Q1 2018 Global Refinery Maintenance Review - Asia Records Highest Unplanned Maintenance

Summary

Fire and explosion form most important factor for unplanned refinery maintenance. Unplanned refinery maintenance was usually due to power outage, unfavorable weather, and technical issues.

In Q1 2018, among all regions, North America had the highest refining capacity under maintenance (both planned and unplanned) with 2,398 thousand barrels per day (mbd). The Middle East and Asia came second and third, respectively.

Port Arthur II refinery in the US with refining capacity of 578 mbd, Mailiao refinery in Taiwan (540 mbd) and Mina Al-Ahmadi refinery in Kuwait (466 mbd) were the top three refineries in terms of refining capacity shutdown for planned maintenance. In terms of refining capacity shutdown due to unplanned maintenance, Kochi refinery in India (311 mbd), Port Harcourt I in Nigeria (210 mbd) and Pavlodar in Kazakhstan (151 mbd) were the key refineries globally. The unscheduled maintenance in Kochi and Pavlodar were due to fire incidents, while Port Harcourt I was shut down due to damaged equipment.

In Q1 2017, the top three refineries in terms of planned maintenance were - the Ruwais refinery (800 mbd) in the UAE, operated by Abu Dhabi Oil Refining Co; the Mailiao refinery (540 mbd) in Taiwan, operated by Formosa Petrochemical Corporation; and the Sinopec Maoming Company-operated Maoming refinery (472 mbd) in China.

Key Highlights included in this report:
  • North America also had the highest refining capacity of 2,236 mbd under planned maintenance in Q1.
  • Asia had the highest refining capacity of 311 mbd under unplanned maintenance in Q1 2018. Africa and North America followed with 283 mbd and 162 mbd, respectively.
  • Globally, among countries, the US (1,816 mbd), Canada, and Taiwan had the highest refining capacities under maintenance (both planned and unplanned) in the quarter.
  • Among refineries, Port Arthur II in the US, Mailiao in Taiwan, and Mina Al-Ahmadi in Kuwait had the highest refining capacities under maintenance
Scope
  • Analysis of capacity under maintenance for crude distillation, coking, fluid catalytic cracking, hydrocracker, hydrotreater, and reformer units globally for Q1 2018 and Q1 2017
  • Comparison of select refinery units under maintenance (planned, unplanned and both) by major regions for Q1 2018 and Q1 2017
  • Comparison of select refinery units under maintenance (planned, unplanned and both) by PADD regions in the US for both the quarters
  • Comparison of select refinery units under maintenance (planned, unplanned and both) by operators for both the quarters
  • Comparison of factors responsible for unplanned maintenance globally by region for Q1 2018 and Q1 2017.
Reasons to buy
  • Keep abreast of major refinery units (crude distillation, coking, fluid catalytic cracking, hydrocracker, hydrotreater and reformer) undergoing maintenance globally
  • Obtain information on region-wise maintenance globally for Q1 2018 in comparison with Q1 2017
  • Identify and compare PADD regions and operators with highest maintenance in both the quarters
  • Facilitate decision making on the basis of strong refinery maintenance data
  • Assess your competitor’s refinery maintenance data.
READ MORE
Note: Product cover images may vary from those shown
2 of 3
1 Table of Contents

2. Q1 2018 Global Refinery Maintenance Review
2.1. Key Highlights
2.2. Major Outages in Q1 2018 vis-à-vis Q1 2017
2.3. Regional Maintenance Briefs
2.4. FactorsResponsible for Unplanned Maintenance by Region, Q1 2018 vis-à-vis Q1 2017
2.5. Global Refining Capacity Outlook under Planned Maintenance
2.6. Maintenance by Region
2.6.1. Global Refining Capacity under Maintenance by Region, Q1 2018 vis-à-vis Q1 2017
2.6.2. Global Coking Capacity under Maintenance by Region, Q1 2018 vis-à-vis Q1 2017
2.6.3. Global Fluid Catalytic Cracking (FCC) Capacity under Maintenance by Region, Q1 2018 vis-à-vis Q1 2017
2.6.4. Global Hydrocracker Capacity under Maintenance by Region, Q1 2018 vis-à-vis Q1 2017
2.6.5. Global Hydrotreater Capacity under Maintenance by Region, Q1 2018 vis-à-vis Q1 2017
2.6.6. Global Reformer Capacity under Maintenance by Region, Q1 2018 vis-à-vis Q1 2017
2.7. Maintenance by Petroleum Administration for Defense Districts (PADD) Regions in the US
2.7.1. Refining Capacity under Maintenance by PADD Regions in the US, Q1 2018 vis-à-vis Q1 2017
2.7.2. Coking Capacity under Maintenance by PADD Regions in the US, Q1 2018 vis-à-vis Q1 2017
2.7.3. FCC Capacity under Maintenance by PADD Regions in the US, Q1 2018 vis-à-vis Q1 2017
2.7.4. Hydrocracker Capacity under Maintenance by PADD Regions in the US, Q1 2018 vis-à-vis Q1 2017
2.7.5. Hydrotreater Capacity under Maintenance by PADD Regions in the US, Q1 2018 vis-à-vis Q1 2017
2.7.6. Reformer Capacity under Maintenance by PADD Regions in the US, Q1 2018 vis-à-vis Q1 2017
2.8. Maintenance by Operator
2.8.1. Global Refining Capacity under Maintenance by Operator, Q1 2018 vis-à-vis Q1 2017
2.8.2. Global Coking Capacity under Maintenance by Operator, Q1 2018 vis-à-vis Q1 2017
2.8.3. Global FCC Capacity under Maintenance by Operator, Q1 2018 vis-à-vis Q1 2017
2.8.4. Global Hydrocracker Capacity under Maintenance by Operator, Q1 2018 vis-à-vis Q1 2017
2.8.5. Global Hydrotreater Capacity under Maintenance by Operator, Q1 2018 vis-à-vis Q1 2017
2.8.6. Global Reformer Capacity under Maintenance by Operator, Q1 2018 vis-à-vis Q1 2017

3. Appendix
3.1. Abbreviations
3.2. Methodology
3.2.1. Coverage
3.2.2. Secondary Research
3.3. Contact
3.4. Disclaimer

List of Tables
Table 1: Global Refining Capacity Outlook under Planned Maintenance
Table 2: Global Refining Capacity Outlook under Planned Maintenance (Contd.)

List of Figures
Figure 1: Factors Responsible for Unplanned Maintenance in North America*
Figure 2: Factors Responsible for Unplanned Maintenance in Africa*
Figure 3: Factors Responsible for Unplanned Maintenance in Asia
Figure 4: Factors Responsible for Unplanned Maintenance in Europe*
Figure 5: Factors Responsible for Unplanned Maintenance in the Former Soviet Union
Figure 6: Factors Responsible for Unplanned Maintenance in South America*
Figure 7: Factors Responsible for Unplanned Maintenance in Caribbean*
Figure 8: Factors Responsible for Unplanned Maintenance in the Middle East*
Figure 9: Factors Responsible for Unplanned Maintenance in Oceania*
Figure 10: Global Refining Capacity Outlook under Planned Maintenance by Region (mbd)
Figure 11: Global Refining Capacity Outlook under Planned Maintenance by Operator (mbd)
Figure 12: Global Refining Capacity under Maintenance by Region, Q1 2018 vis-à-vis Q1 2017*#
Figure 13: Global Refining Capacity under Planned Maintenance by Region, Q1 2018 vis-à-vis Q1 2017
Figure 14: Global Refining Capacity under Unplanned Maintenance by Region, Q1 2018 vis-à-vis Q1 2017
Figure 15: Global Coking Capacity under Maintenance by Region, Q1 2018 vis-à-vis Q1 2017*
Figure 16: Global Coking Capacity under Planned Maintenance by Region, Q1 2018 vis-à-vis Q1 2017
Figure 17: Global Coking Capacity under Unplanned Maintenance by Region, Q1 2018 vis-à-vis Q1 2017
Figure 18: Global FCC Capacity under Maintenance by Region, Q1 2018 vis-à-vis Q1 2017*
Figure 19: Global FCC Capacity under Planned Maintenance by Region, Q1 2018 vis-à-vis Q1 2017
Figure 20: Global FCC Capacity under Unplanned Maintenance by Region, Q1 2018 vis-à-vis Q1 2017
Figure 21: Global Hydrocracker Capacity under Maintenance by Region, Q1 2018 vis-à-vis Q1 2017*
Figure 22: Global Hydrocracker Capacity under Planned Maintenance by Region, Q1 2018 vis-à-vis Q1 2017
Figure 23: Global Hydrocracker Capacity under Unplanned Maintenance by Region, Q1 2018 vis-à-vis Q1 2017
Figure 24: Global Hydrotreater Capacity under Maintenance by Region, Q1 2018 vis-à-vis Q1 2017*
Figure 25: Global Hydrotreater Capacity under Planned Maintenance by Region, Q1 2018 vis-à-vis Q1 2017
Figure 26: Global Hydrotreater Capacity under Unplanned Maintenance by Region, Q1 2018 vis-à-vis Q1 2017
Figure 27: Global Reformer Capacity under Maintenance by Region, Q1 2018 vis-à-vis Q1 2017*
Figure 28: Global Reformer Capacity under Planned Maintenance by Region, Q1 2018 vis-à-vis Q1 2017
Figure 29: Refining Capacity under Maintenance by PADD Regions in the US, Q1 2018 vis-à-vis Q1 2017*
Figure 30: Refining Capacity under Planned Maintenance by PADD Regions in the US, Q1 2018 vis-à-vis Q1 2017
Figure 31: Refining Capacity under Unplanned Maintenance by PADD Regions in the US, Q1 2018 vis-à-vis Q1 2017
Figure 32: Coking Capacity under Maintenance by PADD Regions in the US, Q1 2018 vis-à-vis Q1 2017*
Figure 33: Coking Capacity under Planned Maintenance by PADD Regions in the US, Q1 2018 vis-à-vis Q1 2017
Figure 34: FCC Capacity under Maintenance by PADD Regions in the US, Q1 2018 vis-à-vis Q1 2017*
Figure 35: FCC Capacity under Planned Maintenance by PADD Regions in the US, Q1 2018 vis-à-vis Q1 2017
Figure 36: FCC Capacity under Unplanned Maintenance by PADD Regions in the US, Q1 2018 vis-à-vis Q1 2017
Figure 37: Hydrocracker Capacity under Maintenance by PADD Regions in the US, Q1 2018 vis-à-vis Q1 2017*
Figure 38: Hydrocracker Capacity under Planned Maintenance by PADD Regions in the US, Q1 2018 vis-à-vis Q1 2017
Figure 39: Hydrotreater Capacity under Maintenance by PADD Regions in the US, Q1 2018 vis-à-vis Q1 2017*
Figure 40: Hydrotreater Capacity under Planned Maintenance by PADD Regions in the US, Q1 2018 vis-à-vis Q1 2017
Figure 41: Hydrotreater Capacity under Unplanned Maintenance by PADD Regions in the US, Q1 2018 vis-à-vis Q1 2017
Figure 42: Reformer Capacity under Maintenance by PADD Regions in the US, Q1 2018 vis-à-vis Q1 2017*
Figure 43: Reformer Capacity under Planned Maintenance by PADD Regions in the US, Q1 2018 vis-à-vis Q1 2017
Figure 44: Global Refining Capacity under Maintenance by Key Operators, Q1 2018 vis-à-vis Q1 2017*
Figure 45: Global Refining Capacity under Planned Maintenance by Operator, Q1 2018 vis-à-vis Q1 2017
Figure 46: Global Refining Capacity under Unplanned Maintenance by Operator, Q1 2018 vis-à-vis Q1 2017
Figure 47: Global Coking Capacity under Maintenance by Operator, Q1 2018 vis-à-vis Q1 2017*
Figure 48: Global Coking Capacity under Planned Maintenance by Operator, Q1 2018 vis-à-vis Q1 2017
Figure 49: Global Coking Capacity under Unplanned Maintenance by Operator, Q1 2018 vis-à-vis Q1 2017
Figure 50: Global FCC Capacity under Maintenance by Operator, Q1 2018 vis-à-vis Q1 2017*
Figure 51: Global FCC Capacity under Planned Maintenance by Operator, Q1 2018 vis-à-vis Q1 2017
Figure 52: Global FCC Capacity under Unplanned Maintenance by Operator, Q1 2018 vis-à-vis Q1 2017
Figure 53: Global Hydrocracker Capacity under Maintenance by Operator, Q1 2018 vis-à-vis Q1 2017*
Figure 54: Global Hydrocracker Capacity under Planned Maintenance by Operator, Q1 2018 vis-à-vis Q1 2017
Figure 55: Global Hydrotreater Capacity under Maintenance by Operator, Q1 2018 vis-à-vis Q1 2017*
Figure 56: Global Hydrotreater Capacity under Planned Maintenance by Operator, Q1 2018 vis-à-vis Q1 2017
Figure 57: Global Hydrotreater Capacity under Unplanned Maintenance by Operator, Q1 2018 vis-à-vis Q1 2017
Figure 58: Global Reformer Capacity under Maintenance by Operator, Q1 2018 vis-à-vis Q1 2017*
Figure 59: Global Reformer Capacity under Planned Maintenance by Operator, Q1 2018 vis-à-vis Q1 2017
Note: Product cover images may vary from those shown
3 of 3

Loading
LOADING...

4 of 3
Note: Product cover images may vary from those shown
Adroll
adroll