+353-1-416-8900REST OF WORLD
+44-20-3973-8888REST OF WORLD
1-917-300-0470EAST COAST U.S
1-800-526-8630U.S. (TOLL FREE)

PRINTER FRIENDLY

Data Center Construction Market in Nordics 2016-2020- Product Image
Data Center Construction Market in Nordics 2016-2020- Product Image

Data Center Construction Market in Nordics 2016-2020

  • ID: 3672034
  • Report
  • April 2016
  • Region: Global
  • 82 pages
  • TechNavio

FEATURED COMPANIES

  • AECOM
  • Arup Associates
  • Coromatic
  • DPR Construction
  • Mercury Engineering
  • Rittal
1h Free Analyst Time

Speak directly to the analyst to clarify any post sales queries you may have.

About Data Center Construction Market in Nordic Region

The demand for cloud-based services and the growth of the Internet of Things (IoT) are prompting enterprises in the Nordic region to construct data centers to gain a competitive edge. Complexities associated with business applications have increased due to an exponential growth in data volumes, triggering an increased need for construction and renovation of data centers. In addition, enterprises are focusing on the construction of green data center facilities to reduce power consumption and carbon dioxide emissions.

The analysts forecast the data center construction market in the Nordic region to grow at a CAGR of 22.36% during the period 2016-2020.

Covered in this report
The report covers the present scenario and the growth prospects of the data center construction market in the Nordic region for 2015-2020. To calculate the market size, the report considers the revenue generated from new data center construction (including modular data centers) and renovation of data centers.

The market is divided into the following segments based on electrical construction:
- UPS systems
- Energy storage equipment
- Generators
- Transfer switches and switchgear
- Others

The report, Data Center Construction Market in Nordic Region 2016-2020, has been prepared based on an in-depth market analysis with inputs from industry experts. The report covers the market landscape and its growth prospects over the coming years. The report also includes a discussion of the key vendors operating in this market.

Key vendors
- AECOM
- Arup Associates
- DPR Construction
- Modular Data Centers Stockholm
- Mercury Engineering

Other prominent vendors
- Coromatic
- Nordisk Kombination Arkitekter
- Rittal
- Schneider Electric
- (AST Modular)

Market drivers
- Sustainable operational environment
- For a full, detailed list, view the full report

Market challenges
- Lack of construction expertise
- For a full, detailed list, view the full report

Market trends
- Green data centers
- For a full, detailed list, view the full report

Key questions answered in this report
- What will the market size be in 2020 and what will the growth rate be?
- What are the key market trends?
- What is driving this market?
- What are the challenges to market growth?
- Who are the key vendors in this market space?
- What are the market opportunities and threats faced by the key vendors?
- What are the strengths and weaknesses of the key vendors?

You can request one free hour of our analyst’s time when you purchase this market report. Details are provided within the report.
Note: Product cover images may vary from those shown

FEATURED COMPANIES

  • AECOM
  • Arup Associates
  • Coromatic
  • DPR Construction
  • Mercury Engineering
  • Rittal
PART 01: Executive summary
  • Highlights
PART 02: Scope of the report
  • Market overview
  • Top-vendor offerings
PART 03: Market research methodology
  • Research methodology
  • Economic indicators
PART 04: Introduction
  • Key market highlights
PART 05: Market landscape
  • Market overview
  • Market size and forecast
  • Five forces analysis
PART 06: Market segmentation by electrical construction
  • UPS systems
  • Energy storage equipment
  • Generators
  • Transfer switches and switchgear
  • Others
PART 07: Market segmentation mechanical construction
  • Cooling solutions
  • Racks
  • Other
PART 08: Market segmentation by general construction

PART 09: Market segmentation by tier standards
  • Tier 1
  • Tier 2
  • Tier 3
  • Tier 4
PART 10: Market segmentation by countries
  • Denmark
  • Norway
  • Sweden
  • Finland and Iceland
PART 11: Market drivers

PART 12: Impact of drivers

PART 13: Market challenges

PART 14: Impact of drivers and challenges

PART 15: Market trends

PART 16: Vendor landscape
  • Competitive analysis
  • AECOM
  • Arup Associates
  • DPR Construction
  • MDC Stockholm
  • Mercury Engineering
  • Other prominent vendors
PART 17: Appendix
  • List of abbreviations
PART 18: About the Author

Exhibit 01: Scope of the report
Exhibit 02: Data center site selection criteria
Exhibit 03: Data center construction cost analysis
Exhibit 04: Energy generation versus consumption (TWh)
Exhibit 05: Total energy production versus renewable energy production (TWh)
Exhibit 06: Percentage of renewable energy use
Exhibit 07: Average temperature in Nordic countries (°F)
Exhibit 08: Data center construction project flow
Exhibit 09: Data center construction market in Nordic region 2015-2020 ($ billions)
Exhibit 10: New data center construction market in Nordic region 2015-2020 ($ billions)
Exhibit 11: Data center renovation market in Nordic region 2015-2020 ($ millions)
Exhibit 12: Type of data center construction
Exhibit 13: Data center construction market in Nordic region by construction type 2015-2020 ($ billions)
Exhibit 14: Five forces analysis
Exhibit 15: Data center construction market in Nordic region by electrical construction 2015-2020 ($ billions)
Exhibit 16: Data center construction market in Nordic region by electrical construction 2015-2020 ($ millions)
Exhibit 17: Data center construction market in Nordic region by UPS systems 2015-2020 ($ millions)
Exhibit 18: Data center construction market in Nordics by energy storage equipment 2015-2020 ($ millions)
Exhibit 19: Data center construction market in Nordic region by generators 2015-2020 ($ millions)
Exhibit 20: Data center construction market in Nordic region by transfer switches and switchgear 2015-2020 ($ millions)
Exhibit 21: Data center construction market in Nordic region by other electrical infrastructure 2015-2020 ($ millions)
Exhibit 22: Mechanical infrastructure involved in data center construction
Exhibit 23: Data center construction market in Nordic region by mechanical construction 2015-2020 ($ millions)
Exhibit 24: Mechanical infrastructure market for data center construction in Nordic region 2015-2020 ($ millions)
Exhibit 25: Data center construction market in Nordic region by cooling solutions 2015-2020 ($ millions)
Exhibit 26: Data center construction market in Nordic region by racks 2015-2020 ($ millions)
Exhibit 27: Data center construction market in Nordic region by other mechanical infrastructure 2015-2020 ($ millions)
Exhibit 28: Work involved in general construction
Exhibit 29: General construction market for data centers in Nordic region 2015-2020 ($ billions)
Exhibit 30: Data center tier levels
Exhibit 31: Data center construction market in Nordic region by tier standards 2015-2020 ($ billions)
Exhibit 32: Tier 1 and Tier 2 data center construction market in Nordic region 2015-2020 ($ billions)
Exhibit 33: Tier 3 data center construction market in Nordic region 2015-2020 ($ billions)
Exhibit 34: Tier 4 data center construction market in Nordic region 2015-2020 ($ billions)
Exhibit 35: New data center construction market in Denmark 2015-2020 ($ billions)
Exhibit 36: New data center construction market in Norway 2015-2020 ($ billions)
Exhibit 37: New data center construction market in Sweden 2015-2020 ($ billions)
Exhibit 38: New data center construction market in Finland and Iceland 2015-2020 ($ billions)
Exhibit 39: Impact of drivers
Exhibit 40: Impact of drivers and challenges
Exhibit 41: Service levels offered by vendors
Exhibit 42: AECOM: Business segmentation by revenue 2015
Exhibit 43: AECOM: Geographical segmentation by revenue 2014
Exhibit 44: Arup Associates: End-markets
Exhibit 45: DPR Construction: Business segmentation
Exhibit 46: Mercury Engineering: Business segmentation
Note: Product cover images may vary from those shown

FEATURED COMPANIES

  • AECOM
  • Arup Associates
  • Coromatic
  • DPR Construction
  • Mercury Engineering
  • Rittal
New Report Released: – Data Center Construction Market in the Nordic Region 2016-2020

The author of the report recognizes the following companies as the key players in the Data Center Construction Market in the Nordic Region: AECOM, Arup Associates, DPR Construction, Modular Data Centers Stockholm, and Mercury Engineering.

Other Prominent Vendors in the market are: Coromatic, Nordisk Kombination Arkitekter, Rittal, Schneider Electric (AST Modular).

Commenting on the report, an analyst from the research team said: “Increased carbon emissions and the consumption of electricity in data centers worldwide is creating awareness among enterprises with regard to the construction of green data center facilities. These services help in the operation of energy efficient IT, power, and cooling infrastructure, thereby reducing the electricity consumption and carbon footprint.”

According to the report, many global data center operators like Amazon, Google, Facebook, and Microsoft have established a presence in the Nordic region for data center construction; the area offers benefits in terms of the availability of renewable energy sources and suitable climatic conditions. The region also facilitates the use of free cooling techniques to reduce the heat generated by data center IT infrastructure. In addition, these methods reduce the electricity consumption in data centers.

Further, the report states that the issues related to the lack of local expertise will be resolved over time with the growth of data center construction.

The study was conducted using an objective combination of primary and secondary information including inputs from key participants in the industry. The report contains a comprehensive market and vendor landscape in addition to a SWOT analysis of the key vendors.
Note: Product cover images may vary from those shown
- AECOM
- Arup Associates
- DPR Construction
- Modular Data Centers Stockholm
- Mercury Engineering
- Coromatic
- Nordisk Kombination Arkitekter
- Rittal
- Schneider Electric (AST Modular).
Note: Product cover images may vary from those shown

Loading
LOADING...

Adroll
adroll