Summary

The global tunnel construction projects pipeline, as tracked by researchers, stands at US$1.75 trillion, comprising projects at all stages of development from announcement to execution. The total pipeline value reflects the overall values of projects that are either entirely tunnels or that have tunnels as an integral part of the work.

In terms of the tunneling project pipeline value, Europe accounts for the highest share with US$695.8 billion - equivalent to 39.8% of the total global value of tunnel projects. Asia-Pacific follows, with projects valuing US$654.3 billion. The Americas has projects valued at US$256.7 billion, while the Middle East and Africa has a project pipeline of US$142.3 billion, trailing the other regions.

Of the total pipeline, projects at the execution stage account for 57% of the total, valuing US$990.0 billion. Projects at the early stages of pre-planning (announcement and study) and planning have a combined value of US$540.1 billion, while those in the pre-execution stages (design, tender and award) amount to US$218.9 billion.

Assuming all projects proceed as planned and that spending is evenly distributed over the construction phase, global spending on tunnel projects (including infrastructure projects with integral tunneling works) will reach US$172.3 billion in 2021, up from US$136.4 billion in 2020. Of the spending in 2020, US$85.4 billion relates to projects that have already proceeded to the execution stage.

This report provides a detailed analysis of tunnels construction projects globally, based on projects tracked by researchers.

Scope

  • The report provides analysis based on the construction projects showing total project values and analysis by stage and funding. The top 50 global projects are listed giving country, stage, value of projects.
  • Ranked listings of the key operators for the sector are also provided showing the leading contractors, consulting engineers and project owners. Country profiles are provided for the top 10 countries including the China, the US, the UK and India.

Reasons to buy

  • Gain insight into the development of the tunnels construction sector.
  • Assess all major projects by value, start date, scope and stage of development globally, for the regions and top 10 countries to support business development activities.
  • Plan campaigns by country based on specific project opportunities and align resources to the most attractive markets.

Table of Contents

1. GLOBAL OVERVIEW
2. REGIONAL OVERVIEWS
2.1. The Americas
2.2. Asia-Pacific
2.3. Europe
2.4. Middle East and Africa
3. PROJECT ANALYTICS BY COUNTRY
3.1. China
3.2. The UK
3.3. The US
3.4. India
3.5. France
3.6. Japan
3.7. Australia
3.8. Russia
3.9. Switzerland
3.10. Italy
4. ABOUT GLOBAL DATA
4.1. Author at a Glance
4.2. Author Construction
4.3. Disclaimer
4.4. Contact Us
List of Tables
Table 1: Global - Tunnel Construction Project Pipeline, Value by Country and Stage (US$ million)
Table 2: Top 50 Global Tunnel Projects by Value
Table 3: The Americas - Tunnel, Construction Projects, Key Contractors
Table 4: The Americas - Tunnel, Construction Projects, Key Consulting Engineers
Table 5: The Americas - Tunnel, Construction Projects, Key Project Owners
Table 6: Asia-Pacific - Tunnel, Construction Projects, Key Contractors
Table 7: Asia-Pacific - Tunnel, Construction Projects, Key Consultants
Table 8: Asia-Pacific - Tunnel, Construction Projects, Key Project Owners
Table 9: Europe - Tunnel, Construction Projects, Key Contractors
Table 10: Europe - Tunnel, Construction Projects, Key Consulting Engineers
Table 11: Europe - Tunnel, Construction Projects, Key Project Owners
Table 12: Middle East and Africa - Tunnel, Construction Projects, Key Contractors
Table 13: Middle East and Africa - Tunnel, Construction Projects, Key Consulting Engineers
Table 14: Middle East and Africa - Tunnel, Construction Projects, Key Project Owners
List of Figures
Figure 1: Global - Tunnel, Construction Project Pipeline, Value by Stage (US$ million)
Figure 2: Global - Tunnel, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 3: Global - Tunnel, Construction Project Pipeline, Value Regions by Stage (US$ million)
Figure 4: Global - Tunnel, Construction Project Pipeline, Top 10 Countries by Value and Stage (US$ million)
Figure 5: Global - Tunnel, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 6: Global - Tunnel, Construction Project Pipeline, Value by Completion Year (US$ million)
Figure 7: Global - Tunnel, Construction Project Pipeline, Length by Stage (Km)
Figure 8: Global - Tunnel, Construction Project Pipeline, Length by Top 10 Countries (Km)
Figure 9: The Americas - Tunnel, Construction Project Pipeline Values (US$ million)
Figure 10: The Americas - Tunnel, Construction Project Pipeline, Value by Stage (US$ million)
Figure 11: The Americas - Tunnel, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 12: The Americas - Tunnel, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 13: The Americas - Tunnel, Construction Project Pipeline, Value by Completion Year (US$ million)
Figure 14: The Americas - Tunnel, Construction Project Pipeline, Top 10 Countries by Value and Stage (US$ million)
Figure 15: The Americas - Tunnel, Construction Project Pipeline, Length by Stage (Km)
Figure 16: The Americas - Tunnel, Construction Project Pipeline, Top 10 Countries by Length and Stage (Km)
Figure 17: Asia-Pacific - Tunnel, Construction Project Pipeline Values (US$ million)
Figure 18: Asia-Pacific - Tunnel, Construction Project Pipeline, Value by Stage (US$ million)
Figure 19: Asia-Pacific - Tunnel, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 20: Asia-Pacific - Tunnel, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 21: Asia-Pacific- Tunnel, Construction Project Pipeline, Value by Completion Year (US$ million)
Figure 22: Asia-Pacific - Tunnel, Construction Project Pipeline, Top 10 Countries by Value and Stage (US$ million)
Figure 23: Asia-Pacific - Tunnel, Construction Project Pipeline, Length by Stage (Km)
Figure 24: Asia-Pacific - Tunnel, Construction Project Pipeline, Top 10 Countries by Length and Stage (Km)
Figure 25: Europe - Tunnel, Construction Project Pipeline Values (US$ million)
Figure 26: Europe - Tunnel, Construction Project Pipeline, Value by Stage (US$ million)
Figure 27: Europe - Tunnel, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 28: Europe - Tunnel, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 29: Europe - Tunnel, Construction Project Pipeline, Value by Completion Year (US$ million)
Figure 30: Europe - Tunnel, Construction Project Pipeline, Top 10 Countries by Value and Stage (US$ million)
Figure 31: Europe - Tunnel, Construction Project Pipeline, Length by Stage (Km)
Figure 32: Europe - Tunnel, Construction Project Pipeline, Top 10 Countries by Length and Stage (Km)
Figure 33: Middle East and Africa - Tunnel, Construction Project Pipeline Values (US$ million)
Figure 34: Middle East and Africa - Tunnel, Construction Project Pipeline, Value by Stage (US$ million)
Figure 35: Middle East and Africa - Tunnel, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 36: Middle East and Africa - Tunnel, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 37: Middle East and Africa- Tunnel, Construction Project Pipeline, Value by Completion Year (US$ million)
Figure 38: Middle East and Africa - Tunnel, Construction Project Pipeline, Top Countries by Value and Stage (US$ million)
Figure 39: Middle East and Africa - Tunnel, Construction Project Pipeline, Length by Stage (Km)
Figure 40: Middle East and Africa - Tunnel, Construction Project Pipeline, Top Countries by Length and Stage (Km)
Figure 41: China - Tunnel, Construction Project Pipeline, Value by Stage (US$ million)
Figure 42: China - Tunnel, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 43: China - Tunnel, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 44: The UK - Tunnel, Construction Project Pipeline, Value by Stage (US$ million)
Figure 45: The UK - Tunnel, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 46: The UK - Tunnel, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 47: The US - Tunnel, Construction Project Pipeline, Value by Stage (US$ million)
Figure 48: The US - Tunnel, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 49: The US - Tunnel, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 50: India - Tunnel, Construction Project Pipeline, Value by Stage (US$ million)
Figure 51: India - Tunnel, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 52: India - Tunnel, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 53: France - Tunnel, Construction Project Pipeline, Value by Stage (US$ million)
Figure 54: France - Tunnel, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 55: France - Tunnel, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 56: Japan - Tunnel, Construction Project Pipeline, Value by Stage (US$ million)
Figure 57: Japan - Tunnel, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 58: Japan - Tunnel, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 59: Australia - Tunnel, Construction Project Pipeline, Value by Stage (US$ million)
Figure 60: Australia - Tunnel, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 61: Australia - Tunnel, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 62: Russia - Tunnel, Construction Project Pipeline, Value by Stage (US$ million)
Figure 63: Russia - Tunnel, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 64: Russia - Tunnel, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 65: Switzerland - Tunnel, Construction Project Pipeline, Value by Stage (US$ million)
Figure 66: Switzerland - Tunnel, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 67: Switzerland - Tunnel, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)
Figure 68: Italy - Tunnel, Construction Project Pipeline, Value by Stage (US$ million)
Figure 69: Italy - Tunnel, Construction Project Pipeline, Projected Spending by Stage (US$ million)
Figure 70: Italy - Tunnel, Construction Project Pipeline, Funding Mode (% of Total Pipeline Value)