UDAY's Impact and Compatibility

  • ID: 4425814
  • Report
  • Region: Global
  • 350 pages
  • Enincon
1 of 3
State wise indexing of Integrated Power Supply Chain in India - 2017

UDAY scheme was touted as the next paladin to bail out the struggling Discoms, in order to turn them green in a time horizon of 3-4 years from 2015/16. Though was optional for the states, as of now 27 States/UTs are on board and INR 2,32,163 Crore of bonds have been issued which accounts for 85% of the debt to be restructured under this scheme. The cumulative AT&C* Loss stands at 20.42% with ACS-ARR Gap of INR 0.45/kWh. Also, tariff revision of 25 states have been done out of participating states.

Key Queries Resolved:
  • What is the power distribution scenario in India?
  • What is the impact of UDAY on financial health of discoms?
  • What is the impact of UDAY on Operational Efficiency of discoms?
  • What is the impact of UDAY on RPO compliance of discoms?
  • What is the impact of UDAY on power generation capacity addition?
  • Which is the best performing state post implementation of discom?
  • Which is the best performing discom post implementation of UDAY?
Key Highlights:
  • Analysing power demand and supply scenario in India
  • Identifying trends and outlook for AT&C loss levels
  • Identifying trends and outlook for billing efficiency of discoms
  • Identifying trends and outlook for collection efficiency of discoms
  • Identifying feeder segregation status
  • Identifying feeder metering status
  • Identifying smart metering status
  • Gap evaluation of ACS and ARR
  • Consumer category wise demand and revenue breakup
Note: Product cover images may vary from those shown
2 of 3
Contents and Coverage
  • Impact of UDAY on fuel supply economics
  • Impact of UDAY on upcoming generation capacity
  • Impact of UDAY on RPO Compliance
  • State wise feeder metering status trends and outlook
  • State wise feeder segregation status trends and outlook
  • State wise smart metering status trends and outlook
  • State wise AT&C Loss status trends and outlook
  • State wise Billing efficiency trends and outlook
  • State wise collection efficiency trends and outlook
  • Gap evaluation of ACS and ARR
  • Parametric evaluation of best performing state
  • Parametric evaluation of best performing discom
Note: Product cover images may vary from those shown
3 of 3

Loading
LOADING...

4 of 3
Note: Product cover images may vary from those shown
Adroll
adroll