+353-1-416-8900REST OF WORLD
+44-20-3973-8888REST OF WORLD
1-917-300-0470EAST COAST U.S
1-800-526-8630U.S. (TOLL FREE)

Project Insight: Global Industrial Construction Projects

  • PDF Icon

    Report

  • 49 Pages
  • March 2019
  • Region: Global
  • GlobalData
  • ID: 4770987
Project Insight: Global Industrial Construction Projects

Summary

The global industrial construction projects pipeline, stands at US$2.58 trillion. Asia-Pacific accounts for the major share of projects value, with US$1.27 trillion of projects equivalent to 49% of the total global total, reflecting its position as the leader in economic development. The Americas is in second place, with projects valuing US$510.3 billion. The Middle East and Africa has projects valued at US$462.8 billion.

Europe has a project pipeline of US$339.8 billion, being a mature economic region, has the least industrial investment of the four regions whilst the Americas lag behind Asia-Pacific for industrial investment. China, India and the US are the global leaders in industrial projects.

China leads the global project pipeline, with projects valued at US$353.9 billion, followed by India with US$322.6 billion. The highest value category of industrial project is manufacturing plants, with a value of US$840.4 billion, followed by chemical and pharmaceutical plants with US$601.1 billion. Private investment is responsible for the funding of the highest proportion of projects, with 75%, with public funding at 13% and the remaining 12% of projects financed by public/private funding.

The highest value of projects are at the planning stage, with US$1.11 trillion, followed by projects at the execution stage with US$926.2 billion. Assuming all projects tracked go ahead as planned, the highest value of projected contract value is in 2020, with US$577.9 billion, falling to US$134.1 billion in 2023.

The report "Project Insight: Global Industrial Construction Projects", provides detailed metrics on global and the regions’ industrial construction projects (as tracked) split by country, stage and value. Detailed metrics are also provided for the top 10 countries by value, stage and type of industrial project.

The top 50 global projects are listed giving country, stage, value of industrial construction projects. Analysis is also provided by six types of industrial projects and by stage. Ranked listings of the key operators for the sector are also provided showing the leading contractors, consulting engineers and project owners. Country profiles are provided for the top 10 countries including China, India and the US. The value is also provided for six types of industrial project by stage.

Scope
  • The report provides analysis based on CIC projects showing total project values and analysis by stage and funding for the top ten countries.

  • The top 50 global projects are listed giving country, stage, value of industrial construction projects.

  • Analysis is also provided by six types of industrial projects and by stage.

  • Ranked listings of the key operators for the sector are also provided showing the leading contractors, consulting engineers and project owners.

  • Country profiles are provided for the top 10 countries including China, India and the US.

  • The value is also provided for six types of industrial project by stage.


Reasons to Buy
  • Gain insight into the development of the industrial construction sector.

  • Assess all major projects by value, start date, scope and stage of development globally, for the regions and top 10 countries to support business development activities.

  • Plan campaigns by country based on specific project opportunities and align resources to the most attractive markets.

Table of Contents

1. GLOBAL OVERVIEW
2. REGIONAL OVERVIEWS
2.1. The Americas
2.2. Asia-Pacific
2.3. Europe
2.4. Middle East and Africa
3. PROJECT ANALYTICS BY COUNTRY
3.1. China
3.2. India
3.3. The US
3.4. Russia
3.5. Indonesia
3.6. Australia
3.7. Saudi Arabia
3.8. Brazil
3.9. Vietnam
3.10. Philippines
4. About the publisher
4.1. The Publisher at a Glance
4.2. The Publisher Construction
4.3. Disclaimer
4.4. Contact Us
List of Tables
Table 1: Global - Industrial Construction Project Pipeline, Value by Country and Stage (US$ million)
Table 2: Top 50 Global Industrial Projects by Value
Table 3: The Americas - Industrial, Construction Projects, Key Contractors
Table 4: The Americas - Industrial, Construction Projects, Key Consulting Engineers
Table 5: The Americas - Industrial, Construction Projects, Key Project Owners
Table 6: Asia-Pacific - Industrial, Construction Projects, Key Contractors
Table 7: Asia-Pacific - Industrial, Construction Projects, Key Consulting Engineers
Table 8: Asia-Pacific - Industrial, Construction Projects, Key Project Owners
Table 9: Europe - Industrial, Construction Projects, Key Contractors
Table 10: Europe - Industrial, Construction Projects, Key Consulting Engineers
Table 11: Europe - Industrial, Construction Projects, Key Project Owners
Table 12: Middle East and Africa - Industrial, Construction Projects, Key Contractors
Table 13: Middle East and Africa - Industrial, Construction Projects, Key Consulting Engineers
Table 14: Middle East and Africa - Industrial, Construction Projects, Key Project Owners
List of Figures
Figure 1: Global - Industrial, Construction Project Pipeline, Value by Stage (US$ million)
Figure 2: Global - Industrial, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 3: Global - Industrial, Construction Project Pipeline, Value Regions by Stage (US$ million)
Figure 4: Global - Industrial, Construction Project Pipeline, Top 10 Countries by Value and Stage (US$ million)
Figure 5: Global - Industrial, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 6: Global - Industrial, Construction Project Pipeline, Value by Completion Year (US$ million)
Figure 7: Global - Industrial, Construction Project Pipeline, Type by Stage (US$ million)
Figure 8: Global - Industrial, Construction Project Pipeline, Type by Top 10 Countries (US$ million)
Figure 9: The Americas - Industrial Construction Project Pipeline, (US$ million)
Figure 10: The Americas - Industrial, Construction Project Pipeline, Value by Stage (US$ million)
Figure 11: The Americas - Industrial, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 12: The Americas - Industrial, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 13: The Americas - Industrial, Construction Project Pipeline, Value by Completion Year (US$ million)
Figure 14: The Americas - Industrial, Construction Project Pipeline, Top 10 Countries by Value and Stage (US$ million)
Figure 15: The Americas - Industrial, Construction Project Pipeline, Type by Stage (US$ million)
Figure 16: Asia-Pacific - Industrial Construction Project Pipeline (US$ million)
Figure 17: Asia-Pacific - Industrial Construction Project Pipeline (US$ million)
Figure 18: Asia-Pacific - Industrial, Construction Project Pipeline, Value by Stage (US$ million)
Figure 19: Asia-Pacific - Industrial, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 20: Asia-Pacific - Industrial, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 21: Asia-Pacific- Industrial, Construction Project Pipeline, Value by Completion Year (US$ million)
Figure 22: Asia-Pacific -Industrial, Construction Project Pipeline, Top 10 Countries by Value and Stage (US$ million)
Figure 23: Asia-Pacific - Industrial, Construction Project Pipeline, Type by Stage (US$ million)
Figure 24: Europe - Industrial Construction Project Pipeline (US$ million)
Figure 25: Europe - Industrial, Construction Project Pipeline, Value by Stage (US$ million)
Figure 26: Europe - Industrial, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 27: Europe - Industrial, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 28: Europe - Industrial, Construction Project Pipeline, Value by Completion Year (US$ million)
Figure 29: Europe - Industrial, Construction Project Pipeline, Top 10 Countries by Value and Stage (US$ million)
Figure 30: Europe - Industrial, Construction Project Pipeline, Type and Stage (US$ million)
Figure 31: Middle East and Africa - Industrial Construction Project Pipeline (US$ million)
Figure 32: Middle East and Africa - Industrial, Construction Project Pipeline, Value by Stage (US$ million)
Figure 33: Middle East and Africa - Industrial, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 34: Middle East and Africa - Industrial, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 35: Middle East and Africa- Industrial, Construction Project Pipeline, Value by Completion Year (US$ million)
Figure 36: Middle East and Africa - Industrial, Construction Project Pipeline, Top Countries by Value and Stage (US$ million)
Figure 37: Middle East and Africa - Industrial, Construction Project Pipeline, Type and Stage (US$ million)
Figure 38: China - Industrial, Construction Project Pipeline, Value by Stage (US$ million)
Figure 39: China - Industrial, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 40: China - Industrial, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 41: India - Industrial, Construction Project Pipeline, Value by Stage (US$ million)
Figure 42: India - Industrial, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 43: India - Industrial, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 44: The US - Industrial, Construction Project Pipeline, Value by Stage (US$ million)
Figure 45: The US - Industrial, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 46: The US - Industrial, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 47: Russia - Industrial, Construction Project Pipeline, Value by Stage (US$ million)
Figure 48: Russia - Industrial, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 49: Russia - Industrial, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 50: Indonesia - Industrial, Construction Project Pipeline, Value by Stage (US$ million)
Figure 51: Indonesia - Industrial, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 52: Indonesia - Industrial, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 53: Australia - Industrial, Construction Project Pipeline, Value by Stage (US$ million)
Figure 54: Australia - Industrial, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 55: Australia - Industrial, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 56: Saudi Arabia - Industrial, Construction Project Pipeline, Value by Stage (US$ million)
Figure 57: Saudi Arabia - Industrial, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 58: Saudi Arabia - Industrial, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 59: Brazil - Industrial, Construction Project Pipeline, Value by Stage (US$ million)
Figure 60: Brazil - Industrial, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 61: Brazil - Industrial, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 62: Vietnam - Industrial, Construction Project Pipeline, Value by Stage (US$ million)
Figure 63: Vietnam - Industrial, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 64: Vietnam - Industrial, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 65: Philippines - Industrial, Construction Project Pipeline, Value by Stage (US$ million)
Figure 66: Philippines - Industrial, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 67: Philippines - Industrial, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)