+353-1-416-8900REST OF WORLD
+44-20-3973-8888REST OF WORLD
1-917-300-0470EAST COAST U.S
1-800-526-8630U.S. (TOLL FREE)

Data Center Construction Market by Data Center Types, by Design Types, and by Tier Types - Global Forecast to 2019

  • ID: 3009109
  • Report
  • Region: Global
  • 181 Pages
  • Markets and Markets
1 of 6

FEATURED COMPANIES

  • Aecom Technology Corp.
  • Arcadis Nv
  • Balfour Beatty Plc
  • Fluor Corporation
  • Gilbane Inc.
  • Hochtief Ag
  • MORE
Data Center Construction Market by Data Center Types (Colocation, Enterprise, Telecom), by Design Types (Electrical, Mechanical), and by Tier Types (Tier 1, Tier 2, Tier 3, Tier 4) – Global Forecast to 2019

Business demands are continuously growing with technological advancements and increase in the availability of resources. To cater to these increasing business demands, organizations have increased their dependency on IT. In the present scenario, organizations need to have a strong, agile, and cost-effective IT infrastructure in order to cope up with customers’ demands. Even in the datacenter industry, business demands are growing rapidly, with a continuously surging need for efficient and cost-effective data storage. The organizations are increasing their datacenter capacity by building new or expanding existing datacenter, creating direct impact on the datacenter construction market.

Datacenter constructions are playing vital role in various industry verticals as it provides effective management IT equipment. These datacenter constructions help organizations to attain best possible profitability, efficiency and reputation in the datacenter space. The Information Technology (IT) vertical is expected to hold the largest market share of the total datacenter construction market throughout the forecast period of 2014 to 2019 followed by Banking, Financial Services and Insurance (BFSI) vertical. There are huge business opportunities in the Asia-Pacific region, due to presence of emerging economies in this region. However, there is growing trend of providing colocation facilities by vendors in this market.

There are various assumptions that we have taken into consideration for market sizing and forecast exercise. A few of the assumptions include political, economic, social, technological and economic factors. For instance, exchange rates, one of the economic factors, are expected to have a moderate rating of impact on this market. Therefore, dollar fluctuations are expected to not seriously affect the forecasts in the emerging APAC regions.

The report will help the market leaders/new entrants in this market in the following ways:

1. This report covers the datacenter construction market comprehensively by providing the closest approximations of the revenue numbers for the overall market and the sub-segments. The market numbers are further split across the different verticals and regions.

2. This report will help them better understand the competitor and gain more insights to better position their business. There is a separate section on competitive landscape, including competitor ecosystem and competitor portfolio comparison. Besides, there are company profiles of 10 key players in this market. In this section, market internals are provided that can put them ahead of the competitors.

3. The report helps them understand the pulse of the market. The report provides information on key market drivers, restraints, challenges, and opportunities.
READ MORE
Note: Product cover images may vary from those shown
2 of 6

FEATURED COMPANIES

  • Aecom Technology Corp.
  • Arcadis Nv
  • Balfour Beatty Plc
  • Fluor Corporation
  • Gilbane Inc.
  • Hochtief Ag
  • MORE
1 Introduction
1.1 Objectives Of The Study
1.2 Report Description
1.3 Markets Covered
1.4 Stakeholders

2 Research Methodology
2.1 Market Size Estimation
2.2 Market Share Estimation
2.2.1 Key Data Points Taken From Secondary Sources
2.2.2 Key Data Points From Primary Sources
2.2.2.1 Key Industry Insights
2.2.3 Assumptions

3 Executive Summary

4 Premium Insights
4.1 Attractive Market Opportunities In Data center Construction
4.2 Top Three Data Center Types
4.3 Datacenter Constrcution Market Across Various Regions
4.4 Life Cycle Analysis, By Region

5 Market Overview
5.1 Introduction
5.2 Evolution
5.3 Market Segmentation
5.3.1 Market By Datacenter Types
5.3.2 Market By Design Type
5.3.3 Market By Tier Type
5.4 Market Dynamics
5.4.1 Drivers
5.4.1.1 Cost Benefit
5.4.1.2 Colocation Services
5.4.1.3 Cloud
5.4.2 Restraints
5.4.2.1 Huge Investment
5.4.2.2 Scaling High-Bandwidth Network
5.4.3 Opportunities
5.4.3.1 New Datacenter Infrastructure Solutions
5.4.3.2 Colocation Providers

6 Industry Trends
6.1 Value Chain Analysis
6.2 Technology Trends & Standards
6.2.1 Introduction
6.2.2 Infrastructure Standards & Guidelines
6.2.2.1 American National Standards Institute (Ansi)
6.2.2.2 Telecommunication Industry Association (Tia)
6.2.2.3 National Electrical Manufacturers Association (Nema)
6.2.2.4 Canadian Standards Association (Csa)
6.2.2.5 Underwriters Laboratory (Ul)
6.2.2.6 Factory Mutual (Fm) Approved
6.2.2.7 Health Insurance Portability And Accountability Act Of 1996 (Hipaa)
6.2.2.8 Made In Usa (For U.S. Region)

7 Data center Construction: Market, By Datacenter Type
7.1 Introduction
7.2 Colocation
7.2.1 Overview
7.2.2 Market Size And Forecast
7.2.2.1 Market Size And Forecast By Tier Type
7.3 Enterprise
7.3.1 Overview
7.3.2 Market Size And Forecast
7.3.2.1 Market Size And Forecast By Tier Type
7.4 Telecom
7.4.1 Overview
7.4.2 Market Size And Forecast
7.4.2.1 Market Size And Forecast By Tier Type

8 Data center Construction: Market, By Design Type
8.2 Introduction
8.3 Electrical
8.3.1 Overview
8.3.2 Market Size And Forecast
8.3.2.1 Ups
8.3.2.1.1 Market Size And Forecast By Vertical
8.3.2.1.2 Market Size And Forecast By Region
8.3.2.1.3 Market Size And Forecast By Tier Type
8.3.2.2 Batteries
8.3.2.2.1 Market Size And Forecast By Vertical
8.3.2.2.2 Market Size And Forecast By Region
8.3.2.2.3 Market Size And Forecast By Tier Type
8.3.2.3 Generators
8.3.2.3.1 Market Size And Forecast By Vertical
8.3.2.3.2 Market Size And Forecast By Region
8.3.2.3.3 Market Size And Forecast By Tier Type
8.3.2.4 Transfer Switches
8.3.2.4.1 Market Size And Forecast By Vertical
8.3.2.4.2 Market Size And Forecast By Region
8.3.2.4.3 Market Size And Forecast By Tier Type
8.3.2.5 Others (Pdu, General Construction)
8.3.2.5.1 Market Size And Forecast By Vertical
8.3.2.5.2 Market Size And Forecast By Region
8.3.2.5.3 Market Size And Forecast By Tier Type
8.4 Mechanical
8.4.1 Overview
8.4.2 Market Size And Forecast
8.4.2.1 Crac
8.4.2.1.1 Market Size And Forecast By Vertical
8.4.2.1.2 Market Size And Forecast By Region
8.4.2.1.3 Market Size And Forecast By Tier Type
8.4.2.2 Crah
8.4.2.2.1 Market Size And Forecast By Vertical
8.4.2.2.2 Market Size And Forecast By Region
8.4.2.2.3 Market Size And Forecast By Tier Type
8.4.2.3 In-Row Units
8.4.2.3.1 Market Size And Forecast By Vertical
8.4.2.3.2 Market Size And Forecast By Region
8.4.2.3.3 Market Size And Forecast By Tier Type
8.4.2.4 Cooling Equipment
8.4.2.4.1 Market Size And Forecast By Vertical
8.4.2.4.2 Market Size And Forecast By Region
8.4.2.4.3 Market Size And Forecast By Tier Type
8.4.2.5 Others (Pumps, Filters, And Belts)
8.4.2.5.1 Market Size And Forecast By Vertical
8.4.2.5.2 Market Size And Forecast By Region
8.4.2.5.3 Market Size And Forecast By Tier Type

9 Data center Construction: Market, By Tier Type
9.1 Introduction
9.2 Tier 1
9.2.1 Overview
9.2.2 Market Size And Forecast
9.2.2.1 Market Size And Forecast By Region
9.3 Tier 2
9.3.1 Overview
9.3.2 Market Size And Forecast
9.3.2.1 Market Size And Forecast By Region
9.4 Tier 3
9.4.1 Overview
9.4.2 Market Size And Forecast
9.4.2.1 Market Size And Forecast By Region
9.5 Tier 4
9.5.1 Overview
9.5.2 Market Size And Forecast
9.5.2.1 Market Size And Forecast By Region

10 Data center Construction: Market, By Vertical
10.1 Introduction
10.2 Banking Financial Services And Insurance (Bfsi)
10.2.1 Overview
10.2.2 Market Size And Forecast
10.2.2.1 Market Size And Forecast By Region
10.2.2.2 Market Size And Forecast By Datacenter Type
10.2.2.3 Market Size And Forecast By Tier Type
10.3 Public Sector
10.3.1 Overview
10.3.2 Market Size And Forecast
10.3.2.1 Market Size And Forecast By Region
10.3.2.2 Market Size And Forecast By Datacenter Type
10.3.2.3 Market Size And Forecast By Tier Type
10.4 Media And Entertainment
10.4.1 Overview
10.4.2 Market Size And Forecast
10.4.2.1 Market Size And Forecast By Region
10.4.2.2 Market Size And Forecast By Datacenter Type
10.4.2.3 Market Size And Forecast By Tier Type
10.5 IT
10.5.1 Overview
10.5.2 Market Size And Forecast
10.5.2.1 Market Size And Forecast By Region
10.5.2.2 Market Size And Forecast By Datacenter Type
10.5.2.3 Market Size And Forecast By Tier Type
10.6 Healthcare
10.6.1 Overview
10.6.2 Market Size And Forecast
10.6.2.1 Market Size And Forecast By Region
10.6.2.2 Market Size And Forecast By Datacenter Type
10.6.2.3 Market Size And Forecast By Tier Type
10.7 Oil And Energy
10.7.1 Overview
10.7.2 Market Size And Forecast
10.7.2.1 Market Size And Forecast By Region
10.7.2.2 Market Size And Forecast By Datacenter Type
10.7.2.3 Market Size And Forecast By Tier Type
10.8 Manufacturing
10.8.1 Overview
10.8.2 Market Size And Forecast
10.8.2.1 Market Size And Forecast By Region
10.8.2.2 Market Size And Forecast By Datacenter Type
10.8.2.3 Market Size And Forecast By Tier Type
10.9 Other Verticals
10.9.1 Overview
10.9.2 Market Size And Forecast
10.9.2.1 Market Size And Forecast By Region
10.9.2.2 Market Size And Forecast By Datacenter Type
10.9.2.3 Market Size And Forecast By Tier Type

11 Data center Construction: Market, By Region
11.1 Introduction
11.2 North America
11.2.1 Overview
11.2.2 Market Size And Forecast
11.2.2.1 Market Size And Forecast By Datacenter Type
11.3 Europe
11.3.1 Overview
11.3.2 Market Size And Forecast
11.3.2.1 Market Size And Forecast By Datacenter Type
11.4 Asia-Pacific (Apac)
11.4.1 Overview
11.4.2 Market Size And Forecast
11.4.2.1 Market Size And Forecast By Datacenter Type
11.5 Middle East And Africa (Mea)
11.5.1 Overview
11.5.2 Market Size And Forecast
11.5.2.1 Market Size And Forecast By Datacenter Type
11.6 Latin America (La)
11.6.1 Overview
11.6.2 Market Size And Forecast
11.6.2.1 Market Size And Forecast By Datacenter Type

12 Competitive Landscape
12.1 Overview
12.1.1 Ecosystem And Roles
12.2 End-User Landscape
12.2.1 Market Opportunity Analysis
12.2.2 End-User Analysis
12.2.2.1 North American Colocation Market Is Expected To Grow By 15% Annually
12.2.2.2 Modular Datacenter Is Setting New Benchmarks In Efficiency
12.2.2.3 The Space Required For Datacenter Will Surpass 500,000 Square Feet
12.2.2.4 Electricity Prices In The U.S. Is Expected To Rise More Than 21.35% In The Coming 10 Years
12.2.2.5 Mega Datacenter Market Is Expected To Worth $20.55 Billion By 2019
12.3 New Project Launches
12.4 Agreements, Partnerships, Collaborations, And Joint Ventures
12.5 Partnerships And Merger & Acquisitions
12.6 Expansion

13 Company Profiles
13.1 Introduction
13.2 Aecom Technology Corp.
13.2.1 Business Overview
13.2.2 Project Portfolio
13.2.3 Key Strategies
13.2.4 Recent Developments
13.2.5 Swot Analysis
13.2.6 Mnm View
13.3 Skanska Ab
13.3.1 Business Overview
13.3.2 Project Portfolio
13.3.3 Key Strategies
13.3.4 Recent Developments
13.3.5 Swot Analysis
13.3.6 Mnm View
13.4 Jacobs Engineering Group, Inc.
13.4.1 Business Overview
13.4.2 Service Portfolio
13.4.3 Key Strategies
13.4.4 Recent Developments
13.4.5 Swot Analysis
13.4.6 Mnm View
13.5 Arcadis Nv
13.5.1 Business Overview
13.5.2 Project Portfolio
13.5.3 Key Strategies
13.5.4 Recent Developments
13.5.5 Swot Analysis
13.5.6 Mnm View
13.6 Balfour Beatty Plc
13.6.1 Business Overview
13.6.2 Project Portfolio
13.6.3 Key Strategies
13.6.4 Recent Developments
13.6.5 Swot Analysis
13.6.6 Mnm View
13.7 Ibi Group, Inc.
13.7.1 Business Overview
13.7.2 Project Portfolio
13.7.3 Key Strategies
13.7.4 Recent Developments
13.7.5 Mnm View
13.8 Fluor Corporation
13.8.1 Business Overview
13.8.2 Project Portfolio
13.8.3 Key Strategies
13.8.4 Recent Developments
13.8.5 Mnm View
13.9 Urs Corporation
13.9.1 Business Overview
13.9.2 Project Portfolio
13.9.3 Key Strategies
13.9.4 Recent Developments
13.9.5 Mnm View
13.10 Hochtief Ag
13.10.1 Business Overview
13.10.2 Project Portfolio
13.10.3 Key Strategies
13.10.4 Recent Developments
13.10.5 Mnm View
13.11 Gilbane Inc.
13.11.1 Business Overview
13.11.2 Service Portfolio
13.11.3 Key Strategies
13.11.4 Recent Developments
13.11.5 Mnm View

14 Appendix
14.1 Introducing Rt: Real-Time Market Intelligence
14.2 Available Customizations
14.3 Related Reports

List Of Tables (150 Tables)

Table 1 Global Data center Construction Market: Assumptions
Table 2 Cost Benefit Is Propelling The Growth Of Market
Table 3 Scaling High-Bandwidth Network Is Restraining The Market
Table 4 New Datacenter Infrastructure Solutions Is Paving New Growth Avenues For Players In The Market
Table 5 Global Market Size, By Datacenter Type, 2014–2019 ($Billion)
Table 6 Global Market Growth, By Datacenter Type, 2014–2019 (Y-O-Y %)
Table 7 Colocation Market Size, By Tier Type, 2014–2019 ($Billion)
Table 8 Colocation Market Growth, By Tier Type, 2014–2019 ( Y-O-Y %)
Table 9 Enterprise Market Size, By Tier Type, 2014–2019 ($Billion)
Table 10 Enterprise Market Growth, By Tier Type, 2014–2019 (Y-O-Y %)
Table 11 Telecom Market Size, By Tier Type, 2014–2019 ($Billion)
Table 12 Telecom Market Growth, By Tier Type, 2014–2019 (Y-O-Y %)
Table 13 Global Data center Construction: Market Size , By Design Type, 2014–2019 ($Billion)
Table 14 Global Data center Construction: Market Growth, By Design Type, 2014–2019 (Y-O-Y %)
Table 15 UPS Market Size, By Vertical, 2014–2019 ($Billion)
Table 16 UPS Market Growth, By Vertical, 2014–2019 (Y-O-Y %)
Table 17 UPS Market Size, By Region, 2014–2019 ($Billion)
Table 18 UPS Market Growth, By Region, 2014–2019, (Y-O-Y %)
Table 19 UPS Market Size, By Tier Type, 2014–2019 ($Billion)
Table 20 UPS Market Growth, By Tier Type, 2014–2019, (Y-O-Y %)
Table 21 Batteries Market Size, By Vertical, 2014–2019 ($Billion)
Table 22 Batteries Market Growth, By Vertical, 2014–2019 (Y-O-Y %)
Table 23 Batteries Market Size, By Region, 2014–2019 ($Billion)
Table 24 Batteries Market Growth, By Region, 2014–2019, (Y-O-Y %)
Table 25 Batteries Market Size, By Tier Type, 2014–2019 ($Billion)
Table 26 Batteries Market Growth, By Tier Type, 2014–2019, (Y-O-Y %)
Table 27 Generators Market Size, By Vertical, 2014–2019 ($Billion)
Table 28 Generators Market Growth, By Vertical, 2014–2019 (Y-O-Y %)
Table 29 Generators Market Size, By Region, 2014–2019 ($Billion)
Table 30 Generators Market Growth, By Region, 2014–2019, (Y-O-Y %)
Table 31 Generators Market Size, By Tier Type, 2014–2019 ($Billion)
Table 32 Generators Market Growth, By Tier Type, 2014–2019, (Y-O-Y %)
Table 33 Transfer Switches Market Size, By Vertical, 2014–2019 ($Billion)
Table 34 Transfer Switches Market Growth, By Vertical, 2014–2019 (Y-O-Y %)
Table 35 Transfer Switches Market Size, By Region, 2014–2019 ($Billion)
Table 36 Transfer Switches Market Growth, By Region, 2014–2019, (Y-O-Y %)
Table 37 Transfer Switches Market Size, By Tier Type, 2014–2019 ($Billion)
Table 38 Transfer Switches Market Growth, By Tier Type, 2014–2019, (Y-O-Y %)
Table 39 Others (Pdu, General Construction) Market Size, By Vertical, 2014–2019 ($Billion)
Table 40 Others (Pdu, General Construction) Market Growth, By Vertical, 2014–2019 (Y-O-Y %)
Table 41 Others (Pdu, General Construction) Market Size, By Region, 2014–2019 ($Billion)
Table 42 Others (Pdu, General Construction) Market Growth, By Region, 2014–2019, (Y-O-Y %)
Table 43 Others (Pdu, General Construction) Market Size, By Tier Type, 2014–2019 ($Billion)
Table 44 Others (Pdu, General Construction) Market Growth, By Tier Type, 2014–2019, (Y-O-Y %)
Table 45 Crac Market Size, By Vertical, 2014–2019 ($Billion)
Table 46 Crac Market Growth, By Vertical, 2014–2019 (Y-O-Y %)
Table 47 Crac Market Size, By Region, 2014–2019 ($Billion)
Table 48 Crac Market Growth, By Region, 2014–2019, (Y-O-Y %)
Table 49 Crac Market Size, By Tier Type, 2014–2019 ($Billion)
Table 50 Crac Market Growth, By Tier Type, 2014–2019, (Y-O-Y %)
Table 51 Crah Market Size, By Vertical, 2014–2019 ($Billion)
Table 52 Crah Market Growth, By Vertical, 2014–2019 (Y-O-Y %)
Table 53 Crah Market Size, By Region, 2014–2019 ($Billion)
Table 54 Crah Market Growth, By Region, 2014–2019, (Y-O-Y %)
Table 55 Crah Market Size, By Tier Type, 2014–2019 ($Billion)
Table 56 Crah Market Growth, By Tier Type, 2014–2019, (Y-O-Y %)
Table 57 In-Row Units Market Size, By Vertical, 2014–2019 ($Billion)
Table 58 In-Row Units Market Growth, By Vertical, 2014–2019 (Y-O-Y %)
Table 59 In-Row Units Market Size, By Region, 2014–2019 ($Billion)
Table 60 In-Row Units Market Growth, By Region, 2014–2019, (Y-O-Y %)
Table 61 In-Row Units Market Size, By Tier Type, 2014–2019 ($Billion)
Table 62 In-Row Units Market Growth, By Tier Type, 2014–2019, (Y-O-Y %)
Table 63 Cooling Equipment Market Size, By Vertical, 2014–2019 ($Billion)
Table 64 Cooling Equipment Market Growth, By Vertical, 2014–2019 (Y-O-Y %)
Table 65 Cooling Equipment Market Size, By Region, 2014–2019 ($Billion)
Table 66 Cooling Equipment Market Growth, By Region, 2014–2019, (Y-O-Y %)
Table 67 Cooling Equipment Market Size, By Tier Type, 2014–2019 ($Billion)
Table 68 Cooling Equipment Market Growth, By Tier Type, 2014–2019, (Y-O-Y %)
Table 69 Others (Pumps, Filters, And Belts) Market Size, By Vertical, 2014–2019 ($Billion)
Table 70 Others (Pumps, Filters, And Belts) Market Growth, By Vertical, 2014–2019 (Y-O-Y %)
Table 71 Others (Pumps, Filters, And Belts) Market Size, By Region, 2014–2019 ($Billion)
Table 72 Others (Pumps, Filters, And Belts) Market Growth, By Region, 2014–2019, (Y-O-Y %)
Table 73 Others (Pumps, Filters, And Belts) Market Size, By Tier Type, 2014–2019 ($Billion)
Table 74 Others (Pumps, Filters, And Belts) Market Growth, By Tier Type, 2014–2019, (Y-O-Y %)
Table 75 Global Data center Construction: Market Size, By Tier Type, 2014–2019 ($Billion)
Table 76 Global Data center Construction: Market Growth, By Tier Type, 2014–2019 (Y-O-Y %)
Table 77 Tier 1 Market Size, By Region, 2014–2019 ($Billion)
Table 78 Tier 1 Market Growth, By Region, 2014–2019 (Y-O-Y %)
Table 79 Tier 2 Market Size, By Region, 2014–2019 ($Billion)
Table 80 Tier 2 Market Growth, By Region, 2014–2019 (Y-O-Y %)
Table 81 Tier 3 Market Size, By Region, 2014–2019 ($Billion)
Table 82 Tier 3 Market Growth, By Region, 2014–2019 (Y-O-Y %)
Table 83 Tier 4 Market Size, By Region, 2014–2019 ($Billion)
Table 84 Tier 4 Market Growth, By Region, 2014–2019 (Y-O-Y %)
Table 85 Global Data center Construction: Market Size , By Vertical, 2014–2019 ($Billion)
Table 86 Global Data center Construction: Market Growth, By Vertical, 2014–2019 (Y-O-Y %)
Table 87 BFSI Market Size, By Region, 2014–2019 ($Billion)
Table 88 BFSI Market Growth, By Region, 2014–2019 (Y-O-Y %)
Table 89 BFSI Market Size, By Datacenter Type, 2014–2019 ($Billion)
Table 90 BFSI Market Growth, By Datacenter Type, 2014–2019 (Y-O-Y %)
Table 91 BFSI Market Size, By Tier Type, 2014–2019 ($Billion)
Table 92 BFSI Market Growth, By Tier Type, 2014–2019 (Y-O-Y %)
Table 93 Public Sector Market Size, By Region, 2014–2019 ($Billion)
Table 94 Public Sector Market Growth, By Region, 2014–2019 (Y-O-Y %)
Table 95 Public Sector Market Size, By Datacenter Type, 2014–2019 ($Billion)
Table 96 Public Sector Market Growth, By Datacenter Type, 2014–2019 (Y-O-Y %)
Table 97 Public Sector Market Size, By Tier Type, 2014–2019 ($Billion)
Table 98 Public Sector Market Growth, By Tier Type, 2014–2019 (Y-O-Y %)
Table 99 Media And Entertainment Market Size, By Region, 2014–2019 ($Billion)
Table 100 Media And Entertainment Market Growth, By Region, 2014–2019 (Y-O-Y %)
Table 101 Media And Entertainment Market Size, By Datacenter Type, 2014–2019 ($Billion)
Table 102 Media And Entertainment Market Growth, By Datacenter Type, 2014–2019 (Y-O-Y %)
Table 103 Media And Entertainment Market Size, By Tier Type, 2014–2019 ($Billion)
Table 104 Media And Entertainment Market Growth, By Tier Type, 2014–2019 (Y-O-Y %)
Table 105 IT Market Size, By Region, 2014–2019 ($Billion)
Table 106 IT Market Growth, By Region, 2014–2019 (Y-O-Y %)
Table 107 IT Market Size, By Datacenter Type, 2014–2019 ($Billion)
Table 108 IT Market Growth, By Datacenter Type, 2014–2019 (Y-O-Y %)
Table 109 IT Market Size, By Tier Type, 2014–2019 ($Billion)
Table 110 IT Market Growth, By Tier Type, 2014–2019 (Y-O-Y %)
Table 111 Healthcare Market Size, By Region, 2014–2019 ($Billion)
Table 112 Healthcare Market Growth, By Region, 2014–2019 (Y-O-Y %)
Table 113 Healthcare Market Size, By Datacenter Type, 2014–2019 ($Billion)
Table 114 Healthcare Market Growth, By Datacenter Type, 2014–2019 (Y-O-Y %)
Table 115 Healthcare Market Size, By Tier Type, 2014–2019 ($Billion)
Table 116 Healthcare Market Growth, By Tier Type, 2014–2019 (Y-O-Y %)
Table 117 Oil & Energy Market Size, By Region, 2014–2019 ($Billion)
Table 118 Oil & Energy Market Growth, By Region, 2014–2019 (Y-O-Y %)
Table 119 Oil & Energy Market Size, By Datacenter Type, 2014–2019 ($Billion)
Table 120 Oil & Energy Market Growth, By Datacenter Type, 2014–2019 (Y-O-Y %)
Table 121 Oil & Energy Market Size, By Tier Type, 2014–2019 ($Billion)
Table 122 Oil & Energy Market Growth, By Tier Type, 2014–2019 (Y-O-Y %)
Table 123 Manufacturing Market Size, By Region, 2014–2019 ($Billion)
Table 124 Manufacturing Market Growth, By Region, 2014–2019 (Y-O-Y %)
Table 125 Manufacturing Market Size, By Datacenter Type, 2014–2019 ($Billion)
Table 126 Manufacturing Market Growth, By Datacenter Type, 2014–2019 (Y-O-Y %)
Table 127 Manufacturing Market Size, By Tier Type, 2014–2019 ($Billion)
Table 128 Manufacturing Market Growth, By Tier Type, 2014–2019 (Y-O-Y %)
Table 129 Other Verticals Market Size, By Region, 2014–2019 ($Billion)
Table 130 Other Verticals Market Growth, By Region, 2014–2019 (Y-O-Y %)
Table 131 Other Verticals Market Size, By Datacenter Type, 2014–2019 ($Billion)
Table 132 Other Verticals Market Growth, By Datacenter Type, 2014–2019 (Y-O-Y %)
Table 133 Other Verticals Market Size, By Tier Type, 2014–2019 ($Billion)
Table 134 Other Verticals Market Growth, By Tier Type, 2014–2019 (Y-O-Y %)
Table 135 Global Data center Construction: Market Size , By Region, 2014–2019 ($Billion)
Table 136 Global Data center Construction: Market Growth, By Region, 2014–2019 (Y-O-Y %)
Table 137 North America: Market Size, By Datacenter Type, 2014–2019 ($Billion)
Table 138 North America: Market Growth, By Datacenter Type, 2014–2019 (Y-O-Y %)
Table 139 Europe: Market Size, By Datacenter Type, 2014–2019 ($Billion)
Table 140 Europe: Market Growth, By Datacenter Type, 2014–2019 (Y-O-Y %)
Table 141 APAC: Market Size, By Datacenter Type, 2014–2019 ($Billion)
Table 142 APAC: Market Growth, By Datacenter Type, 2014–2019 (Y-O-Y %)
Table 143 MEA: Market Size, By Datacenter Type, 2014–2019 ($Billion)
Table 144 MEA: Market Growth, By Datacenter Type, 2014–2019 (Y-O-Y %)
Table 145 Latin America: Market Size, By Datacenter Type, 2014–2019 ($Billion)
Table 146 Latin America: Market Growth, By Datacenter Type, 2014–2019 (Y-O-Y %)
Table 147 New Project Launched, 2010-2014
Table 148 Agreements, Collaborations, And Joint Venture, 2010-2014
Table 149 Partnerships And Merger & Acquisitions, 2010-2014
Table 150 Expansion, 2010-2014

List Of Figures (63 Figures)

Figure 1 Research Methodology
Figure 2 Market Size Estimation Methodology: Bottom-Up Approach
Figure 3 Market Size Estimation Methodology: Top-Down Approach
Figure 4 Break Down Of Primary Interviews: By Company Type, Designation, & Region
Figure 5 Global Data Center Construction: Market, By Datacenter Types, 2014
Figure 6 Attractive Market Opportunities
Figure 7 Colocation Is Expected To Grow At The Fastest Rate Among The Top Three Datacenter Types In The Market
Figure 8 Global Data center Construction: Market Share, 2014
Figure 9 Middle East And Africa Market Soon To Enter Exponential Growth Phase In The Coming Years
Figure 10 Evolution Of Datacenter
Figure 11 Data Center Construction, Market Segmentation: By Datacenter Types
Figure 12 Market Segmentation: By Design Type
Figure 13 Market Segmentation: By Tier Type
Figure 14 Cost Benefit Is Propelling The Growth Of Market
Figure 15 Data Center Construction: Market Drivers & Restraints
Figure 16 Value Chain Analysis (2014): Major Value Is Added During Product Development Phase
Figure 17 Global Market Growth, By Datacenter Type, 2014–2019 (Y-O-Y %)
Figure 18 Colocation Market, 2014–2019 ($Billion, Y-O-Y %)
Figure 19 Enterprise Market, 2014–2019 ($Billion, Y-O-Y %)
Figure 20 Telecom Market, 2014–2019 ($Billion, Y-O-Y %)
Figure 21 Global Market Growth, By Design Type, 2014–2019 (Y-O-Y %)
Figure 22 Electrical Market, 2014–2019 ($Billion, Y-O-Y %)
Figure 23 Mechanical Market, 2014–2019 ($Billion, Y-O-Y %)
Figure 24 Global Data center Construction: Market Growth, By Tier Type, 2014–2019 (Y-O-Y %)
Figure 25 Data Center Construction: Tier 1 Market, 2014–2019 ($Billion, Y-O-Y %)
Figure 26 Tier 2 Market, 2014–2019 ($Billion, Y-O-Y %)
Figure 27 Tier 3 Market, 2014–2019 ($Billion, Y-O-Y %)
Figure 28 Tier 4 Market, 2014–2019 ($Billion, Y-O-Y %)
Figure 29 Global Data center Construction: Market Growth, By Vertical, 2014–2019 (Y-O-Y %)
Figure 30 BFSI Market, 2014–2019 ($Billion, Y-O-Y %)
Figure 31 Public Sector Market, 2014–2019 ($Billion, Y-O-Y %)
Figure 32 Media And Entertainment Market, 2014–2019 ($Billion, Y-O-Y %)
Figure 33 IT Market, 2014–2019 ($Billion, Y-O-Y %)
Figure 34 Healthcare Market, 2014–2019 ($Billion, Y-O-Y %)
Figure 35 Oil & Energy Market, 2014–2019 ($Billion, Y-O-Y %)
Figure 36 Manufacturing Market, 2014–2019 ($Billion, Y-O-Y %)
Figure 37 Data center Construction: Other Verticals Market, 2014–2019 ($Billion, Y-O-Y %)
Figure 38 Global Data center Construction Market Growth, By Region, 2014–2019 (Y-O-Y %)
Figure 39 North America: Market, 2014–2019 ($Billion, Y-O-Y %)
Figure 40 Europe: Market, 2014–2019 ($Billion, Y-O-Y %)
Figure 41 APAC: Market, 2014–2019 ($Billion, Y-O-Y %)
Figure 42 MEA: Market, 2014–2019 ($Billion, Y-O-Y %)
Figure 43 Latin America: Market, 2014–2019 ($Billion, Y-O-Y %)
Figure 44 Companies Adopted Project Joint Venture As The Key Growth Strategy Over The Last Three Years
Figure 45 Arcadis Nv And Aecom Grew At The Fastest Rate Between 2009 - 2013
Figure 46 Data Center Construction: Ecosystem
Figure 47 Data Center Construction: Market Opportunity Plot
Figure 48 Geographic Revenue Mix Of Top 5 Market Players
Figure 49 Aecom Technology Corp.: Business Overview
Figure 50 Swot Analysis
Figure 51 Skanska Ab : Business Overview
Figure 52 Swot Analysis
Figure 53 Jacobs Engineering Group, Inc.: Business Overview
Figure 54 Swot Analysis
Figure 55 Arcadis Nv: Business Overview
Figure 56 Swot Analysis
Figure 57 Balfour Beatty Plc: Business Overview
Figure 58 Swot Analysis
Figure 59 Ibi Group, Inc.: Business Overview
Figure 60 Fluor Corporation: Business Overview
Figure 61 Urs Corporation: Business Overview
Figure 62 Hochtief Ag: Business Overview
Figure 63 Gilbane Inc.: Business Overview
Note: Product cover images may vary from those shown
3 of 6

Loading
LOADING...

4 of 6
5 of 6
- Aecom Technology Corp.
- Arcadis Nv
- Balfour Beatty Plc
- Fluor Corporation
- Gilbane Inc.
- Hochtief Ag
- Ibi Group, Inc.
- Jacobs Engineering Group, Inc.
- Skanska Ab
- Urs Corporation
Note: Product cover images may vary from those shown
6 of 6
Note: Product cover images may vary from those shown
Order Online - visit: https://www.researchandmarkets.com/reports/3009109
Adroll
adroll