2008 Report on China's Power Grid Construction Product Image

2008 Report on China's Power Grid Construction

  • Published: October 2008
  • Region: China
  • 61 pages
  • Market Avenue

Although Chinas general electricity generation has been increasing by more than 10% almost every year since 2000, the construction of power grids have been unable to satisfy the demand for power. The annual growth rate of Chinas investment in grid construction has often been single digit, and in some years it was only 2%. As a result, there have been frequent blackouts along Chinas coasts since 2002.

To make power grids safe and to improve the efficiency of power transmission, Beijing started paying great attention to the construction of a state grid since 2006. According to the countrys 11th "Five-Year Plan", RMB1,200bn would be invested in grid construction from 2006 through 2010, which means that the average yearly investment is more than RMB240bn, 90% more than in the 10th "Five-Year Plan" period.

One of the major problems for Chinas power industry is that the best resources for power generation are often in remote regions, far from most power consumers. Data show that more than two-thirds of the developable hydropower is in the mountainous Tibet and surrounding areas such as Sichuan and Yunnan provinces, while two-thirds of minable coal resources are in Shanxi, Shaanxi, READ MORE >

Chapter One: Overview of Chinas Electric Power Industry
1.1 Status Quo
1.2 Supply and Demand

Chapter Two: Status Quo of Development of Chinas Power Grid
2.1 General
2.2 Operation

Chapter Three: Major Electric Power Grids in China
3.1 Northwestern China Power Grid
3.1.1 Profile
3.1.2 Construction Targets during the 11th "Five-Year Plan" Period
3.2 Northeastern China Power Grid
3.2.1 Profile
3.2.2 Construction Targets during the 11th "Five-Year Plan" Period
3.3 Central China Power Grid
3.3.1 Profile
3.3.2 Construction Targets during the 11th "Five-Year Plan" Period
3.4 Eastern China Power Grid
3.4.1 Profile
3.4.2 Construction Targets during the 11th "Five-Year Plan" Period
3.5 Northwestern China Power Grid
3.5.1 Profile
3.5.2 Construction Targets during the 11th "Five-Year Plan" Period
3.6 Southern China Power Grid
3.6.1 Profile
3.6.2 Construction Targets during the 11th "Five-Year Plan" Period

Chapter Four: Development of Rural Grid in China
4.1 Status Quo
4.2 Construction Targets during the 11th "Five-Year Plan" Period

Chapter Five: Demand for Equipment by Chinas Grid Construction
5.1 Switches
5.1.1 Status Quo
5.1.2 Forecast for Demand
5.2 Wires and Cables
5.2.1 Status Quo
5.2.2 Forecast for Demand
5.3 Transformers
5.3.1 Status Quo
5.3.2 Forecast for Demand
5.4 Equipment for Grid Control and Protection
5.4.1 Status Quo
5.4.2 Forecast for Demand
5.5 Analysis of Equipment for UHV Power Grid
5.5.1 Status Quo
5.5.2 Forecast for Demand

Chapter Six: Development Trend of Chinas Grid Construction during the 11th "Five-Year Plan" Period
6.1 Trend of Technology
6.1.1 750kV AC Transmission System
6.1.2 DC Transmission Engineering
6.1.3 Flexible AC Transmission System (FACTS) (including Line Series Capacitors Compensation)
6.1.4 Large-Capacity Transformers
6.1.5 Compact Transmission System
6.1.6 Other New Grid Technology
6.2 Trend of the Industry
6.2.1 Outlook
6.2.2 Forecast for Investing in the Industry