Global Data Center Construction Market 2017-2021

  • ID: 4143913
  • Report
  • Region: Global
  • 70 pages
  • TechNavio
OFF
until May 31st 2018
1 of 5

FEATURED COMPANIES

  • AECOM
  • Cannon Technologies
  • DPR Construction
  • Holder Construction Group
  • Kirby Group
  • Merrick
  • MORE
1h Free Analyst Time

Speak directly to the analyst to clarify any post sales queries you may have.

About Data Center Construction

A data center is a centralized storehouse — physical or virtual — for remote storage, and processing of data and information. Data centers constitute the backbone of essential business operations. There is a significant growth in the enterprise application worldwide because of the use of advanced technologies to gain competitive advantage. Enterprises are focusing on the construction of green data centers to reduce power consumption and protect the environment. The construction of a data center includes design, architecture, installation of electrical and mechanical systems, as well as general construction services. Data center certifications have gained importance, especially for colocation and managed hosting service providers. They use these certifications to widen their customer base.

The analysts forecast the global data center construction market to grow at a CAGR of 8.32% during the period 2017-2021.

Covered in this report
The report covers the present scenario and the growth prospects of the global data center construction market for 2017-2021. To calculate the market size, the report considers the revenue generated from the investments made in new data centers and the renovation of existing ones to calculate the market size.

The market is divided into the following segments based on geography:
- Americas
- APAC
- EMEA

The report, Global Data Center Construction Market 2017-2021, has been prepared based on an in-depth market analysis with inputs from industry experts. The report covers the market landscape and its growth prospects over the coming years. The report also includes a discussion of the key vendors operating in this market.

Key vendors
- AECOM
- Arup Group
- Corgan
- DPR Construction
- Gensler
- HDR
- Page Southerland Page
- Holder Construction Group
- Jones Engineering Group
- Structure Tone
- Syska Hennessy
- Turner Construction

Other prominent vendors
- Baselayer Technology
- Balfour Beatty
- Beca
- Cannon Technologies
- Clune Construction
- Commodore Contracting
- Constructora Sudamericana
- Drake & Scull International
- Fluor
- Gilbane
- Integrated Design Group
- Jacobs Engineering
- JE Dunn Construction
- Kirby Group
- Kohlberg Kravis Roberts
- M+W Group
- McGough
- Mercury Engineering
- Merrick
- Mortenson Construction
- Nova Mission Critical
- PTS
- Skanska
- Whiting-Turner

Market drivers
- Data center tax incentives and reduction in electricity cost.
- For a full, detailed list, view the full report

Market challenges
- Increased power consumption in data centers.
- For a full, detailed list, view the full report

Market trends
- Adoption of energy-efficient infrastructure.
- For a full, detailed list, view the full report

Key questions answered in this report
- What will the market size be in 2021 and what will the growth rate be?
- What are the key market trends?
- What is driving this market?
- What are the challenges to market growth?
- Who are the Key vendors in this market space?
- What are the market opportunities and threats faced by the key vendors?
- What are the strengths and weaknesses of the key vendors?

You can request one free hour of the analyst’s time when you purchase this market report. Details are provided within the report.
READ MORE
Note: Product cover images may vary from those shown
2 of 5

FEATURED COMPANIES

  • AECOM
  • Cannon Technologies
  • DPR Construction
  • Holder Construction Group
  • Kirby Group
  • Merrick
  • MORE
1h Free Analyst Time

Speak directly to the analyst to clarify any post sales queries you may have.

PART 01: Executive summary

PART 02: Scope of the report

PART 03: Research Methodology

PART 04: Introduction
  • Key market highlights
PART 05: Market landscape
  • Market overview
  • Market size and forecast
PART 06: Five forces analysis
  • Five forces analysis
PART 07: Market segmentation by end-user
  • Global data center construction market by end-user
PART 08: Market segmentation by electrical construction
  • Global data center construction market by electrical construction
PART 09: Market segmentation by mechanical construction
  • Global data center construction by mechanical construction
  • Market segmentation by tier type
  • Global data center construction market by tier type
PART 10: Market segmentation by geography
  • Global data center construction market by geography
PART 11: Decision framework

PART 12: Drivers and challenges
  • Market drivers
  • Impact of drivers on key customer segments
  • Market challenges
  • Impact of challenges on key customer segments
PART 13: Market trends

PART 14: Vendor landscape
  • Competitive scenario
  • Key vendor analysis
PART 15: Appendix
  • List of abbreviations
List of Exhibits
Exhibit 01: Data center construction: Cost analysis
Exhibit 02: Average rack power density of data center 2016 and 2021 (kW per rack)
Exhibit 03: Global data center construction market 2016-2021 ($ billions)
Exhibit 04: Global new data center construction market 2016-2021 ($ billions)
Exhibit 05: Global data center renovation market 2016-2021 ($ billions)
Exhibit 06: Five forces analysis
Exhibit 07: General construction: Services
Exhibit 08: Global data center construction market by general construction segment 2016-2021 ($ billions)
Exhibit 09: Global data center construction market by electrical construction segment 2016-2021 ($ billions)
Exhibit 10: Global data center construction market by mechanical construction segment 2016-2021 ($ billions)
Exhibit 11: Global data center construction market: Segmentation by electrical construction 2016-2021 ($ billions)
Exhibit 12: Global data center construction market: Segmentation by UPS 2016-2021 ($ billions)
Exhibit 13: Global data center construction market: Segmentation by generators 2016-2021 ($ billions)
Exhibit 14: Global data center construction market: Segmentation by transfer switches and switchgears 2016-2021 ($ billions)
Exhibit 15: Global data center construction market: Segmentation by rack PDU 2016-2021 ($ billions)
Exhibit 16: Global data center construction market: Segmentation by others electrical infrastructure 2016-2021 ($ billions)
Exhibit 17: Global data center construction market: Segmentation by mechanical construction 2016-2021 ($ billions)
Exhibit 18: Global data center construction market by cooling solutions segment 2016-2021 ($ billions)
Exhibit 19: Global data center construction market by racks segment 2016-2021 ($ billions)
Exhibit 20: Global data center construction market by other mechanical constructions segment 2016-2021 ($ billions)
Exhibit 21: Tier system for data centers
Exhibit 22: Global Tier 1 and Tier 2 data center construction market 2016-2021 ($ billions)
Exhibit 23: Global Tier 3 data center construction market 2016-2021 ($ billions)
Exhibit 24: Global Tier 4 data center construction market 2016-2021 ($ billions)
Exhibit 25: Global data center construction market by geography 2016 (% share)
Exhibit 26: Global data center construction market by geography 2021 (% share)
Exhibit 27: Data center construction market in Americas 2016-2021 ($ billions)
Exhibit 28: Data center construction market in APAC 2016-2021 ($ billions)
Exhibit 29: Data center construction market in EMEA 2016-2021 ($ billions)
Exhibit 30: Impact of drivers
Exhibit 31: Impact of challenges
Exhibit 32: Other prominent vendors
Note: Product cover images may vary from those shown
3 of 5

Loading
LOADING...

4 of 5

FEATURED COMPANIES

  • AECOM
  • Cannon Technologies
  • DPR Construction
  • Holder Construction Group
  • Kirby Group
  • Merrick
  • MORE
1h Free Analyst Time

Speak directly to the analyst to clarify any post sales queries you may have.

New Report Released: – Global Data Center Construction Market 2017-2021

The author of the report recognizes the following companies as the key players in the global data center construction market: AECOM, Arup Group, Corgan, DPR Construction, Gensler, HDR, Page Southerland Page, Holder Construction Group, Jones Engineering Group, Structure Tone, Syska Hennessy, and Turner Construction.

Other Prominent Vendors in the market are: Baselayer Technology, Balfour Beatty, Beca, Cannon Technologies, Clune Construction, Commodore Contracting, Constructora Sudamericana, Drake & Scull International, Fluor, Gilbane, Integrated Design Group, Jacobs Engineering, JE Dunn Construction, Kirby Group, Kohlberg Kravis Roberts, M+W Group, McGough, Mercury Engineering, Merrick, Mortenson Construction, Nova Mission Critical, PTS, Skanska, and Whiting-Turner.

Commenting on the report, an analyst from the research team said: “One trend in market is increase in purchase of renewable sources of energy. The escalating consumption of electricity by data centers worldwide is creating a thrust toward green data centers that are powered by renewable sources of energy. Advanced designs and strategies are implemented in data centers to enhance its operational performance. Use of renewable energy sources, energy-efficient infrastructure, and waste recycling are some of the methods implemented in green data centers. Most of the mega data centers are being powered by renewable resources such as wind energy and solar panels. Google is planning to power all its data center operations using renewable sources of energy by 2017. Microsoft has purchased more than 500 MW of renewable power in the US in 2016.”

According to the report, one driver in market is data center tax incentives and reduction in electricity cost. Tax incentives play a vital role in the establishment of data centers worldwide. When an enterprise chooses a location for setting up a facility, it considers factors such as availability of power, connectivity, and tax incentives offered by the local government. If an enterprise can create jobs for the native population by establishing a data center, it can earn more tax incentives. Almost all states in the US offer tax incentives to organizations that are establishing data center facilities. This trend can be witnessed worldwide in a majority of countries.

Further, the report states that one challenge in market is consolidation of data centers. There are many reasons for enterprises to consolidate data center projects, but the reduction of cost is the primary motivation. Consolidation helps in saving costs up to 30%, enhance security up to 35%, improves efficiency by 50% and reduction in power consumption by 55%. In 2015, the federal government of the US saved close to $3 billion by the consolidation of data centers. The US Federal agencies plan to save around $8 billion via consolidation that will lead to the closing down of around 5,000 data centers across the country by 2019. Many enterprises are consolidating their existing facilities; they are moving their IT operations to colocation data centers and adopting of cloud-based services. Increased OPEX due to higher power consumption and carbon emission will lead to more consolidation during the forecast period.

The study was conducted using an objective combination of primary and secondary information including inputs from key participants in the industry. The report contains a comprehensive market and vendor landscape in addition to a SWOT analysis of the key vendors.
Note: Product cover images may vary from those shown
5 of 5
1h Free Analyst Time

Speak directly to the analyst to clarify any post sales queries you may have.

  • AECOM
  • Arup Group
  • Corgan
  • DPR Construction
  • Gensler
  • HDR
  • Page Southerland Page
  • Holder Construction Group
  • Jones Engineering Group
  • Structure Tone
  • Syska Hennessy
  • Turner Construction
  • Baselayer Technology
  • Balfour Beatty
  • Beca
  • Cannon Technologies
  • Clune Construction
  • Commodore Contracting
  • Constructora Sudamericana
  • Drake & Scull International
  • Fluor
  • Gilbane
  • Integrated Design Group
  • Jacobs Engineering
  • JE Dunn Construction
  • Kirby Group
  • Kohlberg Kravis Roberts
  • M+W Group
  • McGough
  • Mercury Engineering
  • Merrick
  • Mortenson Construction
  • Nova Mission Critical
  • PTS
  • Skanska
  • Whiting-Turner
Note: Product cover images may vary from those shown
6 of 5
Note: Product cover images may vary from those shown
Adroll
adroll