+353-1-416-8900REST OF WORLD
+44-20-3973-8888REST OF WORLD
1-917-300-0470EAST COAST U.S
1-800-526-8630U.S. (TOLL FREE)

PRINTER FRIENDLY

Data Center Construction Market in GCC 2016-2020 - Product Image

Data Center Construction Market in GCC 2016-2020

  • ID: 3623675
  • Report
  • Region: GCC
  • 64 pages
  • TechNavio
OFF
1h Free Analyst Time

Speak directly to the analyst to clarify any post sales queries you may have.

1 of 4

FEATURED COMPANIES

  • Arup Associates
  • Edarat
  • Gensler
  • ISG
  • McLaren Construction
  • Mercury MENA
  • MORE
About Data Center Construction Market in GCC

Data centers are used to house enterprise IT infrastructure, and serve as the backbone of essential business operations. The demand for cloud-based services and the growth of the Internet of Things (IoT) are prompting enterprises in the GCC to construct data centers to gain a competitive edge. Complexities associated with business applications have increased because of enormous growth in data volumes, triggering an increased need for the construction and renovation of data centers. In addition, enterprises in the GCC are focusing on building green data center facilities to reduce power consumption and carbon dioxide emissions.

The analysts forecast the data center construction market in the GCC to grow at a CAGR of 19.87% during the period 2016-2020.

Covered in this report

The report covers the present scenario and the growth prospects of the data center construction market in GCC for 2015-2020. To calculate the market size, the report considers the revenue generated from new data center construction and renovation of data centers.

The market is divided into the following segments based on electrical construction:

- UPS
- Energy storage equipment
- Generators
- Transfer switches and switchgear
- Others (PDUs, external lighting, panels, and utility transformers)

The report, Data Center Construction Market in GCC 2016-2020, has been prepared based on an in-depth market analysis with inputs from industry experts. The report covers the market landscape and its growth prospects over the coming years. The report also includes a discussion of the key vendors operating in this market.

Key vendors:

- Arup Associates
- Data Center Technologies - Gulf
- Drake & Scull International
- Edarat
- ISG
- McLaren Construction

Other prominent vendors:

- Gensler
- Mercury MENA
- NOVA
- Syska Hennessy
- Turner Construction

Market drivers

- High demand for cloud-based services
- For a full, detailed list, view the full report

Market challenges

- Lack of infrastructure expertise
- For a full, detailed list, view the full report

Market trends

- Adoption of SDDCs
- For a full, detailed list, view the full report

Key questions answered in this report

- What will the market size be in 2020 and what will the growth rate be?
- What are the key market trends?
- What is driving this market?
- What are the challenges to market growth?
- Who are the key vendors in this market space?
- What are the market opportunities and threats faced by the key vendors?
- What are the strengths and weaknesses of the key vendors?
Note: Product cover images may vary from those shown
2 of 4

FEATURED COMPANIES

  • Arup Associates
  • Edarat
  • Gensler
  • ISG
  • McLaren Construction
  • Mercury MENA
  • MORE
PART 01: Executive summary
  • Highlights
PART 02: Scope of the report
  • Market overview
  • Top-vendor offerings
PART 03: Market research methodology
  • Research methodology
  • Economic indicators
PART 04: Introduction
  • Key market highlights
PART 05: Market landscape
  • Market overview
  • Market size and forecast
  • Five forces analysis
PART 06: Market segmentation by electrical construction
  • UPS systems
  • Energy storage equipment
  • Generators
  • Transfer switches and switchgear
  • Others
PART 07: Market segmentation by mechanical construction
  • Cooling solutions
  • Racks
  • Other
PART 08: Market segmentation by general construction

PART 09: Market segmentation by tier standards
  • Tier 1
  • Tier 2
  • Tier 3
  • Tier 4
PART 10: Market drivers

PART 11: Impact of drivers

PART 12: Market challenges

PART 13: Impact of drivers and challenges

PART 14: Market trends

PART 15: Vendor landscape
  • Arup Associates
  • Data Center Technologies - Gulf
  • Drake & Scull International
  • Edarat
  • ISG
  • McLaren Construction
  • Other prominent vendors
PART 16: Appendix
  • List of abbreviations
PART 17: About Author

List of Exhibits

Exhibit 01: Scope of the report 8
Exhibit 02: Service offerings 9
Exhibit 03: Data center construction project flow
Exhibit 04: Data center construction market in the GCC 2015-2020 ($ billions)
Exhibit 05: New data center construction market in the GCC 2015-2020 ($ billions)
Exhibit 06: Data center renovation market in the GCC 2015-2020 ($ millions)
Exhibit 07: Type of data center construction
Exhibit 08: Data center construction market in the GCC by construction type 2015-2020 ($ billions)
Exhibit 09: Five forces analysis
Exhibit 10: Data center construction market in the GCC by electrical construction 2015-2020 ($ billions)
Exhibit 11: Data center construction market in the GCC by electrical construction 2015-2020 ($ millions)
Exhibit 12: Data center construction market in the GCC by UPS systems 2015-2020 ($ millions)
Exhibit 13: Data center construction market in the GCC by energy storage equipment 2015-2020 ($ millions)
Exhibit 14: Data center construction market in the GCC by generators 2015-2020 ($ millions)
Exhibit 15: Data center construction market in the GCC by transfer switches and switchgear 2015-2020 ($ millions)
Exhibit 16: Data center construction market in the GCC by other electrical infrastructure 2015-2020 ($ millions)
Exhibit 17: Mechanical infrastructure involved in data center construction
Exhibit 18: Data center construction market in the GCC by mechanical construction 2015-2020 ($ billions)
Exhibit 19: Mechanical infrastructure market for data center construction in the GCC 2015-2020 ($ millions)
Exhibit 20: Data center construction market in the GCC by cooling solutions 2015-2020 ($ millions)
Exhibit 21: Data center construction market in the GCC by racks 2015-2020 ($ millions)
Exhibit 22: Data center construction market in the GCC by other mechanical infrastructure 2015-2020 ($ millions)
Exhibit 23: Work involved in general construction
Exhibit 24: General construction market for data centers in the GCC 2015-2020 ($ millions)
Exhibit 25: Data center tier levels
Exhibit 26: Data center construction market in the GCC by tier standards 2015-2020 ($ billions)
Exhibit 27: Tier 1 and Tier 2 data center construction market in the GCC 2015-2020 ($ millions)
Exhibit 28: Tier 3 data center construction market in the GCC 2015-2020 ($ billions)
Exhibit 29: Tier 4 data center construction market in the GCC 2015-2020 ($ millions)
Exhibit 30: Impact of drivers
Exhibit 31: Impact of drivers and challenges
Exhibit 32: Arup Associates: End-markets
Exhibit 33: Drake & Scull International: Business segmentation by revenue 2014
Exhibit 34: Drake & Scull International: Geographical segmentation by revenue 2014
Exhibit 35: Edarat: Business solutions
Exhibit 36: ISG: Business segmentation by revenue 2015
Exhibit 37: McLaren Construction: Business segmentation
Note: Product cover images may vary from those shown
3 of 4

Loading
LOADING...

4 of 4

FEATURED COMPANIES

  • Arup Associates
  • Edarat
  • Gensler
  • ISG
  • McLaren Construction
  • Mercury MENA
  • MORE
New Report Released: – Data Center Construction Market in GCC 2016-2020

The author of the report recognizes the following companies as the key players in the Data Center Construction Market in GCC: Arup Associates, Data Center Technologies – Gulf, Drake & Scull International, Edarat, ISG and McLaren Construction

Other Prominent Vendors in the market are: Gensler, Mercury MENA, NOVA, Syska Hennessy and Turner Construction

Commenting on the report, an analyst from the research team said: “A software-defined data center (SDDC) is a data center where infrastructure is delivered as a service through virtualization of the physical infrastructure; hardware infrastructure is managed through intelligent software systems. SDDC supports both legacy applications and cloud computing services. It improves efficiency, lowers costs, provides applications in minutes, offers higher availability and better security, and creates an opportunity for the delivery of workloads through the cloud.”

According to the report, the number of services offered to end-users through the cloud has seen a marked increase over the past few years. The demand for cloud-based services is growing in GCC, as it aids in improving the overall operational efficiency of enterprises on a local and a global scale.

Further, the report states that lack of infrastructure expertise restricts the market growth.

The study was conducted using an objective combination of primary and secondary information including inputs from key participants in the industry. The report contains a comprehensive market and vendor landscape in addition to a SWOT analysis of the key vendors.
Note: Product cover images may vary from those shown
5 of 4
- Arup Associates
- Data Center Technologies – Gulf
- Drake & Scull International
- Edarat
- ISG
- McLaren Construction
- Gensler
- Mercury MENA
- NOVA
- Syska Hennessy
- Turner Construction
Note: Product cover images may vary from those shown
Adroll
adroll