Data Center Construction Market in Latin America - Industry Outlook and Forecast 2018-2023

  • ID: 4471616
  • Report
  • Region: America, America (exc North), Latin America
  • 127 pages
  • Arizton
1 of 5

FEATURED COMPANIES

  • ABB
  • ASSA ABLOY
  • Cisco System
  • Flex Enclosure
  • Holder Construction
  • Intel DCM
  • MORE
This market research report on data center construction market in Latin America offers analysis on market size & forecast, market share, industry trends, growth drivers, and vendor analysis. The market study also includes insights on segmentation by type (building development, installation and commissioning services, building design, physical security, and DCIM) and by geography (Brazil, Colombia, Chile, and Rest of Latin America).

Data Center Construction Market in Latin America - Overview

The rapid proliferation of mobile devices and high-speed broadband connectivity is attributing to the growth of the data center construction market in Latin America. The growing demand for connected devices and the introduction of new technologies such as cloud-based services, IoT, and big data analytics is boosting the demand for new facilities in the Latin American market. Countries such as Chile, Colombia, Mexico, Argentina, and Peru are the major revenue contributors in the Latin American market.

The increasing development of modular data center solutions will offer new investment opportunities for leading vendors in the market in the region. The growing need for cloud computing services will result in higher revenues for colocation service providers in the Latin American market. Connectivity solutions offered by colocation service providers such as Equinix and Ascenty to cloud data center operates by AWS, Microsoft, Google, Oracle, and IBM will transform the Latin American data center market. The market in Latin America consists of local building developers, installation and commissioning service providers, and architectural firms.

The increasing awareness about end-to-end monitoring of infrastructure facilities is expected to gain traction in Latin American market over the next few years. The adoption of efficient infrastructure and increasing focus to reduce power consumption through monitoring and management of facilities will revolutionize the market in this region. The data center construction market in Latin America is expected to generate revenues of approximately $316 million by 2023 and is projected to grow at a CAGR of around 11% during the forecast period.

Data Center Construction Market in Latin America - Dynamics

The government initiatives to offer land for development of new facilities and tax incentives will propel the development of the data center construction market in Latin America. The Brazilian government introduced Regime Especial de Tributação do Programa Nacional de Banda Larga (REPNBL) program that offers incentives towards the purchase of infrastructure for the data center that aids in improving local broadband connectivity in the country. Similarly, there are free trade zones in Colombia and Mexico offers zero taxation for activities that include the development, maintenance, and integration of computer systems. Such benefits offered by the government and regulatory bodies in Latin America will boost the deployment of modern data center facilities in the region.

Data Center Construction Market in Latin America - Segmentation

This market research report includes a detailed segmentation of the market by type and by geography.

Data Center Construction Market in Latin America - By Type

Modular infrastructure to gain traction in the data center construction market in Latin America during forecast period.

The data center construction market in Latin America by type is segmented into building development, installation and commissioning services, building design, physical security, and DCIM. Building development segment occupied the largest market share in 2017 and is projected to grow at a CAGR of approximately 8% during the forecast period. The growing adoption of modular infrastructure is attributing to the growth of the market in the region.

New building development projects across the region will offer lucrative opportunities for architectural firms, infrastructure providers, and data center operators in Latin America. The increasing focus on building modern facilities that can withstand effects from natural disasters such as earthquakes will revolutionize the market in Latin America. The growing number of greenfield construction projects that provide access through network fibers will continue to be a market trend in Latin America during the forecast period.

Data Center Construction Market in Latin America - By Geography

Expansion projects by colocation providers such as Ascenty and Equinix across Latin America will boost growth of data center construction market during forecast period.

The geographical segment in the data center construction market in Latin America is classified as Brazil, Colombia, Chile, and Rest of Latin America. Brazil dominated the market share in 2017 and is anticipated to grow at a CAGR of more than 9% during the forecast period. The increasing penetration of internet and use of cloud-based services is boosting demand for new facilities in the Brazilian market. In 2017, Equinix and Ascenty are the largest revenues contributors in the market in Brazil and Latin America.

Major submarine cable projects such as BRUSA and Monet are expected complete by 2018 which will result in establishing strong connectivity between the US and the Brazilian market. The rapid deployment of colocation and modular infrastructure facilities is expected to help operators gain larger market share in the Latin American and especially Brazilian market over the next few years.

Key Vendor Analysis

The data center construction market in Latin America is witnessing a massive increase in the expansion projects by the local and global colocation providers and cloud service providers. The leading operators are focusing on building new facilities that meet the Uptime Institute and International Computer Room Experts Association (ICREA) guidelines to attract new consumers in the market. The development of new data centers of tier 3 standards with the installation of at least N+N redundant infrastructure for power and cooling will help players attract more customers in the Latin American market. Partnerships among local players and colocation providers will provide more revenue opportunities for vendors in the Latin American market.

The major vendors in the market are:
  • Construction Contractors
  • - KKR Investment Group (Aceco TI S.A.)
  • - AECOM
  • - Flex Enclosure
  • - ZFB Group
  • Physical Security and DCIM Providers
  • - ABB
  • - Assa Abloy
  • - Bosch Security Systems (Robert Bosch)
  • - Honeywell International
  • - Schneider Electric
  • - Siemens
  • - Vertiv
Other prominent vendors include: Fluor Corp., Jacobs Engineering Group, Holder Construction, Mortenson Construction, Axis Communication, Cisco, Eaton, Intel DCM, and Panduit.

Key market insights include
1. The analysis of data center construction market in Latin America provides market size and growth rate for the forecast period 2018-2023.
2. It offers comprehensive insights on current industry trends, trend forecast, and growth drivers about the data center construction market in Latin America.
3. The report provides the latest analysis of market share, growth drivers, challenges, and investment opportunities.
4. It offers a complete overview of market segments and the regional outlook for data center construction market in Latin America.
5. The report offers a detailed overview of the vendor landscape, competitive analysis, and key market strategies to gain competitive advantage.

Report Snapshot

According to the latest industry analysis, the data center construction market size in Latin America is expected to reach approximately $316 million by 2023, growing at an impressive CAGR of around 11% 2018-2023. The market research report provides in-depth market analysis and segmental analysis of the data center construction market in Latin America by type and geography.

Base Year: 2017
Forecast Year: 2018-2023

The study considers the present scenario of the data center construction market in Latin America and its market dynamics for the period 2018-2023. It covers a detailed overview of several market growth enablers, restraints, and trends. The study covers both the demand and supply sides of the market. It also profiles and analyzes the leading companies and other prominent companies operating in the market.

Major Vendors in the Data Center Construction Market in Latin America
  • Construction Contractors
  • - KKR Investment Group (Aceco TI S.A.)
  • Overview
  • Product Offerings
  • Key News
  • - AECOM
  • - Flex Enclosure
  • - ZFB Group
  • Physical Security and DCIM Providers
  • - ABB
  • - Assa Abloy
  • - Bosch Security Systems (Robert Bosch)
  • - Honeywell International
  • - Schneider Electric
  • - Siemens
  • - Vertiv
Prominent Players in the Data Center Construction Market in Latin America
  • Construction Contractors
  • - Fluor Corp.
  • Product Offerings
  • - Jacobs Engineering Group
  • - Holder Construction
  • - Mortenson Construction
  • Physical Security and DCIM Providers
  • - Axis Communication
  • - Cisco
  • - Eaton
  • - Intel DCM
  • - Panduit
Market Segmentation by Type
  • Building Development
  • Installation and Commissioning Services
  • Building Design
  • Physical Security
  • DCIM
Market Segmentation by Geography
  • Brazil
  • Colombia
  • Chile
  • Rest of Latin America
READ MORE
Note: Product cover images may vary from those shown
2 of 5

FEATURED COMPANIES

  • ABB
  • ASSA ABLOY
  • Cisco System
  • Flex Enclosure
  • Holder Construction
  • Intel DCM
  • MORE
1 Research Methodology

2 Research Objectives

3 Research Process

4 Report Coverage
4.1 Market Definition
4.2 Base Year
4.3 Scope Of Study
4.3.1 Market Segmentation By Type
4.3.2 Market Segmentation By Geography

5 Report Assumptions & Caveats
5.1 Key Caveats
5.2 Inclusions
5.3 Currency Conversion
5.4 Market Derivation

6 Market at a Glance

7 Introduction
7.1 Market Overview
7.2 Internet Penetration

8 Market Dynamics
8.1.1 Demand for Colocation, Cloud, And Managed Service Providers
8.1.2 Increased Interest for Modular Data Center Deployment
8.1.3 Growth in Construction Of Green Data Center Facilities
8.1.4 YOY Impact of Market Growth Enablers
8.2 Market Growth Restraint
8.2.1 Lack Of Expertise
8.2.2 Location Constraints For Data Center Construction
8.2.3 YOY Impact Of Market Growth Restraints
8.3 Market Opportunities & Trends
8.3.1 Increase In Adoption Of DCIM Solutions
8.3.2 Growing Rack Power Density in Data Centers
8.3.3 Growing Network Connectivity and High-Speed Bandwidth
8.3.4 Increased Tax Incentives and Low-Cost Land For Data Center Construction
8.3.5 YOY Impact Of Market Opportunities & Trends

9 Data Center Construction Market In Latin America
9.1 Market Overview
9.2 Market Size & Forecast
9.3 Porter’s Five Forces Analysis
9.3.1 Threat Of New Entrants
9.3.2 Bargaining Power Of Suppliers
9.3.3 Bargaining Power Of Buyers
9.3.4 Threat Of Substitutes
9.3.5 Competitive Rivalry

10 Market By Construction Type
10.1 Building Development
10.1.1 Market Overview
10.1.2 Market Size & Forecast
10.2 Installation and Commissioning Services
10.2.1 Market Overview
10.2.2 Market Size & Forecast
10.3 Building Design
10.3.1 Market Overview
10.3.2 Market Size & Forecast
10.4 Physical Security
10.4.1 Market Overview
10.4.2 Market Size & Forecast
10.5 Data Center Infrastructure Management (DCIM)
10.5.1 Market Overview
10.5.2 Market Size & Forecast

11 Geographical Segmentation

12 Brazil
12.1 Market Overview
12.2 Market Size & Forecast
12.3 Data Center Construction Market By Types
12.3.1 Data Center Building Development: Market Size & Forecast
12.3.2 Data Center Installation And Commissioning Services: Market Size & Forecast
12.3.3 Data Center Building Design: Market Size & Forecast
12.3.4 Data Center Physical Security: Market Size & Forecast
12.3.5 Data Center Infrastructure Management (DCIM): Market Size & Forecast

13 Colombia
13.1 Market Overview
13.2 Market Size & Forecast
13.3 Data Center Construction Market By Type
13.3.1 Data Center Building Development: Market Size & Forecast
13.3.2 Data Center Installation And Commissioning Services: Market Size & Forecast
13.3.3 Data Center Building Design: Market Size & Forecast
13.3.4 Data Center Physical Security: Market Size & Forecast
13.3.5 Data Center Infrastructure Management (DCIM): Market Size & Forecast

14 Chile
14.1 Market Overview
14.2 Market Size & Forecast
14.3 Data Center Construction Market By Types
14.3.1 Data Center Building Development: Market Size & Forecast
14.3.2 Data Center Installation And Commissioning Services: Market Size & Forecast
14.3.3 Data Center Building Design: Market Size & Forecast
14.3.4 Data Center Physical Security: Market Size & Forecast
14.3.5 Data Center Infrastructure Management (DCIM): Market Size & Forecast

15 Rest Of Latin America
15.1 Market Overview
15.2 Market Size & Forecast
15.3 Data Center Construction Market By Types
15.3.1 Data Center Building Development: Market Size & Forecast
15.3.2 Data Center Installation And Commissioning Services: Market Size & Forecast
15.3.3 Data Center Building Design: Market Size & Forecast
15.3.4 Data Center Physical Security: Market Size & Forecast
15.3.5 Data Center Infrastructure Management (DCIM): Market Size & Forecast

16 Competitive Scenario

17 Key Market Participants: Construction Contractors
17.1 KKR Investment Group (Aceco TI S.A.)
17.1.1 Overview
17.1.2 Service Offerings
17.2 AECOM
17.2.1 Overview
17.2.2 Service Offerings
17.2.3 Constructora Sudamericana S.A.
17.2.4 Service Offerings
17.3 Flex Enclosure
17.3.1 Service Offerings
17.4 ZFB Group
17.4.1 Service Offerings

18 Key Market Participants: Physical Security And DCIM
18.1 ABB
18.1.1 Overview
18.1.2 Product Offerings
18.1.3 Key News
18.2 Assa Abloy
18.2.1 Overview
18.2.2 Product Offerings
18.3 Bosch Security Systems (Robert Bosch)
18.3.1 Overview
18.3.2 Product Offerings
18.4 Honeywell International
18.4.1 Overview
18.4.2 Product Offerings
18.4.3 Key News
18.5 Schneider Electric
18.5.1 Overview
18.5.2 Product Offerings
18.5.3 Key News
18.6 Siemens
18.6.1 Overview
18.6.2 Product Offerings
18.7 Vertiv
18.7.1 Overview
18.7.2 Product Offerings
18.7.3 Key News

19 Prominent Construction Contractors
19.1 Fluor Corp.
19.1.1 Service Offerings
19.2 Jacobs Engineering Group
19.2.1 Overview
19.2.2 Service Offerings
19.3 Holder Construction
19.3.1 Overview
19.3.2 Service Offerings
19.4 Mortenson Construction
19.4.1 Product Offerings

20 Prominent Physical Security And DCIM Providers
20.1 Axis Communication
20.1.1 Product Offerings
20.2 Cisco
20.2.1 Product Offerings
20.3 Eaton
20.3.1 Product Offerings
20.3.2 Product Offering
20.4 Intel DCM
20.4.1 Product Offering
20.5 Panduit
20.5.1 Product Offerings

21 Report Summary
21.1 Key Takeaways
21.2 Strategic Recommendations
21.3 Qualitative Summary
21.4 Quantitative Summary
21.4.1 Overall Market
21.4.2 Market By Country
21.4.3 Market By Square Feet Area
21.4.4 Market By Power Capacity
21.4.5 Market By Construction Type
21.4.6 Market By Brazil
21.4.7 Market By Colombia
21.4.8 Market By Chile
21.4.9 Market By Rest Of Latin America

22 Appendix
22.1 Abbreviations

List of Exhibits
Exhibit 1 Segmentation Of Data Center Construction Market In Latin America
Exhibit 2 Market Size Calculation Approach 2017
Exhibit 3 Rack Power Density In Data Center Market In Latin America (2010-2023)
Exhibit 4 Data Center Construction Market In Latin America 2017-2023 ($ Million)
Exhibit 5 Data Center Construction Market In Latin America By Area 2017-2023 (Million Square Feet)
Exhibit 6 Data Center Construction Market In Latin America By Power Capacity 2017-2023 (Mw)
Exhibit 7 Five Forces Analysis 2017
Exhibit 8 Data Center Construction Market In Latin America By Building Development 2017-2023 ($ Million)
Exhibit 9 Data Center Construction Market In Latin America By Installation And Commissioning Services 2017-2023 ($ Million)
Exhibit 10 Data Center Construction Market In Latin America By Building Design 2017-2023 ($ Million)
Exhibit 11 Data Center Construction Market In Latin America By Physical Security 2017-2023 ($ Million)
Exhibit 12 Data Center Construction Market In Latin America By Dcim 2017-2023 ($ Million)
Exhibit 13 Data Center Construction Market In Brazil 2017-2023 ($ Million)
Exhibit 14 Data Center Construction Market In Brazil By Area 2017-2023 (Million Square Feet)
Exhibit 15 Data Center Construction Market In Brazil By Power Capacity 2017-2023 (Mw)
Exhibit 16 Data Center Construction Market In Brazil By Building Development 2017-2023 ($ Million)
Exhibit 17 Data Center Construction Market In Brazil By Installation And Commissioning Services 2017-2023 ($ Million)
Exhibit 18 Data Center Construction Market In Brazil By Building Design 2017-2023 ($ Million)
Exhibit 19 Data Center Construction Market In Brazil By Physical Security 2017-2023 ($ Million)
Exhibit 20 Data Center Construction Market In Brazil By Dcim 2017-2023 ($ Million)
Exhibit 21 Data Center Construction Market In Colombia 2017-2023 ($ Million)
Exhibit 22 Data Center Construction Market In Colombia By Area 2017-2023 (Million Square Feet)
Exhibit 23 Data Center Construction Market In Colombia By Power Capacity 2017-2023 (Mw)
Exhibit 24 Data Center Construction Market In Colombia By Building Development 2017-2023 ($ Million)
Exhibit 25 Data Center Construction Market In Colombia By Installation And Commissioning Services 2017-2023 ($ Million)
Exhibit 26 Data Center Construction Market In Colombia By Building Design 2017-2023 ($ Million)
Exhibit 27 Data Center Construction Market In Colombia By Physical Security 2017-2023 ($ Million)
Exhibit 28 Data Center Construction Market In Colombia By DCIM 2017-2023 ($ Million)
Exhibit 29 Data Center Construction Market In Chile 2017-2023 ($ Million)
Exhibit 30 Data Center Construction Market In Chile By Area 2017-2023 (Million Square Feet)
Exhibit 31 Data Center Construction Market In Chile By Power Capacity 2017-2023 (Mw)
Exhibit 32 Data Center Construction Market In Chile By Building Development 2017-2023 ($ Million)
Exhibit 33 Data Center Construction Market In Chile By Installation And Commissioning Services 2017-2023 ($ Million)
Exhibit 34 Data Center Construction Market In Chile By Building Design 2017-2023 ($ Million)
Exhibit 35 Data Center Construction Market In Chile By Physical Security 2017-2023 ($ Million)
Exhibit 36 Data Center Construction Market In Chile By DCIM 2017-2023 ($ Million)
Exhibit 37 Data Center Construction Market In Rest Of Latin America By Area 2017-2023 ($ Million)
Exhibit 38 Data Center Construction Market In Rest Of Latin America By Area 2017-2023 (Million Square Feet)
Exhibit 39 Data Center Construction Market In Rest Of Latin America By Power Capacity 2017-2023 (MW)
Exhibit 40 Data Center Construction Market In Rest Of Latin America By Building Development 2017-2023 ($ Million)
Exhibit 41 Data Center Construction Market In Rest Of Latin America By Installation And Commissioning Services 2017-2023 ($ Million)
Exhibit 42 Data Center Construction Market In Rest Of Latin America By Building Design 2017-2023 ($ Million)
Exhibit 43 Data Center Construction Market In Rest Of Latin America By Physical Security 2017-2023 ($ Million)
Exhibit 44 Data Center Construction Market In Rest Of Latin America By DCIM 2017-2023 ($ Million)

List of Tables
Table 1 Key Geographies Definition
Table 2 Key Caveats
Table 3 Currency Conversion 2013-2017
Table 4 Cost Calculation Of Data Centers Based On Tier Standards ($)
Table 5 YOY Impact Of Market Growth Enablers 2017-2023
Table 6 YOY Impact Of Market Growth Restraints 2017-2023
Table 7 YOY Impact Of Market Opportunities & Trends 2017-2023
Table 8 Qualitative Summary Of Data Center Construction Market In Latin America
Table 9 Quantitative Summary Of Data Center Construction Market In Latin America 2017-2023
Table 10 Quantitative Summary of Data Center Construction Market in Latin America by Countries 2017-2023 ($ million)
Table 11 Quantitative Summary of Data Center Construction Market in Latin America by Area 2017-2023 (Million Square Feet)
Table 12 Quantitative Summary of Data Center Construction Market in Latin America by Power Capacity 2017-2023 (MW)
Table 13 Quantitative Summary of Data Center Construction Market in Latin America by Construction Type 2017-2023 ($ million)
Table 14 Quantitative Summary Of Data Center Construction Market In Brazil 2017-2023 ($ Million)
Table 15 Quantitative Summary Of Data Center Construction Market In Colombia 2017-2023 ($ Million)
Table 16 Quantitative Summary Of Data Center Construction Market In Chile 2017-2023 ($ Million)
Table 17 Quantitative Summary of Data Center Construction Market in Rest of Latin America 2017-2023 ($ million)
Note: Product cover images may vary from those shown
3 of 5

Loading
LOADING...

4 of 5
  • KKR Investment Group (Aceco TI S.A.)
  • Intel DCM
  • Axis Communication
  • Flex Enclosure
  • ZFB Group
  • Bosch Security Systems (Robert Bosch)
  • Vertiv
  • Mortenson Construction
  • Fluor Corporation
  • Honeywell
  • ABB
  • Siemens
  • AECOM
  • Holder Construction
  • Jacobs Engineering
  • Eaton
  • Panduit
  • ASSA ABLOY
  • Cisco System
Note: Product cover images may vary from those shown
5 of 5
Note: Product cover images may vary from those shown
Adroll
adroll