+353-1-416-8900REST OF WORLD
+44-20-3973-8888REST OF WORLD
1-917-300-0470EAST COAST U.S
1-800-526-8630U.S. (TOLL FREE)

PRINTER FRIENDLY

Data center Construction Market in US 2016 - Product Image

Data center Construction Market in US 2016

  • ID: 3678050
  • Report
  • Region: United States
  • 83 pages
  • TechNavio
OFF
1h Free Analyst Time

Speak directly to the analyst to clarify any post sales queries you may have.

1 of 4

FEATURED COMPANIES

  • AECOM
  • Clune Construction
  • Fortis Construction
  • Hensel Phelps
  • Jacobs
  • Mortenson Construction
  • MORE
About Data Center Construction Market in the US 2016-2020

The construction of a data center encompasses design, architecture, installation of electrical and mechanical systems, and general building works.

The US is a suitable location for data center construction due to benefits such as low electricity cost, high network connectivity, tax incentives, ease of business operations, and availability of resources.

With the increase in data center construction in the US, investments in network connectivity are expected to grow for continued operational support. State governments are offering tax incentives for enterprises planning to establish a data center presence.

In addition, they are reducing electricity prices for these businesses and promoting the use of renewable energy. Therefore, the generation of renewables, for both commercial and consumer use, is growing to support green initiatives.

The analysts forecast the data center construction market in the US to grow at a CAGR of 4.38% during the period 2016-2020.

Covered in this report

The report covers the present scenario and the growth prospects of the data center construction market in the US for 2016-2020. To calculate the market size, the report considers the revenue generated from the building of new data centers (including modular data center facilities) and the renovation of data centers.

The market is divided into the following segments based on electrical construction:

- UPS
- Energy storage equipment
- Generators
- Transfer switches and switchgear

The report, Data Center Construction Market in the US 2016-2020, has been prepared based on an in-depth market analysis with inputs from industry experts. The report covers the market landscape and its growth prospects over the coming years. The report also includes a discussion of the key vendors operating in this market.

Key vendors

- Corgan Associates
- DPR Construction
- Fluor
- Gensler
- HDR
- Holder Construction
- Jacobs
- Syska Hennessy Group
- Turner Construction Company

Other prominent vendors

- AECOM
- AKF Group
- Balfour Beatty
- Carlson Design Construct
- Clune Construction
- Fortis Construction
- Gilbane
- Hensel Phelps
- HITT Contracting
- Integrated Design Group
- JE Dunn Construction
- McGough
- Merrick & Company
- Mortenson Construction
- Page Southerland Page
- Pepper Construction
- PTS
- Skanska
- Structure Tone
- URS Corporation

Market drivers

- Growth of IoT

Market challenges

- Containerized data centers

Market trends

- Green data centers

Key questions answered in this report:

- What will the market size be in 2020 and what will the growth rate be?
- What are the key market trends?
- What is driving this market?
- What are the challenges to market growth?
- Who are the key vendors in this market space?
- What are the market opportunities and threats faced by the key vendors?
- What are the strengths and weaknesses of the key vendors?
Note: Product cover images may vary from those shown
2 of 4

FEATURED COMPANIES

  • AECOM
  • Clune Construction
  • Fortis Construction
  • Hensel Phelps
  • Jacobs
  • Mortenson Construction
  • MORE
PART 01: Executive summary
  • Highlights
PART 02: Scope of the report
  • Market overview
  • Top-vendor offerings
PART 03: Market research methodology
  • Research methodology
  • Economic indicators
PART 04: Introduction
  • Key market highlights
PART 05: Market landscape
  • Market overview
  • Market size and forecast
  • Five forces analysis
PART 06: Market segmentation by electrical construction
  • UPS systems
  • Energy storage equipment
  • Generators
  • Transfer switches and switchgear
  • Others
PART 07: Market segmentation by mechanical construction
  • Cooling solutions
  • Racks
  • Other
PART 08: Market segmentation by general construction

PART 09: Market segmentation by tier standards
  • Tier 1 and Tier 2
  • Tier 3
  • Tier 4
PART 10: Market drivers

PART 11: Impact of drivers

PART 12: Market challenges

PART 13: Impact of drivers and challenges

PART 14: Market trends

PART 15: Vendor landscape
  • Competitive scenario
  • Other prominent vendors
PART 16: Appendix
  • List of abbreviations
PART 17: About the Author

List of Exhibits

Exhibit 01: Scope of the report
Exhibit 02: Service offerings
Exhibit 03: Data center site selection criteria
Exhibit 04: Data center construction cost analysis
Exhibit 05: Average ambient temperature in US by state (°F)
Exhibit 06: Electricity price for data centers (cents/kWh)
Exhibit 07: Electricity cost in US by state (cents/kWh)
Exhibit 08: Availability of tax incentives for data centers by state
Exhibit 09: Data center construction project flow
Exhibit 10: Data center construction market in US 2015-2020 ($ billions)
Exhibit 11: New data center construction market in US 2015-2020 ($ billions)
Exhibit 12: Data center renovation market in US 2015-2020 ($ billions)
Exhibit 13: Type of data center construction
Exhibit 14: Data center construction market in US by construction type 2015-2020 ($ billions)
Exhibit 15: Five forces analysis
Exhibit 16: Data center construction market in US by electrical construction 2015-2020 ($ billions)
Exhibit 17: Data center construction market in US by electrical construction 2015-2020 ($ millions)
Exhibit 18: Data center construction market in US by UPS systems 2015-2020 ($ billions)
Exhibit 19: Data center construction market in US by energy storage equipment 2015-2020 ($ millions)
Exhibit 20: Data center construction market in US by generators 2015-2020 ($ millions)
Exhibit 21: Data center construction market in US by transfer switches and switchgear 2015-2020 ($ millions)
Exhibit 22: Data center construction market in US by other electrical infrastructure 2015-2020 ($ billions)
Exhibit 23: Mechanical infrastructure involved in data center construction
Exhibit 24: Data center construction market in US by mechanical construction 2015-2020 ($ billions)
Exhibit 25: Mechanical infrastructure market for data center construction in US 2015-2020 ($ millions)
Exhibit 26: Data center construction market in US by cooling solutions 2015-2020 ($ billions)
Exhibit 27: Data center construction market in US by racks 2015-2020 ($ millions)
Exhibit 28: Data center construction market in US by other mechanical infrastructure 2015-2020 ($ billions)
Exhibit 29: Work involved in general construction
Exhibit 30: General construction market for data centers in US 2015-2020 ($ billions)
Exhibit 31: Data center tier levels
Exhibit 32: Data center construction market in US by tier standards 2015-2020 ($ billions)
Exhibit 33: Tier 1 and Tier 2 data center construction market in US 2015-2020 ($ billions)
Exhibit 34: Tier 3 data center construction market in US 2015-2020 ($ billions)
Exhibit 35: Tier 4 data center construction market in US 2015-2020 ($ billions)
Exhibit 36: Impact of drivers
Exhibit 37: Impact of drivers and challenges
Note: Product cover images may vary from those shown
3 of 4

Loading
LOADING...

4 of 4

FEATURED COMPANIES

  • AECOM
  • Clune Construction
  • Fortis Construction
  • Hensel Phelps
  • Jacobs
  • Mortenson Construction
  • MORE
New Report Released: – Data Center Construction Market in the US 2016-2020

The author of the report recognizes the following companies as the key players in the Data Center Construction Market in the US: Corgan Associates, DPR Construction, Fluor, Gensler, HDR, Holder Construction, Jacobs, Syska Hennessy Group, and Turner Construction Company.

Other Prominent Vendors in the market are: AECOM, AKF Group, Balfour Beatty, Carlson Design Construct, Clune Construction, Fortis Construction, Gilbane, Hensel Phelps, HITT Contracting, Integrated Design Group, JE Dunn Construction, McGough, Merrick & Company, Mortenson Construction, Page Southerland Page, Pepper Construction, PTS, Skanska, Structure Tone, and URS Corporation.

Commenting on the report, an analyst from the research team said: “Power consumption among data centers in the US has increased considerably. Therefore, enterprises are seeking to build data centers that consume significantly less power with minimized environmental impact. This trend will gain traction in the near future.”

According to the report, the US government has built many smart cities over the years. The exponential growth of IoT presents challenges in terms of capacity, analytics, and security. Therefore, the need for data centers equipped to deal with these difficulties has increased in the country. It will be a challenging task to process large data volumes generated by connected devices, especially if the data is stored in a single location.

Further, the report states that the adoption of containerized data centers will increase during the forecast period given their benefits. Vendors in the containerized data center market pose a significant threat to those in the traditional data center construction market.

The study was conducted using an objective combination of primary and secondary information including inputs from key participants in the industry. The report contains a comprehensive market and vendor landscape in addition to a SWOT analysis of the key vendors.
Note: Product cover images may vary from those shown
5 of 4
- Corgan Associates
- DPR Construction
- Fluor
- Gensler
- HDR
- Holder Construction
- Jacobs
- Syska Hennessy Group
- Turner Construction Company
- AECOM
- AKF Group
- Balfour Beatty
- Carlson Design Construct
- Clune Construction
- Fortis Construction
- Gilbane
- Hensel Phelps
- HITT Contracting
- Integrated Design Group
- JE Dunn Construction
- McGough
- Merrick & Company
- Mortenson Construction
- Page Southerland Page
- Pepper Construction
- PTS
- Skanska
- Structure Tone
- URS Corporation.
Note: Product cover images may vary from those shown
Adroll
adroll