strategy 4.1.3 Analysis on financing & investment in hydropower industry 4.1.4 Analysis on Tax policy of hydropower Industry 4.1.5 Change of foreign investment policy on hydropower in post-WTO 4.1.6 Forecast on key development areas & restructure of hydropower 4.2 Influence of Environment Protection Policy on the Development of Hydropower Industry 4.2.1 Influence of United Nations Framework Convention on Climate Change on the hydropower development 4.2.2 Influence of Law of Environmental Impact Assessment on hydropower development in our country 4.2.3 Influence of Environmental Protection Act of Construction Item to Hydropower development 4.3 Influence of River Water on the Development of Hydropower Power Industry 4.3.1 Analysis on the stability of hydrologic records of main rivers in China 4.3.2 Main ways to maintain the stability of hydropower water supply
Section 5 Analysis & Research on Policies & System Reform of Hydropower Industry 5.1 Relevant Industry Policy for the Development of Hydropower 5.1.1 Transmission from active development to orderly development 5.1.2 Analysis on the draft plan of China power during the period of "Eleventh Five-year Plan" 5.1.3 "Notice on accelerating the restructuring of the electric power industry, promote the healthy & orderly development" 5.1.4 Implementation of "renewable energy Law" 5.1.5 Power planning throughout China 5.2 Analysis on Electric Power System Reform 5.2.1 System reform policy of China electric power 5.2.2 Electric power system reform of foreign countries as reference 5.3 Outlook of China Hydropower Industry-Related Policy, 2007-2008
Section 6 Analysis on the Overall Operation of China Hydropower Industry, 2006 6.1 Analysis on Overall China Hydropower Industry 6.2 Status of Hydropower in China Energy System 6.3 Characteristics of China Hydropower Industry 6.3.1 Big investment, long period of construction 6.3.2 Long-term benefits & short-term poor benefits, slow recovery of funds 6.3.3 Natural & seasonal influence 6.3.4 Uneven distribution of water & electricity, more in the west, less in the east 6.4 Main Problems of China Hydropower Industry 6.4.1 Slow process of hydropower industry 6.4.2 Grid construction is lagging behind, restricting the development of domestic hydroelectric industries 6.4.3 Formation of price control mechanism restricts development of hydropower industry
Section 7 Analysis on Production Ability of China Hydropower Industry, 2007-2008 7.1 Analysis on Production of Hydropower Industry, 2006 7.2 Analysis on Installed Capacity of China Hydropower Changes, 2007-2008 7.3 Analysis on the Changes of China Hydropower Generation, 2007-2008 7.4 Analysis on Hydropower Production, 2007-2008 7.4.1 Index of General Economic Operation 7.4.2 Analysis on Hydropower Production in Different Area 7.4.3 Analysis on different ownership enterprises 7.4.4 Analysis on enterprises with different scale 7.5 Main Problems in Hydropower Generation in China
Section 8 Forecast & Analysis on Supply & Demand in China Hydropower Market, 2007-2008 8.1 Forecast & Analysis on Market Demand in China Hydropower Market, 2007-2008 8.1.1 Analysis on development trend of power consumption 8.1.2 Analysis on China power demand 8.2 Forecast & Analysis on Non-water Electric Power in China, 2007-2008 8.2.1 Analysis on thermal power supply 8.2.2 Analysis on nuclear power supply 8.2.3 Analysis & Forecast of Wind Power Supply 8.2.4 Analysis & Forecast of Gas power supply 8.2.5 Analysis on thermal power, nuclear power, wind power & gas power generation projects 8.2.6 Analysis on supply & demand of Non-hydropower 8.3 Forecasts of China Demand for Hydropower Market, 2007-2008
Section 9 Analysis on Sales Channel & Marketing Modes of China Hydropower, 2007-2008 9.1 Analysis on Sales Channels of Current Hydropower 9.2 Comparative Analysis on Advantages & Disadvantages of Major Client's Direct Electricity & Bidding 9.3 Relations between Differentiated Pricing & Bidding 9.3.1 Grid price difference between Hydropower & thermal power 9.3.2 Price difference among the hydro-electricity in different regions 9.4 Analysis on Trading Patterns of Different Types of Hydropower 9.4.1 Hydropower station with Comprehensive Utilization mainly & balance generating 9.4.2 Stations integrating power generation, flood control, shipping 9.4.3 Runoff - Hydropower Station 9.4.4 Hydropower stations with regulatory functions over the quarter 9.4.5 Cascade Hydropower 9.5 Analysis on Diversification Trend of Hydropower Sales 9.6 Discussion on the Hydropower onto-grid Discrimination 9.6.1 Status of private Grid utilities & foreign enterprises 9.6.2 China hydropower Grid policies 9.6.3 Main problems of Chinese private & foreign investment in hydropower Grid 9.6.4 Whether discrimination exists in Grid
Section 10 Analysis on China Hydropower onto-grid Price Competition, 2007-2008 10.1 Analysis on China Electricity Price reform 10.2 Analysis on China Power Bidding Status 10.3 Comparison of Costs among Main Power Sources in China 10.3.1 Cost of Thermal Power 10.3.2 Generation Cost of Hydropower 10.3.3 Generation Cost of Nuclear Power 10.3.4 Generation Cost of Wind Power 10.3.5 Generation Cost of Solar Power 10.4 Competitive Advantage of China Hydropower Onto-grid Prices 10.5 Development Trend of China Hydropower Bidding
Section 11 Forecast of China Hydropower Equipment Industry, 2007-2008 11.1 Analysis on Hydropower Equipment Market 11.1.1 Analysis on electrical equipment production growth 11.1.2 Production of power generating equipment 11.2 Development Opportunities of Hydropower Equipment Market 11.2.1 Forecast of Demand for Generating Equipment at home & abroad 11.2.2 Grid planning 11.3 Forecast & Trend of Hydropower Equipment Industry
Section 12 Analysis on China Constructing & Planning Hydropower Projects Scale, 2007-2008 12.1 Scale of China Hydropower 12.2 Proposed Scale of China Hydropower, 2007-2008 12.3 Analysis on Installed Capacity of China Hydropower, 2007-2008
Section 13 Forecast & Analysis on the Competition in China Hydropower Industry, 2007-2008 13.1 Overall Pattern of Competition among China Hydropower Industry 13.1.1 Original "five power companies" further strengthen hydropower 13.1.2 Huge State-owned Enterprises have brought an enormous amount of money into the electricity 13.1.3 Central Electricity Generation's merger with local hydropower enterprises have become the trend 13.1.4 Hydropower Development accelerates 13.2 Analysis on Competitive Groups in China Hydropower Industry 13.2.1 Classification of Competitive Groups in China Hydropower Industry 13.2.2 SWOT 13.3 Forecast of Competition in China Hydropower Industry 13.3.1 Inevitable inter-regional expansion of large enterprises generating 13.3.2 Low-cost advantages of hydropower is gradually emerging 13.3.3 SHP investment prospect 13.3.4 Foreign & private capital enter the hydropower sector investment 13.3.5 Integrated energy companies will become the trend within the next decade
Section 14 Analysis on Regional Development of China Hydropower Industry, 2007-2008 14.1 Analysis on Sichuan Hydropower Development 14.1.1 Water resource & development of Sichuan 14.1.2 Sichuan hydropower development & investment policy 14.1.3 Sichuan Constructing & Planning Hydropower Projects 14.1.4 Sichuan main rivers with much developed value 14.1.5 Sichuan hydropower industry development trend 14.2 Analysis on Hydropower Development in Yunnan 14.2.1 Yunnan water resources & development situation 14.2.2 Yunnan hydropower development & investment policy 14.2.3 Yunnan Constructing & Planning Hydropower Projects 14.2.4 Yunnan main rivers with much developed value 14.2.5 Yunnan hydropower industry development trend 14.3 Analysis on Guizhou Hydropower Development 14.3.1 Guizhou water resources & development situation 14.3.2 Guizhou Constructing & Planning Hydropower Projects 14.3.3 Guizhou main rivers with much developed value 14.3.4 Development trend of Guizhou hydropower industry 14.4 Analysis on Guangxi Hydropower Development 14.4.1 Guangxi water resources & development situation 14.4.2 Guangxi hydropower development & investment policy 14.4.3 Guangxi Constructing & Planning Hydropower Projects 14.4.4 Main rivers with much developed value in Guangxi 14.4.5 Xijiang river system 14.5 Analysis on Hubei Hydropower Development 14.5.1 Hubei water resources & development situation 14.5.2 Hubei hydropower development & investment policy 14.5.3 Hubei main rivers with much developed value 14.5.4 Hubei Constructing & Planning Hydropower Projects 14.5.5 Development trend of Hydropower industry in Hubei 14.6 Analysis on Hunan Hydropower Development 14.6.1 Hunan water resources & development situation 14.6.2 Hunan hydropower development & investment policy 14.6.3 Hunan main rivers with much developed value 14.6.4 Hunan Constructing & Planning Hydropower Projects 14.6.5 Onto-grid & common measure of Hunan Hydropower 14.6.6 Hunan hydropower industry development trend
Section 15 Operation of Key Listing Companies of Hydropower Industry 15.1 China Yangtze Power Co. Ltd. 15.1.1 Basic Situation 15.1.2 Business Situation in Recent Three Years 15.1.3 Plant Distribution & Power Resource Structure 15.1.4 Analysis on Constructing & Planning Projects, 2007-2008 15.1.5 Development Plan during the Period of "Eleventh Five-year Plan" 15.1.6 Business Diversification 15.2 Chongqing Three Gorges Electric Power Co. Ltd. 15.2.1 Basic Situation 15.2.2 Business Situation in Recent Three Years 15.2.3 Plant Distribution & Power Resource Structure 15.2.4 Analysis on Constructing & Planning Projects, 2007-2008 15.2.5 Development Plan during the Period of "Eleventh Five-year Plan" 15.2.6 Business Diversification 15.3 Leshan Electric Power Co. Ltd. 15.3.1 Basic Situation 15.3.2 Business Situation in Recent Three Years 15.3.3 Plant Distribution & Power Resource Structure 15.3.4 Analysis on Constructing & Planning Projects, 2007-2008 15.3.5 Development Plan during the Period of "Eleventh Five-year Plan" 15.3.6 Business Diversification 15.4 Guangxi Guidong Electric Power Co. Ltd. 15.4.1 Basic Situation 15.4.2 Business Situation in Recent Three Years 15.4.3 Plant Distribution & Power Resource Structure 15.4.4 Analysis on Constructing & Planning Projects, 2007-2008 15.4.5 Development Plan during the Period of "Eleventh Five-year Plan" 15.4.6 Business Diversification 15.5 Fujian MingDong Electric Power Co. Ltd. 15.5.1 Basic Situation 15.5.2 Business Situation in Recent Three Years 15.5.3 Plant Distribution & Power Resource Structure 15.5.4 Analysis on Constructing & Planning Projects, 2007-2008 15.5.5 Development Plan during the Period of "Eleventh Five-year Plan" 15.5.6 Business Diversification 15.6 Qianjiang Water Resources Development Co. Ltd. 15.6.1 Basic Situation 15.6.2 Business Situation in Recent Three Years 15.6.3 Plant Distribution & Power Resource Structure 15.6.4 Analysis on Constructing & Planning Projects, 2007-2008 15.6.5 Development Plan during the Period of "Eleventh Five-year Plan" 15.6.6 Business Diversification 15.7 Sichuan Xichang Electric Power Co. Ltd. 15.7.1 Basic Situation 15.7.2 Business Situation in Recent Three Years 15.7.3 Plant Distribution & Power Resource Structure 15.7.4 Analysis on Constructing & Planning Projects, 2007-2008 15.7.5 Development Plan during the Period of "Eleventh Five-year Plan" 15.7.6 Business Diversification 15.8 SiChuan Ming Xing Electric Power Co. Ltd. 15.8.1 Basic Situation 15.8.2 Business Situation in Recent Three Years 15.8.3 Plant Distribution & Power Resource Structure 15.8.4 Analysis on Constructing & Planning Projects, 2007-2008 15.8.5 Development Plan during the Period of "Eleventh Five-year Plan" 15.8.6 Business Diversification 15.9 Guangxi Guiguan Electric Power Co. Ltd. 15.9.1 Basic Situation 15.9.2 Business Situation in Recent Three Years 15.9.3 Plant Distribution & Power Resource Structure 15.9.4 Analysis on Constructing & Planning Projects, 2007-2008 15.9.5 Development Plan during the Period of "Eleventh Five-year Plan" 15.9.6 Business Diversification 15.10 Guizhou Qianyuan Power Co. Ltd. 15.10.1 Basic Situation 15.10.2 Business Situation in Recent Three Years 15.10.3 Plant Distribution & Power Resource Structure 15.10.4 Analysis on Constructing & Planning Projects, 2007-2008 15.10.5 Development Plan during the Period of "Eleventh Five-year Plan" 15.10.6 Business Diversification
Section 16 Analysis on Price Competition for Hydropower in Power Market 16.1 Analysis on Hydropower in Competitive Market 16.2 Participants of Hydropower in the Market adhere to the Principle 16.3 Coordination between Quotation Subject &d Successful Bid Quantity 16.3.1 Quotation of Cascade Station the main way 16.3.2 Coordination of hydropower stations in the competitive market 16.4 Treatment of Consumption Deviation Resulting from Inaccuracies in Hydrological Forecast 16.4.1 Ideas for handling consumption deviation resulting from inaccuracies in hydrological forecast 16.4.2 Treatment of waste water due to unsuccessful bidding in hydropower market
Section 17 Prospect & Forecast of China Hydropower Industry, 2007-2008 17.1 Forecast of Economic Circle of Power Industry 17.2 Forecast of Hydropower Installed Capacity 17.2.1 By 2015, hydropower Installed Capacity in China will reach 150 million KW 17.2.2 By 2020, China hydropower Installed Capacity will reach 250 million KW 17.3 Prediction of Current Power Structure 17.4 Prediction & Analysis on China Water Development ¡¡
Section 18 Investment Risk & Suggestion of China Hydropower Industry, 2007-2008 18.1 Analysis on Cost & Benefit of China Hydropower Industry 18.1.1 Cost Analysis 18.1.2 Benefit Analysis 18.2 Analysis on Investment Opportunity & Risk 18.2.1 Regional Limits & Policy Risk of Small Hydroelectric Projects 18.2.2 Risk of Hydropower's dependence on rainfall & other natural conditions 18.2.3 Risk of environmental restrictions 18.2.4 Risk of the changes in Power supply & demand in the market 18.3 Analysis on Regional Investment 18.3.1 Changjiang River upstream 18.3.2 All rivers in southwest China 18.3.3 Yellow River Upper Reaches 18.4 Investment Strategies
Charts Chart 1 Reserves & Distribution of China Hydro-energy resources Chart 2 Developable Hydro-energy resources in China Chart 3 Twelve Hydropower Bases Chart 4 Twelve Hydropower Bases in China Chart 5 Depth of Main Rivers in Southeast Coast Chart 6 Distribution & Utilization of Global Water Resources Chart 7 Developable Energy in Technology in some countries Chart 8 Dam & Hydropower in some countries, 2005 Chart 9 Number of Global Dams Chart 10 Main Technological Parameters of Global Hydropower Development, 2005 Chart 11 Number & Loss of Enterprises above the scale, Feb-Dec 2006 Chart 12 Product of China Hydropower Industry, Feb-Dec 2006 Chart 13 Product Increasing trend, Feb-Dec 2006 Chart 14 Changes of Installed Capacity for years Chart 15 Comparison between Hydropower & Thermal Power, Jan-Oct 2006 (Unit: 0.1 billion KWH) Chart 16 Hydro Power Generation & Increase Trend for months, 2004-2006 Chart 17 Accumulative Increase of Hydro Power Generation for month, 2004-2006 Chart 18 Assets & Liabilities of Hydropower Industry, Feb-Dec 2006 Unit: Thousand Yuan Chart 19 Cost & Expense of China Hydropower Industry, Feb-Dec 2006 Unit: Thousand Yuan Chart 20 Profit making of Hydropower Industry, Feb-Dec 2006 Unit: Thousand Yuan Chart 21 Main Economic Index of Hydropower Industry, Feb-Dec 2006 Unit: Thousand Yuan Chart 22 Number of enterprises above the scale & their Loss of Hydropower Industry in Different Area, 2006 Chart 23 Liabilities of Hydropower Industry in Different Area, 2006 Unit: Thousand Yuan Chart 24 Profit making of Hydropower Industry in different area, 2006 Unit: Thousand Yuan Chart 25 Number of enterprises above the scale & their Loss of Hydropower Industry in Different ownership, 2006 Chart 26 Assets and Liabilities of different ownership enterprises of hydropower industry, 2006 Chart 27 Profit making situation of enterprises with different ownership in hydropower industry, 2006 Chart 28 Number of enterprises above the scale & loss in hydropower industry, 2006 Unit: Thousand Yuan Chart 29 Liabilities of enterprises with different scale in hydropower industry, 2006 Unit: Thousand Yuan Chart 30 Profit-making situation of enterprises with different scale in hydropower industry, 2006 Unit: Thousand Yuan Chart 31 Forecast on the power consumption in China, 2002-2008 Chart 32 Status of China Thermal Power Industry (Unit: Thousand Yuan), 2006 Chart 33 Project of Yueyang Nuclear Power Station Chart 34 Accumulative generation & increase in the months, 2004-2006 Chart 35 Supply Structure of China Power, 2006 Chart 36 Cost of Thermal Power Chart 37 Cost of Thermal power Chart 38 Generation Cost of Hydropower Chart 39 Generation Cost of Nuclear Power Chart 40 Generation Cost of Wind Power Chart 41 Cost of Wind Power Chart 42 Decreasing Generation Cost of Wind Power Unit: Euro cent/KWH Chart 43 Generation Cost of Solar Power Chart 44 Sales Revenue Increase of Transmission & Transformation Equipment, 2006 Chart 45 Forecast on Increase of Installed Capacity & Generation equipment during "Eleventh Five-year Plan" Chart 46 Annual Changes of Hydropower Installed Capacity Chart 47 Comparisons between the five generation groups, 2005 Chart 48 Sichuan water resources distribution Chart 49 Analysis on market for Sichuan Power transferring to coastal provinces (ten thousand KW) Chart 50 Constructing & Planning Projects in Sichuan Chart 51 Hydropower Development of Main Rivers in Sichuan Chart 52 Constructing & Planning Projects in Yunnan Chart 53 Guizhou Constructing & Planning Hydropower Projects Chart 54 Guangxi Constructing & Planning Hydropower Projects Chart 55 Hubei Constructing & Planning Hydropower Projects Chart 56 Hunan Constructing & Planning Hydropower Projects Chart 57 Assets of China Yangtze Power Co. Ltd., 2006 Chart 58 Profit of China Yangtze Power Co. Ltd., 2006 Chart 59 Generation Power of Three Gorges Station & Gezhouba Station, 2006 Chart 60 Business Status of Chongqing Three Gorges Water Conservancy & Electric Power Co. Ltd., 2006 Chart 61 Business Status of Leshan Electric Power Co. Ltd., 2006 Chart 62 Business Structure of Leshan Electric Power Co. Ltd., 2006 Chart 63 Operating Status of Guangxi Guidong Electric Power Co. Ltd., 2006 Chart 64 Business Structure of Guangxi Guidong Electric Power Co. Ltd., 2006 Chart 65 Business Status of Fujian MingDong Electric Power Co. Ltd., 2006 Chart 66 Business Structure of Fujian MingDong Electric Power Co. Ltd., 2006 Chart 67 Operating Status of Qianjiang Water Resources Development Co. Ltd., 2006 Chart 68 Business Status of Sichuan Xichang Electric Power Co. Ltd., Jan-Sept 2006 Chart 69 Business Status of SiChuan Ming Xing Electric Power Co. Ltd., 2006 Chart 70 Business Structure of SiChuan Ming Xing Electric Power Co. Ltd., Jan-Sept 2006 Chart 71 Business Status of Guangxi Guiguan Electric Power Co. Ltd., 2006 Chart 72 Business Structure of Guangxi Guiguan Electric Power Co. Ltd., Jan-Sept 2006 Unit: Yuan Chart 73 Business status of Guizhou Qianyuan Power Co. Ltd., 2006 Chart 74 Forecast of power source structure in the world, 1999-2020 Unit:1015Btu Chart 75 Increasing Trend of Cost & Expense of China Hydropower Industry, 2006 (1) Chart 76 Increasing Trend of Cost & Expense of China Hydropower Industry, 2006 (2) Chart 77 Cost and Expense Contrast of Small, Middle & Large Size Enterprises of China Hydropower Industry Chart 78 Main Economic Index of Hydropower Industry, 2006 |
|
Companies Mentioned |
- China Yangtze Power Co. Ltd.
- Chongqing Three Gorges Electric Power Co. Ltd.
- Leshan Electric Power Co. Ltd.
- Guangxi Guidong Electric Power Co. Ltd.
- Fujian MingDong Electric Power Co. Ltd.
- Qianjiang Water Resources Development Co. Ltd.
- Sichuan Xichang Electric Power Co. Ltd.
- SiChuan Ming Xing Electric Power Co. Ltd.
- Guangxi Guiguan Electric Power Co. Ltd.
- Guizhou Qianyuan Power Co. Ltd. |
|
Ordering: |
Order Online - visit http://www.researchandmarkets.com/reports/480978
Order by Fax - using the order form below
Order By Post - print the order form below and send to
 |
Research and Markets,
Guinness Centre,
Taylors Lane,
Dublin 8,
Ireland.
|
|
|
 |
Page 1 of 2 Printed 26/11/2009 19:29:14 |
|
Fax Order Form
To place an order via fax simply print this form, fill in the information below and
fax the completed form to
646-607-1907 (from USA) or +353 1 6849977 (from Rest of World). If you have any questions please email help@researchandmarkets.net
Order information
Please verify that the product information is correct and select the format you require.
|
|
|
Product Name: |
2007-2008 Report on the Survey & Forecast of Investment Prospect of Hydropower Industry in China
|
|
Web Address: |
http://www.researchandmarkets.com/reports/480978
|
|
Office Code: |
|
OC8HJNPOUMUXU
|
Report formats
Please enter the quantity of the report format you require.
|
|
Format
|
Quantity
|
Price
|
|
Electronic (PDF)
- Single User
|
|
€1,593.00
|
Contact information
Please enter all the information below in BLOCK CAPITALS.
 |
|
First Name: |
Last Name: |
|
Email Address: |
 |
|
Job Title: |
 |
|
Organisation: |
 |
|
Address: |
 |
|
City: |
 |
|
Postal/Zip Code: |
 |
|
Country: |
 |
|
Phone Number: |
 |
|
Fax Number: |
 |
|
Please fax this form to: (646) 607-1907 or (646) 964-6609 (from USA) +353-1-481-1716 or +353-1-653-1571 (from Rest of World)
 |
Page 2 of 2 Printed 26/11/2009 19:29:14
|
|
Payment information
Please indicate the payment method you would like to use by selecting the appropriate
box.
|
|
|
|
American Express
|
|
Diners Club
|
|
Master Card
|
|
Visa
|
|
|
|
 |
|
Cardholder's Name: |
 |
|
|
|
Cardholder's Signature: |
 |
|
|
|
Expiry Date: |
/  |
|
|
|
Card Number: |
 |
|
|
|
CVV Security Code: |
 |
|
|
|
Issue Date: |
/ (Diners
Club only)
|
|
|
|
 |
Please post the check, accompanied by this form, to:
Research and Markets,
Guinness Centre,
Taylors Lane,
Dublin 8,
Ireland.
|
|
 |
|
 |
Please transfer funds to:
 |
|
Account number: |
83313083 |
|
Sort code: |
98-53-30 |
|
Swift code: |
ULSBIE2D |
|
IBAN number: |
IE78ULSB98533083313083 |
|
Bank Address: |
Ulster Bank,
27-35 Main St,
Blackrock,
Co. Dublin,
Ireland. |
|
|
|
If you have a Marketing Code please enter it below:
|
|
|
Marketing Code: |
 |
|
Please note that by ordering from Research and Markets you are agreeing to our Terms and Conditions at http://www.researchandmarkets.com/info/terms.asp
|
|
Please fax this form to: (646) 607-1907 or (646) 964-6609 (from USA) +353-1-481-1716 or +353-1-653-1571 (from Rest of World)
|
 |
 |
|
|