Summary

Globally, more than 40 refineries witnessed maintenance (planned and unplanned) across 56 units in Q4 2016. Planned maintenance accounted for 60% of the maintenance in the quarter and the remaining was unplanned. Among regions, North America had the highest capacity under both planned and unplanned maintenance. Among countries, the US and Saudi Arabia had the highest capacity under planned maintenance in the quarter. Equipment issues and fire were the major factors for unplanned maintenance globally. Other factors include leakage and power outage.

Scope

- Analysis of capacity under maintenance for crude distillation, coking, fluid catalytic cracking, hydrocracker, hydrotreater and reformer units
- Comparison of select refinery units under maintenance (planned, unplanned and both) by major regions in the world for Q4 2016 and Q4 2015
- Comparison of select refinery units under maintenance (planned, unplanned and both) by PADD regions in the US for both the quarters
- Comparison of select refinery units under maintenance (planned, unplanned and both) by operators for both the quarters
- Comparison of factors responsible for unplanned maintenance globally by region for Q4 2016 and Q4 2015

Reasons to buy

- Keep abreast of major refinery units (crude distillation, coking, fluid catalytic cracking, hydrocracker, hydrotreater and reformer) undergoing maintenance globally
- Obtain information on region-wise maintenance globally for Q4 2016 in comparison with Q4 2015
- Identify and compare PADD regions and operators with highest maintenance in both the quarters
- Facilitate decision making on the basis of strong refinery maintenance data
- Assess your competitor’s refinery maintenance data
READ MORE
Note: Product cover images may vary from those shown
2 of 3
1 Table of Contents
2 Q4 2016 Global Refinery Maintenance Review
2.1 Key Highlights
2.2 Major Outages in Q4 2016
2.3 Major Outages in Q4 2015
2.4 Regional Maintenance Briefs
2.5 Global Refining Capacity under Maintenance by Region, Q4 2016 vis-à-vis Q4 2015
2.5.1 Refining Capacity under Maintenance by Region
2.5.2 Refining Capacity under Planned and Unplanned Maintenance by Region
2.5.3 Factors Responsible for Unplanned Maintenance in the World by Region, Q4 2016 vis-à-vis Q4 2015
2.5.4 Global Outlook of Refining Capacity under Planned Maintenance
2.6 Global Coking Capacity under Maintenance by Region, Q4 2016 vis-à-vis Q4 2015
2.6.1 Coking Capacity under Maintenance by Region
2.6.2 Coking Capacity under Planned and Unplanned Maintenance by Region
2.7 Global Fluid Catalytic Cracking (FCC) Capacity under Maintenance by Region, Q4 2016 vis-à-vis Q4 2015
2.7.1 FCC Capacity under Maintenance by Region
2.7.2 FCC Capacity under Planned and Unplanned Maintenance by Region
2.8 Global Hydrocracker Capacity under Maintenance by Region, Q4 2016 vis-à-vis Q4 2015
2.9 Global Hydrotreater Capacity under Maintenance by Region, Q4 2016 vis-à-vis Q4 2015
2.9.1 Hydrotreater Capacity under Maintenance by Region
2.9.2 Hydrotreater Capacity under Planned and Unplanned Maintenance by Region
2.10 Global Reformer Capacity under Maintenance by Region, Q4 2016 vis-à-vis Q4 2015
2.10.1 Reformer Capacity under Maintenance by Region
2.10.2 Reformer Capacity under Planned and Unplanned Maintenance by Region
2.11 Refining Capacity under Maintenance by Petroleum Administration for Defense Districts (PADD) Regions in the US, Q4 2016 vis-à-vis Q4 2015
2.11.1 Refining Capacity under Maintenance by PADD Regions
2.11.2 Refining Capacity under Planned and Unplanned Maintenance by PADD Regions
2.12 Coking Capacity under Maintenance by PADD Regions in the US, Q4 2016 vis-à-vis Q4 2015
2.12.1 Coking Capacity under Maintenance by PADD Regions
2.12.2 Coking Capacity under Planned and Unplanned Maintenance by PADD Regions
2.13 FCC Capacity under Maintenance by PADD Regions in the US, Q4 2016 vis-à-vis Q4 2015
2.13.1 FCC Capacity under Maintenance by PADD Regions
2.13.2 FCC Capacity under Planned and Unplanned Maintenance by PADD Regions
2.14 Hydrocracker Capacity under Maintenance by PADD Regions in the US, Q4 2016 vis-à-vis Q4 2015
2.15 Hydrotreater Capacity under Maintenance by PADD Regions in the US, Q4 2016 vis-à-vis Q4 2015
2.15.1 Hydrotreater Capacity under Maintenance by PADD Regions
2.15.2 Hydrotreater Capacity under Planned and Unplanned Maintenance by PADD Regions
2.16 Reformer Capacity under Maintenance by PADD Regions in the US, Q4 2016 vis-à-vis Q4 2015
2.16.1 Reformer Capacity under Maintenance by PADD Regions
2.16.2 Reformer Capacity under Planned and Unplanned Maintenance by PADD Regions
2.17 Global Refining Capacity under Maintenance by Operator, Q4 2016 vis-à-vis Q4 2015
2.17.1 Refining Capacity under Maintenance by Operator
2.17.2 Refining Capacity under Planned and Unplanned Maintenance by Operator
2.18 Global Coking Capacity under Maintenance by Operator, Q4 2016 vis-à-vis Q4 2015
2.18.1 Coking Capacity under Maintenance by Operator
2.18.2 Coking Capacity under Planned and Unplanned Maintenance by Operator
2.19 Global FCC Capacity under Maintenance by Operator, Q4 2016 vis-à-vis Q4 2015
2.19.1 FCC Capacity under Maintenance by Operator
2.19.2 FCC Capacity under Planned and Unplanned Maintenance by Operator
2.20 Global Hydrocracker Capacity under Maintenance by Operator, Q4 2016 vis-à-vis Q4 2015
2.21 Global Hydrotreater Capacity under Maintenance by Operator, Q4 2016 vis-à-vis Q4 2015
2.21.1 Hydrotreater Capacity under Maintenance by Operator
2.21.2 Hydrotreater Capacity under Planned and Unplanned Maintenance by Operator
2.22 Global Reformer Capacity under Maintenance by Operator, Q4 2016 vis-à-vis Q4 2015
2.22.1 Reformer Capacity under Maintenance by Operator
2.22.2 Reformer Capacity under Planned and Unplanned Maintenance by Operator
3 Appendix
3.1 Abbreviations
3.2 Methodology
3.2.1 Coverage
3.2.2 Secondary Research
3.3 Disclaimer

1.1 List of Tables

Table 1: Global Outlook of Refining Capacity under Planned Maintenance

1.2 List of Figures

Figure 1: Global Refining Capacity under Maintenance by Region, Q4 2016 vis-à-vis Q4 2015 -
Figure 2: Global Refining Capacity under Planned Maintenance by Region, Q4 2016 vis-à-vis Q4 2015
Figure 3: Global Refining Capacity under Unplanned Maintenance by Region, Q4 2016 vis-à-vis Q4 2015
Figure 4: Factors Responsible for Unplanned Maintenance in North America
Figure 5: Factors Responsible for Unplanned Maintenance in the South America
Figure 6: Factors Responsible for Unplanned Maintenance in Asia
Figure 7: Factors Responsible for Unplanned Maintenance in Middle East
Figure 8: Factors Responsible for Unplanned Maintenance in Europe^
Figure 9: Factors Responsible for Unplanned Maintenance in Africa^
Figure 10: Global Outlook of Refining Capacity under Planned Maintenance by Region (bd)
Figure 11: Global Outlook of Refining Capacity under Planned Maintenance by Operator (bd)
Figure 12: Global Coking Capacity under Maintenance by Region, Q4 2016 vis-à-vis Q4 2015 -
Figure 13: Global Coking Capacity under Planned Maintenance by Region, Q4 2016 vis-à-vis Q4 2015
Figure 14: Global Coking Capacity under Unplanned Maintenance by Region, Q4 2016 vis-à-vis Q4 2015
Figure 15: Global FCC Capacity under Maintenance by Region, Q4 2016 vis-à-vis Q4 2015 -
Figure 16: Global FCC Capacity under Planned Maintenance by Region, Q4 2016 vis-à-vis Q4 2015
Figure 17: Global FCC Capacity under Unplanned Maintenance by Region, Q4 2016 vis-à-vis Q4 2015
Figure 18: Global Hydrotreater Capacity under Maintenance by Region, Q4 2016 vis-à-vis Q4 2015 -
Figure 19: Global Hydrotreater Capacity under Planned Maintenance by Region, Q4 2016 vis-à-vis Q4 2015
Figure 20: Global Hydrotreater Capacity under Unplanned Maintenance by Region, Q4 2016 vis-à-vis Q4 2015^
Figure 21: Global Reformer Capacity under Maintenance by Region, Q4 2016 vis-à-vis Q4 2015 -
Figure 22: Global Reformer Capacity under Planned Maintenance by Region, Q4 2016 vis-à-vis Q4 2015
Figure 23: Global Reformer Capacity under Unplanned Maintenance by Region, Q4 2016 vis-à-vis Q4 2015
Figure 24: Refining Capacity under Maintenance by PADD Regions, Q4 2016 vis-à-vis Q4 2015 -
Figure 25: Refining Capacity under Planned Maintenance by PADD Regions, Q4 2016 vis-à-vis Q4 2015
Figure 26: Refining Capacity under Unplanned Maintenance by PADD Regions, Q4 2016 vis-à-vis Q4 2015
Figure 27: Coking Capacity under Maintenance by PADD Regions, Q4 2016 vis-à-vis Q4 2015 -
Figure 28: Coking Capacity under Planned Maintenance by PADD Regions, Q4 2016 vis-à-vis Q4 2015
Figure 29: Coking Capacity under Unplanned Maintenance by PADD Regions, Q4 2016 vis-à-vis Q4 2015
Figure 30: FCC Capacity under Maintenance by PADD Regions, Q4 2016 vis-à-vis Q4 2015 -
Figure 31: FCC Capacity under Planned Maintenance by PADD Regions, Q4 2016 vis-à-vis Q4 2015
Figure 32: FCC Capacity under Unplanned Maintenance by PADD Regions, Q4 2016 vis-à-vis Q4 2015^
Figure 33: Hydrotreater Capacity under Maintenance by PADD Regions, Q4 2016 vis-à-vis Q4 2015 -
Figure 34: Hydrotreater Capacity under Planned Maintenance by PADD Regions, Q4 2016 vis-à-vis Q4 2015
Figure 35: Hydrotreater Capacity under Unplanned Maintenance by PADD Regions, Q4 2016 vis-à-vis Q4 2015^
Figure 36: Reformer Capacity under Maintenance by PADD Regions, Q4 2016 vis-à-vis Q4 2015 -
Figure 37: Reformer Capacity under Planned Maintenance by PADD Regions, Q4 2016 vis-à-vis Q4 2015^
Figure 38: Reformer Capacity under Unplanned Maintenance by PADD Regions, Q4 2016
Figure 39: Refining Capacity under Maintenance by Operator, Q4 2016 vis-à-vis Q4 2015 -
Figure 40: Refining Capacity under Planned Maintenance by Operator, Q4 2016 vis-à-vis Q4 2015
Figure 41: Refining Capacity under Unplanned Maintenance by Operator, Q4 2016 vis-à-vis Q4 2015
Figure 42: Coking Capacity under Maintenance by Operator, Q4 2016 vis-à-vis Q4 2015 -
Figure 43: Coking Capacity under Planned Maintenance by Operator, Q4 2016 vis-à-vis Q4 2015
Figure 44: Coking Capacity under Unplanned Maintenance by Operator, Q4 2016 vis-à-vis Q4 2015
Figure 45: FCC Capacity under Maintenance by Operator, Q4 2016 vis-à-vis Q4 2015 -
Figure 46: FCC Capacity under Planned Maintenance by Operator, Q4 2016 vis-à-vis Q4 2015^
Figure 47: FCC Capacity under Unplanned Maintenance by Operator, Q4 2016 vis-à-vis Q4 2015
Figure 48: Hydrotreater Capacity under Maintenance by Operator, Q4 2016 vis-à-vis Q4 2015 - ^
Figure 49: Hydrotreater Capacity under Planned Maintenance by Operator, Q4 2016 vis-à-vis Q4 2015^
Figure 50: Hydrotreater Capacity under Unplanned Maintenance by Operator, Q4 2016 vis-à-vis Q4 2015^
Figure 51: Reformer Capacity under Maintenance by Operator, Q4 2016 vis-à-vis Q4 2015 - ^
Figure 52: Reformer Capacity under Planned Maintenance by Operator, Q4 2016 vis-à-vis Q4 2015^
Figure 53: Reformer Capacity under Unplanned Maintenance by Operator, Q4 2016 vis-à-vis Q4 2015^
# Kindly note that some figures in the report might be blank as relevant maintenance activities would not have taken place in Q4 2015 and Q4
Note: Product cover images may vary from those shown
3 of 3

Loading
LOADING...

4 of 3
Note: Product cover images may vary from those shown
Adroll
adroll