Global Transformer Market Trends and Insights
Grid-modernization programs in US & EU
Grid-modernization programs connect wider network investment with transformer deployment at substations. On September 24, 2026, the U.S. Department of Energy announced its intention to help fund 31 grid-improvement projects across 26 states through its Speed to Power through Accelerated Reconductoring and other Key Advanced Transmission Technology Upgrades (SPARK) initiative. Total project funding comprised USD 1.9 billion in prospective federal funding and USD 3.35 billion in recipient cost shares. In December 2025, the European Commission adopted a Grids Package and formalized Energy Highways for strategic interconnection projects. Danube InGrid’s ongoing second phase includes commissioned transformers at 6 existing substations in Slovakia. This deployment connects EU grid modernization to substation-equipment demand, alongside broader transmission and interconnection programs.Accelerated renewable-energy interconnections (wind/solar)
Renewable build-out creates demand for shared grid interfaces that can accommodate more than one generation project. In 2025, global renewable power capacity additions reached 692 GW, including 510 GW of solar and 159 GW of wind, while the renewable capacity stock grew 15.5%. In February 2026, EDF power solutions commissioned South Africa’s Koruson 1 cluster of 3 wind farms, totaling 420 MW, through a consortium-built private substation designed to connect up to 1.5 GW of renewable energy. The substation’s design capacity exceeds the commissioned wind cluster’s capacity, separating the connection investment from the first generation stage. For network-equipment suppliers, staged renewable construction can concentrate demand in shared substations before all connected generation is commissioned.Acute global shortage of CRGO steel & long lead-times
In its September 2026 provisional safeguard regulation, the European Commission put EU producers’ theoretical grain-oriented electrical steel (GOES) supply at around 80% of demand for grades they produced. They could not produce the highest-quality grades required for the most energy-efficient transformers. In June 2025, the National Electrical Manufacturers Association and co-signatories told the U.S. Commerce Department that limited domestic and global GOES availability contributed to widespread transformer shortages. On October 5, 2026, Cleveland-Cliffs said its planned Butler Works project in Pennsylvania would expand GOES production volume by up to 25% to support U.S. transformer demand. India’s Ministry of Power reported cold-rolled grain-oriented (CRGO) steel and component constraints in March 2026, alongside transformer-supply delays affecting substation implementation in Andhra Pradesh and Tamil Nadu.Other drivers and restraints analyzed in the report include:
- Electrification of transport & fast-charging corridors
- Surge in hyperscale data-center capacity additions
- Escalating transformer oil & copper price volatility
Segment Analysis
Small transformers up to 10 MVA were the largest power-transformer segment, with a 42.24% share in 2026, and are forecast to be the fastest-growing segment, at a CAGR of 8.41% during 2027-2032. In July 2025, Zambia’s ZESCO Limited invited bids for 6 three-phase 33/11 kV power transformers across 3 lots rated 2.5 MVA, 5 MVA, and 10 MVA. The common voltage specification places several power requirements within one utility procurement, showing a role for this class beyond a single standard rating. Coverage across these ratings gives a supplier more potential lots to address within the small-power procurement.Large transformers above 100 MVA are illustrated by the July 27, 2026, contract award from Power Grid Corporation of India Limited (POWERGRID) covering 13 single-phase 500 MVA units at 765/400/33 kV in India. The Lot 7 contract record set August 26, 2028, as the completion date. The roughly 25-month contract-to-completion window makes this a long-dated supply commitment for a package of large units.
Oil-cooled transformers accounted for a 72.32% share of the transformer market size in 2026 and are forecast to be the fastest-growing segment, at a CAGR of 7.95% during 2027-2032. In March 2026, Enexis completed a European procurement for oil-filled distribution transformers and awarded contracts to 5 suppliers. The utility used the procurement to secure availability of these components for several years. Access to a multi-year utility supply arrangement, alongside technical product capability, defines a supplier’s position in this demand stream.
In June and July 2026, SCHMACHTL delivered and assembled the first of 2 oil-immersed power transformers rated 150 MVA each for voestalpine Stahl Donawitz GmbH in Austria. SGB Retrasib manufactured the 220/33 kV units in Sibiu, Romania, for future use in the customer’s electric arc furnace power supply. The unit’s dimensions and weight made coordination between the manufacturing site and the receiving facility a demanding part of the delivery. The first unit’s main body left Sibiu on June 23, 2026, reached the customer site July 1 and was assembled in late July, about 5 weeks after departure.
Complete Report Scope:
- By Power Rating
- Large (Above 100 MVA)
- Medium (10 to 100 MVA)
- Small (Up to 10 MVA)
- By Cooling Type
- Air-cooled
- Oil-cooled
- By Phase
- Single-Phase
- Three-Phase
- By Transformer Type
- Power
- Distribution
- By End-User
- Power Utilities (includes, Renewables, Non-renewables, and T&D)
- Industrial
- Commercial
- Residential
- By Geography
- North America
- United States
- Canada
- Mexico
- Europe
- Germany
- United Kingdom
- France
- Italy
- Spain
- Russia
- Rest of Europe
- Asia-Pacific
- China
- India
- Japan
- South Korea
- ASEAN Countries
- Australia and New Zealand
- Rest of Asia-Pacific
- South America
- Brazil
- Argentina
- Chile
- Rest of South America
- Middle East and Africa
- Saudi Arabia
- United Arab Emirates
- South Africa
- Egypt
- Rest of Middle East and Africa
- North America
Geography Analysis
Asia-Pacific accounted for a 53.37% share of the transformer market size in 2026 and is forecast to be the fastest-growing region, at a CAGR of 8.51% during 2027-2032. In October 2025, Hitachi Energy announced it would supply 1,100 kV transformers for the 1,000 kV step-up substation in phase II of the Nanyang Power Plant project in Henan Province, China. Taiwan Power Company operated 627 substations across Taiwan at the end of 2025. Utility-facing suppliers can address an established network base as well as individual generation projects, giving their regional opportunity a broader foundation than new power-plant construction alone.In North America, Eaglerise Renewable Energy (USA) Inc., an Eaglerise subsidiary, opened its Fort Worth, Texas, plant for local distribution-transformer production on October 22, 2025. In Europe, the European Commission’s June 2025 guidance recommended anticipatory network investment, including preparatory work to enlarge substations for future capacity needs. In the Netherlands, Enexis’s March 2026 plan for annual distribution-transformer additions linked its network reinforcement to growing demand for transport capacity. Local manufacturing in the United States and planned network additions in the Netherlands address different sides of equipment availability. Anticipatory substation preparation adds a third requirement, because equipment and network space must be available together for a capacity addition.
In South America, the Operador Nacional do Sistema Elétrico (ONS), Brazil’s national electricity system operator, recommended 24,314 MVA of additional transformer capacity at new and existing substations in its PAR/PEL 2025 plan for 2026-2030. In September 2025, Peru’s PROINVERSIÓN awarded 4 transmission and substation projects across Arequipa, Lima, Apurímac and Puno, expected to benefit 2.3 million people. Within the Middle East and Africa, Eskom reported 4,000 MVA of transmission transformer capacity installed and commissioned in South Africa during FY2026, which ended March 31, 2026. In Ghana, Ghana Grid Company’s September 2026 invitation covered feeder-bay provision and transformer installation at Elubo Substation, with bids due November 3, 2026. Only Ghana’s invitation carries a bid deadline, while Brazil’s recommendation and Peru’s award sit earlier or later in the project cycle and Eskom’s figure reports capacity already in service.
List of Companies Covered in this Report:
- ABB Ltd
- Siemens Energy AG
- Hitachi Energy Ltd
- GE Vernova Inc.
- Schneider Electric SE
- Mitsubishi Electric Corp.
- Toshiba Corp.
- Hyosung Heavy Industries
- HD Hyundai Electric
- CG Power & Industrial Solutions
- Bharat Heavy Electricals Ltd
- LS Electric Co.
- Eaton Corporation plc
- Fuji Electric Co.
- TBEA Co. Ltd
- Prolec-GE Waukesha, Inc.
- SGB-SMIT Group
- Voltamp Transformers Ltd
- Daihen Corp.
- NARI Group Corporation
Additional Benefits:
- The market estimate (ME) sheet in Excel format
- 3 months of analyst support
Table of Contents
Companies Mentioned (Partial List)
A selection of companies mentioned in this report includes, but is not limited to:
- ABB Ltd
- Siemens Energy AG
- Hitachi Energy Ltd
- GE Vernova Inc.
- Schneider Electric SE
- Mitsubishi Electric Corp.
- Toshiba Corp.
- Hyosung Heavy Industries
- HD Hyundai Electric
- CG Power & Industrial Solutions
- Bharat Heavy Electricals Ltd
- LS Electric Co.
- Eaton Corporation plc
- Fuji Electric Co.
- TBEA Co. Ltd
- Prolec-GE Waukesha, Inc.
- SGB-SMIT Group
- Voltamp Transformers Ltd
- Daihen Corp.
- NARI Group Corporation