Middle East & Africa Real-Time Location Systems Market Forecast to 2031 - Regional Analysis - by Offering, Technology, Industry Vertical, and Application

  • PDF Icon

    Report

  • 200 Pages
  • April 2025
  • Region: Africa, Middle East
  • The Insight Partners
  • ID: 5888069
The Middle East & Africa real-time location systems market was valued at US$ 603.38 million in 2023 and is expected to reach US$ 3.05 billion by 2031; it is estimated to register a CAGR of 22.5% from 2023 to 2031.

Growing Use of RTLS in Healthcare Sector Drives Middle East & Africa Real-Time Location Systems Market

In the healthcare sector, RTLS is used to maintain patient safety and provide great experience and satisfaction. The technology can assist in tracking patient flow for throughput management, which can further help recognize and address bottlenecks. It can also help find solutions for problems such as long waiting times; overcrowding in emergency rooms, outpatient clinics, and post-anesthesia care units; delay or rescheduling of surgeries; and shortage of beds for patients. RTLS technology is used in everyday operations or emergencies at hospitals to locate hospital assets such as beds, equipment, wheelchairs, and others quickly and reliably. In emergencies and when the hospital is nearing capacity, RTLS can help notify the availability of a bed when a patient is discharged. Through this, hospitals can achieve up to 50% faster bed turnover times. In addition, the technology can assist in keeping track of medical devices such as IV pumps, ICU ventilators, and defibrillators to ensure their availability when needed, thus helping to save the lives of critical patients. Furthermore, by using RTLS, patients or staff members can be tracked. For instance, patients suffering from mental distress who must be watched closely can be easily tracked through RTLS technology if they wander away from their treatment area or into other parts of the facility. The RTLS-embedded solution will send an alert whenever patients cross a virtual boundary into an unauthorized area. It can provide a high level of security to patients and reduce the time of staff members, which should be devoted to directly monitoring these patients. As the RTLS technology can help track assets and patients, its demand is expected to increase in the healthcare sector during the forecast period.

Additionally, SLAM technology could significantly enhance the effectiveness of the RTLS in healthcare. By using SLAM, hospitals can improve the precision of indoor navigation and asset tracking, even in complex environments with limited GPS access. SLAM enables real-time mapping and location tracking, allowing healthcare providers to monitor the movement of patients, staff, and medical equipment more accurately. As SLAM improves the accuracy and reliability of RTLS, its integration into healthcare systems is expected to drive the demand for real-time location tracking solutions, improving patient care and operational efficiency.

Middle East & Africa Real-Time Location Systems Market Overview

The Middle East & Africa real-time location system market is segmented into South Africa, Saudi Arabia, the UAE, and the Rest of MEA. With the rising proliferation of smartphones, coupled with the expansion of internet connectivity across the Middle East, there is a noteworthy increase in online shopping in the region. Additionally, several countries in the MEA have a large internet user base. For instance, according to the Digital 2023: The United Arab Emirates report, in early 2023, there were ~9.38 million internet users in the UAE, indicating a 99.0% internet penetration rate. Similarly, according to the Digital 2023: Saudi Arabia Report, there were 36.31 million Saudi Arabian internet users in 2023 indicating a 99.0% internet penetration. The increase in internet users in the region is expected to fuel the growth of the e-commerce industry in the MEA. According to the International Trade Administration, by 2024, the number of Saudi internet users for e-commerce is expected to reach 33.6 million, an increase of 42% from 2019. According to the Dubai Chamber of Commerce and Industry, the e-commerce industry in the UAE is expected to generate sales of US$ 8 billion by 2025. Furthermore, other countries in the MEA, such as Bahrain, Kuwait, and Qatar, are adopting the e-retail mode of distribution, which is expected to influence the growth of the MEA real-time location system market in the coming years.

Middle East & Africa Real-Time Location Systems Market Segmentation

The Middle East & Africa real-time location systems market is categorized into offering, technology, industry vertical, application, and country.

By offerings, the Middle East & Africa real-time location systems market is divided into hardware, software, and services. The hardware segment held the largest share of the Middle East & Africa real-time location systems market share in 2023.

In terms of technology, the Middle East & Africa real-time location systems market is segmented into RFID, UWB, BLE, ultrasound, infrared, GPS, Wi-Fi, and ZIGBEE. The BLE segment held the largest share of the Middle East & Africa real-time location systems market share in 2023.

Based on industry vertical, the Middle East & Africa real-time location systems market is segmented into retail, government and defense, manufacturing, healthcare, logistics, heavy industries, construction, oil and gas, automotive, and others. The healthcare segment held the largest share of the Middle East & Africa real-time location systems market share in 2023.

By application, the Middle East & Africa real-time location systems market is divided into personnel or staff locating and monitoring, environmental monitoring, access control and security, warehouse management and monitoring, supply chain management and operation automation or visibility, and others. The supply chain management and operation automation or visibility segment held the largest share of the Middle East & Africa real-time location systems market share in 2023.

Based on country, the Middle East & Africa real-time location systems market is segmented into South Africa, Saudi Arabia, the UAE, and the Rest of Middle East & Africa. The UAE segment held the largest share of Middle East & Africa real-time location systems market in 2023.

AiRISTA Flow Inc, Aruba Networks, Impinj Inc, Kudan Inc, Microsoft Corp, NavVis GmbH, Qorvo Inc, Sevensense Robotics AG, Siemens AG, Slamcore Ltd, Sonitor Technologies AS, Stanley Black & Decker Inc, TeleTracking Technologies Inc, Ubisense Ltd, and Zebra Technologies Corp are among the leading companies operating in the Middle East & Africa real-time location systems market.

Reasons to Buy
  • Save and reduce time carrying out entry-level research by identifying the growth, size, leading players, and segments in the Middle East & Africa real-time location systems market.
  • Highlights key business priorities to assist companies to realign their business strategies.
  • The key findings and recommendations highlight crucial progressive industry trends in Middle East & Africa real-time location systems market, thereby allowing players across the value chain to develop effective long-term strategies.
  • Develop/modify business expansion plans by using substantial growth offering developed and emerging markets.
  • Scrutinize in-depth Middle East & Africa market trends and outlook coupled with the factors driving Middle East & Africa real-time location systems market, as well as those hindering it.
  • Enhance the decision-making process by understanding the strategies that underpin commercial interest with respect to client products, segmentation, pricing, and distribution.

Table of Contents

1. Introduction
1.1 Report Guidance
1.2 Market Segmentation
2. Executive Summary
2.1 Key Insights
2.2 Market Attractiveness
3. Research Methodology
3.1 Secondary Research
3.2 Primary Research
3.2.1 Hypothesis formulation:
3.2.2 Macro-economic factor analysis:
3.2.3 Developing base number:
3.2.4 Data Triangulation:
3.2.5 Country level data:
4. Middle East & Africa Real-Time Location Systems Market Landscape
4.1 Overview
4.2 PEST Analysis
4.3 Ecosystem Analysis
4.3.1 List of Vendors in the Value Chain
5. Middle East & Africa Real-Time Location Systems Market - Key Market Dynamics
5.1 Middle East & Africa Real-Time Location Systems Market - Key Market Dynamics
5.2 Market Drivers
5.2.1 Rising Demand for Connected Devices
5.2.2 Growing E-Commerce Sector
5.3 Market Restraints
5.3.1 Rising Concerns Regarding Data Privacy and Security
5.4 Market Opportunities
5.4.1 Emergence of 5G
5.5 Future Trends
5.5.1 Growing Use of RTLS in Healthcare Sector
5.6 Impact of Drivers and Restraints:
6. Middle East & Africa Real-Time Location Systems Market - Analysis
6.1 Middle East & Africa Real-Time Location Systems Market Revenue (US$ Million), 2021-2031
6.2 Middle East & Africa Real-Time Location Systems Market Forecast Analysis
7. Middle East & Africa Real-Time Location Systems Market Analysis - by Offering
7.1 Hardware
7.1.1 Overview
7.1.2 Hardware: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
7.2 Software
7.2.1 Overview
7.2.2 Software: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
7.3 Services
7.3.1 Overview
7.3.2 Services: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
8. Middle East & Africa Real-Time Location Systems Market Analysis - by Technology
8.1 RFID
8.1.1 Overview
8.1.2 RFID: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
8.2 UWB
8.2.1 Overview
8.2.2 UWB: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
8.3 BLE
8.3.1 Overview
8.3.2 BLE: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
8.4 Ultrasound
8.4.1 Overview
8.4.2 Ultrasound: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
8.5 Infrared
8.5.1 Overview
8.5.2 Infrared: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
8.6 GPS
8.6.1 Overview
8.6.2 GPS: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
8.7 Wi-Fi
8.7.1 Overview
8.7.2 Wi-Fi: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
8.8 ZIGBEE
8.8.1 Overview
8.8.2 ZIGBEE: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
9. Middle East & Africa Real-Time Location Systems Market Analysis - by Industry Vertical
9.1 Retail
9.1.1 Overview
9.1.2 Retail: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
9.2 Government and Defense
9.2.1 Overview
9.2.2 Government and Defense: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
9.3 Manufacturing
9.3.1 Overview
9.3.2 Manufacturing: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
9.4 Healthcare
9.4.1 Overview
9.4.2 Healthcare: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
9.5 Logistics
9.5.1 Overview
9.5.2 Logistics: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
9.6 Heavy Industries
9.6.1 Overview
9.6.2 Heavy Industries: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
9.7 Construction
9.7.1 Overview
9.7.2 Construction: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
9.8 Oil and Gas
9.8.1 Overview
9.8.2 Oil and Gas: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
9.9 Automotive
9.9.1 Overview
9.9.2 Automotive: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
9.10 Others
9.10.1 Overview
9.10.2 Others: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
10. Middle East & Africa Real-Time Location Systems Market Analysis - by Application
10.1 Personnel or Staff Locating and Monitoring
10.1.1 Overview
10.1.2 Personnel or Staff Locating and Monitoring: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
10.2 Environmental Monitoring
10.2.1 Overview
10.2.2 Environmental Monitoring: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
10.3 Access Control and Security
10.3.1 Overview
10.3.2 Access Control and Security: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
10.4 Warehouse Management and Monitoring
10.4.1 Overview
10.4.2 Warehouse Management and Monitoring: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
10.5 Supply Chain Management and Operation Automation or Visibility
10.5.1 Overview
10.5.2 Supply Chain Management and Operation Automation or Visibility: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
10.6 Others
10.6.1 Overview
10.6.2 Others: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
11. Middle East & Africa Real-Time Location Systems Market - Country Analysis
11.1 Middle East & Africa
11.1.1 Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast Analysis - by Country
11.1.1.1 Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast Analysis - by Country
11.1.1.2 South Africa: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
11.1.1.2.1 South Africa: Middle East & Africa Real-Time Location Systems Market Share - by Offering
11.1.1.2.2 South Africa: Middle East & Africa Real-Time Location Systems Market Share - by Technology
11.1.1.2.3 South Africa: Middle East & Africa Real-Time Location Systems Market Share - by Industry Vertical
11.1.1.2.4 South Africa: Middle East & Africa Real-Time Location Systems Market Share - by Application
11.1.1.3 Saudi Arabia: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
11.1.1.3.1 Saudi Arabia: Middle East & Africa Real-Time Location Systems Market Share - by Offering
11.1.1.3.2 Saudi Arabia: Middle East & Africa Real-Time Location Systems Market Share - by Technology
11.1.1.3.3 Saudi Arabia: Middle East & Africa Real-Time Location Systems Market Share - by Industry Vertical
11.1.1.3.4 Saudi Arabia: Middle East & Africa Real-Time Location Systems Market Share - by Application
11.1.1.4 United Arab Emirates: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
11.1.1.4.1 United Arab Emirates: Middle East & Africa Real-Time Location Systems Market Share - by Offering
11.1.1.4.2 United Arab Emirates: Middle East & Africa Real-Time Location Systems Market Share - by Technology
11.1.1.4.3 United Arab Emirates: Middle East & Africa Real-Time Location Systems Market Share - by Industry Vertical
11.1.1.4.4 United Arab Emirates: Middle East & Africa Real-Time Location Systems Market Share - by Application
11.1.1.5 Rest of Middle East & Africa: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
11.1.1.5.1 Rest of Middle East & Africa: Middle East & Africa Real-Time Location Systems Market Share - by Offering
11.1.1.5.2 Rest of Middle East & Africa: Middle East & Africa Real-Time Location Systems Market Share - by Technology
11.1.1.5.3 Rest of Middle East & Africa: Middle East & Africa Real-Time Location Systems Market Share - by Industry Vertical
11.1.1.5.4 Rest of Middle East & Africa: Middle East & Africa Real-Time Location Systems Market Share - by Application
12. Competitive Landscape
12.1 Heat Map Analysis by Key Players
12.2 Company Positioning and Concentration
13. Industry Landscape
13.1 Overview
13.2 Market Initiative
13.3 Product Development
13.4 Mergers & Acquisition
14. Company Profiles
14.1 Aruba Networks
14.1.1 Key Facts
14.1.2 Business Description
14.1.3 Products and Services
14.1.4 Financial Overview
14.1.5 SWOT Analysis
14.1.6 Key Developments
14.2 AiRISTA Flow Inc
14.2.1 Key Facts
14.2.2 Business Description
14.2.3 Products and Services
14.2.4 Financial Overview
14.2.5 SWOT Analysis
14.2.6 Key Developments
14.3 Impinj Inc
14.3.1 Key Facts
14.3.2 Business Description
14.3.3 Products and Services
14.3.4 Financial Overview
14.3.5 SWOT Analysis
14.3.6 Key Developments
14.4 Siemens AG
14.4.1 Key Facts
14.4.2 Business Description
14.4.3 Products and Services
14.4.4 Financial Overview
14.4.5 SWOT Analysis
14.4.6 Key Developments
14.5 Zebra Technologies Corp
14.5.1 Key Facts
14.5.2 Business Description
14.5.3 Products and Services
14.5.4 Financial Overview
14.5.5 SWOT Analysis
14.5.6 Key Developments
14.6 Sonitor Technologies AS
14.6.1 Key Facts
14.6.2 Business Description
14.6.3 Products and Services
14.6.4 Financial Overview
14.6.5 SWOT Analysis
14.6.6 Key Developments
14.7 Stanley Black & Decker Inc
14.7.1 Key Facts
14.7.2 Business Description
14.7.3 Products and Services
14.7.4 Financial Overview
14.7.5 SWOT Analysis
14.7.6 Key Developments
14.8 TeleTracking Technologies Inc
14.8.1 Key Facts
14.8.2 Business Description
14.8.3 Products and Services
14.8.4 Financial Overview
14.8.5 SWOT Analysis
14.8.6 Key Developments
14.9 Ubisense Ltd
14.9.1 Key Facts
14.9.2 Business Description
14.9.3 Products and Services
14.9.4 Financial Overview
14.9.5 SWOT Analysis
14.9.6 Key Developments
14.10 Slamcore Ltd
14.10.1 Key Facts
14.10.2 Business Description
14.10.3 Products and Services
14.10.4 Financial Overview
14.10.5 SWOT Analysis
14.10.6 Key Developments
14.11 Kudan Inc
14.11.1 Key Facts
14.11.2 Business Description
14.11.3 Products and Services
14.11.4 Financial Overview
14.11.5 SWOT Analysis
14.11.6 Key Developments
14.12 Microsoft Corp
14.12.1 Key Facts
14.12.2 Business Description
14.12.3 Products and Services
14.12.4 Financial Overview
14.12.5 SWOT Analysis
14.12.6 Key Developments
14.13 Sevensense Robotics AG
14.13.1 Key Facts
14.13.2 Business Description
14.13.3 Products and Services
14.13.4 Financial Overview
14.13.5 SWOT Analysis
14.13.6 Key Developments
14.14 NavVis GmbH
14.14.1 Key Facts
14.14.2 Business Description
14.14.3 Products and Services
14.14.4 Financial Overview
14.14.5 SWOT Analysis
14.14.6 Key Developments
14.15 Qorvo Inc
14.15.1 Key Facts
14.15.2 Business Description
14.15.3 Products and Services
14.15.4 Financial Overview
14.15.5 SWOT Analysis
14.15.6 Key Developments
15. Appendix
15.1 About Us
List of Tables
Table 1. Middle East & Africa Real-Time Location Systems Market Segmentation
Table 2. List of Vendors
Table 3. Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
Table 4. Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million) - by Offering
Table 5. Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million) - by Technology
Table 6. Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million) - by Industry Vertical
Table 7. Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million) - by Application
Table 8. Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million) - by Country
Table 9. South Africa: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021 - 2031 (US$ Million) - by Offering
Table 10. South Africa: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021 - 2031 (US$ Million) - by Technology
Table 11. South Africa: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021 - 2031 (US$ Million) - by Industry Vertical
Table 12. South Africa: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021 - 2031 (US$ Million) - by Application
Table 13. Saudi Arabia: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021 - 2031 (US$ Million) - by Offering
Table 14. Saudi Arabia: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021 - 2031 (US$ Million) - by Technology
Table 15. Saudi Arabia: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021 - 2031 (US$ Million) - by Industry Vertical
Table 16. Saudi Arabia: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021 - 2031 (US$ Million) - by Application
Table 17. United Arab Emirates: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021 - 2031 (US$ Million) - by Offering
Table 18. United Arab Emirates: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021 - 2031 (US$ Million) - by Technology
Table 19. United Arab Emirates: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021 - 2031 (US$ Million) - by Industry Vertical
Table 20. United Arab Emirates: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021 - 2031 (US$ Million) - by Application
Table 21. Rest of Middle East & Africa: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021 - 2031 (US$ Million) - by Offering
Table 22. Rest of Middle East & Africa: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021 - 2031 (US$ Million) - by Technology
Table 23. Rest of Middle East & Africa: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021 - 2031 (US$ Million) - by Industry Vertical
Table 24. Rest of Middle East & Africa: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021 - 2031 (US$ Million) - by Application
List of Figures
Figure 1. Middle East & Africa Real-Time Location Systems Market Segmentation - Country
Figure 2. Middle East & Africa - PEST Analysis
Figure 3. Impact Analysis of Drivers and Restraints
Figure 4. Middle East & Africa Real-Time Location Systems Market Revenue (US$ Million), 2021-2031
Figure 5. Middle East & Africa Real-Time Location Systems Market Share (%) - by Offering (2023 and 2031)
Figure 6. Hardware: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
Figure 7. Software: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
Figure 8. Services: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
Figure 9. Middle East & Africa Real-Time Location Systems Market Share (%) - by Technology (2023 and 2031)
Figure 10. RFID: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
Figure 11. UWB: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
Figure 12. BLE: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
Figure 13. Ultrasound: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
Figure 14. Infrared: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
Figure 15. GPS: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
Figure 16. Wi-Fi: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
Figure 17. ZIGBEE: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
Figure 18. Middle East & Africa Real-Time Location Systems Market Share (%) - by Industry Vertical (2023 and 2031)
Figure 19. Retail: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
Figure 20. Government and Defense: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
Figure 21. Manufacturing: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
Figure 22. Healthcare: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
Figure 23. Logistics: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
Figure 24. Heavy Industries: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
Figure 25. Construction: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
Figure 26. Oil and Gas: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
Figure 27. Automotive: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
Figure 28. Others: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
Figure 29. Middle East & Africa Real-Time Location Systems Market Share (%) - by Application (2023 and 2031)
Figure 30. Personnel or Staff Locating and Monitoring: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
Figure 31. Environmental Monitoring: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
Figure 32. Access Control and Security: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
Figure 33. Warehouse Management and Monitoring: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
Figure 34. Supply Chain Management and Operation Automation or Visibility: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
Figure 35. Others: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021-2031 (US$ Million)
Figure 36. Middle East & Africa Real-Time Location Systems Market Breakdown, by Key Countries, 2023 and 2031 (%)
Figure 37. South Africa: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021- 2031 (US$ Million)
Figure 38. Saudi Arabia: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021- 2031 (US$ Million)
Figure 39. United Arab Emirates: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021- 2031 (US$ Million)
Figure 40. Rest of Middle East & Africa: Middle East & Africa Real-Time Location Systems Market - Revenue and Forecast, 2021- 2031 (US$ Million)
Figure 41. Heat Map Analysis by Key Players
Figure 42. Company Positioning and Concentration

Companies Mentioned

Some of the leading companies in the Middle East & Africa Real-Time Location Systems Market include:
  • AiRISTA Flow Inc
  • Aruba Networks
  • Impinj Inc
  • Kudan Inc
  • Microsoft Corp
  • NavVis GmbH
  • Qorvo Inc
  • Sevensense Robotics AG
  • Siemens AG
  • Slamcore Ltd
  • Sonitor Technologies AS
  • Stanley Black & Decker Inc
  • TeleTracking Technologies Inc
  • Ubisense Ltd
  • Zebra Technologies Corp

Table Information