Middle East & Africa Real-Time Location Systems Market Forecast to 2030 - Regional Analysis by Offering, Technology, Industry Vertical, and Application

  • PDF Icon

    Report

  • 113 Pages
  • August 2024
  • Region: Africa, Middle East
  • The Insight Partners
  • ID: 5888069
The Middle East & Africa real-time location systems market was valued at US$ 489.76 million in 2022 and is expected to reach US$ 2.66 billion by 2030; it is estimated to record a CAGR of 23.6% from 2022 to 2030 .

Growing Use of RTLS in Healthcare Sector Bolsters Middle East & Africa Real-Time Location Systems Market

In the healthcare sector, RTLS is used to maintain patient safety and provide great experience and satisfaction. The technology can assist in tracking patient flow for throughput management, which can further help to recognize and address bottlenecks. It can also help to find solutions for the problems such as long waiting times; overcrowding in emergency rooms, outpatient clinics, and post-anesthesia care units; delay or rescheduling of surgeries; and shortage of beds for patients. RTLS technology is used in everyday operations or emergencies at hospitals to locate hospital assets such as beds, equipment, wheelchairs, and others quickly and reliably.

In emergencies and when the hospital is nearing capacity, RTLS can help notify the availability of a bed when a patient is discharged. Through this, hospitals can achieve up to 50% faster bed turnover times. In addition, the technology can assist in keeping track of medical devices such as IV pumps, ICU ventilators, and defibrillators to ensure their availability when needed, thus can help to save the life of critical patients. Furthermore, by using RTLS, patients or staff members can be tracked. For instance, patients suffering from mental distress who must be watched closely can be easily tracked through RTLS technology if they wander away from their treatment area or into other parts of the facility.

The RTLS-embedded solution will send an alert whenever patients cross a virtual boundary into an unauthorized area. It can provide a high level of security to patients and reduce the time of staff members, which should be devoted to directly monitoring these patients. As the RTLS technology can help track assets and patients, its demand is expected to increase in the healthcare sector during the forecast period.

Middle East & Africa Real-Time Location Systems Market Overview

The real-time location system market in the MEA is segmented into South Africa, Saudi Arabia, the UAE, and the Rest of MEA. With the rising proliferation of smartphones, coupled with the expansion of internet connectivity across the Middle East, there is a noteworthy increase in online shopping in the region. Additionally, several countries in the MEA have a large internet user base. For instance, according to the Digital 2023: The United Arab Emirates report, in early 2023, there were ~9.38 million internet users in the UAE, indicating a 99.0% internet penetration rate.

Similarly, according to the bulletin of the General Authority for Statistics (GASTAT), the rate of internet users in Saudi Arabia jumped to 94.3% in 2022, which is an increase of 1.4% from 2021. The increase in internet users in the region is expected to fuel the growth of the e-commerce industry in the MEA. According to the International Trade Administration, by 2024, the number of Saudi internet users for e-commerce is expected to reach 33.6 million, an increase of 42% from 2019.

Similarly, the e-commerce market of the UAE jumped by 53% in 2020, with a record of US$ 3.9 billion in e-commerce sales. Furthermore, other countries in the MEA, such as Bahrain, Kuwait, and Qatar, are adopting the e-retail mode of distribution, which is expected to influence the growth of the MEA real-time location system market in the coming years.

The oil & gas industry in the region is one of the largest industries, producing approximately one-third of the total oil production globally. According to the International Trade Administration, the UAE is among the world's top ten largest oil producers. Nearly 96% of the country’s oil reserves, ~100 billion barrels, are in Abu Dhabi. The country also produces an average of 3.2 million barrels of petroleum and liquids per day. Similarly, Saudi Arabia has ~17% of the world’s proven petroleum reserves, making the country one of the largest petroleum exporters. Also, Saudi Arabia has the second-largest proven oil reserves in the world.

Due to the Russia-Ukraine war, many countries have banned business with Russia, which has fueled the growth of the oil & gas industry in the MEA. To cater to this rising demand for oil and gas, various drilling and exploration activities are carried out in the country. These activities need to be monitored properly to stop any mishaps from occurring. The RTLS solutions can help track personnel and assets' location, improving operational efficiency at the oil and gas exploration plants. Hence, growing e-commerce industry and increasing oil and gas exploration activities are expected to propel the growth of the Middle East & Africa real-time location system market during the forecast period.

Middle East & Africa Real-Time Location Systems Market Segmentation

  • The Middle East & Africa real-time location systems market is categorized into offering, technology, industry vertical, application, and country.
  • Based on offering, the Middle East & Africa real-time location systems market is categorized into hardware, software, and services. The hardware segment held the largest market share in 2022.
  • By technology, the Middle East & Africa real-time location systems market is segmented into RFID, UWB, BLE, Ultrasound, Infrared, GPS, Wi-Fi, and ZIGBEE. The BLE segment held the largest market share in 2022.
  • In terms of industry vertical, the Middle East & Africa real-time location systems market is categorized into retail, government and defense, manufacturing, healthcare, logistics, heavy industries, construction, oil and gas, automotive, and others. The healthcare segment held the largest market share in 2022.
  • In terms of application, the Middle East & Africa real-time location systems market is segmented into personnel/staff locating and monitoring, environmental monitoring, access control and security, warehouse management and monitoring, supply chain management and operational automation/visibility, and others. The supply chain management and operational automation/visibility management segment held the largest market share in 2022.
  • By country, the Middle East & Africa real-time location systems market is segmented into South Africa, Saudi Arabia, the UAE, and the Rest of Middle East & Africa. The UAE dominated the Middle East & Africa real-time location systems market share in 2022.
  • Aruba Networks, Qorvo Inc, Siemens AG, Zebra Technologies Corp, Sonitor Technologies AS, and Stanley Black & Decker Inc are some of the leading companies operating in the Middle East & Africa real-time location systems market.

Market Highlights

  • Based on offering, the Middle East & Africa real-time location systems market is categorized into hardware, software, and services. The hardware segment held 68.4% market share in 2022, amassing US$ 334.78 million. It is projected to garner US$ 1.78 billion by 2030 to register 23.3% CAGR during 2022-2030.
  • In terms of technology, the Middle East & Africa real-time location systems market is categorized into RFID, UWB, BLE, Ultrasound, Infrared, GPS, Wi-Fi, and ZIGBEE. The BLE segment held 29.3% share of Middle East & Africa real-time location systems market in 2022, amassing US$ 143.64 million. It is projected to garner US$ 704.28 million by 2030 to expand at 22.0% CAGR from 2022 to 2030.
  • The healthcare segment held 15.5% share of Middle East & Africa real-time location systems market in 2022, amassing US$ 75.83 million. It is predicted to garner US$ 491.58 million by 2030 to expand at 26.3% CAGR between 2022 and 2030.
  • In terms of application, the Middle East & Africa real-time location systems market is segmented into personnel/staff locating and monitoring, environmental monitoring, access control and security, warehouse management and monitoring, supply chain management and operational automation/visibility, and others. The supply chain management and operational automation/visibility management segment held 27.7% share of Middle East & Africa real-time location systems market in 2022, amassing US$ 135.44 million. It is estimated to garner US$ 717.50 million by 2030 to expand at 23.2% CAGR during 2022-2030.
  • This analysis states that the UAE capture 33.6% share of Middle East & Africa real-time location systems market in 2022. It was assessed at US$ 164.55 million in 2022 and is likely to hit US$ 885.17 million by 2030, registering a CAGR of 23.4% during 2022-2030.
  • In October 2022, Zebra Technologies Corporation, an innovator at the front line of business with solutions and partners that deliver a performance edge, announced the new PartnerConnect Location and Tracking Specialization for partners focused on selling RFID and real-time location systems (RTLS). Developed as a strategic component of Zebra’s award-winning PartnerConnect program, the new Location and Tracking Specialization provides resellers with the tools they need to drive RFID and RTLS sales and help businesses successfully deploy these solutions for transformational business benefits.
  • In October 2020, MyTechMag has included Sonitor Technologies in its list of 20 best healthcare solution providers adding value and power to Sonitor Sense RTLS technology platform and increasing the company's market recognition.

Reasons to Buy

  • Save and reduce time carrying out entry-level research by identifying the growth, size, leading players, and segments in the Middle East & Africa real-time location systems market.
  • Highlights key business priorities in order to assist companies to realign their business strategies.
  • The key findings and recommendations highlight crucial progressive industry trends in the Middle East & Africa real-time location systems market, thereby allowing players across the value chain to develop effective long-term strategies.
  • Develop/modify business expansion plans by using substantial growth offering developed and emerging markets.
  • Scrutinize in-depth Middle East & Africa market trends and outlook coupled with the factors driving the Middle East & Africa real-time location systems market, as well as those hindering it.
  • Enhance the decision-making process by understanding the strategies that underpin commercial interest with respect to client products, segmentation, pricing, and distribution.

Table of Contents

1. Introduction
1.1 Report Guidance
1.2 Market Segmentation
2. Executive Summary
2.1 Key Insights
2.2 Market Attractiveness
3. Research Methodology
3.1 Coverage
3.2 Secondary Research
3.3 Primary Research
4. Middle East & Africa Real-Time Location Systems Market Landscape
4.1 Overview
4.2 Ecosystem Analysis
4.3 Premium Insights
4.3.1 Analysis on Market Players in Manufacturing Industry
5. Middle East & Africa Real-Time Location Systems Market Key Market Dynamics
5.1 Market Drivers
5.1.1 Rising Demand for Connected Devices
5.1.2 Growing E-Commerce Sector
5.1.3 Rising Safety and Security Concerns of Patients and Staff
5.2 Key Market Restraints
5.2.1 Rising Concerns Regarding Data Privacy and Security
5.3 Key Market Opportunities
5.3.1 Emergence of 5G
5.3.2 Technological Advancements Associated with RFID
5.4 Future Trends
5.4.1 Growing Use of RTLS in Healthcare Sector
5.5 Impact Analysis of Drivers and Restraints
6. Real-Time Location Systems Market - Middle East & Africa Market Analysis
6.1 Real-Time Location Systems Market - Middle East & Africa Revenue and Forecast to 2030 (US$ Million)
7. Middle East & Africa Real-Time Location Systems Market Analysis - by Offering
7.1 Hardware
7.1.1 Overview
7.1.2 Hardware: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
7.2 Software
7.2.1 Overview
7.2.2 Software: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
7.3 Services
7.3.1 Overview
7.3.2 Services: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
8. Middle East & Africa Real-Time Location Systems Market Analysis - by Technology
8.1 RFID
8.1.1 Overview
8.1.2 RFID: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
8.2 UWB
8.2.1 Overview
8.2.2 UWB: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
8.3 BLE
8.3.1 Overview
8.3.2 BLE: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
8.4 Ultrasound
8.4.1 Overview
8.4.2 Ultrasound: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
8.5 Infrared
8.5.1 Overview
8.5.2 Infrared: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
8.6 GPS
8.6.1 Overview
8.6.2 GPS: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
8.7 Wi-Fi
8.7.1 Overview
8.7.2 Wi-Fi: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
8.8 ZIGBEE
8.8.1 Overview
8.8.2 ZIGBEE: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
9. Middle East & Africa Real-Time Location Systems Market Analysis - by Industry Vertical
9.1 Retail
9.1.1 Overview
9.1.2 Retail: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
9.2 Government and Defense
9.2.1 Overview
9.2.2 Government and Defense: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
9.3 Manufacturing
9.3.1 Overview
9.3.2 Manufacturing: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
9.4 Healthcare
9.4.1 Overview
9.4.2 Healthcare: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
9.5 Logistics
9.5.1 Overview
9.5.2 Logistics: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
9.6 Heavy Industries
9.6.1 Overview
9.6.2 Heavy Industries: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
9.7 Construction
9.7.1 Overview
9.7.2 Construction: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
9.8 Oil and Gas
9.8.1 Overview
9.8.2 Oil and Gas: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
9.9 Automotive
9.9.1 Overview
9.9.2 Automotive: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
9.10 Others
9.10.1 Overview
9.10.2 Others: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
10. Middle East & Africa Real-Time Location Systems Market Analysis - by Application
10.1 Personnel/Staff Locating and Monitoring
10.1.1 Overview
10.1.2 Personnel/Staff Locating and Monitoring: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
10.2 Environmental Monitoring
10.2.1 Overview
10.2.2 Environmental Monitoring: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
10.3 Access Control and Security
10.3.1 Overview
10.3.2 Access Control and Security: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
10.4 Warehouse Management and Monitoring
10.4.1 Overview
10.4.2 Warehouse Management and Monitoring: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
10.5 Supply Chain Management and Operational Automation/Visibility
10.5.1 Overview
10.5.2 Supply Chain Management and Operational Automation/Visibility: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
10.6 Others
10.6.1 Overview
10.6.2 Others: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
11. Middle East & Africa Real-Time Location Systems Market - Country Analysis
11.1 Middle East & Africa Market Overview
11.1.1 Middle East & Africa: Real-Time Location Systems Market - Revenue and Forecast Analysis - by Country
11.1.1.1 Middle East & Africa: Real-Time Location Systems Market - Revenue and Forecast Analysis - by Country
11.1.1.2 South Africa: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
11.1.1.2.1 South Africa: Real-Time Location Systems Market Breakdown, by Offering
11.1.1.2.2 South Africa: Real-Time Location Systems Market Breakdown, by Technology
11.1.1.2.3 South Africa: Real-Time Location Systems Market Breakdown, by Technology
11.1.1.2.4 South Africa: Real-Time Location Systems Market Breakdown, by Industry Vertical
11.1.1.2.5 South Africa: Real-Time Location Systems Market Breakdown, by Application
11.1.1.3 Saudi Arabia: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
11.1.1.3.1 Saudi Arabia: Real-Time Location Systems Market Breakdown, by Offering
11.1.1.3.2 Saudi Arabia: Real-Time Location Systems Market Breakdown, by Technology
11.1.1.3.3 Saudi Arabia: Real-Time Location Systems Market Breakdown, by Technology
11.1.1.3.4 Saudi Arabia: Real-Time Location Systems Market Breakdown, by Industry Vertical
11.1.1.3.5 Saudi Arabia: Real-Time Location Systems Market Breakdown, by Application
11.1.1.4 United Arab Emirates: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
11.1.1.4.1 United Arab Emirates: Real-Time Location Systems Market Breakdown, by Offering
11.1.1.4.2 United Arab Emirates: Real-Time Location Systems Market Breakdown, by Technology
11.1.1.4.3 United Arab Emirates: Real-Time Location Systems Market Breakdown, by Technology
11.1.1.4.4 United Arab Emirates: Real-Time Location Systems Market Breakdown, by Industry Vertical
11.1.1.4.5 United Arab Emirates: Real-Time Location Systems Market Breakdown, by Application
11.1.1.5 Rest of Middle East & Africa: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
11.1.1.5.1 Rest of Middle East & Africa: Real-Time Location Systems Market Breakdown, by Offering
11.1.1.5.2 Rest of Middle East & Africa: Real-Time Location Systems Market Breakdown, by Technology
11.1.1.5.3 Rest of Middle East & Africa: Real-Time Location Systems Market Breakdown, by Technology
11.1.1.5.4 Rest of Middle East & Africa: Real-Time Location Systems Market Breakdown, by Industry Vertical
11.1.1.5.5 Rest of Middle East & Africa: Real-Time Location Systems Market Breakdown, by Application
12. Industry Landscape
12.1 Overview
12.2 Market Initiatives
12.3 Product Developments
12.4 Mergers & Acquisitions
13. Company Profiles
13.1 Aruba Networks
13.1.1 Key Facts
13.1.2 Business Description
13.1.3 Products and Services
13.1.4 Financial Overview
13.1.5 SWOT Analysis
13.1.6 Key Developments
13.2 Qorvo Inc
13.2.1 Key Facts
13.2.2 Business Description
13.2.3 Products and Services
13.2.4 Financial Overview
13.2.5 SWOT Analysis
13.2.6 Key Developments
13.3 Siemens AG
13.3.1 Key Facts
13.3.2 Business Description
13.3.3 Products and Services
13.3.4 Financial Overview
13.3.5 SWOT Analysis
13.3.6 Key Developments
13.4 Zebra Technologies Corp
13.4.1 Key Facts
13.4.2 Business Description
13.4.3 Products and Services
13.4.4 Financial Overview
13.4.5 SWOT Analysis
13.4.6 Key Developments
13.5 Sonitor Technologies AS
13.5.1 Key Facts
13.5.2 Business Description
13.5.3 Products and Services
13.5.4 Financial Overview
13.5.5 SWOT Analysis
13.5.6 Key Developments
13.6 Stanley Black & Decker Inc
13.6.1 Key Facts
13.6.2 Business Description
13.6.3 Products and Services
13.6.4 Financial Overview
13.6.5 SWOT Analysis
13.6.6 Key Developments
14. Appendix
14.1 About the Publisher
14.2 Word Index
List of Tables
Table 1. Middle East & Africa Real-Time Location Systems Market Segmentation
Table 2. Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Table 3. Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million) - by Offering
Table 4. Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million) - by Technology
Table 5. Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million) - by Industry Vertical
Table 6. Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million) - by Application
Table 7. Middle East & Africa: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million) - by Country
Table 8. South Africa: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million) - by Offering
Table 9. South Africa: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million) - by Technology
Table 10. South Africa: Real-Time Location Systems Market - Revenue and Forecast to 2030 (Thousand Units) - by Technology
Table 11. South Africa: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million) - by Industry Vertical
Table 12. South Africa: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million) - by Application
Table 13. Saudi Arabia: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million) - by Offering
Table 14. Saudi Arabia: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million) - by Technology
Table 15. Saudi Arabia: Real-Time Location Systems Market - Revenue and Forecast to 2030 (Thousand Units) - by Technology
Table 16. Saudi Arabia: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million) - by Industry Vertical
Table 17. Saudi Arabia: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million) - by Application
Table 18. United Arab Emirates: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million) - by Offering
Table 19. United Arab Emirates: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million) - by Technology
Table 20. United Arab Emirates: Real-Time Location Systems Market - Revenue and Forecast to 2030 (Thousand Units) - by Technology
Table 21. United Arab Emirates: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million) - by Industry Vertical
Table 22. United Arab Emirates: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million) - by Application
Table 23. Rest of Middle East & Africa: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million) - by Offering
Table 24. Rest of Middle East & Africa: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million) - by Technology
Table 25. Rest of Middle East & Africa: Real-Time Location Systems Market - Revenue and Forecast to 2030 (Thousand Units) - by Technology
Table 26. Rest of Middle East & Africa: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million) - by Industry Vertical
Table 27. Rest of Middle East & Africa: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million) - by Application
Table 28. List of Abbreviation
List of Figures
Figure 1. Middle East & Africa Real-Time Location Systems Market Segmentation, by Country
Figure 2. Real-Time Location Systems Market- Ecosystem Analysis
Figure 3. Real-Time Location Systems Market: Impact Analysis of Drivers and Restraints
Figure 4. Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 5. Real-Time Location Systems Market Share (%) - by Offering (2022 and 2030)
Figure 6. Hardware: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 7. Software: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 8. Services: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 9. Real-Time Location Systems Market Share (%) - by Technology (2022 and 2030)
Figure 10. RFID: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 11. UWB: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 12. BLE: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 13. Ultrasound: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 14. Infrared: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 15. GPS: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 16. Wi-Fi: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 17. ZIGBEE: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 18. Real-Time Location Systems Market Share (%) - by Industry Vertical (2022 and 2030)
Figure 19. Retail: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 20. Government and Defense: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 21. Manufacturing: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 22. Healthcare: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 23. Logistics: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 24. Heavy Industries: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 25. Construction: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 26. Oil and Gas: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 27. Automotive: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 28. Others: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 29. Real-Time Location Systems Market Share (%) - by Application (2022 and 2030)
Figure 30. Personnel/Staff Locating and Monitoring: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 31. Environmental Monitoring: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 32. Access Control and Security: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 33. Warehouse Management and Monitoring: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 34. Supply Chain Management and Operational Automation/Visibility: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 35. Others: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 36. Middle East & Africa: Real-Time Location Systems Market, by Key Countries - Revenue (2022) (US$ Million)
Figure 37. Middle East & Africa: Real-Time Location Systems Market Breakdown, by Key Countries, 2022 and 2030 (%)
Figure 38. South Africa: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 39. Saudi Arabia: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 40. United Arab Emirates: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)
Figure 41. Rest of Middle East & Africa: Real-Time Location Systems Market - Revenue and Forecast to 2030 (US$ Million)

Companies Mentioned

Some of the leading companies in the Middle East and Africa Real-Time Location Systems market include:
  • Aruba Networks.
  • Qorvo Inc.
  • Siemens AG.
  • Zebra Technologies Corp.
  • Sonitor Technologies AS.
  • Stanley Black & Decker Inc.

Table Information

This website uses cookies to ensure you get the best experience. Learn more