Energy and Utilities Construction Market in Egypt: Market Size, Growth and Forecast Analytics to 2022

  • ID: 4497259
  • Report
  • Region: Egypt
  • 73 pages
  • GlobalData
1 of 3
The publisher's "Energy and Utilities Construction Market in Egypt: Market Size, Growth and Forecast Analytics to 2022" contains historic and forecast market data for the energy and utilities construction market in Egypt, with a detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) and by cost type( construction materials, construction equipment and construction services). This report also contains overall values of the energy and utilities construction segments such as Energy and utilities construction market covers the development of energy and telecommunications related projects, oil and gas projects including both upstream and downstream exploration, and utility projects such as water and sewage infrastructure. This market includes five categories: electricity and power, oil & gas, telecommunications, sewage infrastructure and water infrastructure.. This research report provides up-to-date market size data for the period 2013-2017 and an illustrative forecast to 2022.

Summary

Energy and utilities construction market covers the development of energy and telecommunications related projects, oil and gas projects including both upstream and downstream exploration, and utility projects such as water and sewage infrastructure. This market includes five categories: electricity and power, oil & gas, telecommunications, sewage infrastructure and water infrastructure.

The Egyptian energy and utilities construction category continued to increase in the review period with a value of EGP96,691.85 million (US$5,157.59 million) in 2017 and increased at a rate of 51.82% over 2016. The market recorded a CAGR of 44.58% from 2013 through 2017.

"Energy and Utilities Construction Market in Egypt: Market Size, Growth and Forecast Analytics to 2022"' provides a top-level overview and detailed insight into the operating environment of the energy and utilities construction market in Egypt. It is an essential tool for companies active across the Egypt construction value chain and for new players considering to enter the market.

Scope
  • An overview of the energy and utilities construction market in Egypt.
  • Historic (2013 through 2017) and forecast (2018 through 2022) construction market output values are provided.
  • A detailed breakdown of the data by construction activity (new construction, repair and maintenance, refurbishment and demolition) is provided at the market level while the values for the segments are provided by cost types (construction materials, construction equipment & construction services).
  • This report covers all the segments of commercial construction market including Energy and utilities construction market covers the development of energy and telecommunications related projects, oil and gas projects including both upstream and downstream exploration, and utility projects such as water and sewage infrastructure. This market includes five categories: electricity and power, oil & gas, telecommunications, sewage infrastructure and water infrastructure..
Reasons To Buy
  • Enhances your knowledge of the market with key figures detailing construction type.
  • Provides you with a breakdown of the market by construction activity (new construction, repair and maintenance, refurbishment and demolition).
  • Provides you with a breakdown of the segments by cost type (construction materials, construction equipment &construction services).
  • Details the segments covered under commercial construction market.
  • Allows you to plan future business decisions using the forecast figures given.
READ MORE
Note: Product cover images may vary from those shown
2 of 3
1 Introduction
1.1 What is this Report About?
1.2 Definitions
1.3 CAGR Definition and Calculation

2 Overall Energy and Utilities Construction Value: Market Analysis
2.1 Overall Energy and Utilities Construction Output Value, 2013 - 2017
2.2 Overall Energy and Utilities Construction Output Value Forecast, 2018 - 2022
2.3 Overall Energy and Utilities Construction Output Value by Cost Type
2.3.1 Overall Energy and Utilities Construction Output Value by Cost Type, 2013 - 2017
2.3.2 Overall Energy and Utilities Construction Output Value Forecast, by Cost Type, 2018 - 2022

3 Energy and Utilities Construction Output: Analysis by Category
3.1 New Construction Output Value, 2013 - 2017
3.2 New Construction Output Value Forecast, 2018 - 2022
3.3 New Construction Output Value by Cost Type
3.3.1 New Construction Output Value by Cost Type, 2013 - 2017
3.3.2 New Construction Output Value by Cost Type Forecast, 2018 - 2022
3.4 Repair & Maintenance Output Value, 2013 - 2017
3.5 Repair & Maintenance Output value Forecast, 2018 - 2022
3.6 Repair & Maintenance Output Value by Cost Type
3.6.1 Repair & Maintenance Output Value by Cost Type, 2013 - 2017
3.6.2 Repair & Maintenance Output Forecast, by Cost Type, 2018 - 2022
3.7 Refurbishment Construction Output Value, 2013 - 2017
3.8 Refurbishment Construction Output Value Forecast, 2018 - 2022
3.9 Refurbishment Construction Output Value by Cost Type
3.9.1 Refurbishment Construction Output Value by Cost Type, 2013 - 2017
3.9.2 Refurbishment Construction Output Forecast, by Cost type, 2018 - 2022
3.1 Demolition Construction Output Value, 2013 - 2017
3.11 Demolition Construction Output Value Forecast, 2018 - 2022
3.12 Demolition Construction Output Value by Cost Type
3.12.1 Demolition Construction Output Value by Cost Type, 2013 - 2017
3.12.2 Demolition Construction Output by Cost type Forecast, 2018 - 2022

4 Electricity and Power construction: Market Analysis
4.1 Electricity and Power construction Output Value, 2013 - 2017
4.2 Electricity and Power construction Output Value Forecast, 2018 - 2022
4.3 Electricity and Power construction Output, by Cost Type
4.3.1 Electricity and Power construction Output, by Cost Type, 2013 - 2017
4.3.2 Electricity and Power construction Output Forecast, by Cost Type, 2018 - 2022

5 Oil and Gas construction: Market Analysis
5.1 Oil and Gas construction Output Value, 2013 - 2017
5.2 Oil and Gas construction Output Value Forecast, 2018 - 2022
5.3 Oil and Gas construction Output, by Cost Type
5.3.1 Oil and Gas construction Output, by Cost Type, 2013 - 2017
5.3.2 Oil and Gas construction Output Forecast, by Cost Type, 2018 - 2022

6 Telecommunications construction: Market Analysis
6.1 Telecommunications construction Output Value, 2013 - 2017
6.2 Telecommunications construction Output Value Forecast, 2018 - 2022
6.3 Telecommunications construction Output, by Cost Type
6.3.1 Telecommunications construction Output, by Cost Type, 2013 - 2017
6.3.2 Telecommunications construction Output Forecast, by Cost Type, 2018 - 2022

7 Water Infrastructure construction: Market Analysis
7.1 Water Infrastructure construction Output Value, 2013 - 2017
7.2 Water Infrastructure construction Output Value Forecast, 2018 - 2022
7.3 Water Infrastructure construction Output, by Cost Type
7.3.1 Water Infrastructure construction Output, by Cost Type, 2013 - 2017
7.3.2 Water Infrastructure construction Output Forecast, by Cost Type, 2018 - 2022

8 Sewage Infrastructure construction: Market Analysis
8.1 Sewage Infrastructure construction Output Value, 2013 - 2017
8.2 Sewage Infrastructure construction Output Value Forecast, 2018 - 2022
8.3 Sewage Infrastructure construction Output, by Cost Type
8.3.1 Sewage Infrastructure construction Output, by Cost Type, 2013 - 2017
8.3.2 Sewage Infrastructure construction Output Forecast, by Cost Type, 2018 - 2022

9 Appendix
9.1 Summary Methodology
9.2 Exchange Rates
9.3 About Us
9.4 Publisher's Services
9.5 Disclaimer

List of Tables

Table 1: Energy and Utilities Construction Market Definitions
Table 2: Egyptian Overall Energy and Utilities Construction Output Value (US$ Million), 2013 - 2017
Table 3: Egyptian Overall Energy and Utilities Construction Output Value (EGP Million), 2013 - 2017
Table 4: Egyptian Overall Energy and Utilities Construction Output Value (US$ Million), 2018 - 2022
Table 5: Egyptian Overall Energy and Utilities Construction Output Value (EGP Million), 2018 - 2022
Table 6: Egyptian Overall Energy and Utilities Construction Output Value by Cost Type (US$ Million), 2013 - 2017
Table 7: Egyptian Overall Energy and Utilities Construction Output Value by Cost Type (EGP Million), 2013 - 2017
Table 8: Egyptian Overall Energy and Utilities Construction Output Value by Cost Type (US$ Million), 2018 - 2022
Table 9: Egyptian Overall Energy and Utilities Construction Output Value by Cost Type (EGP Million), 2018 - 2022
Table 10: Egyptian Energy and Utilities Construction Output Value, New Construction (US$ Million), 2013 - 2017
Table 11: Egyptian Energy and Utilities Construction Output Value, New Construction (EGP Million), 2013 - 2017
Table 12: Egyptian Energy and Utilities Construction Output Value, New Construction (US$ Million), 2018 - 2022
Table 13: Egyptian Energy and Utilities Construction Output Value, New Construction (EGP Million), 2018 - 2022
Table 14: Egyptian Energy and Utilities Construction Output Value, New Construction by Cost Type (US$ Million), 2013 - 2017
Table 15: Egyptian Energy and Utilities Construction Output Value, New Construction by Cost Type (EGP Million), 2013 - 2017
Table 16: Egyptian Energy and Utilities Construction Output Value, New Construction by Cost Type (US$ Million), 2018 - 2022
Table 17: Egyptian Energy and Utilities Construction Output Value, New Construction by Cost Type (EGP Million), 2018 - 2022
Table 18: Egyptian Energy and Utilities Construction Output Value, Repair & Maintenance (US$ Million), 2013 - 2017
Table 19: Egyptian Energy and Utilities Construction Output Value, Repair & Maintenance (EGP Million), 2013 - 2017
Table 20: Egyptian Energy and Utilities Construction Output Value, Repair & Maintenance (US$ Million), 2018 - 2022
Table 21: Egyptian Energy and Utilities Construction Output Value, Repair & Maintenance (EGP Million), 2018 - 2022
Table 22: Egyptian Energy and Utilities Construction Output Value, Repair & Maintenance by Cost Type (US$ Million), 2013 - 2017
Table 23: Egyptian Energy and Utilities Construction Output Value, Repair & Maintenance by Cost Type (EGP Million), 2013 - 2017
Table 24: Egyptian Energy and Utilities Construction Output Value, Repair & Maintenance by Cost Type (US$ Million), 2018 - 2022
Table 25: Egyptian Energy and Utilities Construction Output Value, Repair & Maintenance by Cost Type (EGP Million), 2018 - 2022
Table 26: Egyptian Energy and Utilities Construction Output Value, Refurbishment (US$ Million), 2013 - 2017
Table 27: Egyptian Energy and Utilities Construction Output Value, Refurbishment (EGP Million), 2013 - 2017
Table 28: Egyptian Energy and Utilities Construction Output Value, Refurbishment (US$ Million), 2018 - 2022
Table 29: Egyptian Energy and Utilities Construction Output Value, Refurbishment (EGP Million), 2018 - 2022
Table 30: Egyptian Energy and Utilities Construction Output Value, Refurbishment by Cost Type (US$ Million), 2013 - 2017
Table 31: Egyptian Energy and Utilities Construction Output Value, Refurbishment by Cost Type (EGP Million), 2013 - 2017
Table 32: Egyptian Energy and Utilities Construction Output Value, Refurbishment by Cost Type (US$ Million), 2018 - 2022
Table 33: Egyptian Energy and Utilities Construction Output Value, Refurbishment by Cost Type (EGP Million), 2018 - 2022
Table 34: Egyptian Energy and Utilities Construction Output Value, Demolition (US$ Million), 2013 - 2017
Table 35: Egyptian Energy and Utilities Construction Output Value, Demolition (EGP Million), 2013 - 2017
Table 36: Egyptian Energy and Utilities Construction Output Value, Demolition (US$ Million), 2018 - 2022
Table 37: Egyptian Energy and Utilities Construction Output Value, Demolition (EGP Million), 2018 - 2022
Table 38: Egyptian Energy and Utilities Construction Output Value, Demolition by Cost Type (US$ Million), 2013 - 2017
Table 39: Egyptian Energy and Utilities Construction Output Value, Demolition by Cost Type (EGP Million), 2013 - 2017
Table 40: Egyptian Energy and Utilities Construction Output Value, Demolition by Cost Type (US$ Million), 2018 - 2022
Table 41: Egyptian Energy and Utilities Construction Output Value, Demolition by Cost Type (EGP Million), 2018 - 2022
Table 42: Egyptian Electricity and Power construction Output Value (US$ Million), 2013 - 2017
Table 43: Egyptian Electricity and Power construction Output Value (EGP Million), 2013 - 2017
Table 44: Egyptian Electricity and Power construction Output Value (US$ Million), 2018 - 2022
Table 45: Egyptian Electricity and Power construction Output Value (EGP Million), 2018 - 2022
Table 46: Egyptian Electricity and Power construction Output, by Cost Type (US$ Million), 2013 - 2017
Table 47: Egyptian Electricity and Power construction Output, by Cost Type (EGP Million), 2013 - 2017
Table 48: Egyptian Electricity and Power construction Output, by Cost Type (US$ Million), 2018 - 2022
Table 49: Egyptian Electricity and Power construction Output, by Cost Type (EGP Million), 2018 - 2022
Table 50: Egyptian Oil and Gas construction Output Value (US$ Million), 2013 - 2017
Table 51: Egyptian Oil and Gas construction Output Value (EGP Million), 2013 - 2017
Table 52: Egyptian Oil and Gas construction Output Value (US$ Million), 2018 - 2022
Table 53: Egyptian Oil and Gas construction Output Value (EGP Million), 2018 - 2022
Table 54: Egyptian Oil and Gas construction Output, by Cost Type (US$ Million), 2013 - 2017
Table 55: Egyptian Oil and Gas construction Output, by Cost Type (EGP Million), 2013 - 2017
Table 56: Egyptian Oil and Gas construction Output, by Cost Type (US$ Million), 2018 - 2022
Table 57: Egyptian Oil and Gas construction Output, by Cost Type (EGP Million), 2018 - 2022
Table 58: Egyptian Telecommunications construction Output Value (US$ Million), 2013 - 2017
Table 59: Egyptian Telecommunications construction Output Value (EGP Million), 2013 - 2017
Table 60: Egyptian Telecommunications construction Output Value (US$ Million), 2018 - 2022
Table 61: Egyptian Telecommunications construction Output Value (EGP Million), 2018 - 2022
Table 62: Egyptian Telecommunications construction Output, by Cost Type (US$ Million), 2013 - 2017
Table 63: Egyptian Telecommunications construction Output, by Cost Type (EGP Million), 2013 - 2017
Table 64: Egyptian Telecommunications construction Output, by Cost Type (US$ Million), 2018 - 2022
Table 65: Egyptian Telecommunications construction Output, by Cost Type (EGP Million), 2018 - 2022
Table 66: Egyptian Water Infrastructure construction Output Value (US$ Million), 2013 - 2017
Table 67: Egyptian Water Infrastructure construction Output Value (EGP Million), 2013 - 2017
Table 68: Egyptian Water Infrastructure construction Output Value (US$ Million), 2018 - 2022
Table 69: Egyptian Water Infrastructure construction Output Value (EGP Million), 2018 - 2022
Table 70: Egyptian Water Infrastructure construction Output, by Cost Type (US$ Million), 2013 - 2017
Table 71: Egyptian Water Infrastructure construction Output, by Cost Type (EGP Million), 2013 - 2017
Table 72: Egyptian Water Infrastructure construction Output, by Cost Type (US$ Million), 2018 - 2022
Table 73: Egyptian Water Infrastructure construction Output, by Cost Type (EGP Million), 2018 - 2022
Table 74: Egyptian Sewage Infrastructure construction Output Value (US$ Million), 2013 - 2017
Table 75: Egyptian Sewage Infrastructure construction Output Value (EGP Million), 2013 - 2017
Table 76: Egyptian Sewage Infrastructure construction Output Value (US$ Million), 2018 - 2022
Table 77: Egyptian Sewage Infrastructure construction Output Value (EGP Million), 2018 - 2022
Table 78: Egyptian Sewage Infrastructure construction Output, by Cost Type (US$ Million), 2013 - 2017
Table 79: Egyptian Sewage Infrastructure construction Output, by Cost Type (EGP Million), 2013 - 2017
Table 80: Egyptian Sewage Infrastructure construction Output, by Cost Type (US$ Million), 2018 - 2022
Table 81: Egyptian Sewage Infrastructure construction Output, by Cost Type (EGP Million), 2018 - 2022
Table 82: Exchange Rate (Annual Average), 2013 – 2017
Table 83: Exchange Rate (Annual Average), 2018 – 2022 Forecast

List of Figures

Figure 1: Egyptian Overall Energy and Utilities Construction Output Value (EGP Million), 2013 - 2017
Figure 2: Egyptian Overall Energy and Utilities Construction Output Value (EGP Million), 2018 - 2022
Figure 3: Egyptian Overall Energy and Utilities Construction Output Value by Cost Type (EGP Million), 2013 - 2017
Figure 4: Egyptian Overall Energy and Utilities Construction Output Value by Cost Type (EGP Million), 2018 - 2022
Figure 5: Egyptian Energy and Utilities Construction Output Value, New Construction (EGP Million), 2013 - 2017
Figure 6: Egyptian Energy and Utilities Construction Output Value, New Construction (EGP Million), 2018 - 2022
Figure 7: Egyptian Energy and Utilities Construction Output Value, New Construction by Cost Type(EGP Million), 2013 - 2017
Figure 8: Egyptian Energy and Utilities Construction Output Value, New Construction by Cost Type (EGP Million), 2018 - 2022
Figure 9: Egyptian Energy and Utilities Construction Output Value, Repair & Maintenance (EGP Million), 2013 - 2017
Figure 10: Egyptian Energy and Utilities Construction Output Value, Repair & Maintenance (EGP Million), 2018 - 2022
Figure 11: Egyptian Energy and Utilities Construction Output Value, Repair & Maintenance by Cost Type (EGP Million), 2013 - 2017
Figure 12: Egyptian Energy and Utilities Construction Output Value, Repair & Maintenance by Cost Type (EGP Million), 2018 - 2022
Figure 13: Egyptian Energy and Utilities Construction Output Value, Refurbishment(EGP Million), 2013 - 2017
Figure 14: Egyptian Energy and Utilities Construction Output Value, Refurbishment(EGP Million), 2018 - 2022
Figure 15: Egyptian Energy and Utilities Construction Output Value, Refurbishment by Cost Type (EGP Million), 2013 - 2017
Figure 16: Egyptian Energy and Utilities Construction Output Value, Refurbishment by Cost Type(EGP Million), 2018 - 2022
Figure 17: Egyptian Energy and Utilities Construction Output Value, Demolition (EGP Million), 2013 - 2017
Figure 18: Egyptian Energy and Utilities Construction Output Value, Demolition (EGP Million), 2018 - 2022
Figure 19: Egyptian Energy and Utilities Construction Output Value, Demolition by Cost Type (EGP Million), 2013 - 2017
Figure 20: Egyptian Energy and Utilities Construction Output Value, Demolition by Cost Type (EGP Million), 2018 - 2022
Figure 21: Egyptian Electricity and Power construction Output Value (EGP Million), 2013 - 2017
Figure 22: Egyptian Electricity and Power construction Output Value (EGP Million), 2018 - 2022
Figure 23: Egyptian Electricity and Power construction Output, by Cost Type (EGP Million), 2013 - 2017
Figure 24: Egyptian Electricity and Power construction Output, by Cost Type (EGP Million), 2018 - 2022
Figure 25: Egyptian Oil and Gas construction Output Value (EGP Million), 2013 - 2017
Figure 26: Egyptian Oil and Gas construction Output Value (EGP Million), 2018 - 2022
Figure 27: Egyptian Oil and Gas construction Output, by Cost Type (EGP Million), 2013 - 2017
Figure 28: Egyptian Oil and Gas construction Output, by Cost Type (EGP Million), 2018 - 2022
Figure 29: Egyptian Telecommunications construction Output Value (EGP Million), 2013 - 2017
Figure 30: Egyptian Telecommunications construction Output Value (EGP Million), 2018 - 2022
Figure 31: Egyptian Telecommunications construction Output, by Cost Type (EGP Million), 2013 - 2017
Figure 32: Egyptian Telecommunications construction Output, by Cost Type (EGP Million), 2018 - 2022
Figure 33: Egyptian Water Infrastructure construction Output Value (EGP Million), 2013 - 2017
Figure 34: Egyptian Water Infrastructure construction Output Value (EGP Million), 2018 - 2022
Figure 35: Egyptian Water Infrastructure construction Output, by Cost Type (EGP Million), 2013 - 2017
Figure 36: Egyptian Water Infrastructure construction Output, by Cost Type (EGP Million), 2018 - 2022
Figure 37: Egyptian Sewage Infrastructure construction Output Value (EGP Million), 2013 - 2017
Figure 38: Egyptian Sewage Infrastructure construction Output Value (EGP Million), 2018 - 2022
Figure 39: Egyptian Sewage Infrastructure construction Output, by Cost Type (EGP Million), 2013 - 2017
Figure 40: Egyptian Sewage Infrastructure construction Output, by Cost Type (EGP Million), 2018 - 2022
Note: Product cover images may vary from those shown
3 of 3

Loading
LOADING...

4 of 3
Note: Product cover images may vary from those shown
Adroll
adroll