Power Plant Instrumentation and Control Handbook, Second Edition, provides a contemporary resource on the practical monitoring of power plant operation, with a focus on efficiency, reliability, accuracy, cost and safety. It includes comprehensive listings of operating values and ranges of parameters for temperature, pressure, flow and levels of both conventional thermal power plant and combined/cogen plants, supercritical plants and once-through boilers. It is updated to include tables, charts and figures from advanced plants in operation or pilot stage. Practicing engineers, freshers, advanced students and researchers will benefit from discussions on advanced instrumentation with specific reference to thermal power generation and operations.
New topics in this updated edition include plant safety lifecycles and safety integrity levels, advanced ultra-supercritical plants with advanced firing systems and associated auxiliaries, integrated gasification combined cycle (IGCC) and integrated gasification fuel cells (IGFC), advanced control systems, and safety lifecycle and safety integrated systems.
Table of Contents
I. Introduction 1. Introduction; 2. Fundamental Knowledge about Basic Process; 3. Process Parameters and Ranges
II. Main Equipment 1. Overview of Types, Functions, and Description of Main Equipment; 2. Steam Generator: Boiler; 3. Turbine Types; 4. Generator; 5. Boiler Feed Pump and Condensate Extraction Pump with Associated Measurements; 6. Deaerators and Heaters; 7. Function and Description of CW and ACW Systems; 8. Demineralizing Plant's Function and Description; 9. Basic System Functions and Description of Coal Handling; 10. Basic System Functions and Description of ASH Handling
III. Plant P&ID Discussions 1. Introduction (P&ID); 2. Main Steam (P&ID); 3. Reheat Steam (P&IDs): Cold and Hot Reheat; 4. Extraction Steam (P&IDs): Bleed Steam; 5. Auxiliary Steam (P&IDs); 6. Feed Water System (P&ID); 7. Condensate System (P&IDs); 8. Heater Drain and Vent (P&IDs); 9. Air and Flue Gas System (P&IDs); 10. Cogeneration P&ID; 11. Miscellaneous Other Systems (P&ID)
IV. General Instruments 1. Introduction; 2. Pressure Measurement: Various Measuring Points and Range Selection; 3. Temperature Measurement: Various Measuring Points and Range Selection; 4. Flow Measurement, Various Measuring Points, Various Types, and Range Selection; 5. Level Measurement
V. Special Instrument 1. Special Instruments; 2. Vibration and Turbovisory Instruments; 3. Gas Analyzers; 4. Steam and Water Analysis System; 5. Sample Conditioning System; 6. Blow Down and Dosing Control; 7. Analyzers for Air Pollution Monitoring and Control (NOX Control)
VI. Final Control Element 1. Valves and Actuators; 2. Control Valve Types; 3. Dampers and Miscellaneous other FCEs; 4. Actuators; 5. Accessories
VII. Intelligent Control System 1. Basics (Discussion on Intelligent Network System); 2. PLC System: Introduction; 3. Annunciation and Sequence of Events: Preamble; 4. Integrated DCS-DDC MIS: Preamble; 5. MMI and Recording: Introduction; 6. MIS: Introduction
VIII. Boiler Control System 1. Basic Control Requirements; 2. Steam Pressure Control with Load Index; 3. Air Flow Control; 4. Fuel Flow Control; 5. Coal Mill Control-Mill Air Flow for TT Boiler; 6. Furnace Draft Control; 7. Drum-Level and Feedwater Controls; 8. Superheater Temperature Control; 9. Reheat Temperature Control; 10. Miscellaneous Boiler Controls, including Overfire Air Dampers; 11. HP-LP Bypass System; 12. Boiler OLCS: Introduction to Interlock and Protection of Boiler BMS, SADC, and SB Control
IX. Turbo Generator Control System 1. Introduction; 2. Electro Hydraulic Governor Control System; 3. Turbine Protection System; 4. ATRS; 5. ATT System; 6. Thermal Stress Evaluator; 7. LPBP System; 8. Turbine Controls: Seal Steam Pressure Control System; 9. Hydrogen Seal Oil System and Differential Pressure Control; 10. Generator Control System; 11. Condenser Level and Deaerator Level Control System; 12. Various TG Options and Miscellaneous TG Controls
X. Coordinated Control System 1. Introduction; 2. Coordinate Control Mode; 3. Turbine Follow Mode; 4. Boiler Follow Mode; 5. Run Back System; 6. Discussions and Explanations
XI. Balance of Plant Control System 1. Balance of Plant: Introduction; 2. BFP Recirculation Control; 3. CEP Recirculation Control; 4. GSC Minimum Flow Control; 5. Deaerator (Pressure) Control; 6. LP Heater Level Control; 7. HP Heater Level Control; 8. Ejector Control and TAS
XII. Installation Practices 1. Introduction; 2. Pipe Valve Fitting Material Specification and Rating; 3. Mechanical Installation of Instruments; 4. Electrical Installation of Instruments
XIII: Advanced Ultra-Supercritical Thermal Power Plant and Associated Auxiliaries
XIV: Plant safety life cycle and Safety Integrated level
Appendix I. Process and Mechanical Standard Table; II. Electrical Data and Tables; III. ISA Standard, Materials, Human Engineering, and Control Room; IV. Network Control and Communication; V. Super/Ultra Super Critical Power Plants; VI. Integrated Gasifier and Combined Cycle Plant (Pollution Control); VII. A Few Operational Features of the Unit