FEATURED COMPANIES
- Ark Data Centres
- Asanti Datacenter
- CyrusOne
- Equinix Data Centre
- GTR Slough
- Proximity Data Centre
This new report covers the UK Data Centre Market and provides the latest information on all of the key issues for Data Centre Providers including the following:
- The key third party Data Centre Providers and Facilities
- Data Centre floor space forecast from 2022 to 2026
- DCCP (Data Centre Customer Power) forecast from 2026 to 2026
- Data Centre Power Costs (in per kWH)
- Data Centre geographical city clusters
- Data Centre Pricing forecast from 2022 to 2026 (in rack space, m2 & p/ kW rentals)
- Public Cloud and Data Centre Revenues - 2022 to 2026
- The key Data Centre Trends & Data Centre Outlook
About the UK Data Centre market
There are over 200 third-party Data Centre Facilities identified in the UK, with close to 1 million m2 of Data Centre raised floor space and well over 1,000 MW of Data Centre Customer Power (DCCP) in total - forecast as of the end of 2021.
New UK Data Centre space is being added by existing Data Centre Providers with space of over 50,000 m2 per annum - mainly based within the London & Inner M25 and Slough areas. New Data Centre space is also being added by a range of regional Data Centre Providers, including with around 20,000 m2 plus of spaces being added per annum.
Above all, there is still a range of Data Centre Providers entering the UK market, including Vantage Data Centers and Asanti Datacenters. The investment in Data Centre capacity in lower cost regions is going to be a key trend going forward.
The UK Data Centre is a large and maturing market and is not going to see the rapid growth of other smaller European markets - but is to have forecast UK Data Centre revenue growth of almost 36 percent over the four-year period to the end of 2025, with an increase in UK Data Centre space and power of 26 percent and 29 percent respectively over the same period.
FEATURED COMPANIES
- Ark Data Centres
- Asanti Datacenter
- CyrusOne
- Equinix Data Centre
- GTR Slough
- Proximity Data Centre
- Methodology
- Acquisitions/Mergers 2019 to to-date
- Data Centre Development in the United Kingdom
- Summary Box - The UK Data Centre Summary
- Data Centre third-party Data Centre Providers and Facilities in the UK
- The Key UK Data Centre Provider Profiles
- UK Data Centre raised floor space forecast - in m2 (2020 to 2024)
- UK Data Centre Customer Power (DCCP) forecast - in MW (2020 to 2024)
- UK Data Centre Power Costs - (in Euro per kWH)
- UK Key Data Centre Clusters
- UK Data Centre Pricing Forecast - in rack space, m2 space & per kW rentals per month (2020 to 2024)
- UK Data Centre Revenue Forecast - in millions of Euro per annum (2020 to 2024)
- UK Public Cloud Revenue Forecast - in millions of Euro per annum (2020 to 2024)
- The Key Trends in the UK Data Centre Market
- UK Data Centre Outlook
List of Figures
Figure 1 - A simplified map of the UK
Figure 2 - A table summarizing the key Data Centre Providers & Facilities in the UK
Figure 3 - A picture showing the proposed Ark Data Centres Longcross development
Figure 4 - A table showing the UK CyrusOne Data Centre facilities - existing & planned
Figure 5 - A table showing the Equinix Data Centre facilities in the UK
Figure 6 - A picture showing the proposed GTR Slough Data Centre facility
Figure 7 - A picture showing the NTT London One Data Centre facility in Dagenham
Figure 8 - A table showing the breakdown of Pulsant’s Data Centre facilities in the UK
Figure 9 - A table showing the Proximity Data Centre facilities throughout the UK
Figure 10 - A table showing a list of the Telehouse Europe Data Centre facilities in the UK
Figure 11 - A picture showing the xScale 11x Data Centre facility in Slough
Figure 12 - A picture of the Vantage Data Centre facility at Newport near Cardiff, Wales
Figure 13 - A picture showing the proposed Yondr Group Slough Data Centre facility
Figure 14 - A chart & table showing the forecast UK Data Centre raised floor space from the end of 2022 to the end of 2026 - in m2
Figure 15 - A pie chart showing the key UK Data Centre Provider market share by raised floor space in percent
Figure 16 - A chart showing the forecast UK Data Centre DCCP in MW from the end of 2022 to the end of 2026 - in MW
Figure 17 - A chart showing the industrial electricity cost in kWH for selected European Countries including the UK (in Euro)
Figure 18 - A chart and table showing the average forecast Data Centre rack space & m2 rentals in Euro per month (from the end of 2022 to the end of 2026)
Figure 19 - A table showing the spread of average European Data Centre pricing rack space (from the lowest to the highest rate) in Euro per month
Figure 20 - A chart showing the forecast UK Data Centre revenues in millions of Euro per annum (from 2022 to 20256
Figure 21 - A chart showing the forecast UK Cloud revenues in millions of Euro per annum (from 2022 to 2026)
A selection of companies mentioned in this report includes:
- Ark Data Centres
- Asanti Datacenter
- CyrusOne
- Equinix Data Centre
- GTR Slough
- NTT London One Data Centre
- Proximity Data Centre
- Pulsant Data Centre
- Telehouse Europe Data Centre
- Vantage Data Centers
- xScale 11x Data Centre
- Yondr Group Slough Data Centre
The analyst researches its reports typically within a three-month period. All of its reports are based on primary and secondary research including interviews with relevant companies/operators covered in the report. The analyst also draws on its extensive in-house database and its contacts in the field of telecommunications it has established since the company was launched in 2006.
The analyst has 26-years of experience in the field of telecoms pricing both mobile and fixed. They have a network of consultants as well as a multi-lingual research team, with languages spoken French, German, Polish and Spanish.
LOADING...