+353-1-416-8900REST OF WORLD
+44-20-3973-8888REST OF WORLD
1-917-300-0470EAST COAST U.S
1-800-526-8630U.S. (TOLL FREE)
Sale

Data Center Construction Market by Data Center Type (Colocation, Edge, Enterprise), Construction Type (New Construction, Retrofit Renovation), Tier Level, Component, End User Industry, Construction Service Type - Global Forecast 2025-2030

  • PDF Icon

    Report

  • 198 Pages
  • August 2025
  • Region: Global
  • 360iResearch™
  • ID: 4807802
UP TO OFF until Jan 01st 2026
1h Free Analyst Time
1h Free Analyst Time

Speak directly to the analyst to clarify any post sales queries you may have.

The Data Center Construction Market grew from USD 236.50 billion in 2024 to USD 257.67 billion in 2025. It is expected to continue growing at a CAGR of 8.62%, reaching USD 388.53 billion by 2030.

Laying the Groundwork for the Future of Data Center Construction Through a Holistic Introduction to Emerging Market Dynamics and Drivers

The data center construction sector stands at the crossroads of unprecedented digital expansion and evolving infrastructure demands. As enterprises worldwide accelerate their transition to cloud computing, edge solutions, and high-performance computing environments, the physical footprint and complexity of data centers have grown exponentially. Simultaneously, emerging trends such as sustainability mandates, energy efficiency goals, and digital automation are reshaping how these critical facilities are planned, designed, and delivered.

In an era marked by rapid technological advancements and stricter regulatory frameworks, project stakeholders must navigate a multifaceted landscape that balances cost optimization with operational resilience. The infusion of renewable energy sources into facility design, the adoption of modular and prefabricated construction approaches, and the integration of intelligent monitoring systems are redefining best practices and raising the bar for performance benchmarks.

This executive summary provides a focused exploration of current market dynamics, transformative shifts, and strategic imperatives. It aims to equip industry leaders, investors, and decision-makers with clear insights into the forces driving change, potential challenges, and emerging opportunities within the global data center construction ecosystem.

Exploring the Pivotal Disruptions Redefining the Data Center Construction Landscape Amid Technological and Operational Transformations

The data center construction landscape is undergoing a fundamental transformation as legacy practices give way to innovative methodologies and advanced technologies. At the heart of this shift is the growing demand for edge computing infrastructure that delivers low-latency processing closer to end users, prompting a surge in smaller, decentralized facility deployments. At the same time, hyperscale operators continue to expand massive campuses capable of supporting artificial intelligence workloads and high-volume data processing, driving economies of scale.

Moreover, the industry is witnessing the rise of modular and prefabricated construction techniques that significantly reduce on-site assembly time, minimize waste, and enhance quality control. Digital twins and advanced building information modeling platforms are enabling real-time simulation and optimization of design elements before breaking ground. In parallel, smart systems powered by the Internet of Things and machine learning are revolutionizing facility management, enabling predictive maintenance and dynamic energy optimization.

These transformative developments are converging to create a more agile, efficient, and resilient data center ecosystem. As the sector continues to evolve, stakeholders must adapt their strategies to capitalize on these innovations, repositioning their operations to thrive in a rapidly shifting competitive environment.

Assessing the Far Reaching Ramifications of Recent Tariff Adjustments on Data Center Construction Trends Within the United States

Recent tariff adjustments implemented in the United States have introduced new cost pressures and supply chain complexities for data center construction projects. Levies on steel, aluminum, and critical electronic components have driven up procurement expenses, prompting stakeholders to reassess sourcing strategies and inventory management practices. Consequently, project pipelines have been reexamined to accommodate potential budget reallocations and material lead time fluctuations.

In response to these challenges, developers are increasingly exploring alternative suppliers outside traditional markets and diversifying procurement to mitigate geopolitical risks. This diversification often entails higher logistical coordination and compliance oversight, which may extend project timelines if not managed proactively. At the same time, some industry participants have accelerated investments in domestic manufacturing capabilities to shore up supply resilience and reduce dependency on imported goods.

Despite these headwinds, the tariff impact has also catalyzed innovation in material utilization and construction methodologies. For example, design teams are optimizing structural frameworks to use less metal while maintaining robustness, and contractors are adopting advanced fabrication techniques to streamline production. Through these adaptive strategies, the sector is learning to navigate tariff-driven volatility and align project execution with evolving policy landscapes.

Gaining Critical Insights into Market Segmentation to Illuminate the Nuances of Data Center Construction Across Diverse Variables

Understanding the diversity of data center requirements begins with examining how facility types shape construction priorities. Colocation providers emphasize scalability and standardized layouts to accommodate multiple tenants, whereas edge facilities prioritize compactness and rapid deployment near population centers. Enterprise data centers demand tailored architectures integrated with corporate IT ecosystems, and hyperscale operations focus on maximizing power density and operational efficiency.

Looking at construction typologies reveals a clear delineation between ground-up developments and retrofit renovations. New construction projects allow for optimal site selection, bespoke infrastructure design, and incorporation of the latest sustainability measures. In contrast, retrofits require careful adaptation of existing structures to improve cooling performance, reinforce power systems, and implement modern security protocols with minimal operational disruption.

Tier classifications further differentiate market practices, ranging from basic Tier I installations to fault-tolerant Tier IV designs. Each tier level entails specific requirements for redundancy, uptime guarantees, and system robustness, influencing decisions around cooling architectures, UPS configurations, and distribution pathways. Component segmentation sheds light on the critical subsystems that underpin facility functionality. From cabling pathways and precision cooling equipment to fire protection systems, each element demands meticulous specification and integration. Power systems encompass generators, switchgear, and uninterruptible power supplies, while security frameworks span access control, intrusion detection, and video surveillance.

Finally, industry verticals and service models guide project scoping and execution. Public sector deployments often adhere to stringent regulatory compliance and regional preferences. Healthcare institutions require stringent reliability and data protection measures. IT and telecom operators focus on connectivity and uptime, and retail chains balance cost constraints with scalability needs. Meanwhile, the choice between design build, general contracting, or specialized contracting services influences risk allocation, project governance, and collaboration dynamics throughout the construction lifecycle.

Uncovering Strategic Regional Differentiators Shaping the Trajectory of Data Center Construction in Key Global Markets

The Americas region continues to lead in large scale data center rollouts, driven by significant investments from cloud service providers, technology corporations, and hyperscale operators. Robust digital infrastructure initiatives, tax incentives, and accessible land parcels in key metro areas have fostered an expansive development pipeline. Meanwhile, the region’s vast geography has enabled strategic diversification of facility locations to address latency requirements and regulatory constraints.

In Europe, Middle East and Africa, a confluence of data sovereignty regulations and sustainability mandates is shaping construction strategies. Providers are increasingly prioritizing greenfield developments that incorporate renewable energy sources and high efficiency designs to meet stringent carbon reduction targets. Additionally, regional hubs in Western Europe and the Gulf Cooperation Council countries are emerging as critical nodes for global data traffic and content delivery networks.

The Asia-Pacific region exhibits the fastest growth trajectory, fueled by rapid digital adoption, government digitization efforts, and burgeoning e-commerce markets. Countries across Southeast Asia and India are expanding edge infrastructures to serve mobile and web based services, while established markets in Japan, South Korea, and Australia continue to scale hyperscale campuses. Policy support for infrastructure modernization, combined with evolving cooling innovations tailored to tropical climates, underscores the region’s dynamic growth profile.

Highlighting Prominent Industry Players Driving Innovation and Competitive Dynamics in the Global Data Center Construction Ecosystem

Leading global engineering and construction firms are expanding their portfolios to deliver turnkey solutions for data center projects, leveraging cross sector expertise in critical infrastructure delivery. These firms are forging strategic alliances with component manufacturers to integrate advanced cooling modules, prefabricated power skids, and modular prefabricated structures into cohesive build packages.

Specialized contractors are gaining prominence by offering niche services such as precision electrical distribution, high density cooling deployments, and advanced fire protection system installations. Their deep technical know how enables rapid deployment cycles and quality assurance that aligns with the rigorous uptime requirements of enterprise and hyperscale operators.

Design build organizations are capitalizing on their integrated offerings, managing everything from site selection and master planning to detailed engineering and construction management under a single contractual umbrella. This model streamlines communication, accelerates decision cycles, and enhances cost transparency. By collaborating closely with technology vendors and IT architects, these firms are ensuring that facility designs accommodate future digital transformation initiatives and evolving compute architectures.

Across all segments, joint ventures and partnerships between global contractors, local developers, and specialized equipment suppliers continue to define competitive dynamics. Through these alliances, companies are combining regional market insights with global best practices to deliver resilient and efficient data center solutions.

Presenting Action Oriented Recommendations to Empower Industry Leaders in Navigating Complexities of Data Center Construction Evolution

To stay ahead in this rapidly evolving market, project developers should prioritize diversified supply chains that include both domestic and international sources for critical materials and equipment. This approach will mitigate tariff impacts and reduce vulnerability to geopolitical disruptions while preserving cost efficiency and project timelines.

Investing in modular and prefabricated construction technologies can substantially shorten on site schedules, improve quality control, and lower waste generation. By adopting offsite fabrication for electrical and mechanical skids, firms can achieve greater predictability and scalability, particularly for edge and hyperscale deployments.

Embracing digital twin platforms and advanced building information modeling will enable real time simulation of facility performance, facilitating iterative design optimization and proactive maintenance planning. These tools not only enhance data driven decision making but also support continuous improvement across the asset lifecycle.

Industry leaders should also integrate renewable energy solutions and high efficiency cooling strategies to align with evolving environmental standards and corporate sustainability goals. Collaboration with energy service providers and participation in demand response programs can further optimize lifecycle costs and minimize carbon footprints.

Finally, fostering partnerships with specialized contractors and technology vendors will ensure access to emerging innovations in power distribution, precision cooling, and security systems. By building an ecosystem of trusted collaborators, organizations can adapt rapidly to market shifts and deliver resilient, future proof facilities.

Detailing Rigorous Research Methodology Underpinning Comprehensive Analysis of Data Center Construction Market Insights and Trends

This analysis was constructed using a multi tiered research framework that combines primary interviews with C level executives, facility managers, and supply chain experts alongside extensive secondary research from regulatory filings, industry publications, and proprietary databases. Each data point has been cross validated through triangulation methodology to ensure accuracy and consistency.

Qualitative insights were gathered through structured conversations with key stakeholders representing hyperscale operators, colocation providers, enterprise IT groups, and specialized contractors. These dialogues provided nuanced perspectives on evolving project priorities, technology adoption rates, and strategic challenges.

Quantitative inputs were derived from a curated set of publicly available and subscription based data sources, followed by rigorous statistical analysis to identify trend correlations and benchmark performance metrics. The underlying dataset was normalized to account for regional cost differentials, tier level requirements, and service model variations.

Throughout the research process, an expert review board comprising engineers, industry consultants, and sustainability specialists assessed the methodology and preliminary findings. This validation step ensured that the conclusions drawn are both technically robust and aligned with the latest market developments.

Finally, the report was refined through multiple editorial iterations, focusing on clarity, coherence, and actionable relevance for decision makers across the data center construction value chain.

Summarizing Core Findings and Their Broader Implications for Stakeholders in the Data Center Construction Industry Landscape

This executive summary has distilled the most critical developments shaping the data center construction sector, from evolving design paradigms and tariff induced supply chain adjustments to segmentation specific demands and regional growth contours. The analysis highlights how technological advancements, regulatory shifts, and sustainability imperatives are converging to redefine project execution models and performance standards.

Key segmentation insights reveal that colocation, edge, enterprise, and hyperscale facilities each carry distinct architectural and operational priorities, while construction type, tier classification, component selection, end user industry, and service model considerations further refine implementation strategies. Regional variations across the Americas, EMEA, and Asia Pacific underscore the importance of localized market understanding and policy alignment.

Leading industry players are differentiating themselves through integrated design build offerings, specialized contracting expertise, and strategic partnerships that blend global best practices with regional insights. Actionable recommendations emphasize supply chain diversification, modular build adoption, digital twin integration, and sustainable energy solutions as essential components of future ready projects.

As stakeholders chart the next phase of infrastructure growth, this summary equips them with the knowledge required to make informed decisions, mitigate risks, and seize emerging opportunities within the dynamic landscape of data center construction.

Market Segmentation & Coverage

This research report categorizes to forecast the revenues and analyze trends in each of the following sub-segmentations:
  • Data Center Type
    • Colocation
    • Edge
    • Enterprise
    • Hyperscale
  • Construction Type
    • New Construction
    • Retrofit Renovation
  • Tier Level
    • Tier I
    • Tier II
    • Tier III
    • Tier IV
  • Component
    • Cabling And Pathways
    • Cooling Systems
      • Air Cooled
      • Liquid Cooled
    • Fire Protection
    • Power Systems
      • Generators
      • Switchgear
      • Uninterruptible Power Supply
    • Racks And Enclosures
    • Security And Surveillance
      • Access Control
      • Intrusion Detection
      • Video Surveillance
  • End User Industry
    • Government
    • Healthcare
    • IT And Telecom
    • Retail
  • Construction Service Type
    • Design Build
    • General Contractor
    • Specialized Contractor
This research report categorizes to forecast the revenues and analyze trends in each of the following sub-regions:
  • Americas
    • United States
      • California
      • Texas
      • New York
      • Florida
      • Illinois
      • Pennsylvania
      • Ohio
    • Canada
    • Mexico
    • Brazil
    • Argentina
  • Europe, Middle East & Africa
    • United Kingdom
    • Germany
    • France
    • Russia
    • Italy
    • Spain
    • United Arab Emirates
    • Saudi Arabia
    • South Africa
    • Denmark
    • Netherlands
    • Qatar
    • Finland
    • Sweden
    • Nigeria
    • Egypt
    • Turkey
    • Israel
    • Norway
    • Ireland
    • Poland
    • Switzerland
  • Asia-Pacific
    • China
    • India
    • Japan
    • Australia
    • South Korea
    • Indonesia
    • Thailand
    • Philippines
    • Malaysia
    • Singapore
    • Vietnam
    • Taiwan
This research report delves into recent significant developments and analyzes trends in each of the following companies:
  • Turner Construction Company
  • Fluor Corporation
  • Skanska USA Building Inc.
  • DPR Construction, Inc.
  • Holder Construction Company LLC
  • Balfour Beatty Construction LLC
  • Clark Construction Group LLC
  • McCarthy Building Companies, Inc.
  • Hensel Phelps Construction Co.
  • Gilbane Building Company

 

Additional Product Information:

  • Purchase of this report includes 1 year online access with quarterly updates.
  • This report can be updated on request. Please contact our Customer Experience team using the Ask a Question widget on our website.

Table of Contents

1. Preface
1.1. Objectives of the Study
1.2. Market Segmentation & Coverage
1.3. Years Considered for the Study
1.4. Currency & Pricing
1.5. Language
1.6. Stakeholders
2. Research Methodology
2.1. Define: Research Objective
2.2. Determine: Research Design
2.3. Prepare: Research Instrument
2.4. Collect: Data Source
2.5. Analyze: Data Interpretation
2.6. Formulate: Data Verification
2.7. Publish: Research Report
2.8. Repeat: Report Update
3. Executive Summary
4. Market Overview
4.1. Introduction
4.2. Market Sizing & Forecasting
5. Market Dynamics
5.1. Integration of liquid cooling systems for high-density computing workloads
5.2. Adoption of modular prefabricated data center units for rapid deployment
5.3. Implementation of renewable energy microgrids to power data center operations
5.4. Deployment of AI-driven facility management systems for predictive maintenance and operational efficiency
5.5. Growing focus on hyperscale edge data centers located near urban fiber network hubs
5.6. Designing seismic-resilient data center infrastructure to withstand high earthquake risk regions
5.7. Use of advanced energy storage solutions for dynamic demand response in data centers
6. Market Insights
6.1. Porter’s Five Forces Analysis
6.2. PESTLE Analysis
7. Cumulative Impact of United States Tariffs 2025
8. Data Center Construction Market, by Data Center Type
8.1. Introduction
8.2. Colocation
8.3. Edge
8.4. Enterprise
8.5. Hyperscale
9. Data Center Construction Market, by Construction Type
9.1. Introduction
9.2. New Construction
9.3. Retrofit Renovation
10. Data Center Construction Market, by Tier Level
10.1. Introduction
10.2. Tier I
10.3. Tier II
10.4. Tier III
10.5. Tier IV
11. Data Center Construction Market, by Component
11.1. Introduction
11.2. Cabling And Pathways
11.3. Cooling Systems
11.3.1. Air Cooled
11.3.2. Liquid Cooled
11.4. Fire Protection
11.5. Power Systems
11.5.1. Generators
11.5.2. Switchgear
11.5.3. Uninterruptible Power Supply
11.6. Racks And Enclosures
11.7. Security And Surveillance
11.7.1. Access Control
11.7.2. Intrusion Detection
11.7.3. Video Surveillance
12. Data Center Construction Market, by End User Industry
12.1. Introduction
12.2. Government
12.3. Healthcare
12.4. IT And Telecom
12.5. Retail
13. Data Center Construction Market, by Construction Service Type
13.1. Introduction
13.2. Design Build
13.3. General Contractor
13.4. Specialized Contractor
14. Americas Data Center Construction Market
14.1. Introduction
14.2. United States
14.3. Canada
14.4. Mexico
14.5. Brazil
14.6. Argentina
15. Europe, Middle East & Africa Data Center Construction Market
15.1. Introduction
15.2. United Kingdom
15.3. Germany
15.4. France
15.5. Russia
15.6. Italy
15.7. Spain
15.8. United Arab Emirates
15.9. Saudi Arabia
15.10. South Africa
15.11. Denmark
15.12. Netherlands
15.13. Qatar
15.14. Finland
15.15. Sweden
15.16. Nigeria
15.17. Egypt
15.18. Turkey
15.19. Israel
15.20. Norway
15.21. Ireland
15.22. Poland
15.23. Switzerland
16. Asia-Pacific Data Center Construction Market
16.1. Introduction
16.2. China
16.3. India
16.4. Japan
16.5. Australia
16.6. South Korea
16.7. Indonesia
16.8. Thailand
16.9. Philippines
16.10. Malaysia
16.11. Singapore
16.12. Vietnam
16.13. Taiwan
17. Competitive Landscape
17.1. Market Share Analysis, 2024
17.2. FPNV Positioning Matrix, 2024
17.3. Competitive Analysis
17.3.1. Turner Construction Company
17.3.2. Fluor Corporation
17.3.3. Skanska USA Building Inc.
17.3.4. DPR Construction, Inc.
17.3.5. Holder Construction Company LLC
17.3.6. Balfour Beatty Construction LLC
17.3.7. Clark Construction Group LLC
17.3.8. McCarthy Building Companies, Inc.
17.3.9. Hensel Phelps Construction Co.
17.3.10. Gilbane Building Company
18. ResearchAI
19. ResearchStatistics
20. ResearchContacts
21. ResearchArticles
22. Appendix
List of Figures
FIGURE 1. DATA CENTER CONSTRUCTION MARKET RESEARCH PROCESS
FIGURE 2. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, 2018-2030 (USD MILLION)
FIGURE 3. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY REGION, 2024 VS 2025 VS 2030 (USD MILLION)
FIGURE 4. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY COUNTRY, 2024 VS 2025 VS 2030 (USD MILLION)
FIGURE 5. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER TYPE, 2024 VS 2030 (%)
FIGURE 6. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER TYPE, 2024 VS 2025 VS 2030 (USD MILLION)
FIGURE 7. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION TYPE, 2024 VS 2030 (%)
FIGURE 8. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION TYPE, 2024 VS 2025 VS 2030 (USD MILLION)
FIGURE 9. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER LEVEL, 2024 VS 2030 (%)
FIGURE 10. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER LEVEL, 2024 VS 2025 VS 2030 (USD MILLION)
FIGURE 11. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY COMPONENT, 2024 VS 2030 (%)
FIGURE 12. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY COMPONENT, 2024 VS 2025 VS 2030 (USD MILLION)
FIGURE 13. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY END USER INDUSTRY, 2024 VS 2030 (%)
FIGURE 14. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY END USER INDUSTRY, 2024 VS 2025 VS 2030 (USD MILLION)
FIGURE 15. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION SERVICE TYPE, 2024 VS 2030 (%)
FIGURE 16. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION SERVICE TYPE, 2024 VS 2025 VS 2030 (USD MILLION)
FIGURE 17. AMERICAS DATA CENTER CONSTRUCTION MARKET SIZE, BY COUNTRY, 2024 VS 2030 (%)
FIGURE 18. AMERICAS DATA CENTER CONSTRUCTION MARKET SIZE, BY COUNTRY, 2024 VS 2025 VS 2030 (USD MILLION)
FIGURE 19. UNITED STATES DATA CENTER CONSTRUCTION MARKET SIZE, BY STATE, 2024 VS 2030 (%)
FIGURE 20. UNITED STATES DATA CENTER CONSTRUCTION MARKET SIZE, BY STATE, 2024 VS 2025 VS 2030 (USD MILLION)
FIGURE 21. EUROPE, MIDDLE EAST & AFRICA DATA CENTER CONSTRUCTION MARKET SIZE, BY COUNTRY, 2024 VS 2030 (%)
FIGURE 22. EUROPE, MIDDLE EAST & AFRICA DATA CENTER CONSTRUCTION MARKET SIZE, BY COUNTRY, 2024 VS 2025 VS 2030 (USD MILLION)
FIGURE 23. ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET SIZE, BY COUNTRY, 2024 VS 2030 (%)
FIGURE 24. ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET SIZE, BY COUNTRY, 2024 VS 2025 VS 2030 (USD MILLION)
FIGURE 25. DATA CENTER CONSTRUCTION MARKET SHARE, BY KEY PLAYER, 2024
FIGURE 26. DATA CENTER CONSTRUCTION MARKET, FPNV POSITIONING MATRIX, 2024
FIGURE 27. DATA CENTER CONSTRUCTION MARKET: RESEARCHAI
FIGURE 28. DATA CENTER CONSTRUCTION MARKET: RESEARCHSTATISTICS
FIGURE 29. DATA CENTER CONSTRUCTION MARKET: RESEARCHCONTACTS
FIGURE 30. DATA CENTER CONSTRUCTION MARKET: RESEARCHARTICLES
List of Tables
TABLE 1. DATA CENTER CONSTRUCTION MARKET SEGMENTATION & COVERAGE
TABLE 2. UNITED STATES DOLLAR EXCHANGE RATE, 2018-2024
TABLE 3. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, 2018-2024 (USD MILLION)
TABLE 4. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, 2025-2030 (USD MILLION)
TABLE 5. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY REGION, 2018-2024 (USD MILLION)
TABLE 6. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY REGION, 2025-2030 (USD MILLION)
TABLE 7. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY COUNTRY, 2018-2024 (USD MILLION)
TABLE 8. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY COUNTRY, 2025-2030 (USD MILLION)
TABLE 9. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER TYPE, 2018-2024 (USD MILLION)
TABLE 10. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER TYPE, 2025-2030 (USD MILLION)
TABLE 11. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY COLOCATION, BY REGION, 2018-2024 (USD MILLION)
TABLE 12. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY COLOCATION, BY REGION, 2025-2030 (USD MILLION)
TABLE 13. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY EDGE, BY REGION, 2018-2024 (USD MILLION)
TABLE 14. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY EDGE, BY REGION, 2025-2030 (USD MILLION)
TABLE 15. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY ENTERPRISE, BY REGION, 2018-2024 (USD MILLION)
TABLE 16. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY ENTERPRISE, BY REGION, 2025-2030 (USD MILLION)
TABLE 17. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY HYPERSCALE, BY REGION, 2018-2024 (USD MILLION)
TABLE 18. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY HYPERSCALE, BY REGION, 2025-2030 (USD MILLION)
TABLE 19. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION TYPE, 2018-2024 (USD MILLION)
TABLE 20. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION TYPE, 2025-2030 (USD MILLION)
TABLE 21. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY NEW CONSTRUCTION, BY REGION, 2018-2024 (USD MILLION)
TABLE 22. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY NEW CONSTRUCTION, BY REGION, 2025-2030 (USD MILLION)
TABLE 23. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY RETROFIT RENOVATION, BY REGION, 2018-2024 (USD MILLION)
TABLE 24. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY RETROFIT RENOVATION, BY REGION, 2025-2030 (USD MILLION)
TABLE 25. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER LEVEL, 2018-2024 (USD MILLION)
TABLE 26. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER LEVEL, 2025-2030 (USD MILLION)
TABLE 27. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER I, BY REGION, 2018-2024 (USD MILLION)
TABLE 28. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER I, BY REGION, 2025-2030 (USD MILLION)
TABLE 29. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER II, BY REGION, 2018-2024 (USD MILLION)
TABLE 30. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER II, BY REGION, 2025-2030 (USD MILLION)
TABLE 31. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER III, BY REGION, 2018-2024 (USD MILLION)
TABLE 32. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER III, BY REGION, 2025-2030 (USD MILLION)
TABLE 33. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER IV, BY REGION, 2018-2024 (USD MILLION)
TABLE 34. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER IV, BY REGION, 2025-2030 (USD MILLION)
TABLE 35. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY COMPONENT, 2018-2024 (USD MILLION)
TABLE 36. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY COMPONENT, 2025-2030 (USD MILLION)
TABLE 37. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY CABLING AND PATHWAYS, BY REGION, 2018-2024 (USD MILLION)
TABLE 38. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY CABLING AND PATHWAYS, BY REGION, 2025-2030 (USD MILLION)
TABLE 39. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY COOLING SYSTEMS, BY REGION, 2018-2024 (USD MILLION)
TABLE 40. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY COOLING SYSTEMS, BY REGION, 2025-2030 (USD MILLION)
TABLE 41. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY AIR COOLED, BY REGION, 2018-2024 (USD MILLION)
TABLE 42. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY AIR COOLED, BY REGION, 2025-2030 (USD MILLION)
TABLE 43. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY LIQUID COOLED, BY REGION, 2018-2024 (USD MILLION)
TABLE 44. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY LIQUID COOLED, BY REGION, 2025-2030 (USD MILLION)
TABLE 45. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY COOLING SYSTEMS, 2018-2024 (USD MILLION)
TABLE 46. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY COOLING SYSTEMS, 2025-2030 (USD MILLION)
TABLE 47. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY FIRE PROTECTION, BY REGION, 2018-2024 (USD MILLION)
TABLE 48. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY FIRE PROTECTION, BY REGION, 2025-2030 (USD MILLION)
TABLE 49. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER SYSTEMS, BY REGION, 2018-2024 (USD MILLION)
TABLE 50. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER SYSTEMS, BY REGION, 2025-2030 (USD MILLION)
TABLE 51. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY GENERATORS, BY REGION, 2018-2024 (USD MILLION)
TABLE 52. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY GENERATORS, BY REGION, 2025-2030 (USD MILLION)
TABLE 53. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY SWITCHGEAR, BY REGION, 2018-2024 (USD MILLION)
TABLE 54. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY SWITCHGEAR, BY REGION, 2025-2030 (USD MILLION)
TABLE 55. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY UNINTERRUPTIBLE POWER SUPPLY, BY REGION, 2018-2024 (USD MILLION)
TABLE 56. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY UNINTERRUPTIBLE POWER SUPPLY, BY REGION, 2025-2030 (USD MILLION)
TABLE 57. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER SYSTEMS, 2018-2024 (USD MILLION)
TABLE 58. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER SYSTEMS, 2025-2030 (USD MILLION)
TABLE 59. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY RACKS AND ENCLOSURES, BY REGION, 2018-2024 (USD MILLION)
TABLE 60. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY RACKS AND ENCLOSURES, BY REGION, 2025-2030 (USD MILLION)
TABLE 61. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY SECURITY AND SURVEILLANCE, BY REGION, 2018-2024 (USD MILLION)
TABLE 62. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY SECURITY AND SURVEILLANCE, BY REGION, 2025-2030 (USD MILLION)
TABLE 63. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY ACCESS CONTROL, BY REGION, 2018-2024 (USD MILLION)
TABLE 64. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY ACCESS CONTROL, BY REGION, 2025-2030 (USD MILLION)
TABLE 65. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY INTRUSION DETECTION, BY REGION, 2018-2024 (USD MILLION)
TABLE 66. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY INTRUSION DETECTION, BY REGION, 2025-2030 (USD MILLION)
TABLE 67. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY VIDEO SURVEILLANCE, BY REGION, 2018-2024 (USD MILLION)
TABLE 68. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY VIDEO SURVEILLANCE, BY REGION, 2025-2030 (USD MILLION)
TABLE 69. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY SECURITY AND SURVEILLANCE, 2018-2024 (USD MILLION)
TABLE 70. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY SECURITY AND SURVEILLANCE, 2025-2030 (USD MILLION)
TABLE 71. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY END USER INDUSTRY, 2018-2024 (USD MILLION)
TABLE 72. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY END USER INDUSTRY, 2025-2030 (USD MILLION)
TABLE 73. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY GOVERNMENT, BY REGION, 2018-2024 (USD MILLION)
TABLE 74. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY GOVERNMENT, BY REGION, 2025-2030 (USD MILLION)
TABLE 75. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY HEALTHCARE, BY REGION, 2018-2024 (USD MILLION)
TABLE 76. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY HEALTHCARE, BY REGION, 2025-2030 (USD MILLION)
TABLE 77. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY IT AND TELECOM, BY REGION, 2018-2024 (USD MILLION)
TABLE 78. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY IT AND TELECOM, BY REGION, 2025-2030 (USD MILLION)
TABLE 79. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY RETAIL, BY REGION, 2018-2024 (USD MILLION)
TABLE 80. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY RETAIL, BY REGION, 2025-2030 (USD MILLION)
TABLE 81. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION SERVICE TYPE, 2018-2024 (USD MILLION)
TABLE 82. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION SERVICE TYPE, 2025-2030 (USD MILLION)
TABLE 83. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY DESIGN BUILD, BY REGION, 2018-2024 (USD MILLION)
TABLE 84. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY DESIGN BUILD, BY REGION, 2025-2030 (USD MILLION)
TABLE 85. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY GENERAL CONTRACTOR, BY REGION, 2018-2024 (USD MILLION)
TABLE 86. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY GENERAL CONTRACTOR, BY REGION, 2025-2030 (USD MILLION)
TABLE 87. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY SPECIALIZED CONTRACTOR, BY REGION, 2018-2024 (USD MILLION)
TABLE 88. GLOBAL DATA CENTER CONSTRUCTION MARKET SIZE, BY SPECIALIZED CONTRACTOR, BY REGION, 2025-2030 (USD MILLION)
TABLE 89. AMERICAS DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER TYPE, 2018-2024 (USD MILLION)
TABLE 90. AMERICAS DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER TYPE, 2025-2030 (USD MILLION)
TABLE 91. AMERICAS DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION TYPE, 2018-2024 (USD MILLION)
TABLE 92. AMERICAS DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION TYPE, 2025-2030 (USD MILLION)
TABLE 93. AMERICAS DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER LEVEL, 2018-2024 (USD MILLION)
TABLE 94. AMERICAS DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER LEVEL, 2025-2030 (USD MILLION)
TABLE 95. AMERICAS DATA CENTER CONSTRUCTION MARKET SIZE, BY COMPONENT, 2018-2024 (USD MILLION)
TABLE 96. AMERICAS DATA CENTER CONSTRUCTION MARKET SIZE, BY COMPONENT, 2025-2030 (USD MILLION)
TABLE 97. AMERICAS DATA CENTER CONSTRUCTION MARKET SIZE, BY COOLING SYSTEMS, 2018-2024 (USD MILLION)
TABLE 98. AMERICAS DATA CENTER CONSTRUCTION MARKET SIZE, BY COOLING SYSTEMS, 2025-2030 (USD MILLION)
TABLE 99. AMERICAS DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER SYSTEMS, 2018-2024 (USD MILLION)
TABLE 100. AMERICAS DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER SYSTEMS, 2025-2030 (USD MILLION)
TABLE 101. AMERICAS DATA CENTER CONSTRUCTION MARKET SIZE, BY SECURITY AND SURVEILLANCE, 2018-2024 (USD MILLION)
TABLE 102. AMERICAS DATA CENTER CONSTRUCTION MARKET SIZE, BY SECURITY AND SURVEILLANCE, 2025-2030 (USD MILLION)
TABLE 103. AMERICAS DATA CENTER CONSTRUCTION MARKET SIZE, BY END USER INDUSTRY, 2018-2024 (USD MILLION)
TABLE 104. AMERICAS DATA CENTER CONSTRUCTION MARKET SIZE, BY END USER INDUSTRY, 2025-2030 (USD MILLION)
TABLE 105. AMERICAS DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION SERVICE TYPE, 2018-2024 (USD MILLION)
TABLE 106. AMERICAS DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION SERVICE TYPE, 2025-2030 (USD MILLION)
TABLE 107. AMERICAS DATA CENTER CONSTRUCTION MARKET SIZE, BY COUNTRY, 2018-2024 (USD MILLION)
TABLE 108. AMERICAS DATA CENTER CONSTRUCTION MARKET SIZE, BY COUNTRY, 2025-2030 (USD MILLION)
TABLE 109. UNITED STATES DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER TYPE, 2018-2024 (USD MILLION)
TABLE 110. UNITED STATES DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER TYPE, 2025-2030 (USD MILLION)
TABLE 111. UNITED STATES DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION TYPE, 2018-2024 (USD MILLION)
TABLE 112. UNITED STATES DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION TYPE, 2025-2030 (USD MILLION)
TABLE 113. UNITED STATES DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER LEVEL, 2018-2024 (USD MILLION)
TABLE 114. UNITED STATES DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER LEVEL, 2025-2030 (USD MILLION)
TABLE 115. UNITED STATES DATA CENTER CONSTRUCTION MARKET SIZE, BY COMPONENT, 2018-2024 (USD MILLION)
TABLE 116. UNITED STATES DATA CENTER CONSTRUCTION MARKET SIZE, BY COMPONENT, 2025-2030 (USD MILLION)
TABLE 117. UNITED STATES DATA CENTER CONSTRUCTION MARKET SIZE, BY COOLING SYSTEMS, 2018-2024 (USD MILLION)
TABLE 118. UNITED STATES DATA CENTER CONSTRUCTION MARKET SIZE, BY COOLING SYSTEMS, 2025-2030 (USD MILLION)
TABLE 119. UNITED STATES DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER SYSTEMS, 2018-2024 (USD MILLION)
TABLE 120. UNITED STATES DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER SYSTEMS, 2025-2030 (USD MILLION)
TABLE 121. UNITED STATES DATA CENTER CONSTRUCTION MARKET SIZE, BY SECURITY AND SURVEILLANCE, 2018-2024 (USD MILLION)
TABLE 122. UNITED STATES DATA CENTER CONSTRUCTION MARKET SIZE, BY SECURITY AND SURVEILLANCE, 2025-2030 (USD MILLION)
TABLE 123. UNITED STATES DATA CENTER CONSTRUCTION MARKET SIZE, BY END USER INDUSTRY, 2018-2024 (USD MILLION)
TABLE 124. UNITED STATES DATA CENTER CONSTRUCTION MARKET SIZE, BY END USER INDUSTRY, 2025-2030 (USD MILLION)
TABLE 125. UNITED STATES DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION SERVICE TYPE, 2018-2024 (USD MILLION)
TABLE 126. UNITED STATES DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION SERVICE TYPE, 2025-2030 (USD MILLION)
TABLE 127. UNITED STATES DATA CENTER CONSTRUCTION MARKET SIZE, BY STATE, 2018-2024 (USD MILLION)
TABLE 128. UNITED STATES DATA CENTER CONSTRUCTION MARKET SIZE, BY STATE, 2025-2030 (USD MILLION)
TABLE 129. CANADA DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER TYPE, 2018-2024 (USD MILLION)
TABLE 130. CANADA DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER TYPE, 2025-2030 (USD MILLION)
TABLE 131. CANADA DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION TYPE, 2018-2024 (USD MILLION)
TABLE 132. CANADA DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION TYPE, 2025-2030 (USD MILLION)
TABLE 133. CANADA DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER LEVEL, 2018-2024 (USD MILLION)
TABLE 134. CANADA DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER LEVEL, 2025-2030 (USD MILLION)
TABLE 135. CANADA DATA CENTER CONSTRUCTION MARKET SIZE, BY COMPONENT, 2018-2024 (USD MILLION)
TABLE 136. CANADA DATA CENTER CONSTRUCTION MARKET SIZE, BY COMPONENT, 2025-2030 (USD MILLION)
TABLE 137. CANADA DATA CENTER CONSTRUCTION MARKET SIZE, BY COOLING SYSTEMS, 2018-2024 (USD MILLION)
TABLE 138. CANADA DATA CENTER CONSTRUCTION MARKET SIZE, BY COOLING SYSTEMS, 2025-2030 (USD MILLION)
TABLE 139. CANADA DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER SYSTEMS, 2018-2024 (USD MILLION)
TABLE 140. CANADA DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER SYSTEMS, 2025-2030 (USD MILLION)
TABLE 141. CANADA DATA CENTER CONSTRUCTION MARKET SIZE, BY SECURITY AND SURVEILLANCE, 2018-2024 (USD MILLION)
TABLE 142. CANADA DATA CENTER CONSTRUCTION MARKET SIZE, BY SECURITY AND SURVEILLANCE, 2025-2030 (USD MILLION)
TABLE 143. CANADA DATA CENTER CONSTRUCTION MARKET SIZE, BY END USER INDUSTRY, 2018-2024 (USD MILLION)
TABLE 144. CANADA DATA CENTER CONSTRUCTION MARKET SIZE, BY END USER INDUSTRY, 2025-2030 (USD MILLION)
TABLE 145. CANADA DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION SERVICE TYPE, 2018-2024 (USD MILLION)
TABLE 146. CANADA DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION SERVICE TYPE, 2025-2030 (USD MILLION)
TABLE 147. MEXICO DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER TYPE, 2018-2024 (USD MILLION)
TABLE 148. MEXICO DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER TYPE, 2025-2030 (USD MILLION)
TABLE 149. MEXICO DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION TYPE, 2018-2024 (USD MILLION)
TABLE 150. MEXICO DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION TYPE, 2025-2030 (USD MILLION)
TABLE 151. MEXICO DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER LEVEL, 2018-2024 (USD MILLION)
TABLE 152. MEXICO DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER LEVEL, 2025-2030 (USD MILLION)
TABLE 153. MEXICO DATA CENTER CONSTRUCTION MARKET SIZE, BY COMPONENT, 2018-2024 (USD MILLION)
TABLE 154. MEXICO DATA CENTER CONSTRUCTION MARKET SIZE, BY COMPONENT, 2025-2030 (USD MILLION)
TABLE 155. MEXICO DATA CENTER CONSTRUCTION MARKET SIZE, BY COOLING SYSTEMS, 2018-2024 (USD MILLION)
TABLE 156. MEXICO DATA CENTER CONSTRUCTION MARKET SIZE, BY COOLING SYSTEMS, 2025-2030 (USD MILLION)
TABLE 157. MEXICO DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER SYSTEMS, 2018-2024 (USD MILLION)
TABLE 158. MEXICO DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER SYSTEMS, 2025-2030 (USD MILLION)
TABLE 159. MEXICO DATA CENTER CONSTRUCTION MARKET SIZE, BY SECURITY AND SURVEILLANCE, 2018-2024 (USD MILLION)
TABLE 160. MEXICO DATA CENTER CONSTRUCTION MARKET SIZE, BY SECURITY AND SURVEILLANCE, 2025-2030 (USD MILLION)
TABLE 161. MEXICO DATA CENTER CONSTRUCTION MARKET SIZE, BY END USER INDUSTRY, 2018-2024 (USD MILLION)
TABLE 162. MEXICO DATA CENTER CONSTRUCTION MARKET SIZE, BY END USER INDUSTRY, 2025-2030 (USD MILLION)
TABLE 163. MEXICO DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION SERVICE TYPE, 2018-2024 (USD MILLION)
TABLE 164. MEXICO DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION SERVICE TYPE, 2025-2030 (USD MILLION)
TABLE 165. BRAZIL DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER TYPE, 2018-2024 (USD MILLION)
TABLE 166. BRAZIL DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER TYPE, 2025-2030 (USD MILLION)
TABLE 167. BRAZIL DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION TYPE, 2018-2024 (USD MILLION)
TABLE 168. BRAZIL DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION TYPE, 2025-2030 (USD MILLION)
TABLE 169. BRAZIL DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER LEVEL, 2018-2024 (USD MILLION)
TABLE 170. BRAZIL DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER LEVEL, 2025-2030 (USD MILLION)
TABLE 171. BRAZIL DATA CENTER CONSTRUCTION MARKET SIZE, BY COMPONENT, 2018-2024 (USD MILLION)
TABLE 172. BRAZIL DATA CENTER CONSTRUCTION MARKET SIZE, BY COMPONENT, 2025-2030 (USD MILLION)
TABLE 173. BRAZIL DATA CENTER CONSTRUCTION MARKET SIZE, BY COOLING SYSTEMS, 2018-2024 (USD MILLION)
TABLE 174. BRAZIL DATA CENTER CONSTRUCTION MARKET SIZE, BY COOLING SYSTEMS, 2025-2030 (USD MILLION)
TABLE 175. BRAZIL DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER SYSTEMS, 2018-2024 (USD MILLION)
TABLE 176. BRAZIL DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER SYSTEMS, 2025-2030 (USD MILLION)
TABLE 177. BRAZIL DATA CENTER CONSTRUCTION MARKET SIZE, BY SECURITY AND SURVEILLANCE, 2018-2024 (USD MILLION)
TABLE 178. BRAZIL DATA CENTER CONSTRUCTION MARKET SIZE, BY SECURITY AND SURVEILLANCE, 2025-2030 (USD MILLION)
TABLE 179. BRAZIL DATA CENTER CONSTRUCTION MARKET SIZE, BY END USER INDUSTRY, 2018-2024 (USD MILLION)
TABLE 180. BRAZIL DATA CENTER CONSTRUCTION MARKET SIZE, BY END USER INDUSTRY, 2025-2030 (USD MILLION)
TABLE 181. BRAZIL DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION SERVICE TYPE, 2018-2024 (USD MILLION)
TABLE 182. BRAZIL DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION SERVICE TYPE, 2025-2030 (USD MILLION)
TABLE 183. ARGENTINA DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER TYPE, 2018-2024 (USD MILLION)
TABLE 184. ARGENTINA DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER TYPE, 2025-2030 (USD MILLION)
TABLE 185. ARGENTINA DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION TYPE, 2018-2024 (USD MILLION)
TABLE 186. ARGENTINA DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION TYPE, 2025-2030 (USD MILLION)
TABLE 187. ARGENTINA DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER LEVEL, 2018-2024 (USD MILLION)
TABLE 188. ARGENTINA DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER LEVEL, 2025-2030 (USD MILLION)
TABLE 189. ARGENTINA DATA CENTER CONSTRUCTION MARKET SIZE, BY COMPONENT, 2018-2024 (USD MILLION)
TABLE 190. ARGENTINA DATA CENTER CONSTRUCTION MARKET SIZE, BY COMPONENT, 2025-2030 (USD MILLION)
TABLE 191. ARGENTINA DATA CENTER CONSTRUCTION MARKET SIZE, BY COOLING SYSTEMS, 2018-2024 (USD MILLION)
TABLE 192. ARGENTINA DATA CENTER CONSTRUCTION MARKET SIZE, BY COOLING SYSTEMS, 2025-2030 (USD MILLION)
TABLE 193. ARGENTINA DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER SYSTEMS, 2018-2024 (USD MILLION)
TABLE 194. ARGENTINA DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER SYSTEMS, 2025-2030 (USD MILLION)
TABLE 195. ARGENTINA DATA CENTER CONSTRUCTION MARKET SIZE, BY SECURITY AND SURVEILLANCE, 2018-2024 (USD MILLION)
TABLE 196. ARGENTINA DATA CENTER CONSTRUCTION MARKET SIZE, BY SECURITY AND SURVEILLANCE, 2025-2030 (USD MILLION)
TABLE 197. ARGENTINA DATA CENTER CONSTRUCTION MARKET SIZE, BY END USER INDUSTRY, 2018-2024 (USD MILLION)
TABLE 198. ARGENTINA DATA CENTER CONSTRUCTION MARKET SIZE, BY END USER INDUSTRY, 2025-2030 (USD MILLION)
TABLE 199. ARGENTINA DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION SERVICE TYPE, 2018-2024 (USD MILLION)
TABLE 200. ARGENTINA DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION SERVICE TYPE, 2025-2030 (USD MILLION)
TABLE 201. EUROPE, MIDDLE EAST & AFRICA DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER TYPE, 2018-2024 (USD MILLION)
TABLE 202. EUROPE, MIDDLE EAST & AFRICA DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER TYPE, 2025-2030 (USD MILLION)
TABLE 203. EUROPE, MIDDLE EAST & AFRICA DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION TYPE, 2018-2024 (USD MILLION)
TABLE 204. EUROPE, MIDDLE EAST & AFRICA DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION TYPE, 2025-2030 (USD MILLION)
TABLE 205. EUROPE, MIDDLE EAST & AFRICA DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER LEVEL, 2018-2024 (USD MILLION)
TABLE 206. EUROPE, MIDDLE EAST & AFRICA DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER LEVEL, 2025-2030 (USD MILLION)
TABLE 207. EUROPE, MIDDLE EAST & AFRICA DATA CENTER CONSTRUCTION MARKET SIZE, BY COMPONENT, 2018-2024 (USD MILLION)
TABLE 208. EUROPE, MIDDLE EAST & AFRICA DATA CENTER CONSTRUCTION MARKET SIZE, BY COMPONENT, 2025-2030 (USD MILLION)
TABLE 209. EUROPE, MIDDLE EAST & AFRICA DATA CENTER CONSTRUCTION MARKET SIZE, BY COOLING SYSTEMS, 2018-2024 (USD MILLION)
TABLE 210. EUROPE, MIDDLE EAST & AFRICA DATA CENTER CONSTRUCTION MARKET SIZE, BY COOLING SYSTEMS, 2025-2030 (USD MILLION)
TABLE 211. EUROPE, MIDDLE EAST & AFRICA DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER SYSTEMS, 2018-2024 (USD MILLION)
TABLE 212. EUROPE, MIDDLE EAST & AFRICA DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER SYSTEMS, 2025-2030 (USD MILLION)
TABLE 213. EUROPE, MIDDLE EAST & AFRICA DATA CENTER CONSTRUCTION MARKET SIZE, BY SECURITY AND SURVEILLANCE, 2018-2024 (USD MILLION)
TABLE 214. EUROPE, MIDDLE EAST & AFRICA DATA CENTER CONSTRUCTION MARKET SIZE, BY SECURITY AND SURVEILLANCE, 2025-2030 (USD MILLION)
TABLE 215. EUROPE, MIDDLE EAST & AFRICA DATA CENTER CONSTRUCTION MARKET SIZE, BY END USER INDUSTRY, 2018-2024 (USD MILLION)
TABLE 216. EUROPE, MIDDLE EAST & AFRICA DATA CENTER CONSTRUCTION MARKET SIZE, BY END USER INDUSTRY, 2025-2030 (USD MILLION)
TABLE 217. EUROPE, MIDDLE EAST & AFRICA DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION SERVICE TYPE, 2018-2024 (USD MILLION)
TABLE 218. EUROPE, MIDDLE EAST & AFRICA DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION SERVICE TYPE, 2025-2030 (USD MILLION)
TABLE 219. EUROPE, MIDDLE EAST & AFRICA DATA CENTER CONSTRUCTION MARKET SIZE, BY COUNTRY, 2018-2024 (USD MILLION)
TABLE 220. EUROPE, MIDDLE EAST & AFRICA DATA CENTER CONSTRUCTION MARKET SIZE, BY COUNTRY, 2025-2030 (USD MILLION)
TABLE 221. UNITED KINGDOM DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER TYPE, 2018-2024 (USD MILLION)
TABLE 222. UNITED KINGDOM DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER TYPE, 2025-2030 (USD MILLION)
TABLE 223. UNITED KINGDOM DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION TYPE, 2018-2024 (USD MILLION)
TABLE 224. UNITED KINGDOM DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION TYPE, 2025-2030 (USD MILLION)
TABLE 225. UNITED KINGDOM DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER LEVEL, 2018-2024 (USD MILLION)
TABLE 226. UNITED KINGDOM DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER LEVEL, 2025-2030 (USD MILLION)
TABLE 227. UNITED KINGDOM DATA CENTER CONSTRUCTION MARKET SIZE, BY COMPONENT, 2018-2024 (USD MILLION)
TABLE 228. UNITED KINGDOM DATA CENTER CONSTRUCTION MARKET SIZE, BY COMPONENT, 2025-2030 (USD MILLION)
TABLE 229. UNITED KINGDOM DATA CENTER CONSTRUCTION MARKET SIZE, BY COOLING SYSTEMS, 2018-2024 (USD MILLION)
TABLE 230. UNITED KINGDOM DATA CENTER CONSTRUCTION MARKET SIZE, BY COOLING SYSTEMS, 2025-2030 (USD MILLION)
TABLE 231. UNITED KINGDOM DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER SYSTEMS, 2018-2024 (USD MILLION)
TABLE 232. UNITED KINGDOM DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER SYSTEMS, 2025-2030 (USD MILLION)
TABLE 233. UNITED KINGDOM DATA CENTER CONSTRUCTION MARKET SIZE, BY SECURITY AND SURVEILLANCE, 2018-2024 (USD MILLION)
TABLE 234. UNITED KINGDOM DATA CENTER CONSTRUCTION MARKET SIZE, BY SECURITY AND SURVEILLANCE, 2025-2030 (USD MILLION)
TABLE 235. UNITED KINGDOM DATA CENTER CONSTRUCTION MARKET SIZE, BY END USER INDUSTRY, 2018-2024 (USD MILLION)
TABLE 236. UNITED KINGDOM DATA CENTER CONSTRUCTION MARKET SIZE, BY END USER INDUSTRY, 2025-2030 (USD MILLION)
TABLE 237. UNITED KINGDOM DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION SERVICE TYPE, 2018-2024 (USD MILLION)
TABLE 238. UNITED KINGDOM DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION SERVICE TYPE, 2025-2030 (USD MILLION)
TABLE 239. GERMANY DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER TYPE, 2018-2024 (USD MILLION)
TABLE 240. GERMANY DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER TYPE, 2025-2030 (USD MILLION)
TABLE 241. GERMANY DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION TYPE, 2018-2024 (USD MILLION)
TABLE 242. GERMANY DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION TYPE, 2025-2030 (USD MILLION)
TABLE 243. GERMANY DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER LEVEL, 2018-2024 (USD MILLION)
TABLE 244. GERMANY DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER LEVEL, 2025-2030 (USD MILLION)
TABLE 245. GERMANY DATA CENTER CONSTRUCTION MARKET SIZE, BY COMPONENT, 2018-2024 (USD MILLION)
TABLE 246. GERMANY DATA CENTER CONSTRUCTION MARKET SIZE, BY COMPONENT, 2025-2030 (USD MILLION)
TABLE 247. GERMANY DATA CENTER CONSTRUCTION MARKET SIZE, BY COOLING SYSTEMS, 2018-2024 (USD MILLION)
TABLE 248. GERMANY DATA CENTER CONSTRUCTION MARKET SIZE, BY COOLING SYSTEMS, 2025-2030 (USD MILLION)
TABLE 249. GERMANY DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER SYSTEMS, 2018-2024 (USD MILLION)
TABLE 250. GERMANY DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER SYSTEMS, 2025-2030 (USD MILLION)
TABLE 251. GERMANY DATA CENTER CONSTRUCTION MARKET SIZE, BY SECURITY AND SURVEILLANCE, 2018-2024 (USD MILLION)
TABLE 252. GERMANY DATA CENTER CONSTRUCTION MARKET SIZE, BY SECURITY AND SURVEILLANCE, 2025-2030 (USD MILLION)
TABLE 253. GERMANY DATA CENTER CONSTRUCTION MARKET SIZE, BY END USER INDUSTRY, 2018-2024 (USD MILLION)
TABLE 254. GERMANY DATA CENTER CONSTRUCTION MARKET SIZE, BY END USER INDUSTRY, 2025-2030 (USD MILLION)
TABLE 255. GERMANY DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION SERVICE TYPE, 2018-2024 (USD MILLION)
TABLE 256. GERMANY DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION SERVICE TYPE, 2025-2030 (USD MILLION)
TABLE 257. FRANCE DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER TYPE, 2018-2024 (USD MILLION)
TABLE 258. FRANCE DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER TYPE, 2025-2030 (USD MILLION)
TABLE 259. FRANCE DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION TYPE, 2018-2024 (USD MILLION)
TABLE 260. FRANCE DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION TYPE, 2025-2030 (USD MILLION)
TABLE 261. FRANCE DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER LEVEL, 2018-2024 (USD MILLION)
TABLE 262. FRANCE DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER LEVEL, 2025-2030 (USD MILLION)
TABLE 263. FRANCE DATA CENTER CONSTRUCTION MARKET SIZE, BY COMPONENT, 2018-2024 (USD MILLION)
TABLE 264. FRANCE DATA CENTER CONSTRUCTION MARKET SIZE, BY COMPONENT, 2025-2030 (USD MILLION)
TABLE 265. FRANCE DATA CENTER CONSTRUCTION MARKET SIZE, BY COOLING SYSTEMS, 2018-2024 (USD MILLION)
TABLE 266. FRANCE DATA CENTER CONSTRUCTION MARKET SIZE, BY COOLING SYSTEMS, 2025-2030 (USD MILLION)
TABLE 267. FRANCE DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER SYSTEMS, 2018-2024 (USD MILLION)
TABLE 268. FRANCE DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER SYSTEMS, 2025-2030 (USD MILLION)
TABLE 269. FRANCE DATA CENTER CONSTRUCTION MARKET SIZE, BY SECURITY AND SURVEILLANCE, 2018-2024 (USD MILLION)
TABLE 270. FRANCE DATA CENTER CONSTRUCTION MARKET SIZE, BY SECURITY AND SURVEILLANCE, 2025-2030 (USD MILLION)
TABLE 271. FRANCE DATA CENTER CONSTRUCTION MARKET SIZE, BY END USER INDUSTRY, 2018-2024 (USD MILLION)
TABLE 272. FRANCE DATA CENTER CONSTRUCTION MARKET SIZE, BY END USER INDUSTRY, 2025-2030 (USD MILLION)
TABLE 273. FRANCE DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION SERVICE TYPE, 2018-2024 (USD MILLION)
TABLE 274. FRANCE DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION SERVICE TYPE, 2025-2030 (USD MILLION)
TABLE 275. RUSSIA DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER TYPE, 2018-2024 (USD MILLION)
TABLE 276. RUSSIA DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER TYPE, 2025-2030 (USD MILLION)
TABLE 277. RUSSIA DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION TYPE, 2018-2024 (USD MILLION)
TABLE 278. RUSSIA DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION TYPE, 2025-2030 (USD MILLION)
TABLE 279. RUSSIA DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER LEVEL, 2018-2024 (USD MILLION)
TABLE 280. RUSSIA DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER LEVEL, 2025-2030 (USD MILLION)
TABLE 281. RUSSIA DATA CENTER CONSTRUCTION MARKET SIZE, BY COMPONENT, 2018-2024 (USD MILLION)
TABLE 282. RUSSIA DATA CENTER CONSTRUCTION MARKET SIZE, BY COMPONENT, 2025-2030 (USD MILLION)
TABLE 283. RUSSIA DATA CENTER CONSTRUCTION MARKET SIZE, BY COOLING SYSTEMS, 2018-2024 (USD MILLION)
TABLE 284. RUSSIA DATA CENTER CONSTRUCTION MARKET SIZE, BY COOLING SYSTEMS, 2025-2030 (USD MILLION)
TABLE 285. RUSSIA DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER SYSTEMS, 2018-2024 (USD MILLION)
TABLE 286. RUSSIA DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER SYSTEMS, 2025-2030 (USD MILLION)
TABLE 287. RUSSIA DATA CENTER CONSTRUCTION MARKET SIZE, BY SECURITY AND SURVEILLANCE, 2018-2024 (USD MILLION)
TABLE 288. RUSSIA DATA CENTER CONSTRUCTION MARKET SIZE, BY SECURITY AND SURVEILLANCE, 2025-2030 (USD MILLION)
TABLE 289. RUSSIA DATA CENTER CONSTRUCTION MARKET SIZE, BY END USER INDUSTRY, 2018-2024 (USD MILLION)
TABLE 290. RUSSIA DATA CENTER CONSTRUCTION MARKET SIZE, BY END USER INDUSTRY, 2025-2030 (USD MILLION)
TABLE 291. RUSSIA DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION SERVICE TYPE, 2018-2024 (USD MILLION)
TABLE 292. RUSSIA DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION SERVICE TYPE, 2025-2030 (USD MILLION)
TABLE 293. ITALY DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER TYPE, 2018-2024 (USD MILLION)
TABLE 294. ITALY DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER TYPE, 2025-2030 (USD MILLION)
TABLE 295. ITALY DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION TYPE, 2018-2024 (USD MILLION)
TABLE 296. ITALY DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION TYPE, 2025-2030 (USD MILLION)
TABLE 297. ITALY DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER LEVEL, 2018-2024 (USD MILLION)
TABLE 298. ITALY DATA CENTER CONSTRUCTION MARKET SIZE, BY TIER LEVEL, 2025-2030 (USD MILLION)
TABLE 299. ITALY DATA CENTER CONSTRUCTION MARKET SIZE, BY COMPONENT, 2018-2024 (USD MILLION)
TABLE 300. ITALY DATA CENTER CONSTRUCTION MARKET SIZE, BY COMPONENT, 2025-2030 (USD MILLION)
TABLE 301. ITALY DATA CENTER CONSTRUCTION MARKET SIZE, BY COOLING SYSTEMS, 2018-2024 (USD MILLION)
TABLE 302. ITALY DATA CENTER CONSTRUCTION MARKET SIZE, BY COOLING SYSTEMS, 2025-2030 (USD MILLION)
TABLE 303. ITALY DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER SYSTEMS, 2018-2024 (USD MILLION)
TABLE 304. ITALY DATA CENTER CONSTRUCTION MARKET SIZE, BY POWER SYSTEMS, 2025-2030 (USD MILLION)
TABLE 305. ITALY DATA CENTER CONSTRUCTION MARKET SIZE, BY SECURITY AND SURVEILLANCE, 2018-2024 (USD MILLION)
TABLE 306. ITALY DATA CENTER CONSTRUCTION MARKET SIZE, BY SECURITY AND SURVEILLANCE, 2025-2030 (USD MILLION)
TABLE 307. ITALY DATA CENTER CONSTRUCTION MARKET SIZE, BY END USER INDUSTRY, 2018-2024 (USD MILLION)
TABLE 308. ITALY DATA CENTER CONSTRUCTION MARKET SIZE, BY END USER INDUSTRY, 2025-2030 (USD MILLION)
TABLE 309. ITALY DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION SERVICE TYPE, 2018-2024 (USD MILLION)
TABLE 310. ITALY DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION SERVICE TYPE, 2025-2030 (USD MILLION)
TABLE 311. SPAIN DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER TYPE, 2018-2024 (USD MILLION)
TABLE 312. SPAIN DATA CENTER CONSTRUCTION MARKET SIZE, BY DATA CENTER TYPE, 2025-2030 (USD MILLION)
TABLE 313. SPAIN DATA CENTER CONSTRUCTION MARKET SIZE, BY CONSTRUCTION TYPE, 2018-2024 (USD MILLION)
TABLE 314. SPAIN DATA CENTER CONSTRUCTION MARKET SIZE,

Samples

Loading
LOADING...

Companies Mentioned

  • Turner Construction Company
  • Fluor Corporation
  • Skanska USA Building Inc.
  • DPR Construction, Inc.
  • Holder Construction Company LLC
  • Balfour Beatty Construction LLC
  • Clark Construction Group LLC
  • McCarthy Building Companies, Inc.
  • Hensel Phelps Construction Co.
  • Gilbane Building Company

Table Information