The data center construction market size was valued at US$ 234.85 billion in 2022 and is expected to reach US$ 448.14 billion by 2030; it is estimated to record a CAGR of 8.4%.
The scope of the data center construction market report covers North America, Europe, Asia Pacific, Middle East and Africa, South and Central America.
The data center industry in the US is expected to evolve over the coming years owing to the new federal mandates and presidential administration for optimization of the data centers. The market for data center construction in the US is also anticipated to grow with the introduction of tax incentives and reduced electricity costs. However, the rising cost of construction and installation is one of the significant barriers to the development of data centers in the country. Nevertheless, companies such as Google, Facebook, and Amazon are building their exclusive data centers across the US. Moreover, in December 2023, Digital Realty announced that Blackstone-affiliated funds led by Infrastructure, Real Estate, and Tactical Opportunities agreed to establish a joint venture with Digital Realty to develop four hyperscale data center campuses across three metro areas. Therefore, the US data center construction market share is growing with the increasing number of data center launches.
The increasing number of mobile data users and smartphone connections (notably exceeding the number of traditional personal computer connections) with the growing dependence on mobile internet services is a noteworthy factor bolstering the data center construction market growth in China. Moreover, the presence of big telecom companies with the need for more storage capacity favors the market growth in the country. China is considered the global manufacturing hub and the largest exporter of several goods, playing an important role in international trade. With many manufacturing and international firms operating in China, the continuous growth in China's economy results in the rising need for scalable data centers. In December 2023, China became the first country to begin the assembly of an underwater commercial data center off the coast of Sanya on Hainan Island. Similarly, in November 2023, Saudi Call (an ICT service provider), China Mobile International Limited (CMI), and Chinese Shanghai Lumaotong Group (LMT) announced the launch of the construction of data centers in the kingdom.
The increasing competition in the banking & finance sector is driving companies to develop their IT infrastructure. To provide customers with advanced banking services, such as mobile banking, application-based services, mobile browsers, and SMS-based services, companies need a data center service provider that can provide security, compliance, flexibility, and scaling options. Further, with the increasing penetration of digitization across sectors outside the banking & finance sector, banking service providers need to constantly evaluate their operations to meet the changing customer demand and expectations. With the establishment of IT infrastructure, the demand for data centers increases, resulting in the construction of more data centers.
The scope of the data center construction market report covers North America, Europe, Asia Pacific, Middle East and Africa, South and Central America.
The data center industry in the US is expected to evolve over the coming years owing to the new federal mandates and presidential administration for optimization of the data centers. The market for data center construction in the US is also anticipated to grow with the introduction of tax incentives and reduced electricity costs. However, the rising cost of construction and installation is one of the significant barriers to the development of data centers in the country. Nevertheless, companies such as Google, Facebook, and Amazon are building their exclusive data centers across the US. Moreover, in December 2023, Digital Realty announced that Blackstone-affiliated funds led by Infrastructure, Real Estate, and Tactical Opportunities agreed to establish a joint venture with Digital Realty to develop four hyperscale data center campuses across three metro areas. Therefore, the US data center construction market share is growing with the increasing number of data center launches.
The increasing number of mobile data users and smartphone connections (notably exceeding the number of traditional personal computer connections) with the growing dependence on mobile internet services is a noteworthy factor bolstering the data center construction market growth in China. Moreover, the presence of big telecom companies with the need for more storage capacity favors the market growth in the country. China is considered the global manufacturing hub and the largest exporter of several goods, playing an important role in international trade. With many manufacturing and international firms operating in China, the continuous growth in China's economy results in the rising need for scalable data centers. In December 2023, China became the first country to begin the assembly of an underwater commercial data center off the coast of Sanya on Hainan Island. Similarly, in November 2023, Saudi Call (an ICT service provider), China Mobile International Limited (CMI), and Chinese Shanghai Lumaotong Group (LMT) announced the launch of the construction of data centers in the kingdom.
The increasing competition in the banking & finance sector is driving companies to develop their IT infrastructure. To provide customers with advanced banking services, such as mobile banking, application-based services, mobile browsers, and SMS-based services, companies need a data center service provider that can provide security, compliance, flexibility, and scaling options. Further, with the increasing penetration of digitization across sectors outside the banking & finance sector, banking service providers need to constantly evaluate their operations to meet the changing customer demand and expectations. With the establishment of IT infrastructure, the demand for data centers increases, resulting in the construction of more data centers.
Data Center Construction Market Segments:
The data center construction market analysis has been carried out by considering the following segments: type of construction, Tier design, and industry vertical. Based on type of construction, the data center construction market is segmented into general construction, electrical construction, and mechanical construction. Based on Tier design, the data center construction market is segmented into Tier 1 and Tier 2, Tier 3, and Tier 4. Based on industry vertical, the data center construction market is segmented into IT & telecom, BFSI, government, manufacturing, retail, transportation, media & entertainment, and others. The report includes growth prospects in light of current data center construction market trends and driving factors influencing the market growth.Data Center Construction Market Competitive Landscape and Key Developments
The data center construction market report covers the company profiling of major players such as Rittal GmbH & Co. K.G. ; Schneider Electric SE; DPR Construction Inc; Mercury Engineering Ltd; STO Building Group Inc; AECOM; HOLDER CONSTRUCTION COMPANY; Turner Construction Co; Eaton Corp Plc; and Nikom InfraSolutions Pvt. Ltd. Several other essential data center construction market players were analyzed to get a holistic view of the market and its ecosystem. The data center construction market forecast can help stakeholders plan their growth strategies.Table of Contents
1. Introduction
1.1 Report Guidance
1.2 Market Segmentation
1.2 Market Segmentation
2. Executive Summary
2.1 Key Insights
2.2 Market Attractiveness
2.2 Market Attractiveness
3. Research Methodology
3.1 Coverage
3.2 Secondary Research
3.3 Primary Research
3.2 Secondary Research
3.3 Primary Research
4. Data Center Construction Market Landscape
4.1 Overview
4.2 PEST Analysis
4.3 Ecosystem Analysis
4.3.1 List of Vendors in the Value Chain
4.2 PEST Analysis
4.3 Ecosystem Analysis
4.3.1 List of Vendors in the Value Chain
5. Data Center Construction Market - Key Market Dynamics
5.1 Data Center Construction Market - Key Market Dynamics
5.1.1 Rise in Launch of New Edge Data Centers
5.1.2 Rapid Expansion of IoT Services
5.1.3 Surge in Data Center Construction Activities
5.2 Market Restraints
5.2.1 Rise in Cost of Infrastructure Development
5.2.2 Complexities in Data Center Infrastructure and its Establishment
5.3 Market Opportunities
5.3.1 Increasing Implementation of Hyperscalers and Colocation
5.3.2 Growing Construction of Tier 4 Data Centers
5.4 Future Trends
5.4.1 Increasing Adoption of Green Data Centers
5.5 Impact of Drivers and Restraints:
5.1.1 Rise in Launch of New Edge Data Centers
5.1.2 Rapid Expansion of IoT Services
5.1.3 Surge in Data Center Construction Activities
5.2 Market Restraints
5.2.1 Rise in Cost of Infrastructure Development
5.2.2 Complexities in Data Center Infrastructure and its Establishment
5.3 Market Opportunities
5.3.1 Increasing Implementation of Hyperscalers and Colocation
5.3.2 Growing Construction of Tier 4 Data Centers
5.4 Future Trends
5.4.1 Increasing Adoption of Green Data Centers
5.5 Impact of Drivers and Restraints:
6. Data Center Construction Market - Global Market Analysis
6.1 Data Center Construction Market Revenue (US$ Million), 2022-2030
6.2 Data Center Construction Market Forecast Analysis
6.2 Data Center Construction Market Forecast Analysis
7. Data Center Construction Market Analysis - by Type Of Construction
7.1 Electrical Construction
7.1.1 Overview
7.1.2 Electrical Construction: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
7.2 General Construction
7.2.1 Overview
7.2.2 General Construction: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
7.3 Mechanical Construction
7.3.1 Overview
7.3.2 Mechanical Construction: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
7.1.1 Overview
7.1.2 Electrical Construction: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
7.2 General Construction
7.2.1 Overview
7.2.2 General Construction: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
7.3 Mechanical Construction
7.3.1 Overview
7.3.2 Mechanical Construction: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
8. Data Center Construction Market Analysis - by Tier Standard
8.1 Tier 3
8.1.1 Overview
8.1.2 Tier 3: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
8.2 Tier 4
8.2.1 Overview
8.2.2 Tier 4: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
8.3 Tier 1 and Tier 2
8.3.1 Overview
8.3.2 Tier 1 and Tier 2: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
8.1.1 Overview
8.1.2 Tier 3: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
8.2 Tier 4
8.2.1 Overview
8.2.2 Tier 4: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
8.3 Tier 1 and Tier 2
8.3.1 Overview
8.3.2 Tier 1 and Tier 2: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
9. Data Center Construction Market Analysis - by Industry Vertical
9.1 IT and telecommunication
9.1.1 Overview
9.1.2 IT and telecommunication: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
9.2 BFSI
9.2.1 Overview
9.2.2 BFSI: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
9.3 Media and Entertainment
9.3.1 Overview
9.3.2 Media and Entertainment: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
9.4 Retail
9.4.1 Overview
9.4.2 Retail: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
9.5 Manufacturing
9.5.1 Overview
9.5.2 Manufacturing: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
9.6 Government
9.6.1 Overview
9.6.2 Government: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
9.7 Transportation
9.7.1 Overview
9.7.2 Transportation: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
9.8 Others
9.8.1 Overview
9.8.2 Others: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
9.1.1 Overview
9.1.2 IT and telecommunication: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
9.2 BFSI
9.2.1 Overview
9.2.2 BFSI: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
9.3 Media and Entertainment
9.3.1 Overview
9.3.2 Media and Entertainment: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
9.4 Retail
9.4.1 Overview
9.4.2 Retail: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
9.5 Manufacturing
9.5.1 Overview
9.5.2 Manufacturing: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
9.6 Government
9.6.1 Overview
9.6.2 Government: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
9.7 Transportation
9.7.1 Overview
9.7.2 Transportation: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
9.8 Others
9.8.1 Overview
9.8.2 Others: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10. Data Center Construction Market - Geographical Analysis
10.1 Overview
10.2 North America
10.2.1 North America Data Center Construction Market Overview
10.2.2 North America: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.2.3 North America: Data Center Construction Market Breakdown, by Type Of Construction
10.2.3.1 North America: Data Center Construction Market - Revenue and Forecast Analysis - by Type Of Construction
10.2.4 North America: Data Center Construction Market Breakdown, by Tier Standard
10.2.4.1 North America: Data Center Construction Market - Revenue and Forecast Analysis - by Tier Standard
10.2.5 North America: Data Center Construction Market Breakdown, by Industry Vertical
10.2.5.1 North America: Data Center Construction Market - Revenue and Forecast Analysis - by Industry Vertical
10.2.6 North America: Data Center Construction Market - Revenue and Forecast Analysis - by Country
10.2.6.1 North America: Data Center Construction Market - Revenue and Forecast Analysis - by Country
10.2.6.2 United States: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.2.6.2.1 United States: Data Center Construction Market Breakdown, by Type Of Construction
10.2.6.2.2 United States: Data Center Construction Market Breakdown, by Tier Standard
10.2.6.2.3 United States: Data Center Construction Market Breakdown, by Industry Vertical
10.2.6.3 Canada: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.2.6.3.1 Canada: Data Center Construction Market Breakdown, by Type Of Construction
10.2.6.3.2 Canada: Data Center Construction Market Breakdown, by Tier Standard
10.2.6.3.3 Canada: Data Center Construction Market Breakdown, by Industry Vertical
10.2.6.4 Mexico: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.2.6.4.1 Mexico: Data Center Construction Market Breakdown, by Type Of Construction
10.2.6.4.2 Mexico: Data Center Construction Market Breakdown, by Tier Standard
10.2.6.4.3 Mexico: Data Center Construction Market Breakdown, by Industry Vertical
10.3 Europe
10.3.1 Europe Data Center Construction Market Overview
10.3.2 Europe: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.3.3 Europe: Data Center Construction Market Breakdown, by Type Of Construction
10.3.3.1 Europe: Data Center Construction Market - Revenue and Forecast Analysis - by Type Of Construction
10.3.4 Europe: Data Center Construction Market Breakdown, by Tier Standard
10.3.4.1 Europe: Data Center Construction Market - Revenue and Forecast Analysis - by Tier Standard
10.3.5 Europe: Data Center Construction Market Breakdown, by Industry Vertical
10.3.5.1 Europe: Data Center Construction Market - Revenue and Forecast Analysis - by Industry Vertical
10.3.6 Europe: Data Center Construction Market - Revenue and Forecast Analysis - by Country
10.3.6.1 Europe: Data Center Construction Market - Revenue and Forecast Analysis - by Country
10.3.6.2 Germany: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.3.6.2.1 Germany: Data Center Construction Market Breakdown, by Type Of Construction
10.3.6.2.2 Germany: Data Center Construction Market Breakdown, by Tier Standard
10.3.6.2.3 Germany: Data Center Construction Market Breakdown, by Industry Vertical
10.3.6.3 United Kingdom: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.3.6.3.1 United Kingdom: Data Center Construction Market Breakdown, by Type Of Construction
10.3.6.3.2 United Kingdom: Data Center Construction Market Breakdown, by Tier Standard
10.3.6.3.3 United Kingdom: Data Center Construction Market Breakdown, by Industry Vertical
10.3.6.4 France: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.3.6.4.1 France: Data Center Construction Market Breakdown, by Type Of Construction
10.3.6.4.2 France: Data Center Construction Market Breakdown, by Tier Standard
10.3.6.4.3 France: Data Center Construction Market Breakdown, by Industry Vertical
10.3.6.5 Sweden: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.3.6.5.1 Sweden: Data Center Construction Market Breakdown, by Type Of Construction
10.3.6.5.2 Sweden: Data Center Construction Market Breakdown, by Tier Standard
10.3.6.5.3 Sweden: Data Center Construction Market Breakdown, by Industry Vertical
10.3.6.6 Rest of Europe: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.3.6.6.1 Rest of Europe: Data Center Construction Market Breakdown, by Type Of Construction
10.3.6.6.2 Rest of Europe: Data Center Construction Market Breakdown, by Tier Standard
10.3.6.6.3 Rest of Europe: Data Center Construction Market Breakdown, by Industry Vertical
10.4 Asia Pacific
10.4.1 Asia Pacific Data Center Construction Market Overview
10.4.2 Asia Pacific: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.4.3 Asia Pacific: Data Center Construction Market Breakdown, by Type Of Construction
10.4.3.1 Asia Pacific: Data Center Construction Market - Revenue and Forecast Analysis - by Type Of Construction
10.4.4 Asia Pacific: Data Center Construction Market Breakdown, by Tier Standard
10.4.4.1 Asia Pacific: Data Center Construction Market - Revenue and Forecast Analysis - by Tier Standard
10.4.5 Asia Pacific: Data Center Construction Market Breakdown, by Industry Vertical
10.4.5.1 Asia Pacific: Data Center Construction Market - Revenue and Forecast Analysis - by Industry Vertical
10.4.6 Asia Pacific: Data Center Construction Market - Revenue and Forecast Analysis - by Country
10.4.6.1 Asia Pacific: Data Center Construction Market - Revenue and Forecast Analysis - by Country
10.4.6.2 China: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.4.6.2.1 China: Data Center Construction Market Breakdown, by Type Of Construction
10.4.6.2.2 China: Data Center Construction Market Breakdown, by Tier Standard
10.4.6.2.3 China: Data Center Construction Market Breakdown, by Industry Vertical
10.4.6.3 Japan: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.4.6.3.1 Japan: Data Center Construction Market Breakdown, by Type Of Construction
10.4.6.3.2 Japan: Data Center Construction Market Breakdown, by Tier Standard
10.4.6.3.3 Japan: Data Center Construction Market Breakdown, by Industry Vertical
10.4.6.4 South Korea: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.4.6.4.1 South Korea: Data Center Construction Market Breakdown, by Type Of Construction
10.4.6.4.2 South Korea: Data Center Construction Market Breakdown, by Tier Standard
10.4.6.4.3 South Korea: Data Center Construction Market Breakdown, by Industry Vertical
10.4.6.5 India: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.4.6.5.1 India: Data Center Construction Market Breakdown, by Type Of Construction
10.4.6.5.2 India: Data Center Construction Market Breakdown, by Tier Standard
10.4.6.5.3 India: Data Center Construction Market Breakdown, by Industry Vertical
10.4.6.6 Australia: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.4.6.6.1 Australia: Data Center Construction Market Breakdown, by Type Of Construction
10.4.6.6.2 Australia: Data Center Construction Market Breakdown, by Tier Standard
10.4.6.6.3 Australia: Data Center Construction Market Breakdown, by Industry Vertical
10.4.6.7 Rest of APAC: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.4.6.7.1 Rest of APAC: Data Center Construction Market Breakdown, by Type Of Construction
10.4.6.7.2 Rest of APAC: Data Center Construction Market Breakdown, by Tier Standard
10.4.6.7.3 Rest of APAC: Data Center Construction Market Breakdown, by Industry Vertical
10.5 Middle East and Africa
10.5.1 Middle East and Africa Data Center Construction Market Overview
10.5.2 Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.5.3 Middle East and Africa: Data Center Construction Market Breakdown, by Type Of Construction
10.5.3.1 Middle East and Africa: Data Center Construction Market - Revenue and Forecast Analysis - by Type Of Construction
10.5.4 Middle East and Africa: Data Center Construction Market Breakdown, by Tier Standard
10.5.4.1 Middle East and Africa: Data Center Construction Market - Revenue and Forecast Analysis - by Tier Standard
10.5.5 Middle East and Africa: Data Center Construction Market Breakdown, by Industry Vertical
10.5.5.1 Middle East and Africa: Data Center Construction Market - Revenue and Forecast Analysis - by Industry Vertical
10.5.6 Middle East and Africa: Data Center Construction Market - Revenue and Forecast Analysis - by Country
10.5.6.1 Middle East and Africa: Data Center Construction Market - Revenue and Forecast Analysis - by Country
10.5.6.2 Saudi Arabia: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.5.6.2.1 Saudi Arabia: Data Center Construction Market Breakdown, by Type Of Construction
10.5.6.2.2 Saudi Arabia: Data Center Construction Market Breakdown, by Tier Standard
10.5.6.2.3 Saudi Arabia: Data Center Construction Market Breakdown, by Industry Vertical
10.5.6.3 United Arab Emirates: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.5.6.3.1 United Arab Emirates: Data Center Construction Market Breakdown, by Type Of Construction
10.5.6.3.2 United Arab Emirates: Data Center Construction Market Breakdown, by Tier Standard
10.5.6.3.3 United Arab Emirates: Data Center Construction Market Breakdown, by Industry Vertical
10.5.6.4 South Africa: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.5.6.4.1 South Africa: Data Center Construction Market Breakdown, by Type Of Construction
10.5.6.4.2 South Africa: Data Center Construction Market Breakdown, by Tier Standard
10.5.6.4.3 South Africa: Data Center Construction Market Breakdown, by Industry Vertical
10.5.6.5 Rest of Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.5.6.5.1 Rest of Middle East and Africa: Data Center Construction Market Breakdown, by Type Of Construction
10.5.6.5.2 Rest of Middle East and Africa: Data Center Construction Market Breakdown, by Tier Standard
10.5.6.5.3 Rest of Middle East and Africa: Data Center Construction Market Breakdown, by Industry Vertical
10.6 South and Central America
10.6.1 South and Central America Data Center Construction Market Overview
10.6.2 South and Central America: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.6.3 South and Central America: Data Center Construction Market Breakdown, by Type Of Construction
10.6.3.1 South and Central America: Data Center Construction Market - Revenue and Forecast Analysis - by Type Of Construction
10.6.4 South and Central America: Data Center Construction Market Breakdown, by Tier Standard
10.6.4.1 South and Central America: Data Center Construction Market - Revenue and Forecast Analysis - by Tier Standard
10.6.5 South and Central America: Data Center Construction Market Breakdown, by Industry Vertical
10.6.5.1 South and Central America: Data Center Construction Market - Revenue and Forecast Analysis - by Industry Vertical
10.6.6 South and Central America: Data Center Construction Market - Revenue and Forecast Analysis - by Country
10.6.6.1 South and Central America: Data Center Construction Market - Revenue and Forecast Analysis - by Country
10.6.6.2 Brazil: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.6.6.2.1 Brazil: Data Center Construction Market Breakdown, by Type Of Construction
10.6.6.2.2 Brazil: Data Center Construction Market Breakdown, by Tier Standard
10.6.6.2.3 Brazil: Data Center Construction Market Breakdown, by Industry Vertical
10.6.6.3 Argentina: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.6.6.3.1 Argentina: Data Center Construction Market Breakdown, by Type Of Construction
10.6.6.3.2 Argentina: Data Center Construction Market Breakdown, by Tier Standard
10.6.6.3.3 Argentina: Data Center Construction Market Breakdown, by Industry Vertical
10.6.6.4 Rest of South and Central America: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.6.6.4.1 Rest of South and Central America: Data Center Construction Market Breakdown, by Type Of Construction
10.6.6.4.2 Rest of South and Central America: Data Center Construction Market Breakdown, by Tier Standard
10.6.6.4.3 Rest of South and Central America: Data Center Construction Market Breakdown, by Industry Vertical
10.2 North America
10.2.1 North America Data Center Construction Market Overview
10.2.2 North America: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.2.3 North America: Data Center Construction Market Breakdown, by Type Of Construction
10.2.3.1 North America: Data Center Construction Market - Revenue and Forecast Analysis - by Type Of Construction
10.2.4 North America: Data Center Construction Market Breakdown, by Tier Standard
10.2.4.1 North America: Data Center Construction Market - Revenue and Forecast Analysis - by Tier Standard
10.2.5 North America: Data Center Construction Market Breakdown, by Industry Vertical
10.2.5.1 North America: Data Center Construction Market - Revenue and Forecast Analysis - by Industry Vertical
10.2.6 North America: Data Center Construction Market - Revenue and Forecast Analysis - by Country
10.2.6.1 North America: Data Center Construction Market - Revenue and Forecast Analysis - by Country
10.2.6.2 United States: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.2.6.2.1 United States: Data Center Construction Market Breakdown, by Type Of Construction
10.2.6.2.2 United States: Data Center Construction Market Breakdown, by Tier Standard
10.2.6.2.3 United States: Data Center Construction Market Breakdown, by Industry Vertical
10.2.6.3 Canada: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.2.6.3.1 Canada: Data Center Construction Market Breakdown, by Type Of Construction
10.2.6.3.2 Canada: Data Center Construction Market Breakdown, by Tier Standard
10.2.6.3.3 Canada: Data Center Construction Market Breakdown, by Industry Vertical
10.2.6.4 Mexico: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.2.6.4.1 Mexico: Data Center Construction Market Breakdown, by Type Of Construction
10.2.6.4.2 Mexico: Data Center Construction Market Breakdown, by Tier Standard
10.2.6.4.3 Mexico: Data Center Construction Market Breakdown, by Industry Vertical
10.3 Europe
10.3.1 Europe Data Center Construction Market Overview
10.3.2 Europe: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.3.3 Europe: Data Center Construction Market Breakdown, by Type Of Construction
10.3.3.1 Europe: Data Center Construction Market - Revenue and Forecast Analysis - by Type Of Construction
10.3.4 Europe: Data Center Construction Market Breakdown, by Tier Standard
10.3.4.1 Europe: Data Center Construction Market - Revenue and Forecast Analysis - by Tier Standard
10.3.5 Europe: Data Center Construction Market Breakdown, by Industry Vertical
10.3.5.1 Europe: Data Center Construction Market - Revenue and Forecast Analysis - by Industry Vertical
10.3.6 Europe: Data Center Construction Market - Revenue and Forecast Analysis - by Country
10.3.6.1 Europe: Data Center Construction Market - Revenue and Forecast Analysis - by Country
10.3.6.2 Germany: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.3.6.2.1 Germany: Data Center Construction Market Breakdown, by Type Of Construction
10.3.6.2.2 Germany: Data Center Construction Market Breakdown, by Tier Standard
10.3.6.2.3 Germany: Data Center Construction Market Breakdown, by Industry Vertical
10.3.6.3 United Kingdom: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.3.6.3.1 United Kingdom: Data Center Construction Market Breakdown, by Type Of Construction
10.3.6.3.2 United Kingdom: Data Center Construction Market Breakdown, by Tier Standard
10.3.6.3.3 United Kingdom: Data Center Construction Market Breakdown, by Industry Vertical
10.3.6.4 France: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.3.6.4.1 France: Data Center Construction Market Breakdown, by Type Of Construction
10.3.6.4.2 France: Data Center Construction Market Breakdown, by Tier Standard
10.3.6.4.3 France: Data Center Construction Market Breakdown, by Industry Vertical
10.3.6.5 Sweden: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.3.6.5.1 Sweden: Data Center Construction Market Breakdown, by Type Of Construction
10.3.6.5.2 Sweden: Data Center Construction Market Breakdown, by Tier Standard
10.3.6.5.3 Sweden: Data Center Construction Market Breakdown, by Industry Vertical
10.3.6.6 Rest of Europe: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.3.6.6.1 Rest of Europe: Data Center Construction Market Breakdown, by Type Of Construction
10.3.6.6.2 Rest of Europe: Data Center Construction Market Breakdown, by Tier Standard
10.3.6.6.3 Rest of Europe: Data Center Construction Market Breakdown, by Industry Vertical
10.4 Asia Pacific
10.4.1 Asia Pacific Data Center Construction Market Overview
10.4.2 Asia Pacific: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.4.3 Asia Pacific: Data Center Construction Market Breakdown, by Type Of Construction
10.4.3.1 Asia Pacific: Data Center Construction Market - Revenue and Forecast Analysis - by Type Of Construction
10.4.4 Asia Pacific: Data Center Construction Market Breakdown, by Tier Standard
10.4.4.1 Asia Pacific: Data Center Construction Market - Revenue and Forecast Analysis - by Tier Standard
10.4.5 Asia Pacific: Data Center Construction Market Breakdown, by Industry Vertical
10.4.5.1 Asia Pacific: Data Center Construction Market - Revenue and Forecast Analysis - by Industry Vertical
10.4.6 Asia Pacific: Data Center Construction Market - Revenue and Forecast Analysis - by Country
10.4.6.1 Asia Pacific: Data Center Construction Market - Revenue and Forecast Analysis - by Country
10.4.6.2 China: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.4.6.2.1 China: Data Center Construction Market Breakdown, by Type Of Construction
10.4.6.2.2 China: Data Center Construction Market Breakdown, by Tier Standard
10.4.6.2.3 China: Data Center Construction Market Breakdown, by Industry Vertical
10.4.6.3 Japan: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.4.6.3.1 Japan: Data Center Construction Market Breakdown, by Type Of Construction
10.4.6.3.2 Japan: Data Center Construction Market Breakdown, by Tier Standard
10.4.6.3.3 Japan: Data Center Construction Market Breakdown, by Industry Vertical
10.4.6.4 South Korea: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.4.6.4.1 South Korea: Data Center Construction Market Breakdown, by Type Of Construction
10.4.6.4.2 South Korea: Data Center Construction Market Breakdown, by Tier Standard
10.4.6.4.3 South Korea: Data Center Construction Market Breakdown, by Industry Vertical
10.4.6.5 India: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.4.6.5.1 India: Data Center Construction Market Breakdown, by Type Of Construction
10.4.6.5.2 India: Data Center Construction Market Breakdown, by Tier Standard
10.4.6.5.3 India: Data Center Construction Market Breakdown, by Industry Vertical
10.4.6.6 Australia: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.4.6.6.1 Australia: Data Center Construction Market Breakdown, by Type Of Construction
10.4.6.6.2 Australia: Data Center Construction Market Breakdown, by Tier Standard
10.4.6.6.3 Australia: Data Center Construction Market Breakdown, by Industry Vertical
10.4.6.7 Rest of APAC: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.4.6.7.1 Rest of APAC: Data Center Construction Market Breakdown, by Type Of Construction
10.4.6.7.2 Rest of APAC: Data Center Construction Market Breakdown, by Tier Standard
10.4.6.7.3 Rest of APAC: Data Center Construction Market Breakdown, by Industry Vertical
10.5 Middle East and Africa
10.5.1 Middle East and Africa Data Center Construction Market Overview
10.5.2 Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.5.3 Middle East and Africa: Data Center Construction Market Breakdown, by Type Of Construction
10.5.3.1 Middle East and Africa: Data Center Construction Market - Revenue and Forecast Analysis - by Type Of Construction
10.5.4 Middle East and Africa: Data Center Construction Market Breakdown, by Tier Standard
10.5.4.1 Middle East and Africa: Data Center Construction Market - Revenue and Forecast Analysis - by Tier Standard
10.5.5 Middle East and Africa: Data Center Construction Market Breakdown, by Industry Vertical
10.5.5.1 Middle East and Africa: Data Center Construction Market - Revenue and Forecast Analysis - by Industry Vertical
10.5.6 Middle East and Africa: Data Center Construction Market - Revenue and Forecast Analysis - by Country
10.5.6.1 Middle East and Africa: Data Center Construction Market - Revenue and Forecast Analysis - by Country
10.5.6.2 Saudi Arabia: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.5.6.2.1 Saudi Arabia: Data Center Construction Market Breakdown, by Type Of Construction
10.5.6.2.2 Saudi Arabia: Data Center Construction Market Breakdown, by Tier Standard
10.5.6.2.3 Saudi Arabia: Data Center Construction Market Breakdown, by Industry Vertical
10.5.6.3 United Arab Emirates: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.5.6.3.1 United Arab Emirates: Data Center Construction Market Breakdown, by Type Of Construction
10.5.6.3.2 United Arab Emirates: Data Center Construction Market Breakdown, by Tier Standard
10.5.6.3.3 United Arab Emirates: Data Center Construction Market Breakdown, by Industry Vertical
10.5.6.4 South Africa: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.5.6.4.1 South Africa: Data Center Construction Market Breakdown, by Type Of Construction
10.5.6.4.2 South Africa: Data Center Construction Market Breakdown, by Tier Standard
10.5.6.4.3 South Africa: Data Center Construction Market Breakdown, by Industry Vertical
10.5.6.5 Rest of Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.5.6.5.1 Rest of Middle East and Africa: Data Center Construction Market Breakdown, by Type Of Construction
10.5.6.5.2 Rest of Middle East and Africa: Data Center Construction Market Breakdown, by Tier Standard
10.5.6.5.3 Rest of Middle East and Africa: Data Center Construction Market Breakdown, by Industry Vertical
10.6 South and Central America
10.6.1 South and Central America Data Center Construction Market Overview
10.6.2 South and Central America: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.6.3 South and Central America: Data Center Construction Market Breakdown, by Type Of Construction
10.6.3.1 South and Central America: Data Center Construction Market - Revenue and Forecast Analysis - by Type Of Construction
10.6.4 South and Central America: Data Center Construction Market Breakdown, by Tier Standard
10.6.4.1 South and Central America: Data Center Construction Market - Revenue and Forecast Analysis - by Tier Standard
10.6.5 South and Central America: Data Center Construction Market Breakdown, by Industry Vertical
10.6.5.1 South and Central America: Data Center Construction Market - Revenue and Forecast Analysis - by Industry Vertical
10.6.6 South and Central America: Data Center Construction Market - Revenue and Forecast Analysis - by Country
10.6.6.1 South and Central America: Data Center Construction Market - Revenue and Forecast Analysis - by Country
10.6.6.2 Brazil: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.6.6.2.1 Brazil: Data Center Construction Market Breakdown, by Type Of Construction
10.6.6.2.2 Brazil: Data Center Construction Market Breakdown, by Tier Standard
10.6.6.2.3 Brazil: Data Center Construction Market Breakdown, by Industry Vertical
10.6.6.3 Argentina: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.6.6.3.1 Argentina: Data Center Construction Market Breakdown, by Type Of Construction
10.6.6.3.2 Argentina: Data Center Construction Market Breakdown, by Tier Standard
10.6.6.3.3 Argentina: Data Center Construction Market Breakdown, by Industry Vertical
10.6.6.4 Rest of South and Central America: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
10.6.6.4.1 Rest of South and Central America: Data Center Construction Market Breakdown, by Type Of Construction
10.6.6.4.2 Rest of South and Central America: Data Center Construction Market Breakdown, by Tier Standard
10.6.6.4.3 Rest of South and Central America: Data Center Construction Market Breakdown, by Industry Vertical
11. Competitive Landscape
11.1 Heat Map Analysis by Key Players
11.2 Company Positioning & Concentration
11.2 Company Positioning & Concentration
12. Industry Landscape
12.1 Overview
12.2 Market Initiative
12.2 Market Initiative
13. Company Profiles
13.1 Rittal GmbH & Co KG
13.1.1 Key Facts
13.1.2 Business Description
13.1.3 Products and Services
13.1.4 Financial Overview
13.1.5 SWOT Analysis
13.1.6 Key Developments
13.2 Schneider Electric SE
13.2.1 Key Facts
13.2.2 Business Description
13.2.3 Products and Services
13.2.4 Financial Overview
13.2.5 SWOT Analysis
13.2.6 Key Developments
13.3 DPR Construction Inc
13.3.1 Key Facts
13.3.2 Business Description
13.3.3 Products and Services
13.3.4 Financial Overview
13.3.5 SWOT Analysis
13.3.6 Key Developments
13.4 Mercury Engineering Ltd
13.4.1 Key Facts
13.4.2 Business Description
13.4.3 Products and Services
13.4.4 Financial Overview
13.4.5 SWOT Analysis
13.4.6 Key Developments
13.5 STO Building Group Inc
13.5.1 Key Facts
13.5.2 Business Description
13.5.3 Products and Services
13.5.4 Financial Overview
13.5.5 SWOT Analysis
13.5.6 Key Developments
13.6 AECOM
13.6.1 Key Facts
13.6.2 Business Description
13.6.3 Products and Services
13.6.4 Financial Overview
13.6.5 SWOT Analysis
13.6.6 Key Developments
13.7 HOLDER CONSTRUCTION COMPANY
13.7.1 Key Facts
13.7.2 Business Description
13.7.3 Products and Services
13.7.4 Financial Overview
13.7.5 SWOT Analysis
13.7.6 Key Developments
13.8 Turner Construction Co
13.8.1 Key Facts
13.8.2 Business Description
13.8.3 Products and Services
13.8.4 Financial Overview
13.8.5 SWOT Analysis
13.8.6 Key Developments
13.9 Eaton Corp Plc
13.9.1 Key Facts
13.9.2 Business Description
13.9.3 Products and Services
13.9.4 Financial Overview
13.9.5 SWOT Analysis
13.9.6 Key Developments
13.10 Nikom InfraSolutions Pvt. Ltd
13.10.1 Key Facts
13.10.2 Business Description
13.10.3 Products and Services
13.10.4 Financial Overview
13.10.5 SWOT Analysis
13.10.6 Key Developments
13.1.1 Key Facts
13.1.2 Business Description
13.1.3 Products and Services
13.1.4 Financial Overview
13.1.5 SWOT Analysis
13.1.6 Key Developments
13.2 Schneider Electric SE
13.2.1 Key Facts
13.2.2 Business Description
13.2.3 Products and Services
13.2.4 Financial Overview
13.2.5 SWOT Analysis
13.2.6 Key Developments
13.3 DPR Construction Inc
13.3.1 Key Facts
13.3.2 Business Description
13.3.3 Products and Services
13.3.4 Financial Overview
13.3.5 SWOT Analysis
13.3.6 Key Developments
13.4 Mercury Engineering Ltd
13.4.1 Key Facts
13.4.2 Business Description
13.4.3 Products and Services
13.4.4 Financial Overview
13.4.5 SWOT Analysis
13.4.6 Key Developments
13.5 STO Building Group Inc
13.5.1 Key Facts
13.5.2 Business Description
13.5.3 Products and Services
13.5.4 Financial Overview
13.5.5 SWOT Analysis
13.5.6 Key Developments
13.6 AECOM
13.6.1 Key Facts
13.6.2 Business Description
13.6.3 Products and Services
13.6.4 Financial Overview
13.6.5 SWOT Analysis
13.6.6 Key Developments
13.7 HOLDER CONSTRUCTION COMPANY
13.7.1 Key Facts
13.7.2 Business Description
13.7.3 Products and Services
13.7.4 Financial Overview
13.7.5 SWOT Analysis
13.7.6 Key Developments
13.8 Turner Construction Co
13.8.1 Key Facts
13.8.2 Business Description
13.8.3 Products and Services
13.8.4 Financial Overview
13.8.5 SWOT Analysis
13.8.6 Key Developments
13.9 Eaton Corp Plc
13.9.1 Key Facts
13.9.2 Business Description
13.9.3 Products and Services
13.9.4 Financial Overview
13.9.5 SWOT Analysis
13.9.6 Key Developments
13.10 Nikom InfraSolutions Pvt. Ltd
13.10.1 Key Facts
13.10.2 Business Description
13.10.3 Products and Services
13.10.4 Financial Overview
13.10.5 SWOT Analysis
13.10.6 Key Developments
14. Appendix
14.1 About the Publisher
List of Tables
Table 1. Data Center Construction Market Segmentation
Table 2. List of Vendors
Table 3. Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Table 4. Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million) - by Type Of Construction
Table 5. Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million) - by Tier Standard
Table 6. Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million) - by Industry Vertical
Table 7. North America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 8. North America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 9. North America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 10. North America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Country
Table 11. United States: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 12. United States: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 13. United States: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 14. Canada: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 15. Canada: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 16. Canada: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 17. Mexico: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 18. Mexico: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 19. Mexico: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 20. Europe: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 21. Europe: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 22. Europe: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 23. Europe: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Country
Table 24. Germany: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 25. Germany: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 26. Germany: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 27. United Kingdom: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 28. United Kingdom: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 29. United Kingdom: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 30. France: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 31. France: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 32. France: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 33. Sweden: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 34. Sweden: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 35. Sweden: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 36. Rest of Europe: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 37. Rest of Europe: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 38. Rest of Europe: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 39. Asia Pacific: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 40. Asia Pacific: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 41. Asia Pacific: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 42. Asia Pacific: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Country
Table 43. China: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 44. China: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 45. China: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 46. Japan: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 47. Japan: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 48. Japan: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 49. South Korea: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 50. South Korea: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 51. South Korea: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 52. India: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 53. India: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 54. India: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 55. Australia: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 56. Australia: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 57. Australia: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 58. Rest of APAC: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 59. Rest of APAC: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 60. Rest of APAC: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 61. Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 62. Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 63. Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 64. Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Country
Table 65. Saudi Arabia: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 66. Saudi Arabia: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 67. Saudi Arabia: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 68. United Arab Emirates: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 69. United Arab Emirates: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 70. United Arab Emirates: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 71. South Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 72. South Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 73. South Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 74. Rest of Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 75. Rest of Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 76. Rest of Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 77. South and Central America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 78. South and Central America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 79. South and Central America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 80. South and Central America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Country
Table 81. Brazil: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 82. Brazil: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 83. Brazil: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 84. Argentina: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 85. Argentina: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 86. Argentina: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 87. Rest of South and Central America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 88. Rest of South and Central America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 89. Rest of South and Central America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 90. Heat Map Analysis By Key Players
Table 2. List of Vendors
Table 3. Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Table 4. Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million) - by Type Of Construction
Table 5. Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million) - by Tier Standard
Table 6. Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million) - by Industry Vertical
Table 7. North America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 8. North America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 9. North America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 10. North America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Country
Table 11. United States: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 12. United States: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 13. United States: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 14. Canada: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 15. Canada: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 16. Canada: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 17. Mexico: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 18. Mexico: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 19. Mexico: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 20. Europe: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 21. Europe: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 22. Europe: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 23. Europe: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Country
Table 24. Germany: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 25. Germany: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 26. Germany: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 27. United Kingdom: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 28. United Kingdom: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 29. United Kingdom: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 30. France: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 31. France: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 32. France: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 33. Sweden: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 34. Sweden: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 35. Sweden: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 36. Rest of Europe: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 37. Rest of Europe: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 38. Rest of Europe: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 39. Asia Pacific: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 40. Asia Pacific: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 41. Asia Pacific: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 42. Asia Pacific: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Country
Table 43. China: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 44. China: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 45. China: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 46. Japan: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 47. Japan: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 48. Japan: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 49. South Korea: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 50. South Korea: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 51. South Korea: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 52. India: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 53. India: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 54. India: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 55. Australia: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 56. Australia: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 57. Australia: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 58. Rest of APAC: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 59. Rest of APAC: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 60. Rest of APAC: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 61. Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 62. Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 63. Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 64. Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Country
Table 65. Saudi Arabia: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 66. Saudi Arabia: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 67. Saudi Arabia: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 68. United Arab Emirates: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 69. United Arab Emirates: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 70. United Arab Emirates: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 71. South Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 72. South Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 73. South Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 74. Rest of Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 75. Rest of Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 76. Rest of Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 77. South and Central America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 78. South and Central America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 79. South and Central America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 80. South and Central America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Country
Table 81. Brazil: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 82. Brazil: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 83. Brazil: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 84. Argentina: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 85. Argentina: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 86. Argentina: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 87. Rest of South and Central America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Type Of Construction
Table 88. Rest of South and Central America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Tier Standard
Table 89. Rest of South and Central America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million) - by Industry Vertical
Table 90. Heat Map Analysis By Key Players
List of Tables
Figure 1. Data Center Construction Market Segmentation, by Geography
Figure 2. PEST Analysis
Figure 3. Ecosystem Analysis
Figure 4. Impact Analysis of Drivers and Restraints
Figure 5. Data Center Construction Market Breakdown by Geography, 2022 and 2030 (%)
Figure 6. Data Center Construction Market Revenue (US$ Million), 2022-2030
Figure 7. Data Center Construction Market Share (%) - by Type Of Construction (2022 and 2030)
Figure 8. Electrical Construction: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 9. General Construction: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 10. Mechanical Construction: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 11. Data Center Construction Market Share (%) - by Tier Standard (2022 and 2030)
Figure 12. Tier 3: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 13. Tier 4: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 14. Tier 1 and Tier 2: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 15. Data Center Construction Market Share (%) - by Industry Vertical (2022 and 2030)
Figure 16. IT and telecommunication: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 17. BFSI: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 18. Media and Entertainment: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 19. Retail: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 20. Manufacturing: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 21. Government: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 22. Transportation: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 23. Others: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 24. Data Center Construction Market Breakdown by Region, 2022 and 2030 (%)
Figure 25. North America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 26. North America: Data Center Construction Market Breakdown, by Type Of Construction (2022 and 2030)
Figure 27. North America: Data Center Construction Market Breakdown, by Tier Standard (2022 and 2030)
Figure 28. North America: Data Center Construction Market Breakdown, by Industry Vertical (2022 and 2030)
Figure 29. North America: Data Center Construction Market Breakdown, by Key Countries, 2022 and 2030 (%)
Figure 30. United States: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 31. Canada: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 32. Mexico: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 33. Europe: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 34. Europe: Data Center Construction Market Breakdown, by Type Of Construction (2022 and 2030)
Figure 35. Europe: Data Center Construction Market Breakdown, by Tier Standard (2022 and 2030)
Figure 36. Europe: Data Center Construction Market Breakdown, by Industry Vertical (2022 and 2030)
Figure 37. Europe: Data Center Construction Market Breakdown, by Key Countries, 2022 and 2030 (%)
Figure 38. Germany: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 39. United Kingdom: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 40. France: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 41. Sweden: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 42. Rest of Europe: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 43. Asia Pacific: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 44. Asia Pacific: Data Center Construction Market Breakdown, by Type Of Construction (2022 and 2030)
Figure 45. Asia Pacific: Data Center Construction Market Breakdown, by Tier Standard (2022 and 2030)
Figure 46. Asia Pacific: Data Center Construction Market Breakdown, by Industry Vertical (2022 and 2030)
Figure 47. Asia Pacific: Data Center Construction Market Breakdown, by Key Countries, 2022 and 2030 (%)
Figure 48. China: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 49. Japan: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 50. South Korea: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 51. India: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 52. Australia: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 53. Rest of APAC: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 54. Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 55. Middle East and Africa: Data Center Construction Market Breakdown, by Type Of Construction (2022 and 2030)
Figure 56. Middle East and Africa: Data Center Construction Market Breakdown, by Tier Standard (2022 and 2030)
Figure 57. Middle East and Africa: Data Center Construction Market Breakdown, by Industry Vertical (2022 and 2030)
Figure 58. Middle East and Africa: Data Center Construction Market Breakdown, by Key Countries, 2022 and 2030 (%)
Figure 59. Saudi Arabia: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 60. United Arab Emirates: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 61. South Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 62. Rest of Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 63. South and Central America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 64. South and Central America: Data Center Construction Market Breakdown, by Type Of Construction (2022 and 2030)
Figure 65. South and Central America: Data Center Construction Market Breakdown, by Tier Standard (2022 and 2030)
Figure 66. South and Central America: Data Center Construction Market Breakdown, by Industry Vertical (2022 and 2030)
Figure 67. South and Central America: Data Center Construction Market Breakdown, by Key Countries, 2022 and 2030 (%)
Figure 68. Brazil: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 69. Argentina: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 70. Rest of South and Central America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 71. Company Positioning & Concentration
Figure 2. PEST Analysis
Figure 3. Ecosystem Analysis
Figure 4. Impact Analysis of Drivers and Restraints
Figure 5. Data Center Construction Market Breakdown by Geography, 2022 and 2030 (%)
Figure 6. Data Center Construction Market Revenue (US$ Million), 2022-2030
Figure 7. Data Center Construction Market Share (%) - by Type Of Construction (2022 and 2030)
Figure 8. Electrical Construction: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 9. General Construction: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 10. Mechanical Construction: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 11. Data Center Construction Market Share (%) - by Tier Standard (2022 and 2030)
Figure 12. Tier 3: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 13. Tier 4: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 14. Tier 1 and Tier 2: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 15. Data Center Construction Market Share (%) - by Industry Vertical (2022 and 2030)
Figure 16. IT and telecommunication: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 17. BFSI: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 18. Media and Entertainment: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 19. Retail: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 20. Manufacturing: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 21. Government: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 22. Transportation: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 23. Others: Data Center Construction Market - Revenue and Forecast to 2030 (US$ Million)
Figure 24. Data Center Construction Market Breakdown by Region, 2022 and 2030 (%)
Figure 25. North America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 26. North America: Data Center Construction Market Breakdown, by Type Of Construction (2022 and 2030)
Figure 27. North America: Data Center Construction Market Breakdown, by Tier Standard (2022 and 2030)
Figure 28. North America: Data Center Construction Market Breakdown, by Industry Vertical (2022 and 2030)
Figure 29. North America: Data Center Construction Market Breakdown, by Key Countries, 2022 and 2030 (%)
Figure 30. United States: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 31. Canada: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 32. Mexico: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 33. Europe: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 34. Europe: Data Center Construction Market Breakdown, by Type Of Construction (2022 and 2030)
Figure 35. Europe: Data Center Construction Market Breakdown, by Tier Standard (2022 and 2030)
Figure 36. Europe: Data Center Construction Market Breakdown, by Industry Vertical (2022 and 2030)
Figure 37. Europe: Data Center Construction Market Breakdown, by Key Countries, 2022 and 2030 (%)
Figure 38. Germany: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 39. United Kingdom: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 40. France: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 41. Sweden: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 42. Rest of Europe: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 43. Asia Pacific: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 44. Asia Pacific: Data Center Construction Market Breakdown, by Type Of Construction (2022 and 2030)
Figure 45. Asia Pacific: Data Center Construction Market Breakdown, by Tier Standard (2022 and 2030)
Figure 46. Asia Pacific: Data Center Construction Market Breakdown, by Industry Vertical (2022 and 2030)
Figure 47. Asia Pacific: Data Center Construction Market Breakdown, by Key Countries, 2022 and 2030 (%)
Figure 48. China: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 49. Japan: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 50. South Korea: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 51. India: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 52. Australia: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 53. Rest of APAC: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 54. Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 55. Middle East and Africa: Data Center Construction Market Breakdown, by Type Of Construction (2022 and 2030)
Figure 56. Middle East and Africa: Data Center Construction Market Breakdown, by Tier Standard (2022 and 2030)
Figure 57. Middle East and Africa: Data Center Construction Market Breakdown, by Industry Vertical (2022 and 2030)
Figure 58. Middle East and Africa: Data Center Construction Market Breakdown, by Key Countries, 2022 and 2030 (%)
Figure 59. Saudi Arabia: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 60. United Arab Emirates: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 61. South Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 62. Rest of Middle East and Africa: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 63. South and Central America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 64. South and Central America: Data Center Construction Market Breakdown, by Type Of Construction (2022 and 2030)
Figure 65. South and Central America: Data Center Construction Market Breakdown, by Tier Standard (2022 and 2030)
Figure 66. South and Central America: Data Center Construction Market Breakdown, by Industry Vertical (2022 and 2030)
Figure 67. South and Central America: Data Center Construction Market Breakdown, by Key Countries, 2022 and 2030 (%)
Figure 68. Brazil: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 69. Argentina: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 70. Rest of South and Central America: Data Center Construction Market - Revenue and Forecast to 2030(US$ Million)
Figure 71. Company Positioning & Concentration
Companies Mentioned
- Rittal GmbH & Co. K.G.
- Schneider Electric SE
- DPR Construction Inc
- Mercury Engineering Ltd
- STO Building Group Inc
- AECOM
- HOLDER CONSTRUCTION COMPANY
- Turner Construction Co
- Eaton Corp Plc
- Nikom InfraSolutions Pvt. Ltd.
Table Information
Report Attribute | Details |
---|---|
No. of Pages | 239 |
Published | May 2024 |
Forecast Period | 2022 - 2030 |
Estimated Market Value ( USD | $ 234.85 Billion |
Forecasted Market Value ( USD | $ 448.14 Billion |
Compound Annual Growth Rate | 8.4% |
Regions Covered | Global |
No. of Companies Mentioned | 10 |