Project Insight - Airport Construction Projects: Asia-Pacific

  • ID: 4243535
  • Report
  • 21 pages
  • Timetric
1 of 3
The report provides detailed market analysis, information and insights based on over 240 CIC projects in Asia-Pacific for 32 countries.

The report provides detailed metrics on the region's airport construction projects (as tracked by CIC) split by country, type and value.

Detailed metrics are also provided for the top 10 countries.

Summary:

The Construction Intelligence Center (CIC) is currently tracking airport construction projects in Asia-Pacific with a total value of US$291.2 billion, comprising projects from the announced to execution stages.

The top 10 countries (in terms of the value of their project pipelines) account for 83% of the total value of airport construction projects in Asia-Pacific with US$241.5 billion. These are, in order of project value, China, the Philippines, Vietnam, Hong Kong, India, Australia, Guam, Singapore, Indonesia and South Korea.

Scope:

The report provides analysis based on CIC projects showing total project values for Asia-Pacific and analysis by stage and funding for the top 10 countries. Top project listings and top participants for the sector are also shown.

Reasons To Buy:

Gain insight into the main drivers of activity and forecasts, and an understanding of key trends, analysis of projects by value for the Asia-Pacific market and its main countries, enabling clients to target products and services for each type of project.

Read analysis of main project participants by value for the sector, enabling clients to target products and services for each type of project.

Access top project data with location, value, stage and start date.

Key Highlights:

Projects in the execution stage have a total value of US$134.0 billion, while those in the planning stage amount to US$12.2 billion.

Projects in the pre-execution stage amount to US$40.5 billion followed by projects at the pre-planning stage (announced and study phase) with US$12.2 billion.

Assuming all projects proceed as planned, total annual spending is set to reach US$41.1 billion in 2018, before rising to US$44.8 billion in 2019.
READ MORE
Note: Product cover images may vary from those shown
2 of 3
1. Regional Overview
2. Key Operators
3. Project Analytics by Country
3.1. China
3.2. Philippines
3.3. Vietnam
3.4. Hong Kong
3.5. India
3.6. Australia
3.7. Guam
3.8. Singapore
3.9. Indonesia
3.10. South Korea
4. Methodology
5. Disclaimer

List of Tables:
Table 1: Asia-Pacific - Project Pipeline, Value by Country and Stage (US$ million)
Table 2: Top 50 Projects by Value
Table 3: Key Contractors - Value of Projects
Table 4: Key Consulting Engineers - Value of Projects
Table 5: Key Project Owners - Value of Projects

List of Figures:
Figure 1: Asia-Pacific - Project Pipeline, All Countries’ Value by Stage (US$ million)
Figure 2: Asia-Pacific - Project Pipeline, All Countries’ Projected Annual Spending By Stage and Year of Project Term (US$ million)
Figure 3: Asia-Pacific - Project Pipeline, Top 10 Countries (US$ million)
Figure 4: Asia-Pacific - Project Pipeline, Top 10 Countries by Stage (US$ million)
Figure 5: Asia-Pacific - Project Pipeline, Top 10 Countries Projected Annual Spending by Stage and Year of Project Term (US$ million)
Figure 6: Asia-Pacific - Airport Construction Projects by Funding Mode (% of Total Pipeline Value)
Figure 7: Asia-Pacific - Airport Construction Project Values by Completion Year (US$ million)
Figure 8: China - Airport Construction Projects Pipeline, Value by Stage (US$ million)
Figure 9: China - Airport Projects Pipeline, Projected Annual Spending by Stage and Year of Project Term (US$ million)
Figure 10: China - Airport Construction Projects by Funding Mode (% of Total Pipeline Value)
Figure 11: China - Airport Construction Project Values by Completion Year (US$ million)
Figure 12: Philippines - Airport Construction Projects Pipeline, Value by Stage (US$ million)
Figure 13: Philippines - Airport Projects Pipeline, Projected Annual Spending by Stage and Year of Project Term (US$ million)
Figure 14: Philippines - Airport Construction Projects by Funding Mode (% of Total Pipeline Value)
Figure 15: Philippines - Airport Construction Project Values by Completion Year (US$ million)
Figure 16: Vietnam - Airport Construction Projects Pipeline, Value by Stage (US$ million)
Figure 17: Vietnam - Airport Projects Pipeline, Projected Annual Spending by Stage and Year of Project Term (US$ million)
Figure 18: Vietnam - Airport Construction Projects by Funding Mode (% of Total Pipeline Value)
Figure 19: Vietnam - Airport Construction Project Values by Completion Year (US$ million)
Figure 20: Hong Kong - Airport Construction Projects Pipeline, Value by Stage (US$ million)
Figure 21: Hong Kong - Airport Projects Pipeline, Projected Annual Spending by Stage and Year of Project Term (US$ million)
Figure 22: Hong Kong - Airport Construction Projects by Funding Mode (% of Total Pipeline Value)
Figure 23: Hong Kong - Airport Construction Project Values by Completion Year (US$ million)
Figure 24: India - Airport Construction Projects Pipeline, Value by Stage (US$ million)
Figure 25: India - Airport Projects Pipeline, Projected Annual Spending by Stage and Year of Project Term (US$ million)
Figure 26: India - Airport Construction Projects by Funding Mode (% of Total Pipeline Value)
Figure 27: India - Airport Construction Project Values by Completion Year (US$ million)
Figure 28: Australia - Airport Construction Projects Pipeline, Value by Stage (US$ million)
Figure 29: Australia - Airport Projects Pipeline, Projected Annual Spending by Stage and Year of Project Term (US$ million)
Figure 30: Australia - Airport Construction Projects by Funding Mode (% of Total Pipeline Value)
Figure 31: Australia - Airport Construction Project Values by Completion Year (US$ million)
Figure 32: Guam - Airport Construction Projects Pipeline, Value by Stage (US$ million)
Figure 33: Guam - Airport Projects Pipeline, Projected Annual Spending by Stage and Year of Project Term (US$ million)
Figure 34: Guam - Airport Construction Projects by Funding Mode (% of Total Pipeline Value)
Figure 35: Guam - Airport, Construction Project Values by Completion Year (US$ million)
Figure 36: Singapore - Airport Construction Projects Pipeline, Value by Stage (US$ million)
Figure 37: Singapore - Airport Projects Pipeline, Projected Annual Spending by Stage and Year of Project Term (US$ million)
Figure 38: Singapore - Airport Construction Projects by Funding Mode (% of Total Pipeline Value)
Figure 39: Singapore - Airport Construction Project Values by Completion Year (US$ million)
Figure 40: Indonesia - Airport Construction Projects Pipeline, Value by Stage (US$ million)
Figure 41: Indonesia - Airport Projects Pipeline, Projected Annual Spending by Stage and Year of Project Term (US$ million)
Figure 42: Indonesia - Airport Construction Projects by Funding Mode (% of Total Pipeline Value)
Figure 43: Indonesia - Airport Construction Project Values by Completion Year (US$ million)
Figure 44: South Korea - Airport Construction Projects Pipeline, Value by Stage (US$ million)
Figure 45: South Korea - Airport Projects Pipeline, Projected Annual Spending by Stage and Year of Project Term (US$ million)
Figure 46: South Korea - Airport Construction Projects by Funding Mode (% of Total Pipeline Value)
Figure 47: South Korea - Airport Construction Project Values by Completion Year (US$ million)
Note: Product cover images may vary from those shown
3 of 3

Loading
LOADING...

4 of 3
Note: Product cover images may vary from those shown
Adroll