+353-1-416-8900REST OF WORLD
+44-20-3973-8888REST OF WORLD
1-917-300-0470EAST COAST U.S
1-800-526-8630U.S. (TOLL FREE)

Taiwan Data Center Construction - Market Share Analysis, Industry Trends & Statistics, Growth Forecasts 2019 - 2029

  • PDF Icon

    Report

  • 120 Pages
  • February 2024
  • Region: Taiwan
  • Mordor Intelligence
  • ID: 5937743
The Taiwan Data Center Market is projected to register a CAGR of 7.03% over the forecast period.

Key Highlights

  • Under Construction IT Load Capacity:The upcoming IT load capacity of the Taiwan data center construction market is expected to reach 304.2 MW by 2029.
  • Under Construction Raised Floor Space: The country's construction of raised floor area is expected to increase 1.5 million sq.ft. by 2029.
  • Planned Racks: The country's total number of racks to be installed is expected to reach 76,040 by 2029. Taipei is expected to house the maximum number of racks over the years.
  • Planned Submarine Cables: There are close to 15 submarine cable systems connecting Taiwan, and many are under construction. One such submarine cable that is estimated to start service in 2024 is Apricot, which stretches over 11,972 Kilometers with landing points from Toucheng to Taiwan.

Taiwan Data Center Construction Market Trends

Taipei is Expected to Remain Major Data Center Hotspot in Taiwan

  • The data center market in Taipei reached an IT load capacity of 171.3 MW in 2022. It is expected to witness a CAGR of 7.03% to reach a capacity of 304.2 MW by 2029.
  • Since more than half of the city's facilities are large, Taipei is the preferred location in the nation for the construction of gigantic data centers. Up to 2029, the city's significant facilities are also anticipated to increase gradually. Up until 2029, Taiwan's medium and small facilities will remain unchanged at 5.18 MW and 1.79 MW, respectively. One of Taiwan's largest economic contributors is Taipei. When compared to other cities, the city has a significant presence of major data centers. The market has seen more changes as a result of increased energy efficiency concerns and the growing acceptance of digitization, both of which go hand in hand.
  • The city's main development areas right now are in the areas of information and communication technology (ICT), biotechnology, general merchandise (wholesale/retail), financial services, meetings, incentives, conferences, and exhibits (MICE) industries. 3,700 registered foreign firms, or more than half of all foreign investment in Taiwan, are based in Taipei. Taipei City, which also receives 50% of all foreign investment, is home to over 70% of foreign businesses. These developments will make it simpler for data centers to grow, and more racks will need to be added to keep up with demand.


IT and Telecom Market to Hold Significant Market Share

  • With an increase in smartphone users in Taiwan, the demand for telecom services is expected to grow. The use of digital consumer products such as smartphones and the data generated via them may allow telecom companies to securely manage and store large volumes of data and scale up the storage capacity as per their requirements.
  • Furthermore, the 5G mobile data speed in the country was 289.25 Mbps in 2022, which is expected to witness a CAGR of 14.80% during the forecast period to reach 662.0 Mbps by 2029.
  • The adoption of these 5G services is projected to be accelerated by the rising need for high-speed data access for cloud and IoT applications, such as smart home energy management. However, as 5G networks offer faster speeds, higher capacity, and lower latency than 4G LTE networks, the number of 5G subscribers is growing at a quicker rate. In Taiwan, the total number of 5G customers has surpassed 1 million in the five months after the introduction of the technology. By the end of 2021, 5G penetration increased to over 30%.
  • Furthermore, In 2022, a survey by Taiwan Network Information Center revealed that 19 percent of respondents (n=2650) in Taiwan had used 5G. Another 20 percent of respondents expressed willingness to adopt 5G. A majority of survey participants were satisfied with the current 3G/4G Wi-Fi services on the Democratic island.
  • To support telecommunications operators, the Taiwanese government allocated USD 650 million, which was distributed between 2019 and 2022, to subsidize the installation of 5G in the country. Such initiatives are expected to increase demand for data centers in the country.


Taiwan Data Center Construction Industry Overview

The Taiwan Data Center Construction Market is consolidated with significant players, such as AECOM, Legrand, HITEC Power Protection, M+W Group, and CRXCONEC.

In August 2022, Taiwanese telco Chunghwa announced plans to build a data center in Taoyuan City. The company plans to build one basement and five floors above ground on a floor area of about 6,277. The construction is estimated to cost USD 53 million. This is expected to create opportunities for the vendors in the market.

Additional Benefits:

  • The market estimate (ME) sheet in Excel format
  • 3 months of analyst support


This product will be delivered within 2 business days.

Table of Contents

1 INTRODUCTION
1.1 Study Assumption & Market Definition
1.2 Scope of the Study
2 Research Methodology3 Executive Summary4 MARKET INSIGHTS5 Market Overview
6 Industry Attractiveness - Porter's Five Forces Analysis
6.1 Bargaining Power of Suppliers
6.2 Bargaining Power of Buyers
6.3 Threat of New Entrants
6.4 Threat of Substitutes
6.5 Degree of Competition
7 Key Industry Statistics
7.1 Planned/Under Construction IT Load Capacity
7.2 Planned/Under Construction Raised Floor Space
7.3 Planned/Under Construction Racks
7.4 Planned Submarine Cable
8 MARKET DYNAMICS
9 Market Drivers
9.1 Increased Internet Penetration
9.2 Established 'Mobile-First' Landscape Since the Recent Past
10 Market Restraints
10.1 Shortage of Skilled Professionals Presenting a Challenge for Several Contractors
11 MARKET SEGMENTATION
11.1 By Infrastructure
11.1.1 Electrical Infrastructure
11.1.1.1 UPS Systems
11.1.1.2 Other Electrical Infrastructure
11.1.2 Mechanical Infrastructure
11.1.2.1 Cooling Systems
11.1.2.2 Racks
11.1.2.3 Other Mechanical Infrastructure
11.1.3 Other Infrastructure
11.2 By End User
11.2.1 IT & Telecommunication
11.2.2 BFSI
11.2.3 Government
11.2.4 Healthcare
11.2.5 Other End User
12 COMPETITIVE LANDSCAPE
13 Company Profiles
13.1 AECOM
13.2 NTT Communications Corporation
13.3 Fujitsu Ltd
13.4 GTN Data Center
13.5 JLL
13.6 Legrand
13.7 Indosat Tbk PT
13.8 Powerware Systems
13.9 HITEC Power Protection
13.10 Schneider electric Philippines
13.11 PT. Faasri Utama Sakti
13.12 AVO Technology Sdn. Bhd
13.13 Biznet Networks
13.14 Project Planning Service
13.15 M+W Group
13.16 Space DC Pte Ltd
13.17 CRXCONEC
14 INVESTMENT ANALYSIS15 MARKET OPPORTUNITIES AND FUTURE TRENDS

Methodology

Loading
LOADING...