Data Center Construction Market in US - Industry Outlook and Forecast 2018-2023

  • ID: 4471618
  • Report
  • Region: United States
  • 170 pages
  • Arizton
1 of 5

FEATURED COMPANIES

  • ABB
  • Corgan Associates
  • FM Engineering
  • Hensel Phelps
  • JE Dunn Construction
  • Schneider Electric
  • MORE
This market research report on data center construction market in US offers analysis on market size & forecast, market share, industry trends, growth drivers, and vendor analysis. The market study also includes insights on segmentation by type (building development, installation and commissioning services, building design, physical security, and DCIM), by tier standards (Tier 1 and Tier 2, Tier 3, and Tier 4), and by regions (South Eastern US, South Western US, Mid-Western US, Western US, and North Eastern US).

Data Center Construction Market in US - Overview

The significant change in the use of IT infrastructure and growing adoption of cloud-based solutions across industries is propelling the growth of the data center construction in US. The BFSI, healthcare, government, and heavy industries are highest revenues generators in the US market. The increase in mega facilities construction will provide higher revenue opportunity for construction contractors, sub-contractors, architectural and engineering firms, physical security solution provider and DCIM vendors in the data center construction market in US.

The installation of systems that can support density up to 200 kW is expected to gain traction in the market during the forecast period. The colocation and cloud service providers are largest contributors in the market in the US. The major markets for operations in the US include Virginia, Texas, California, New York, North Carolina, and Illinois. Moreover, growing investments made by colocation and cloud hosting service providers in the region will boost the revenues in the overall market.

The various construction contractors, sub-contractors, architectural and engineering firms are focusing on building facilities that match the design and sustainability standards in the market. Certification from Uptime Institute and LEED on the design, development, and operational stability of the facility will help colocation providers attract new consumers and gain a larger market share. The data center construction market in US is projected to generate revenues of approximately $3 billion by 2023 and is projected to grow at a CAGR of 4% during the forecast period.

Data Center Construction Market in US - Dynamics

The increasing demand for the facilities at the edge is augmenting the development of the data center construction market in US. The exponential growth of connected devices across business and consumer segments and demand high bandwidth internet across rural areas promote the development of edge data centers in the US market. The initiation of smart cities that require facilities close to customer locations will create lucrative opportunities for local and global vendors in the US market. Players such as vXchnge, EdgeConneX, and 365 Data Centers are some of the key edge-developers in the market. Furthermore, the rapid deployment of modular, containerized, performance optimized data center (POD) facilities will gain predominance in the US market over the next few years.

Data Center Construction Market in US - Segmentation

This market research report on data center constrution market includes a detailed segmentation of the market by type, tier standards, and regions.

Data Center Construction Market in US - By Type

Greenfield data center developments spanning acres in land space will aid in the growth of the market during the forecast period.

The data center construction market in US by type is classified into building development, installation and commissioning services, building design, physical security, and DCIM. Building development dominated the majority of the market share in 2017 and is anticipated to grow at a CAGR of approximately 3% during the forecast period. Building development in the construction market is categorized into greenfield and brownfield development. The establishment of modern facilities that are built to withstand earthquakes and floods is boosting the growth of this segment in the US market. The installation of renewable energy sources such as wind and solar energy for partial or complete power operations in greenfield data center development will revolutionize the data center construction market in the US.

Data Center Construction Market in US - By Tier Standards

LEED and the Uptime Institute certification to help operators attract new consumers in the data center construction market in US.

The tier standards segment in the data center construction market is divided into Tier 1 and Tier 2, Tier 3, and Tier 4. Tier 3 standard dominated the market share in 2017 and is expected to grow at a CAGR of more than 5% during the forecast period. The growing requirement for sustainable designs to reduce power consumption and carbon emission of facilities is boosting the demand in this market segment in the US. The data center operators are focusing on obtaining certification from Uptime Institute, LEED and BICSI to attract new consumers and gain a larger market share. . Vendors are also focusing on adding flexibility and reducing complexity in the installation and commissioning services process to aid data center operators to react quickly to the growing demand for their services in the US market.

Data Center Construction Market in US - By Regions

South Eastern and South Western region will continue to add more revenue to the data center construction market in US.

The data center construction market in US by region is segmented into South Eastern US, South Western US, Mid-Western US, Western US, and North Eastern US. South Eastern US region to dominate the market share in 2017 and is projected to grow at a CAGR of over 4% during the forecast period. Major investment projects by key vendors such as Facebook, Carolina, Digital Realty, CyrusOne and RangingWire in Virginia will propel the expansion of the data center market in the region. The availability of cheap power, strong fiber connectivity, low taxes, and tax incentives are some of the factors propelling the growth of the market in US. The growing demand for edge data center facilities in secondary data center market such as North Carolina, South Carolina, and Tennessee will also augment the growth of this region in the US market during the forecast period.

Key Vendor Analysis

The data center construction market in US is highly competitive, and the leading vendors are focusing on launching innovative solutions to sustain the competition in the market. The new development projects will offer lucrative revenue opportunities for local construction contractors, sub-contracts, installation and commissioning service providers, and architectural firms in the US market. The DCIM software will help operators reduce power consumption and carbon emissions to attract new consumers and gain a larger market share in the US. The deployment of modular data centers and brownfield construction will help players expand in untapped regions in the US market.

The major vendors in the data center construction market in US are:
  • Construction Contractors
  • - Turner Construction
  • - Holder Construction
  • - DPR Construction
  • - Jacobs Engineering Group
  • - Corgan
  • - AECOM
  • - Syska Hennessy Group
  • Physical Security and DCIM Providers
  • - ABB
  • - Assa Abloy
  • - Bosch Security Systems (Robert Bosch)
  • - Honeywell International
  • - Nlyte Software
  • - Schneider Electric
  • - Siemens
  • - SimplexGrinnell (Tyco International)
  • - Sunbird Software
  • - Vertiv
Other prominent vendors include: Clune Construction, Fluor Corp., FM Engineering, Fortis Construction, Gensler, Gilabne Building Co., HDR, Hensel Phelps, HITT Contracting, Hoffman Construction, JE Dunn Construction, Morrison Hershfield, Mortenson Construction, Structure Tone, Whiting-Turner Contracting Co., Allegion, Axis Communication, Cisco, Cormant, Digitus-Biometrics, Eaton, EMKA Group, FNT, Geist: Environet, Hangzhou Hikvision Digital Technology, Intel DCM, Modius, Optimum Path: Visual Data Center, Panduit, Rackwise, and Vigilent.

Key market insights include
1. The analysis of data center construction market in US provides market size and growth rate for the forecast period 2018-2023.
2. It offers comprehensive insights on current industry trends, trend forecast, and growth drivers about the data center construction market in US.
3. The report provides the latest analysis of market share, growth drivers, challenges, and investment opportunities.
4. It offers a complete overview of market segments and the regional outlook for data center construction market in US.
5. The report offers a detailed overview of the vendor landscape, competitive analysis, and key market strategies to gain competitive advantage.

Report Snapshot

According to the latest industry analysis, the data center construction market in US size is expected to reach about $3 billion by 2023, growing at a CAGR of more than 4% during the forecast period. The market research report provides in-depth market analysis and segmental analysis of the data center construction market in US by type, tier standards, and regions.

Base Year: 2017
Forecast Year: 2018-2023

The study considers the present scenario of the data center construction market in the US and its market dynamics for the period 2018-2023. It covers a detailed overview of several market growth enablers, restraints, and trends. The study covers both the demand and supply sides of the market. It also profiles and analyzes the leading 17 companies and 33 other prominent companies operating in the market.

Major Vendors in the Data Center Construction Market in US
  • Construction Contractors
  • - Turner Construction
  • Overview
  • Service Offerings
  • - Holder Construction
  • - DPR Construction
  • - Jacobs Engineering Group
  • - Corgan
  • - AECOM
  • - Syska Hennessy Group
  • Physical Security and DCIM Providers
  • - ABB
  • - Assa Abloy
  • - Bosch Security Systems (Robert Bosch)
  • - Honeywell International
  • - Nlyte Software
  • - Schneider Electric
  • - Siemens
  • - SimplexGrinnell (Tyco International)
  • - Sunbird Software
  • - Vertiv
Prominent Players in the Data Center Construction Market in US
  • Construction Contractors
  • - Clune Construction
  • - Service Offerings
  • - Fluor Corp.
  • - FM Engineering
  • - Fortis Construction
  • - Gensler
  • - Gilabne Building Co.
  • - HDR
  • - Hensel Phelps
  • - HITT Contracting
  • - Hoffman Construction
  • - JE Dunn Construction
  • - Morrison Hershfield
  • - Mortenson Construction
  • - Structure Tone
  • - Whiting-Turner Contracting Co.
  • Physical Security and DCIM Providers
  • - Allegion
  • - Axis Communication
  • - Cisco
  • - Cormant
  • - Digitus-Biometrics
  • - Eaton
  • - EMKA Group
  • - FNT
  • - Geist: Environet
  • - Hangzhou Hikvision Digital Technology
  • - Intel DCM
  • - Modius
  • - Optimum Path: Visual Data Center
  • - Panduit
  • - Rackwise
  • - Vigilent
Market Segmentation by Type
  • building development
  • installation and commissioning services
  • building design
  • physical security
  • DCIM
Market Segmentation by Tier Standard
  • Tier 1 and Tier 2
  • Tier 3
  • Tier 4
Market Segmentation by Geography
  • South Eastern US
  • South Western US
  • Mid-Western US
  • Western US
  • North Eastern US
READ MORE
Note: Product cover images may vary from those shown
2 of 5

FEATURED COMPANIES

  • ABB
  • Corgan Associates
  • FM Engineering
  • Hensel Phelps
  • JE Dunn Construction
  • Schneider Electric
  • MORE
1 Research Methodology

2 Research Objectives

3 Research Process

4 Report Coverage
4.1 Market Definition
4.2 Base Year
4.3 Scope Of Study
4.3.1 Market Segmentation By Type
4.3.2 Market Segmentation By Tier Standards
4.3.3 Market Segmentation By Geography

5 Report Assumptions & Caveats
5.1 Key Caveats
5.2 Inclusions
5.3 Currency Conversion
5.4 Market Derivation

6 Market at a Glance

7 Introduction
7.1 Market Overview
7.2 Rack Power Density

8 Market Dynamics
8.1 Market Growth Enablers
8.1.1 Increasing Demand For Cloud Computing
8.1.2 Growing Customer Base For Colocation Providers And Managed Service Providers
8.1.3 Growing Construction Of Green Data Center Facilities
8.1.4 Tax Incentives and Availability Of Resources
8.1.5 YOY Impact of Market Growth Enablers
8.2 Market Growth Restraint
8.2.1 Growth Of Consolidation Initiatives
8.2.2 Increase In Power Outages And Power Consumption By Data Centers
8.2.3 Location Constraints For Data Center Construction
8.2.4 YOY Impact Of Market Growth Restraints
8.3 Market Opportunities & Trends
8.3.1 Increase In Adoption Of Automation And Monitoring Solutions
8.3.2 Higher Interest To Procure Renewable Energy For Data Centers
8.3.3 Increased Demand For Data Center At The Edge
8.3.4 Increase In Modular Data Center Deployment
8.3.5 YOY Impact Of Market Opportunities & Trends

9 Data Center Construction Market In US
9.1 Market Overview
9.2 Market Size & Forecast
9.3 Porter’s Five Forces Analysis
9.3.1 Threat Of New Entrants
9.3.2 Bargaining Power Of Suppliers
9.3.3 Bargaining Power Of Buyers
9.3.4 Threat Of Substitutes
9.3.5 Competitive Rivalry

10 Market By Type
10.1 Building Development
10.1.1 Market Overview
10.1.2 Market Size & Forecast
10.2 Installation And Commissioning Services
10.2.1 Market Overview
10.2.2 Market Size & Forecast
10.3 Building Design
10.3.1 Market Overview
10.3.2 Market Size & Forecast
10.4 Physical Security
10.4.1 Market Overview
10.4.2 Market Size & Forecast
10.5 Data Center Infrastructure Management (DCIM)
10.5.1 Market Overview
10.5.2 Market Size & Forecast

11 Market by Tier Standards
11.1 Market Overview
11.2 Tier 1 and Tier 2
11.2.1 Market Overview
11.2.2 Market Size & Forecast
11.3 Tier 3
11.3.1 Market Overview
11.3.2 Market Size & Forecast
11.4 Tier 4
11.4.1 Market Overview
11.4.2 Market Size & Forecast

12 Regional Segmentation

13 Market By Southeastern US
13.1 Market Overview
13.2 Market Size & Forecast
13.3 Southeastern US Market By Construction Type
13.3.1 Data Center Building Development: Market Size & Forecast
13.3.2 Data Center Installation & Commissioning Services: Market Size & Forecast
13.3.3 Data Center Building Design: Market Size & Forecast
13.3.4 Data Center Physical Security: Market Size & Forecast
13.3.5 Data Center Infrastructure Management: Market Size & Forecast

14 Market By Southwestern US
14.1 Market Overview
14.2 Market Size & Forecast
14.3 Southwestern US Market By Construction Type
14.3.1 Data Center Building Development: Market Size & Forecast
14.3.2 Data Center Installation & Commissioning Services: Market Size & Forecast
14.3.3 Data Center Building Design: Market Size & Forecast
14.3.4 Data Center Physical Security: Market Size & Forecast
14.3.5 Data Center Infrastructure Management: Market Size & Forecast

15 Market By Mid-Western US
15.1 Market Overview
15.2 Market Size & Forecast
15.3 Mid-Western US Market By Construction Type
15.3.1 Data Center Building Development: Market Size & Forecast
15.3.2 Data Center Installation & Commissioning Services: Market Size & Forecast
15.3.3 Data Center Building Design: Market Size & Forecast
15.3.4 Data Center Physical Security: Market Size & Forecast
15.3.5 Data Center Infrastructure Management: Market Size & Forecast

16 Market By Western US
16.1 Market Overview
16.2 Market Size & Forecast
16.3 Western US Market By Construction Type
16.3.1 Data Center Building Development: Market Size & Forecast
16.3.2 Data Center Installation & Commissioning Services: Market Size & Forecast
16.3.3 Data Center Building Design: Market Size & Forecast
16.3.4 Data Center Physical Security: Market Size & Forecast
16.3.5 Data Center Infrastructure Management: Market Size & Forecast

17 Market By Northeastern US
17.1 Market Overview
17.2 Market Size & Forecast
17.3 Northeastern Us Market By Construction Type
17.3.1 Data Center Building Development: Market Size & Forecast
17.3.2 Data Center Installation & Commissioning Services: Market Size & Forecast
17.3.3 Data Center Building Design: Market Size & Forecast
17.3.4 Data Center Physical Security: Market Size & Forecast
17.3.5 Data Center Infrastructure Management: Market Size & Forecast

18 Competitive Scenario

19 Key Market Participants: Construction Contractors
19.1 Turner Construction
19.1.1 Overview
19.1.2 Service Offerings
19.2 Holder Construction
19.2.1 Overview
19.2.2 Service Offerings
19.3 DPR Construction
19.3.1 Overview
19.3.2 Service Offerings
19.3.3 Key News
19.4 Jacobs Engineering Group
19.4.1 Overview
19.4.2 Service Offerings
19.5 Corgan
19.5.1 Overview
19.5.2 Service Offerings
19.6 AECOM
19.6.1 Overview
19.6.2 Service Offerings
19.6.3 Key News
19.7 Syska Hennessy Group
19.7.1 Overview
19.7.2 Service Offerings

20 Key Market Participants: Physical Security And DCIM Providers
20.1 ABB
20.1.1 Overview
20.1.2 Product Offerings
20.1.3 Key News
20.2 Assa Abloy
20.2.1 Overview
20.2.2 Product Offerings
20.3 Bosch Security Systems (Robert Bosch)
20.3.1 Overview
20.3.2 Product Offerings
20.4 Honeywell International
20.4.1 Overview
20.4.2 Product Offerings
20.5 Nlyte Software
20.5.1 Product Offerings
20.5.2 Key News
20.6 Schneider Electric
20.6.1 Overview
20.6.2 Product Offerings
20.6.3 Key News
20.7 Siemens
20.7.1 Overview
20.7.2 Product Offerings
20.8 Simplexgrinnell (Tyco International)
20.8.1 Overview
20.8.2 Product Offerings
20.9 Sunbird Software
20.9.1 Product Offerings
20.10 Vertiv
20.10.1 Overview
20.10.2 Product Offerings
20.10.3 Key News

21 Prominent Construction Contractors
21.1 Clune Construction
21.1.1 Service Offerings
21.2 Fluor Corp.
21.2.1 Service Offerings
21.3 Fortis Construction
21.3.1 Service Offerings
21.4 Gensler
21.4.1 Service Offerings
21.5 Gilbane Building Co.
21.5.1 Service Offerings
21.6 HDR
21.6.1 Service Offerings
21.7 Hensel Phelps
21.7.1 Service Offerings
21.8 Hitt Contracting
21.8.1 Service Offerings
21.9 Hoffman Construction
21.9.1 Service Offerings
21.1 Je Dunn Construction
21.10.1 Service Offerings
21.11 Morrison Hershfield
21.11.1 Service Offerings
21.12 Mortenson Construction
21.12.1 Product Offerings
21.13 Structure Tone
21.13.1 Product Offerings
21.14 Whiting-Turner Contracting Co.
21.14.1 Product Offerings

22 Prominent Physical Security And DCIM Providers
22.1 Allegion
22.1.1 Product Offerings
22.2 Axis Communication
22.2.1 Product Offerings
22.3 Cisco
22.3.1 Product Offerings
22.4 Cormant
22.4.1 Product Offerings
22.5 Digitus-Biometrics
22.5.1 Product Offerings
22.6 Eaton
22.6.1 Product Offerings
22.7 EMKA Group
22.7.1 Product Offerings
22.8 FNT
22.8.1 Product Offerings
22.9 Geist: Environet
22.9.1 Product Offerings
22.1 Hangzhou Hikvision Digital Technology
22.10.1 Product Offerings
22.11 Intel DCM
22.11.1 Product Offering
22.12 Modius
22.12.1 Product Offering
22.13 Optimum Path: Visual Data Center
22.13.1 Product Offerings
22.14 Panduit
22.14.1 Product Offerings
22.15 Rackwise
22.15.1 Product Offering
22.16 Vigilent
22.16.1 Product Offerings

23 Report Summary
23.1 Key Takeaways
23.2 Strategic Recommendations
23.3 Qualitative Summary: Data Center Construction Market In US
23.4 Quantitative Summary: Data Center Construction Market In US
23.4.1 Overall Market
23.4.2 Market By Regions
23.4.3 Square Feet Area By Regions
23.4.4 Power Capacity By Regions
23.4.5 Market By Construction Type
23.4.6 Southeastern Us Market By Construction Type
23.4.7 Southwestern Us Market By Construction Type
23.4.8 Mid-Western Us Market By Construction Type
23.4.9 Western Us Market By Construction Type
23.4.10 Northeastern Us Market By Construction Type

24 Appendix
24.1 Abbreviations

List of Exhibits
Exhibit 1 Segmentation of Data Center Construction Market in US
Exhibit 2 Market Size Calculation Approach 2017
Exhibit 3 Rack Power Density in Data Center Market in US (2010-2023)
Exhibit 4 Data Center Construction Market in US 2017-2023 ($ million)
Exhibit 5 Data Center Construction Market in US by Area 2017-2023 (Million Square Feet)
Exhibit 6 Data Center Construction Market in US by Power Capacity 2017-2023 (MW)
Exhibit 7 Five Forces Analysis 2017
Exhibit 8 Construction Market Size in US by Type (2017 & 2023)
Exhibit 9 Data Center Construction Market in US by Building Development 2017-2023 ($ million)
Exhibit 10 Data Center Construction Market in US by Installation and Commissioning Services 2017-2023 ($ million)
Exhibit 11 Data Center Construction Market in US by Building Design 2017-2023 ($ million)
Exhibit 12 Data Center Construction Market in US by Physical Security 2017-2023 ($ million)
Exhibit 13 Data Center Construction Market in US by DCIM 2017-2023 ($ million)
Exhibit 14 Construction Market Size in US by Tier Standards (2017 & 2023)
Exhibit 15 Data Center Tier Standards
Exhibit 16 Data Center Construction Market in US by Tier 1 & Tier 2 Facilities 2017-2023 ($ million)
Exhibit 17 Data Center Construction Market in US by Tier 3 facilities 2017-2023 ($ million)
Exhibit 18 Data Center Construction Market in US by Tier 4 facilities 2017-2023($ million)
Exhibit 19 Construction Market Size in US by Regions (2017 & 2023)
Exhibit 20 Construction Market Size in Southeastern US (2017 & 2023)
Exhibit 21 Data Center Construction Market in Southeastern US 2017-2023 ($ million)
Exhibit 22 Data Center Construction Market in Southeastern US by Area 2017-2023 (Million Square Feet)
Exhibit 23 Data Center Construction Market in Southeastern US by Power Capacity 2017-2023 (MW)
Exhibit 24 Data Center Construction Market in Southeastern US by Building Development 2017-2023 ($ million)
Exhibit 25 Data Center Construction Market in Southeastern US by Installation and Commissioning Services 2017-2023 ($ million)
Exhibit 26 Data Center Construction Market in Southeastern US by Building Design 2017-2023 ($ million)
Exhibit 27 Data Center Construction Market in Southeastern US by Physical Security 2017-2023 ($ million)
Exhibit 28 Data Center Construction Market in Southeastern US by DCIM 2017-2023 ($ million)
Exhibit 29 Construction Market Size in Southwestern US (2017 & 2023)
Exhibit 30 Data Center Construction Market in Southwestern US 2017-2023 ($ million)
Exhibit 31 Data Center Construction Market in Southwestern US by Area 2017-2023 (Million Square Feet)
Exhibit 32 Data Center Construction Market in Southwestern US by Power Capacity 2017-2023 (MW)
Exhibit 33 Data Center Construction Market in Southwestern US by Building Development 2017-2023 ($ million)
Exhibit 34 Data Center Construction Market in Southwestern US by Installation and Commissioning Services 2017-2023 ($ million)
Exhibit 35 Data Center Construction Market in Southwestern US by Building Design 2017-2023 ($ million)
Exhibit 36 Data Center Construction Market in Southwestern US by Physical Security 2017-2023 ($ million)
Exhibit 37 Data Center Construction Market in Southwestern US by DCIM 2017-2023 ($ million)
Exhibit 38 Construction Market Size in Mid-Western US (2017 & 2023)
Exhibit 39 Data Center Construction Market in Mid-Western US 2017-2023 ($ million)
Exhibit 40 Data Center Construction Market in Mid-Western US by Area 2017-2023 (Million Square Feet)
Exhibit 41 Data Center Construction Market in Mid-Western US by Power Capacity 2017-2023 (MW)
Exhibit 42 Data Center Construction Market in Mid-Western US by Building Development 2017-2023 ($ million)
Exhibit 43 Data Center Construction Market in Mid-Western US by Installation & Commissioning Services 2017-2023 ($ million)
Exhibit 44 Data Center Construction Market in Mid-Western US by Building Design 2017-2023 ($ million)
Exhibit 45 Data Center Construction Market in Mid-Western US by Physical Security 2017-2023 ($ million)
Exhibit 46 Data Center Construction Market in Mid-Western US by DCIM 2017-2023 ($ million)
Exhibit 47 Construction Market Size in Western US (2017 & 2023)
Exhibit 48 Data Center Construction Market in Western US 2017-2023 ($ million)
Exhibit 49 Data Center Construction Market in Western US by Area 2017-2023 (Million Square Feet)
Exhibit 50 Data Center Construction Market in Western US by Power Capacity 2017-2023 (MW)
Exhibit 51 Data Center Construction Market in Western US by Building Development 2017-2023 ($ million)
Exhibit 52 Data Center Construction Market in Western US by Installation & Commissioning Services 2017-2023 ($ million)
Exhibit 53 Data Center Construction Market in Western US by Building Design 2017-2023 ($ million)
Exhibit 54 Data Center Construction Market in Western US by Physical Security 2017-2023 ($ million)
Exhibit 55 Data Center Construction Market in Western US by DCIM 2017-2023 ($ million)
Exhibit 56 Construction Market Size in Northeastern US (2017 & 2023)
Exhibit 57 Data Center Construction Market in Northeastern US 2017-2023 ($ million)
Exhibit 58 Data Center Construction Market in Northeastern US by Area 2017-2023 (Million Square Feet)
Exhibit 59 Data Center Construction Market in Northeastern US by Power Capacity 2017-2023 (MW)
Exhibit 60 Data Center Construction Market in Northeastern by Building Development 2017-2023 ($ million)
Exhibit 61 Data Center Construction Market in Northeastern US by Installation & Commissioning Services 2017-2023 ($ million)
Exhibit 62 Data Center Construction Market in Northeastern US by Building Design 2017-2023 ($ million)
Exhibit 63 Data Center Construction Market in Northeastern US by Physical Security 2017-2023 ($ million)
Exhibit 64 Data Center Construction Market in Northeastern US by DCIM 2017-2023 ($ million)

List of Tables
Table 1 Key Geographies Definition
Table 2 Key Caveats
Table 3 Currency Conversion 2013-2017
Table 4 Cost Calculation of Data Centers based on Tier Standards ($)
Table 5 YOY Impact of Market Growth Enablers 2017-2023
Table 6 YOY Impact of Market Growth Restraints 2017-2023
Table 7 YOY Impact of Market Opportunities & Trends 2017-2023
Table 8 Qualitative Summary of Data Center Construction Market in US
Table 9 Data Center Construction Market in US 2017-2023
Table 10 Data Center Construction Market in US by Regions 2017-2023
Table 11 Data Center Construction in US by Regional Area 2017-2023 (Million Square Feet)
Table 12 Data Center Construction in US by Regional Power Capacity 2017-2023 Power (MW)
Table 13 Data Center Construction in US by Construction Type 2017-2023 ($ million)
Table 14 Data Center Construction in Southeastern US by Construction Type 2017-2023 ($ million)
Table 15 Data Center Construction in Southwestern US by Construction Type 2017-2023 ($ million)
Table 16 Data Center Construction in Mid-Western US by Construction Type 2017-2023 ($ million)
Table 17 Data Center Construction in Western US by Construction Type 2017-2023 ($ million)
Table 18 Data Center Construction in Northeastern US by Construction Type 2017-2023 ($ million)
Note: Product cover images may vary from those shown
3 of 5

Loading
LOADING...

4 of 5
  • Rackwise
  • Optimum Path: Visual Data Center
  • Modius
  • Intel DCM
  • Hangzhou Hikvision Digital Technology
  • Geist: Environet
  • FNT
  • EMKA Group
  • Digitus-Biometrics
  • Cormant
  • Axis Communication
  • Allegion
  • HDR
  • Sunbird Software
  • SimplexGrinnell (Tyco International)
  • Bosch Security Systems (Robert Bosch)
  • Vigilent
  • Vertiv
  • Structure Tone
  • Mortenson Construction
  • Morrison Hershfield
  • JE Dunn Construction
  • Hoffman Construction
  • HITT Contracting
  • Hensel Phelps
  • Gilbane Building Co
  • Fortis Construction
  • FM Engineering
  • Fluor Corporation
  • Clune Construction
  • Nlyte Software
  • Syska Hennessy Group
  • Honeywell
  • ABB
  • Siemens
  • Corgan Associates
  • Gensler
  • AECOM
  • DPR Construction
  • Holder Construction
  • Turner Construction
  • Jacob Engineering Group
  • The Whiting-Turner Contracting.
  • Eaton
  • Panduit
  • ASSA ABLOY
  • Schneider Electric
  • Cisco System .
Note: Product cover images may vary from those shown
5 of 5
Note: Product cover images may vary from those shown
Adroll
adroll