+353-1-416-8900REST OF WORLD
+44-20-3973-8888REST OF WORLD
1-917-300-0470EAST COAST U.S
1-800-526-8630U.S. (TOLL FREE)

PRINTER FRIENDLY

Data Center Construction Market in Latin America 2016-2020- Product Image

Data Center Construction Market in Latin America 2016-2020

  • ID: 3619096
  • Report
  • February 2016
  • Region: Latin America
  • 73 pages
  • TechNavio

Enquire about COVID-19 updates for this product.

Enquire Now

FEATURED COMPANIES

  • Aceco TI
  • AECOM
  • Analógica
  • Constructora Sudamericana
  • Fluor
  • Holder Construction
About Data Center Construction Market in Latin America

Data centers are used to house enterprise IT infrastructure. They are the backbone of essential business operations. The demand for cloud-based services and the growth of the Internet of Things (IoT) are prompting enterprises in Latin America to construct data centers to gain a competitive edge. Complexities associated with business applications have increased because of enormous growth in data volumes, triggering an increased need for the construction and renovation of data centers. In addition, enterprises in Latin America are focusing on the construction of green data center facilities to reduce power consumption and carbon dioxide emissions.

The construction of a data center encompasses design, architecture, installation of electrical and mechanical systems, and incorporation of security mechanisms. Infrastructure certifications play a vital role in the building of data center facilities.

The analysts forecast the data center construction market in Latin America to grow at a CAGR of 14.77% during the period 2016-2020.

Covered in this report
The report covers the present scenario and the growth prospects of the data center construction market in Latin America for 2015-2020. To calculate the market size, the report considers the revenue generated from new data center construction and renovation of data centers.

The market is divided into the following segments based on construction type:
- Electrical construction
- Mechanical construction
- General construction

The report, Data Center Construction Market in Latin America 2016-2020, has been prepared based on an in-depth market analysis with inputs from industry experts. The report covers the market landscape and its growth prospects over the coming years. The report also includes a discussion of the key vendors operating in this market.

Key vendors
- Aceco TI
- AECOM
- Analógica
- Constructora Sudamericana
- Turner Construction

Other prominent vendors
- Fluor
- Jacobs Engineering
- Holder Construction
- Mortenson Construction

Market drivers
- Growing adoption of cloud-based services
- For a full, detailed list, view the full report

Market challenges
- Lack of infrastructure expertise
- For a full, detailed list, view the full report

Market trends
- Green data center
- For a full, detailed list, view the full report

Key questions answered in this report
- What will the market size be in 2020 and what will the growth rate be?
- What are the key market trends?
- What is driving this market?
- What are the challenges to market growth?
- Who are the key vendors in this market space?
- What are the market opportunities and threats faced by the key vendors?
- What are the strengths and weaknesses of the key vendors?

You can request one free hour of our analyst’s time when you purchase this market report. Details are provided within the report.
Note: Product cover images may vary from those shown

FEATURED COMPANIES

  • Aceco TI
  • AECOM
  • Analógica
  • Constructora Sudamericana
  • Fluor
  • Holder Construction
PART 01: Executive summary
  • Highlights
PART 02: Scope of the report
  • Market overview
  • Top-vendor offerings
PART 03: Market research methodology
  • Research methodology
  • Economic indicators
PART 04: Introduction
  • Key market highlights
PART 05: Market landscape
  • Market overview
  • Market size and forecast
  • Five forces analysis
PART 06: Market segmentation by electrical construction
  • UPS systems
  • Energy storage equipment
  • Generators
  • Transfer switches
  • Others
PART 07: Market segmentation by mechanical construction
  • Cooling solutions
  • Racks
  • Other
PART 08: Market segmentation by general construction

PART 09: Market segmentation by tier standards
  • Tier 1
  • Tier 2
  • Tier 3
  • Tier 4
PART 10: Market drivers

PART 11: Impact of drivers

PART 12: Market challenges

PART 13: Impact of drivers and challenges

PART 14: Market trends

PART 15: Vendor landscape
  • Aceco TI
  • AECOM
  • Analógica
  • Constructora Sudamericana
  • Turner Construction
  • Other prominent vendors
PART 16: Appendix
  • List of abbreviations
PART 17: About the Author

LOE
Exhibit 01: Scope of the report
Exhibit 02: Product offerings
Exhibit 03: Data center construction project flow
Exhibit 04: Data center construction market in Latin America 2015-2020 ($ billions)
Exhibit 05: New data center construction market in Latin America 2015-2020 ($ billions)
Exhibit 06: Data center renovation market in Latin America 2015-2020 ($ millions)
Exhibit 07: Type of data center construction
Exhibit 08: Data center construction market in Latin America by construction type 2015-2020 ($ billions)
Exhibit 09: Five forces analysis
Exhibit 10: Data center construction market in Latin America by electrical construction 2015-2020 ($ billions)
Exhibit 11: Data center construction market in Latin America by electrical construction 2015-2020 ($ millions)
Exhibit 12: Data center construction market in Latin America by UPS systems 2015-2020 ($ millions)
Exhibit 13: Data center construction market in Latin America by energy storage equipment 2015-2020 ($ millions)
Exhibit 14: Data center construction market in Latin America by generators 2015-2020 ($ millions)
Exhibit 15: Data center construction market in Latin America by transfer switches and switchgear 2015-2020 ($ millions)
Exhibit 16: Data center construction market in Latin America by other electrical infrastructure 2015-2020 ($ millions)
Exhibit 17: Mechanical infrastructure involved in data center construction
Exhibit 18: Data center construction market in Latin America by mechanical construction 2015-2020 ($ billions)
Exhibit 19: Mechanical infrastructure market for data center construction in Latin America 2015-2020 ($ millions)
Exhibit 20: Data center construction market in Latin America by cooling solutions 2015-2020 ($ millions)
Exhibit 21: Data center construction market in Latin America by racks 2015-2020 ($ millions)
Exhibit 22: Data center construction market in Latin America by other mechanical infrastructure 2015-2020 ($ millions)
Exhibit 23: Work involved in general construction
Exhibit 24: General construction market for data centers in Latin America 2015-2020 ($ billions)
Exhibit 25: Data center tier levels
Exhibit 26: Data center construction market in Latin America by tier standards 2015-2020 ($ billions)
Exhibit 27: Tier 1 and Tier 2 data center construction market in Latin America 2015-2020 ($ millions)
Exhibit 28: Tier 3 data center construction market in Latin America 2015-2020 ($ billions)
Exhibit 29: Tier 4 data center construction market in Latin America 2015-2020 ($ billions)
Exhibit 30: Internet penetration in Latin America by countries
Exhibit 31: Impact of drivers
Exhibit 32: Impact of drivers and challenges
Exhibit 33: Aceco TI: Solutions
Exhibit 34: AECOM: Business segmentation by revenue 2015
Exhibit 35: AECOM: Geographical segmentation by revenue 2014
Exhibit 36: Analógica: Business offerings
Exhibit 37: Constructora Sudamericana: Projects areas
Note: Product cover images may vary from those shown

FEATURED COMPANIES

  • Aceco TI
  • AECOM
  • Analógica
  • Constructora Sudamericana
  • Fluor
  • Holder Construction
New Report Released: – Data Center Construction Market in Latin America 2016-2020

The author of the report recognizes the following companies as the key players in the Data Center Construction Market in Latin America: Aceco TI, AECOM, Analógica, Constructora Sudamericana and Turner Construction.

Other Prominent Vendors in the market are: Fluor, Jacobs Engineering, Holder Construction and Mortenson Construction.

Commenting on the report, an analyst from the research team said: “A green data center uses low-emission building materials, heat pumps, photovoltaics, and evaporative cooling, and creates a sustainable ecosystem through efficient waste recycling mechanisms. Capital investment in a green facility is high, but considering the lower operational costs over a period, such facilities will gain wide acceptance among enterprises in the region, which bodes well for overall market growth.”

According to the report, the countries in Latin America are adopting modern technologies, which would boost their economies and create job opportunities. Cloud computing is considered as an efficient and economical technology by enterprises in Latin America.

Further, the report states that the lack of engineering expertise in the region, especially among countries that lack knowledge in IT infrastructure management, is affecting overall market growth.

The study was conducted using an objective combination of primary and secondary information including inputs from key participants in the industry. The report contains a comprehensive market and vendor landscape in addition to a SWOT analysis of the key vendors.
Note: Product cover images may vary from those shown
- Aceco TI
- AECOM
- Analógica
- Constructora Sudamericana
- Turner Construction
- Fluor
- Jacobs Engineering
- Holder Construction
- Mortenson Construction.
Note: Product cover images may vary from those shown

Loading
LOADING...

Adroll
adroll