Project Insight - Stadium and Arena Construction Projects: Middle East and Africa

  • ID: 4313446
  • Report
  • Region: Africa, Middle East
  • 22 pages
  • Timetric
1 of 3
The report provides detailed market analysis, information and insights based on almost 50 CIC projects in the Middle East and Africa market.

The report provides detailed metrics on the region's stadium and arena construction projects (as tracked by CIC) split by country, type and value.

Detailed metrics are also provided for the top 10 countries.

Summary:

The Construction Intelligence Center (CIC) is currently tracking stadia and arena construction projects in MEA with a total value of US$11.7 billion, which includes projects from the announced to execution stages.

The top 10 countries (in terms of the value of their project pipelines) account for 92% of the total value of stadium and arena construction projects in MEA with US$10.7 billion. In order of project value, these are: Qatar, the UAE, the Ivory Coast, Cameroon, Iraq, Ethiopia, Kuwait, Algeria, Bahrain and Uganda.

Scope:

The report provides analysis based on CIC projects showing total project values for the Middle East and Africa market and analysis by stage and funding for the top 10 countries.

Top project listings and top participants for the sector are also shown.

Reasons To Buy:

Gain insight into the main drivers of activity and forecasts, providing an understanding of key trends, analysis of projects by value for the Middle East and Africa market and main countries, enabling clients to target products and services for each type of project.

Analyze main project participants by value for the sector, enabling clients to target products and services for each type of project.

Access top project data, with location, value, stage and start date.

Key Highlights:

Projects at the execution stage have a combined value of US$6.0 billion, while those at the pre-execution stage amount to US$1.4 billion; the pipeline of projects at the planning stage stood at US$4.3 billion, with projects at the pre-planning stage valued at US$25 million.

Qatar leads with the highest value of projects, with US$3.9 billion, followed by the UAE with US$3.6 billion. The Ivory Coast and Cameroon follow, with projects valuing US$540 million and US$476 million respectively
READ MORE
Note: Product cover images may vary from those shown
2 of 3
1. Regional Overview
2. Key Operators
3. Project Analytics by Country
3.1. Qatar
3.2. 2022 Fifa World Cup
3.3. The UAE
3.4. Ivory Coast
3.5. Cameroon
3.6. Iraq
3.7. Ethiopia
3.8. Kuwait
3.9. Algeria
3.10. Bahrain
3.11. Uganda
4. Methodology
5. Disclaimer

List of Tables:
Table 1: MEA - Project Pipeline, Value by Country and Stage (US$ million)
Table 2: Top Projects by Value
Table 3: Key Contractors - Value of Projects
Table 4: Key Consulting Engineers - Value of Projects
Table 5: Key Project Owners - Value of Projects
Table 6: 2022 Fifa World Cup

List of Figures:
Figure 1: MEA - Project Pipeline, All Countries Value by Stage (US$ million)
Figure 2: MEA - Project Pipeline, All Countries Projected Annual Spending by Stage and Year of Project Term (US$ million)
Figure 3: MEA - Project Pipeline, Top 10 Countries (US$ million)
Figure 4: MEA - Project Pipeline, Top 10 Countries by Stage (US$ million)
Figure 5: MEA - Project Pipeline, Top 10 Countries Projected Annual Spending by Stage and Year of Project Term (US$ million)
Figure 6: MEA - Stadia Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 7: MEA - Stadia Construction Projects, Value by Completion Year (US$ million)
Figure 8: Qatar - Stadia Construction Projects Pipeline, Value by Stage (US$ million)
Figure 9: Qatar - Stadia Projects Pipeline, Projected Annual Spending by Stage and Year of Project Term (US$ million)
Figure 10: Qatar - Stadia Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 11: Qatar - Stadia Construction Projects, Value by Completion Year (US$ million)
Figure 12: 2018 FIFA World Cup - Stadia Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 13: 2018 FIFA World Cup - Stadia Construction Projects, Value by Completion Year (US$ million)
Figure 14: UAE - Stadia Construction Projects Pipeline, Value by Stage (US$ million)
Figure 15: UAE - Stadia Projects Pipeline, Projected Annual Spending by Stage and Year of Project Term (US$ million)
Figure 16: UAE - Stadia Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 17: UAE - Stadia Construction Projects, Value by Completion Year (US$ million)
Figure 18: Ivory Coast - Stadia Construction Projects Pipeline, Value by Stage (US$ million)
Figure 19: Ivory Coast - Stadia Projects Pipeline, Projected Annual Spending by Stage and Year of Project Term (US$ million)
Figure 20: Ivory Coast - Stadia Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 21: Ivory Coast - Stadia Construction Projects, Value by Completion Year (US$ million)
Figure 22: Cameroon - Stadia Construction Projects Pipeline, Value by Stage (US$ million)
Figure 23: Cameroon - Stadia Projects Pipeline, Projected Annual Spending by Stage and Year of Project Term (US$ million)
Figure 24: Cameroon - Stadia Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 25: Cameroon - Stadia Construction Projects, Value by Completion Year (US$ million)
Figure 26: Iraq - Stadia Construction Projects Pipeline, Value by Stage (US$ million)
Figure 27: Iraq - Stadia Projects Pipeline, Projected Annual Spending by Stage and Year of Project Term (US$ million)
Figure 28: Iraq - Stadia Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 29: Iraq - Stadia Construction Projects, Value by Completion Year (US$ million)
Figure 30: Ethiopia - Stadia Construction Projects Pipeline, Value by Stage (US$ million)
Figure 31: Ethiopia - Stadia Projects Pipeline, Projected Annual Spending by Stage and Year of Project Term (US$ million)
Figure 32: Ethiopia - Stadia Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 33: Ethiopia - Stadia Construction Projects, Value by Completion Year (US$ million)
Figure 34: Kuwait - Stadia Construction Projects Pipeline, Value by Stage (US$ million)
Figure 35: Kuwait - Stadia Projects Pipeline, Projected Annual Spending by Stage and Year of Project Term (US$ million)
Figure 36: Kuwait - Stadia Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 37: Kuwait - Stadia Construction Projects Value by Completion Year (US$ million)
Figure 38: Algeria - Stadia Construction Projects Pipeline, Value by Stage (US$ million)
Figure 39: Algeria - Stadia Projects Pipeline, Projected Annual Spending by Stage and Year of Project Term (US$ million)
Figure 40: Algeria - Stadia Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 41: Algeria - Stadia Construction Projects, Value by Completion Year (US$ million)
Figure 42: Bahrain - Stadia Construction Projects Pipeline, Value by Stage (US$ million)
Figure 43: Bahrain - Stadia Projects Pipeline, Projected Annual Spending by Stage and Year of Project Term (US$ million)
Figure 44: Bahrain - Stadia Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 45: Bahrain - Stadia Construction Projects, Value by Completion Year (US$ million)
Figure 46: Uganda - Stadia Construction Projects Pipeline, Value by Stage (US$ million)
Figure 47: Uganda - Stadia Projects Pipeline, Projected Annual Spending by Stage and Year of Project Term (US$ million)
Figure 48: Uganda - Stadia Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 49: Uganda - Stadia Construction Projects, Value by Completion Year (US$ million)
Note: Product cover images may vary from those shown
3 of 3

Loading
LOADING...

4 of 3
Note: Product cover images may vary from those shown
Adroll
adroll