Project Insight - Tunnel Construction Projects: Asia-Pacific

  • ID: 4393199
  • Report
  • 22 pages
  • Timetric
1 of 3
The report provides detailed market analysis, information and insights based on 165 CIC projects in the Asia-Pacific market. The report provides detailed metrics on the region's tunnel related construction projects (as tracked by CIC) split by country, type and value. Detailed metrics are also provided for the top 10 countries.

Summary

The Construction Intelligence Center (CIC) is currently tracking tunnel related construction projects in Asia-Pacific with a total value of US$563.8 billion, which includes projects from the announced to execution stages. China accounts for the highest value of the project pipeline, with a value of US$168.6 billion, followed by Japan with projects valued at US$97.4 billion. Australia and India follow, with projects valued at US$72.3 billion and US$68.9 billion respectively.

Scope

The report provides analysis based on CIC projects showing total project values for the Asia-Pacific market and analysis by stage and funding for the top ten countries. Top project listings and top participants for the sector are also shown. Tunnel length and tunnel method eg tunnel boring machine is provided if known.

Reasons To Buy

Providing insight into main drivers of activity and forecasts, providing an understanding of key trends, analysis of projects by value for the Asia-Pacific market and main countries enabling clients to target products and services for each type of project. Analysis of main projects participants by value for the sector enabling clients to target products and services for each type of project. Providing top projects data with location, value, stage and start date.

Key Highlights

The overall projects pipeline is led by the execution stage, with a total value of US$282.6 billion, followed by projects in planning with US$159.1 billion. Projects in the pre-execution stage amount to US$94.1 billion, while those at the pre-planning stage total US$27.8 billion. If all the projects tracked proceed as planned, spending will reach US$87.4 billion in 2019 and will fall to US$58.0 billion in 2021.
READ MORE
Note: Product cover images may vary from those shown
2 of 3
1. Regional Overview
2. Key Operators
3. Project Analytics by Country
3.1. China
3.2. Japan
3.3. Australia
3.4. India
3.5. Singapore
3.6. Hong Kong
3.7. Taiwan
3.8. Indonesia
3.9. Bangladesh
3.10. New Zealand
4. Methodology
5. Disclaimer

List of Tables
Table 1: Asia-Pacific - Tunnel Construction Project Pipeline, Value by Country and Stage (US$ million)
Table 2: Top 50 Tunnel Projects by Value
Table 3: Key Contractors - Value of Projects
Table 4: Key Consulting Engineers - Value of Projects
Table 5: Key Project Owners - Value of Projects

List of Figures
Figure 1: Asia-Pacific - Tunnel Construction Project Pipeline, All Countries Value by Stage (US$ million)
Figure 2: Asia-Pacific - Tunnel Construction Project Pipeline, All Countries Projected Annual Spending by Stage and Year of Project Term (US$ million)
Figure 3: Asia-Pacific - Tunnel Construction Project Pipeline, Top 10 Countries (US$ million)
Figure 4: Asia-Pacific - Tunnel Construction Project Pipeline, Top 10 Countries by Stage (US$ million)
Figure 5: Asia-Pacific - Tunnel Construction Project Pipeline, Top 10 Countries Projected Annual Spending by Stage (US$ million)
Figure 6: Asia-Pacific - Tunnel Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 7: Asia-Pacific - Tunnel Construction Projects, Value by Completion Year (US$ million)
Figure 8: Asia-Pacific - Tunnel Construction Project Pipeline, Length by Stage (Km)
Figure 9: Asia-Pacific - Tunnel Construction Project Pipeline, Top 10 Countries by Stage (Km)
Figure 10: China - Tunnel Construction Projects Pipeline, Value by Stage (US$ million)
Figure 11: China - Tunnel Construction Projects Pipeline, Projected Annual Spending by Stage (US$ million)
Figure 12: China - Tunnel Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 13: China - Tunnel Construction Projects, Value by Completion Year (US$ million)
Figure 14: Japan - Tunnel Construction Projects Pipeline, Value by Stage (US$ million)
Figure 15: Japan - Tunnel Construction Projects Pipeline, Projected Annual Spending by Stage (US$ million)
Figure 16: Japan - Tunnel Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 17: Japan - Tunnel Construction Projects, Value by Completion Year (US$ million)
Figure 18: Australia - Tunnel Construction Projects Pipeline, Value by Stage (US$ million)
Figure 19: Australia - Tunnel Construction Projects Pipeline, Projected Annual Spending by Stage (US$ million)
Figure 20: Australia - Tunnel Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 21: Australia - Tunnel Construction Projects, Value by Completion Year (US$ million)
Figure 22: India - Tunnel Construction Projects Pipeline, Value by Stage (US$ million)
Figure 23: India - Tunnel Construction Projects Pipeline, Projected Annual Spending by Stage (US$ million)
Figure 24: India - Tunnel Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 25: India - Tunnel Construction Projects, Value by Completion Year (US$ million)
Figure 26: Singapore - Tunnel Construction Projects Pipeline, Value by Stage (US$ million)
Figure 27: Singapore - Tunnel Construction Projects Pipeline, Projected Annual Spending by Stage (US$ million)
Figure 28: Singapore - Tunnel Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 29: Singapore - Tunnel Construction Projects, Value by Completion Year (US$ million)
Figure 30: Hong Kong - Tunnel Construction Projects Pipeline, Value by Stage (US$ million)
Figure 31: Hong Kong - Tunnel Construction Projects Pipeline, Projected Annual Spending by Stage (US$ million)
Figure 32: Hong Kong - Tunnel Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 33: Hong Kong - Tunnel Construction Projects, Value by Completion Year (US$ million)
Figure 34: Taiwan - Tunnel Construction Projects Pipeline, Value by Stage (US$ million)
Figure 35: Taiwan - Tunnel Construction Projects Pipeline, Projected Annual Spending by Stage (US$ million)
Figure 36: Taiwan - Tunnel Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 37: Taiwan - Tunnel Construction Projects, Value by Completion Year (US$ million)
Figure 38: Indonesia - Tunnel Construction Projects Pipeline, Value by Stage (US$ million)
Figure 39: Indonesia - Tunnel Construction Projects Pipeline, Projected Annual Spending by Stage (US$ million)
Figure 40: Indonesia - Tunnel Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 41: Indonesia - Tunnel Construction Projects, Value by Completion Year (US$ million)
Figure 42: Bangladesh - Tunnel Construction Projects Pipeline, Value by Stage (US$ million)
Figure 43: Bangladesh - Tunnel Construction Projects Pipeline, Projected Annual Spending by Stage (US$ million)
Figure 44: Bangladesh - Tunnel Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 45: Bangladesh - Tunnel Construction Projects, Value by Completion Year (US$ million)
Figure 46: New Zealand - Tunnel Construction Projects Pipeline, Value by Stage (US$ million)
Figure 47: New Zealand - Tunnel Construction Projects Pipeline, Projected Annual Spending by Stage (US$ million)
Figure 48: New Zealand - Tunnel Construction Projects, by Funding Mode (% of Total Pipeline Value)
Figure 49: New Zealand - Tunnel Construction Projects, Value by Completion Year (US$ million)
Note: Product cover images may vary from those shown
3 of 3

Loading
LOADING...

4 of 3
Note: Product cover images may vary from those shown
Adroll
adroll