+353-1-416-8900REST OF WORLD
+44-20-3973-8888REST OF WORLD
1-917-300-0470EAST COAST U.S
1-800-526-8630U.S. (TOLL FREE)

PRINTER FRIENDLY

Project Insight - Port Construction Projects: Middle East and Africa

  • ID: 4197317
  • Report
  • Region: Africa, Middle East
  • 26 pages
  • GlobalData
1h Free Analyst Time

Speak directly to the analyst to clarify any post sales queries you may have.

1 of 2
Project Insight - Port Construction Projects: Middle East and Africa

Summary

The Middle East - particularly Gulf Cooperation Council (GCC) countries - is a major exporter of petroleum products, and a major exporter and importer of liquefied natural gas (LNG). The improvement in demand for commodities should provide relief for economies in Africa, where dependence on commodities exports is high; this in turn will increase the need for higher capacity ports in the region. Africa, with its population of 1.2 billion, only handles about 6% of the global water-borne traffic and approximately 3% of the world container traffic, so it is overdue for port expansion. Africa has 38 countries with a coastline, and numerous ports located strategically along their coastlines.

The report “Project Insight - Port Construction Projects: Middle East and Africa” provides analysis based on projects showing total project values for the Middle East and Africa and analysis by stage and funding for the top ten countries. The top 50 projects are listed for the region giving country, stage, value of port construction. Ranked listings of the key operators for the sector are also provided showing the leading contractors, consulting engineers and project owners. Country profiles are provided for the top 10 countries including Iran, Tanzania and Mozambique.

Key Findings:
  • The top ten countries in the region by value of port construction projects is led by Iran, with projects valued at US$34.4 billion, followed by Tanzania with a project value of US$15.5 billion. In order of the projects’ value, the top ten countries are Iran, Tanzania, Mozambique, Kuwait, Saudi Arabia, Iraq, Guinea, Qatar, Nigeria and the UAE
  • Projects at the execution stage dominate with a combined value of US$98.6 billion, while those at the planning stage stand at US$41.6 billion. Projects at the pre-execution stage have a value of US$23.4 billion, with a project value of US$3.2 billion at the pre-planning stage
  • Assuming all projects currently in the pipeline proceed as planned, total spending is projected to reach US$22.8 billion in 2020, and will fall to US$11.7 billion in 2023. The highest value of project completions will be in 2021, with a value of US$16.9 billion
  • The highest proportion of projects are funded by public finance, with 56% with the value of projects funded jointly by public/private investment in the MEA accounting for 34% of the total, followed by private funding for projects with 10%
  • The highest value project tracked in the region is the US$30.0 billion Chabahar Port Development in Iran, followed by the US$11.1 billion Bagamoyo Port Development in Nigeria. The Government of Iran, in a joint venture with the Government of India (GoI), has undertaken the construction of Chabahar Port in Sistan and Baluchestan Province, Iran
The report “Project Insight - Port Construction Projects: Middle East and Africa” enables the user to:

Gain insight into the development of the port construction sector
  • Assess all major projects by value, start date, scope and stage of development for the region and top 10 countries to support business development activities
  • Plan campaigns by country based on specific project opportunities and align resources to the most attractive markets
Scope
  • The report provides analysis based on CIC projects showing total project values for the Middle East and Africa and analysis by stage and funding for the top ten countries.
  • The top 50 projects are listed for the region giving country, stage, value of port construction. Ranked listings of the key operators for the sector are also provided showing the leading contractors, consulting engineers and project owners. Country profiles are provided for the top 10 countries including Iran, Tanzania and Mozambique.
Reasons to Buy
  • Gain insight into the development of the port construction sector.
  • Assess all major projects by value, start date, scope and stage of development for the region and top 10 countries to support business development activities.
  • Plan campaigns by country based on specific project opportunities and align resources to the most attractive markets
Note: Product cover images may vary from those shown
2 of 2
1. Overview

2. Project Analytics By Country
2.1. Iran
2.2. Tanzania
2.3. Mozambique
2.4. Kuwait
2.5. Saudi Arabia
2.6. Iraq
2.7. Guinea
2.8. Qatar
2.9. Nigeria
2.10. The UAE

3. About the Author
3.1. At a Glance
3.2. Construction
3.3. Disclaimer
3.4. Contact Us

List of Tables
  • Table 1: Middle East and Africa - Port, Construction Project Pipeline, Value by Country and Stage (US$ million)
  • Table 2: Middle East and Africa - Port, Construction Projects, Top 50 Projects by Value
  • Table 3: Middle East and Africa - Port, Construction Projects, Key Contractors
  • Table 4: Middle East and Africa - Port, Construction Projects, Key Consulting Engineers
  • Table 5: Middle East and Africa - Port, Construction Projects, Key Project Owners
List of Figures
  • Figure 1: Middle East and Africa - Port Construction Project Pipeline, (US$ million)
  • Figure 2: Middle East and Africa - Port, Construction Project Pipeline, Value by Stage (US$ million)
  • Figure 3: Middle East and Africa - Port, Construction Project Pipeline, Projected Spending by Stage (US$ million)
  • Figure 4: Middle East and Africa - Port, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
  • Figure 5: Middle East and Africa - Port, Construction Project Pipeline, Value by Completion Year (US$ million)
  • Figure 6: Middle East and Africa - Port, Construction Project Pipeline, Top 10 Countries by Value and Stage (US$ million)
  • Figure 8: Iran - Port, Construction Project Pipeline, Value by Stage (US$ million)
  • Figure 9: Iran - Port, Construction Project Pipeline, Projected Spending by Stage (US$ million)
  • Figure 10: Iran - Port, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
  • Figure 11: Tanzania - Port, Construction Project Pipeline, Value by Stage (US$ million)
  • Figure 12: Tanzania - Port, Construction Project Pipeline, Projected Spending by Stage (US$ million)
  • Figure 13: Tanzania - Port, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
  • Figure 14: Mozambique - Port, Construction Project Pipeline, Value by Stage (US$ million)
  • Figure 15: Mozambique - Port, Construction Project Pipeline, Projected Spending by Stage (US$ million)
  • Figure 16: Mozambique - Port, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
  • Figure 17: Kuwait - Port, Construction Project Pipeline, Value by Stage (US$ million)
  • Figure 18: Kuwait - Port, Construction Project Pipeline, Projected Spending by Stage (US$ million)
  • Figure 19: Kuwait - Port, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
  • Figure 20: Saudi Arabia - Port, Construction Project Pipeline, Value by Stage (US$ million)
  • Figure 21: Saudi Arabia - Port, Construction Project Pipeline, Projected Spending by Stage (US$ million)
  • Figure 22: Saudi Arabia - Port, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
  • Figure 23: Iraq - Port, Construction Project Pipeline, Value by Stage (US$ million)
  • Figure 24: Iraq - Port, Construction Project Pipeline, Projected Spending by Stage (US$ million)
  • Figure 25: Iraq - Port, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
  • Figure 26: Guinea - Port, Construction Project Pipeline, Value by Stage (US$ million)
  • Figure 27: Guinea - Port, Construction Project Pipeline, Projected Spending by Stage (US$ million)
  • Figure 28: Guinea - Port, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
  • Figure 29: Qatar - Port, Construction Project Pipeline, Value by Stage (US$ million)
  • Figure 30: Qatar - Port, Construction Project Pipeline, Projected Spending by Stage (US$ million)
  • Figure 31: Qatar - Port, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
  • Figure 32: Nigeria - Port, Construction Project Pipeline, Value by Stage (US$ million)
  • Figure 33: Nigeria - Port, Construction Project Pipeline, Projected Spending by Stage (US$ million)
  • Figure 34: Nigeria - Port, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
  • Figure 35: The UAE - Port, Construction Project Pipeline, Value by Stage (US$ million)
  • Figure 36: The UAE - Port, Construction Project Pipeline, Projected Spending by Stage (US$ million)
  • Figure 37: The UAE - Port, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Note: Product cover images may vary from those shown
3 of 2

Loading
LOADING...

Adroll
adroll