Europe Data Center Construction Market to 2027 - Regional Analysis and Forecasts by Type of Construction, Tier Standard, and Industry Vertical

  • PDF Icon

    Report

  • 180 Pages
  • May 2019
  • Region: Europe
  • The Insight Partners
  • ID: 4275716
The Europe Data Center Construction Market is estimated to be valued at US$ 11.0 Bn in 2018 end and is expected to touch a figure of nearly US$ 20.1 Bn by 2027 end representing a CAGR of 7.6% over the forecast period. The market is expected to gain traction owing to a rise in investment towards the development of technologically superior data centers and thus, provide numerous profitable opportunities for the Europe data center construction market players operating in the market.

The mechanical design of a data center infrastructure comprises of various components required for data center cooling, as cooling of the data center is one of the crucial issue owing to the increasing heat demands by the high-density servers. The mechanical design segment comprises of equipment such as HVAC; condensate drains, leak detection system, fire suppression unit, and raised the floor for environmental control. HVAC (heating, ventilation and air conditioning) systems help in controlling the ambient environment of the data centers, which includes humidity, temperature, air filtering, and air flow. Cooling in data centers utilizes a large portion of energy; thus, a proper HVAC system is a crucial decision in any data center construction. These systems may comprise of rooftop units as well as distributed units which allow localized air cooling. Thus, the growing temperature along with the rise in energy prices is projected to provide numerous profitable opportunities for a mechanical design for the Europe data center construction market players operating in the Europe data center construction market during the coming years.

The Europe data center construction market by cooling equipment, the HVAC (heating, ventilation and air conditioning) systems helps in controlling the ambient environment of the data centers, which includes humidity, temperature, air filtering, and air flow. It is a very critical component of any data center and is operated with other elements of data centers such as data storage, computing hardware, fire protection, cabling, power, and physical security. Cooling in data centers utilizes a large portion of energy; thus, a proper HVAC system is an essential decision in any data center construction. These systems may comprise of rooftop units as well as distributed units which allow localized air cooling. Furthermore, additional air handling and cooling may be needed between the racks. Thus, the cooling systems and equipment for data centers are expected to gain traction and subsequently, provide numerous profitable opportunities for the market players operating in the Europe data center construction market during the forecast period.

For the Europe data center construction market by general construction type, the exterior design of any data center infrastructure is a crucial decision to make while selecting a general contractor for data center construction, this includes proper roofing, cladding, flooring, steel construction, and others. Apart from major cities, data centers are also built in remote locations, and factors such as weather conditions and infrastructure are taken into consideration during construction. Furthermore, steel can be easily recycled and disassembled. On the other hand, the choice of flooring for data centers is also essential as per the requirements of data centers. As a result, the Europe data center construction market is poised to offer numerous profitable business opportunities for the Europe data center construction market players during the forecast period.

The Europe data center construction market by electrical design, the data center comprises a hierarchy of electrical devices, which helps in transmitting power from a utility feed to server racks. Some of the essential tools include utility feeds, switchgear, generators, UPS, PDUs, and others. Electrical supplies arriving at the data center infrastructure need to be transformed to a proper voltage level, which is performed by using a transformer. Whereas, switchgear helps in safely distributing power from the transformer or utility to the data center floor. Furthermore, generators and Uninterruptible Power Supply (UPS) deliver temporary and longer-term backup power. Power Distribution Units (PDU) helps in transmitting electricity or power to racks as well as standalone systems. Thus, the surge in demand for various electrical components for data center maintenance and operation is expected to provide significant business opportunities for the Europe data center construction market players during the forecast period.

Table of Contents

1. Introduction
1.1 Scope of the Study
1.2 Report Guidance
1.3 Market Segmentation
1.3.1 Europe Data Center Construction Market - By Type of Construction
1.3.2 Europe Data Center Construction Market - By Tier Standards
1.3.3 Europe Data Center Construction Market - By Industry Verticals
1.3.4 Europe Data Center Construction Market - By Country
2. Europe Data Center Construction Market - Key Takeaways
3. Research Methodology
3.1 Coverage
3.2 Secondary Research
3.3 Primary Research
4. Europe Data Center Construction Market Landscape
4.1 Market Overview
4.2 Europe PEST Analysis
5. Europe Data Center Construction Market - Key Industry Dynamics
5.1 Key Market Drivers
5.1.1 Emergence of Distributed IT and Edge Computing Saw an Increase in the Number of Data Center being used
5.1.2 Rapidly Increasing Data Traffic
5.1.3 High EBITDA margins in the Infrastructure Sector
5.1.4 Development in Analytical Capabilities for Effective Decision Making
5.2 Key Market Restraints
5.2.1 High CAPEX, OPEX & TCO for Building Data Center
5.2.2 Complex Infrastructure
5.2.3 Emergence of Containerized Data Center
5.3 Key Market Opportunities
5.3.1 Growth In Adoption of Hyper Scale Data Center to Generate Opportunity for the Market
5.3.2 Growth in Green Data Center
5.3.3 Constant Growth In Number Of Data Center Construction
5.4 Future Trends
5.4.1 Colocation And Cloud Services are Expected to Gain the Larger Pie of the Market
5.4.2 Technological Complexity and Need for Security Will Drive the Growth in Near Future
5.5 Impact Analysis of Drivers and Restraints
6. Data Center Construction -Europe Market Analysis
6.1 Europe Data Center Construction Market Overview
6.2 Europe Data Center Construction Market Forecast and Analysis
7. Europe Data Center Construction Market Analysis - By Types Of Construction
7.1 Overview
7.2 Europe Data Center Construction Market Breakdown, By Types Of Construction, 2018 & 2027
7.3 General Construction
7.3.1 Overview
7.3.2 Europe Data Center Construction Market, By General Construction Revenue and Forecasts to 2027 (US$ Mn)
7.4 Electrical Design
7.4.1 Overview
7.4.2 Europe Data Center Construction Market, By Electrical Design Market Revenue and Forecasts to 2027 (US$ Mn)
7.4.3 UPS
7.4.3.1 Overview
7.4.3.2 Europe Data Center Construction Market, By UPS Market Revenue and Forecasts to 2027 (US$ Mn)
7.4.4 Generators
7.4.4.1 Overview
7.4.4.2 Europe Data Center Construction Market, By Generators Market Revenue and Forecasts to 2027 (US$ Mn)
7.4.5 PDU
7.4.5.1 Overview
7.4.5.2 Europe Data Center Construction Market, By PDU Market Revenue and Forecasts to 2027 (US$ Mn)
7.4.6 Transfer Switchgear
7.4.6.1 Overview
7.4.6.2 Europe Data Center Construction Market, By Transfer Switchgear Market Revenue and Forecasts to 2027 (US$ Mn)
7.4.7 Others
7.4.7.1 Overview
7.4.7.2 Europe Data Center Construction Market, By Others Market Revenue and Forecasts to 2027 (US$ Mn)
7.5 Mechanical Design
7.5.1 Overview
7.5.2 Europe Data Center Construction Market, By Mechanical Design Market Revenue and Forecasts to 2027 (US$ Mn)
7.5.3 HVAC
7.5.3.1 Overview
7.5.3.2 Europe Data Center Construction Market, By HVAC Market Revenue and Forecasts to 2027 (US$ Mn)
7.5.4 Other Cooling Equipment
7.5.4.1 Overview
7.5.4.2 Europe Data Center Construction Market, By Other Cooling Equipment Market Revenue and Forecasts to 2027 (US$ Mn)
8. Europe Data Center Construction Market Analysis - By Tier Standards
8.1 Overview
8.2 Europe Data Center Construction Market Breakdown, By Tier Standards, 2018 & 2027
8.3 Tier 1 & Tier 2
8.3.1 Overview
8.3.2 Europe Data Center Construction Market, By Tier 1 & Tier 2 and Forecasts to 2027 (US$ Mn)
8.4 Tier 3
8.4.1 Overview
8.4.2 Europe Data Center Construction Market, By Tier 3 Market Revenue and Forecasts to 2027 (US$ Mn)
8.5 Tier 4
8.5.1 Overview
8.5.2 Europe Data Center Construction Market, By Tier 4 Market Revenue and Forecasts to 2027 (US$ Mn)
9. Europe Data Center Construction Market Analysis - By Industry Vertical
9.1 Overview
9.2 Europe Data Center Construction Market Breakdown, By Industry Vertical, 2018 & 2027
9.3 BFSI
9.3.1 Overview
9.3.2 Europe Data Center Construction Market, By BFSI Market Revenue and Forecasts to 2027 (US$ Mn)
9.4 Government
9.4.1 Overview
9.4.2 Europe Data Center Construction Market, By Government Market Revenue and Forecasts to 2027 (US$ Mn)
9.5 Technology
9.5.1 Overview
9.5.2 Europe Data Center Construction Market, By Technology Market Revenue and Forecasts to 2027 (US$ Mn)
9.6 Telecom Media & Entertainment
9.6.1 Overview
9.6.2 Europe Data Center Construction Market, By Telecom, Media & Entertainment Market Revenue and Forecasts to 2027 (US$ Mn)
9.7 Retail
9.7.1 Overview
9.7.2 Europe Data Center Construction Market, By Retail Market Revenue and Forecasts to 2027 (US$ Mn)
9.8 Healthcare
9.8.1 Overview
9.8.2 Europe Data Center Construction Market, By Healthcare Market Revenue and Forecasts to 2027 (US$ Mn)
9.9 Others
9.9.1 Overview
9.9.2 Europe Data Center Construction Market, By Others Application Market Revenue and Forecasts to 2027 (US$ Mn)
10. Europe Data Center Construction Market - Country Analysis
10.1 Overview
10.1.1 Europe Data Center Construction Market Breakdown, by Key Countries
10.1.1.1 France Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
10.1.1.1.1 France Data Center Construction Market Breakdown by Type Of Construction
10.1.1.1.1.1 France Data Center Construction Market Breakdown by Electrical Design Type
10.1.1.1.1.2 France Data Center Construction Market Breakdown by Mechanical Design Type
10.1.1.1.2 France Data Center Construction Market Breakdown by Tier Standards
10.1.1.1.3 France Data Center Construction Market Breakdown by Industry Verticals
10.1.1.2 UK Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
10.1.1.2.1 UK Data Center Construction Market Breakdown by Type Of Construction
10.1.1.2.1.1 UK Data Center Construction Market Breakdown by Electrical Design Type
10.1.1.2.1.2 UK Data Center Construction Market Breakdown by Mechanical Design Type
10.1.1.2.2 UK Data Center Construction Market Breakdown by Tier Standards
10.1.1.2.3 UK Data Center Construction Market Breakdown by Industry Verticals
10.1.1.3 Germany Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
10.1.1.3.1 Germany Data Center Construction Market Breakdown by Type Of Construction
10.1.1.3.1.1 Germany Data Center Construction Market Breakdown by Electrical Design Type
10.1.1.3.1.2 Germany Data Center Construction Market Breakdown by Mechanical Design Type
10.1.1.3.2 Germany Data Center Construction Market Breakdown by Tier Standards
10.1.1.3.3 Germany Data Center Construction Market Breakdown by Industry Verticals
10.1.1.4 Netherlands Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
10.1.1.4.1 Netherlands Data Center Construction Market Breakdown by Type Of Construction
10.1.1.4.1.1 Netherlands Data Center Construction Market Breakdown by Electrical Design Type
10.1.1.4.1.2 Netherlands Data Center Construction Market Breakdown by Mechanical Design Type
10.1.1.4.2 Netherlands Data Center Construction Market Breakdown by Tier Standards
10.1.1.4.3 Netherlands Data Center Construction Market Breakdown by Industry Verticals
10.1.1.5 Ireland Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
10.1.1.5.1 Ireland Data Center Construction Market Breakdown by Type Of Construction
10.1.1.5.1.1 Ireland Data Center Construction Market Breakdown by Electrical Design Type
10.1.1.5.1.2 Ireland Data Center Construction Market Breakdown by Mechanical Design Type
10.1.1.5.2 Ireland Data Center Construction Market Breakdown by Tier Standards
10.1.1.5.3 Ireland Data Center Construction Market Breakdown by Industry Verticals
10.1.1.6 Denmark Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
10.1.1.6.1 Denmark Data Center Construction Market Breakdown by Type Of Construction
10.1.1.6.1.1 Denmark Data Center Construction Market Breakdown by Electrical Design Type
10.1.1.6.1.2 Denmark Data Center Construction Market Breakdown by Mechanical Design Type
10.1.1.6.2 Denmark Data Center Construction Market Breakdown by Tier Standards
10.1.1.6.3 Denmark Data Center Construction Market Breakdown by Industry Verticals
10.1.1.7 Belgium Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
10.1.1.7.1 Belgium Data Center Construction Market Breakdown by Type Of Construction
10.1.1.7.1.1 Belgium Data Center Construction Market Breakdown by Electrical Design Type
10.1.1.7.1.2 Belgium Data Center Construction Market Breakdown by Mechanical Design Type
10.1.1.7.2 Belgium Data Center Construction Market Breakdown by Tier Standards
10.1.1.7.3 Belgium Data Center Construction Market Breakdown by Industry Verticals
10.1.1.8 Rest of Europe Data Center Construction Market Revenue and Forecasts to 2027 (US$ MN)
10.1.1.8.1 Rest of Europe Data Center Construction Market Breakdown by Type Of Construction
10.1.1.8.1.1 Rest of Europe Data Center Construction Market Breakdown by Electrical Design Type
10.1.1.8.1.2 Rest of Europe Data Center Construction Market Breakdown by Mechanical Design Type
10.1.1.8.2 Rest of Europe Data Center Construction Market Breakdown by Tier Standards
10.1.1.8.3 Rest of Europe Data Center Construction Market Breakdown by Industry Verticals
11. Industry Landscape
11.1 Overview
11.2 Market Initiative
12. Europe Data Center Construction Market - Key Company Profiles
12.1 AECOM Inc.
12.1.1 Key Facts
12.1.2 Business Description
12.1.3 Financial Overview
12.1.4 SWOT Analysis
12.1.5 Key Developments
12.2 Arup
12.2.1 Key Facts
12.2.2 Business Description
12.2.3 Financial Overview
12.2.4 SWOT Analysis
12.2.5 Key Developments
12.3 CAP Ingelec SAS
12.3.1 Key Facts
12.3.2 Business Description
12.3.3 Financial Overview
12.3.4 SWOT Analysis
12.3.5 Key Developments
12.4 ISG PLC
12.4.1 Key Facts
12.4.2 Business Description
12.4.3 Financial Overview
12.4.4 SWOT Analysis
12.4.5 Key Developments
12.5 Jacobs
12.5.1 Key Facts
12.5.2 Business Description
12.5.3 Financial Overview
12.5.4 SWOT Analysis
12.5.5 Key Developments
12.6 John Sisk & Son
12.6.1 Key Facts
12.6.2 Business Description
12.6.3 Financial Overview
12.6.4 SWOT Analysis
12.6.5 Key Developments
12.7 Jones Engineering Group
12.7.1 Key Facts
12.7.2 Business Description
12.7.3 Financial Overview
12.7.4 SWOT Analysis
12.7.5 Key Developments
12.8 Mace Group
12.8.1 Key Facts
12.8.2 Business Description
12.8.3 Financial Overview
12.8.4 SWOT Analysis
12.8.5 Key Developments
12.9 Mercury Engineering
12.9.1 Key Facts
12.9.2 Business Description
12.9.3 Financial Overview
12.9.4 SWOT Analysis
12.9.5 Key Developments
12.10 Skanska
12.10.1 Key Facts
12.10.2 Business Description
12.10.3 Financial Overview
12.10.4 SWOT Analysis
12.10.5 Key Developments
12.11 Structuretone
12.11.1 Key Facts
12.11.2 Business Description
12.11.3 Financial Overview
12.11.4 SWOT Analysis
12.11.5 Key Developments
13. Appendix
13.1 About The Publisher
13.2 Glossary Of Terms

Samples

Loading
LOADING...

Companies Mentioned

A selection of companies mentioned in this report includes:

  • AECOM Inc

  • ISG PLC

  • Jacobs

  • John Sisk & Son

  • Jones Engineering Group

  • Mace Group

  • Mercury Engineering

  • Structuretone

  • Skanska

  • Arup

  • Cap Ingelec