+353-1-416-8900REST OF WORLD
+44-20-3973-8888REST OF WORLD
1-917-300-0470EAST COAST U.S
1-800-526-8630U.S. (TOLL FREE)
Sale

Data Center Construction Market in Nordic - Industry Outlook and Forecast 2020-2025

  • PDF Icon

    Report

  • 263 Pages
  • June 2020
  • Region: Denmark, Finland, Iceland, Norway, Sweden
  • Arizton
  • ID: 5116484
UP TO OFF until Dec 01st 2025
1h Free Analyst Time
1h Free Analyst Time

Speak directly to the analyst to clarify any post sales queries you may have.

In-depth Analysis and Data-driven Insights on the Impact of COVID-19 Included in this Nordic Data Center Construction Market Report

The Nordic data center construction market is expected to grow at a CAGR of over 1% during the period 2019-2025.

The Nordic data center market has been a favorable destination for data center developments and investments for hyperscale data center operators, colocation providers, and cryptocurrency operators. The adoption of cloud-based services, big data analytics, and IoT services has grown significantly by local enterprises across countries in the Nordic region, boosting local colocation demand in the market. Public cloud and hybrid infrastructure services have witnessed strong growth in recent years. The market is witnessing significant investments in submarine cable projects from service providers. Telecommunication providers are investing heavily to strengthen the broadband services in the region. The availability of renewable sources of energy is the major market driver, with majority of data centers powered through renewable energy sources.

The rapid spread of COVID-19 has significantly increased data traffic from March 2020 onwards. The global data center construction market is facing a major slowdown due to the rapid spread of the Covid-19. To provide high availability services, operators are taking precautionary measures for their on-site employees. Colocation data center operators have reduced onsite staff and postponed non-critical maintenance and construction projects.

The following factors are likely to contribute to the growth of the Nordic data center construction market during the forecast period:
  • Increasing Adoption of Distinct Heating Concept
  • Growing Construction of Cryptocurrency Data Centers
  • Rising Modular Data Center Deployment
  • Increasing Adoption of Cloud-based Services

The study considers the present scenario of the Nordic data center construction market and its market dynamics for the period 2019−2025. It covers a detailed overview of several market growth enablers, restraints, and trends. The report offers both the demand and supply aspect of the market. It profiles and examines leading companies and other prominent ones operating in the market.

Nordic Data Center Construction Market Segmentation

This research report includes a detailed segmentation by electrical infrastructure, mechanical infrastructure, general construction, tier standards, and geography. The increased data centers construction in Denmark is expected to observe the demand for intelligent and efficient power infrastructure solutions during the forecast period. The redundancy in infrastructures such as UPS systems and PDUs is likely to be over 2N, whereas for switchgears it will be N+1 configuration with dual power line inside and outside facilities. Several facilities in Sweden have adopted N+N redundant power infrastructure. Data centers must be flexible enough to facilitate additional redundancy. A majority of facilities will be powered by dual power lines, and rural developments will include on-site substations. The use of redundant diesel generators might reduce due to a strong power grid supply in the Nordic region. Generators and switchgears with N+1 redundant configuration are being adopted in the facilities. The UPS and PDUs in N+N, 2N, 2N+1 configuration are being installed due to their flexible designs.

In terms of cooling, data centers in Denmark have an advantage as the region offers 85% free cooling annually. This reduces electricity consumption by cooling units by up to 50%. The data centers in Norway use free cooling chillers, adiabatic dry coolers, and evaporative coolers to cool down the IT infrastructure. The adoption of cooling techniques is highly dependent on the location and design of the facility. It is expected that most future investments will involve evaporative coolers, whereas the possibility of using an abundance of water resources is also high.

In Nordic, the market is completely dominated by greenfield development. In these projects, building development is carried out by major construction contractors in coordination with design and infrastructure providers and service operators. The involvement of sub-contractors is high as they have strong expertise in building structures in a particular location. Denmark continues to dominate with hyperscale greenfield development. These data center projects provide high revenue opportunities for general contractors. Local sub-contractors are also expected to witness continuous growth in their revenues during the forecast period. With the increased construction of hyperscale facilities, the demand for skilled professionals is likely to grow in the country. The growth in greenfield hyperscale facilities will generate more revenue for installation and commission service providers in Nordic.

The Tier I & Tier II data center market is expected to register a negative CAGR during the forecast period. The number of Tier I and Tier II facilities has reduced significantly over the past five years because of the increasing awareness of the use of redundant infrastructure. UPS and PDU systems in Tier II data centers are equipped with minimum N+N redundancy. A majority of under-developed projects across the Nordic region fall under the Tier III category. This trend is likely to continue during the forecast period. Many operators are expected to move to the Tier IV category based on the growth in rack power capacity and critical applications. In Finland and Iceland, there are three data centers that are Uptime Institute Certified under the Tier III category.

Segmentation by Electrical Infrastructure
  • UPS
  • Generators
  • Transfer Switches & Switchgears
  • Rack PDUs
  • Other Electrical Infrastructure
Segmentation by Mechanical Infrastructure
  • Cooling Systems
  • CRAC & CRAH Units
  • Chillers
  • Cooling Towers & Dry Coolers
  • Other Units
  • Racks
  • Other Mechanical Infrastructure
Segmentation by General Construction
  • Building Development
  • Installation & Commissioning Services
  • Building Designs
  • Physical Security
  • DCIM
Segmentation by Tier Standards
  • Tier I & Tier II
  • Tier III
  • Tier IV

Insights by Geography

Facebook investments in its Odense Data Center Facility in Denmark is followed by Google broke ground on its first Denmark data center, which is likely to be functional by 2021. In terms of colocation providers, Bulk Infrastructure invested in its DK01 Campus along with investments from DigiPlex, GlobalConnect, and Interxion are investing in the data center market in Denmark. In Norway, Microsoft and Equinor contributed to the investment along with Green Mountain with investments in facilities such as DC2 Telemark and Telemark & Stavanger Data Center. In 2019, Stockholm was the major investment destination Sweden that includes seven facility development activities with an estimated investment of over $350 million. Hyperscale renewable procurement is growing YOY in the region. For instance, Google has signed a 12-year contract with a power company in Norway to supply 160 MW of wind energy to power its data centers in Europe. The country has ample renewable energy sources to support large facilities.

Segmentation by Geography
  • Denmark
  • Sweden
  • Norway
  • Finland & Iceland

Insights by Vendors

The Nordic data center construction market is witnessing a steady growth in terms of greenfield and modular data center construction, with the high adoption of efficient and modular data center infrastructure solutions. The market has evolved over the years with multiple innovations focused on reducing power and water consumption and decreasing carbon dioxide emissions. Schneider Electric, Eaton, Rittal, Vertiv, and ABB are leading vendors in the electrical infrastructure market. Vendors are also partnering with modular data center developers and direct liquid cooling providers to increase revenues. This trend is likely to continue during the forecast period.

Prominent Support Infrastructure Providers
  • ABB
  • Airedale Air Conditioning
  • Alfa Laval
  • Asetek
  • Bosch Security Systems (Robert Bosch)
  • Caterpillar
  • Cummins
  • Delta Group
  • Eaton
  • KINOLT (Euro-Diesel)
  • Hitech Power Protection
  • KOHLER (SDMO)
  • Legrand
  • Piller Power Systems
  • Riello UPS
  • Rittal
  • MTU On Site Energy (Rolls-Royce Power Systems AG)
  • Schneider Electric
  • Socomec Group
  • STULZ
  • Trane (Ingersoll Rand)
  • Vertiv

Prominent Construction Contractors
  • AECOM
  • Arup Group
  • Bravida
  • COWI
  • Dornan
  • DPR Construction
  • ENACO
  • Etix Everywhere (VANTAGE DATA CENTER)
  • Fortis Construction
  • Granlund
  • HDR Architecture
  • KMCS
  • Mace Group
  • Mercury Engineering
  • MTH GROUP
  • NCC
  • Ramboll
  • Royal HaskoningDHV
  • Skanska
  • SRV Group
  • Sweco

Prominent Data Center Investors
  • Bahnhof
  • BorderLight AB (GoGreenHost)
  • Bulf Infrastructure
  • Digiplex
  • Equinix
  • Facebook
  • GlobalConnect
  • Interxion
  • Microsoft
  • Multigrid
  • Green Mountain AS
  • EcoDataCenter

Key Questions Answered?
1. What is the Nordic data center construction market size and growth forecast?
2. What are the factors impacting the growth of the Nordic data center construction market forecast?
3. What are the leading drivers, trends, and restraints in the Nordic data center construction market?
4. Who are the leading vendors and what are their market shares?
5. What impact the COVID-19 Pandemic have on the market?

Table of Contents

1 Research Methodology2 Research Objectives3 Research Process
4 Scope & Coverage
4.1 Market Definition
4.2 Base Year
4.3 Scope of The Study
4.4 Market Segments
5 Report Assumptions & Caveats
5.1 Key Caveats
5.2 Currency Conversion
5.3 Market Derivation
6 Market at a Glance
7 Introduction
7.1 Internet & Data Growth
7.2 Data Center Site Selection Criteria
7.3 Electricity Pricing Across Major Data Center Locations
7.4 Submarine Cables
8 Impact Of Covid-19
8.1 Impact Of Covid-19 On Data Center Industry
8.2 Impact Of Covid-19 In Nordic
9 Market Opportunities & Trends
9.1 Increasing Adoption Of Distinct Heating Concept
9.2 Growing Construction Of Cryptocurrency Data Centers
9.3 Increasing Construction Hyperscale Data Center Facilities
9.4 Rising Modular Data Center Deployment
10 Market Growth Enablers
10.1 Rising Adoption Of Cloud-Based Services
10.2 Growing Investments In Data Centers By Colocation Operators
10.3 Availability Of Renewable Energy Sources
10.4 Free Cooling Lowers PUE Of Data Centers
10.5 Tax Incentives & Land Availability For Development
11 Market Growth Restraints
11.1 Lack Of Skilled Workforce
11.2 High Procurement Cost Of Efficient Infrastructure
11.3 Physical Security Constraints
12 Market Landscape
12.1 Market Overview
12.2 Investment: Market Size & Forecast
12.3 Area: Market Size & Forecast
12.4 Power Capacity: Market Size & Forecast
12.5 Five Forces Analysis
13 Infrastructure Segmentation
13.1 Market Snapshot & Growth Engine
13.2 Market Overview
13.3 Electrical Infrastructure
13.4 Mechanical Infrastructure
13.5 General Construction
14 Electrical Infrastructure
14.1 Market Snapshot & Growth Engine
14.2 UPS Systems
14.3 Generators
14.4 Transfer Switches & Switchgear
14.5 Power Distribution Units
14.6 Other Electrical Infrastructure
15 Mechanical Infrastructure
15.1 Market Snapshot & Growth Engine
15.2 Cooling Systems
15.3 Racks
15.4 Other Mechanical Infrastructure
16 Cooling Systems
16.1 Market Snapshot & Growth Engine
16.2 CRAC & CRAH Units
16.3 Chiller Units
16.4 Cooling Towers, Dry Coolers, & Condenser
16.5 Economizers & Evaporative Coolers
16.6 Other Cooling Units
17 Cooling Technique
17.1 Market Snapshot & Growth Engine
17.2 Air-Based Cooling Techniques
17.3 Liquid-Based Cooling Techniques
18 General Construction
18.1 Market Snapshot & Growth Engine
18.2 Building Development
18.3 Installation & Commissioning Services
18.4 Building Design
18.5 Physical Security
18.6 DCIM/BMS
19 Tier Standards
19.1 Market Snapshot & Growth Engine
19.2 Overview Of Tier Standards
19.3 Tier I & II
19.4 Tier III
19.5 Tier IV
20 Country Segmentation
20.1 Investment: Snapshot & Growth Engine
20.2 Area: Snapshot & Growth Engine
20.3 Power Capacity: Snapshot & Growth Engine
20.4 Denmark
20.5 Norway
20.6 Sweden
20.7 Finland & Iceland
21 Competitive Landscape
21.1 Overview
21.2 Electrical Infrastructure
21.3 Mechanical Infrastructure
21.4 General Construction
22 Prominent Data Center Support Infrastructure Providers
22.1 ABB
22.2 Airedale Air Conditioning
22.3 ALFA LAVAL
22.4 ASETEK
22.5 Bosch Security Systems (Robert Bosch)
22.6 Caterpillar
22.7 Cummins
22.8 Delta Group
22.9 Eaton
22.10 Euro-Diesel (KINOLT)
22.11 Hitech Power Protection
22.12 KOHLER (SDMO)
22.13 Legrand
22.14 Piller Power Systems
22.15 Riello UPS
22.16 Rittal
22.17 MTU On Site Energy (Rolls-Royce Power Systems AG)
22.18 Schneider Electric
22.19 Socomec
22.20 Stulz
22.21 Trane (Ingersoll Rand)
22.22 Vertiv
23 Prominent Data Center Contractors
23.1 Aecom
23.2 Arup Group
23.3 Bravida
23.4 COWI
23.5 Dornan
23.6 DPR Construction
23.7 ENACO
23.8 Etix Everywhere (Vantage Data Center)
23.9 Fortis Construction
23.10 Granlund
23.11 HDR Architecture
23.12 KMCS
23.13 Mace Group
23.14 Mercury Engineering
23.15 MTH Group
23.16 NCC
23.17 Ramboll
23.18 Royal Haskoningdhv
23.19 SKANSKA
23.20 SRV Group
23.21 Sweco
24 Prominent Data Center Investors
24.1 Bahnhof
24.2 Boderlight AB (GoGREENHOST)
24.3 Bulk Infrastructure
24.4 DIGIPLEX
24.5 Equinix
24.6 Facebook
24.7 GlobalConnect
24.8 INTERXION
24.9 MICROSOFT
24.10 MULTIGRID
24.11 Green Mountain AS
24.12 Ecodatacenter
25 Report Summary
25.1 Key Takeaways
25.2 Strategic Recommendations
26 Quantitative Summary
26.1 Nordic Data Center Market
26.2 Geography
26.3 Denmark
26.4 Sweden
26.5 Norway
26.6 Finland & Iceland
27 Abbreviations
List of Exhibits
Exhibit 1 Segmentation of Nordic Data Center Construction Market
Exhibit 2 Market Size Calculation Approach 2019
Exhibit 3 Nordic Internet Penetration & Mobile Connections 2019
Exhibit 4 Average Electricity Pricing in Nordics 2019 (per kW)
Exhibit 5 Impact of COVID-19 Pandemic on European Data Center Market
Exhibit 6 Impact of Increasing Adoption of Distinct Heating Concept
Exhibit 7 Impact of Growing Construction of Cryptocurrency Data Centers
Exhibit 8 Impact of Increasing Construction Hyperscale Data Center Facilities
Exhibit 9 Impact of Rising Modular Data Center Deployment
Exhibit 10 Impact of Rising Adoption of Cloud-Based Services
Exhibit 11 Estimated Adoption of Cloud Computing among Enterprises in Nordics 2019
Exhibit 12 Impact of Growing Investments in Data Centers by Colocation Operators
Exhibit 13 Nordic Colocation Data Center Project & Area Added
Exhibit 14 Impact of Availability of Renewable Energy Sources
Exhibit 15 Renewable Energy % Share in Nordic Countries 2019
Exhibit 16 Impact of Free Cooling Lowers PUE of Data Centers
Exhibit 17 Impact of Tax Incentives & Land Availability for Development
Exhibit 18 Impact of Lack of Skilled Workforce
Exhibit 19 Impact of High Procurement Cost of Efficient Infrastructure
Exhibit 20 Impact of Physical Security Constraints
Exhibit 21 Nordic Data Center Construction Market 2019-2025 ($ million)
Exhibit 22 Data Center Construction Market in Nordics by Area 2019–2025 (Million Square Feet)
Exhibit 23 Data Center Construction Market in Nordics by Power Capacity 2019–2025 (MW)
Exhibit 24 Five Forces Analysis 2019
Exhibit 25 Incremental Growth by Infrastructure 2019-2025
Exhibit 26 Nordic Data Center Construction Market by Infrastructure
Exhibit 27 Nordic Data Center Construction Electrical Infrastructure Market 2019-2025 ($ million)
Exhibit 28 Nordic Data Center Construction Mechanical Infrastructure Market 2019-2025 ($ million)
Exhibit 29 Nordic Data Center General Construction Market 2019-2025 ($ million)
Exhibit 30 Average Labor Cost in Nordic Countries 2019
Exhibit 31 Incremental Growth by Electrical Infrastructure 2019-2025
Exhibit 32 Nordic Data Center Construction UPS Systems Market 2019-2025 ($ million)
Exhibit 33 Nordic Data Center UPS Share by Countries
Exhibit 34 Nordic Data Center Construction Generators Market 2019-2025 ($ million)
Exhibit 35 Nordic Data Center Construction Generator Share
Exhibit 36 Nordic Data Center Construction Transfer Switches & Switchgears Market 2019-2025 ($ million)
Exhibit 37 Nordic Data Center Transfer Switches & Switchgear Share by Countries
Exhibit 38 Nordic Data Center Construction PDUs Market 2019-2025 ($ million)
Exhibit 39 Nordic Data Center PDU Share by Countries
Exhibit 40 Nordic Data Center Other Power Infrastructure Construction Market 2019-2025 ($ million)
Exhibit 41 Nordic Data Center Other Electrical Infrastructure Market by Country
Exhibit 42 Incremental Growth by Mechanical Infrastructure 2019-2025
Exhibit 43 Nordic Data Center Construction Cooling Systems Market 2019-2025 ($ million)
Exhibit 44 Nordic Data Center Construction Market by Cooling Systems by Country
Exhibit 45 Nordic Data Center Construction Racks Market 2019–2025 ($ million)
Exhibit 46 Nordic Data Center Construction Racks Market by Country
Exhibit 47 Nordic Data Center Construction Other Mechanical Infrastructure Market 2019-2025 ($ million)
Exhibit 48 Nordic Data Center Construction Other Mechanical Infrastructure Market by Country
Exhibit 49 Incremental Growth by Cooling Systems 2019-2025
Exhibit 50 Nordic Data Center Construction CRAC & CRAH Market 2019-2025 ($ million)
Exhibit 51 Nordic Data Center Construction CRAC & CRAH Market by Country
Exhibit 52 Nordic Data Center Construction Chiller Market 2019-2025 ($ million)
Exhibit 53 Nordic Data Center Construction Chiller Market by Country
Exhibit 54 Nordic Data Center Construction Cooling Towers, Dry Coolers & Condensers Market 2019-2025 ($ million)
Exhibit 55 Nordic Data Center Construction Cooling Towers & Dry Coolers Market by Country
Exhibit 56 Nordic Data Center Construction Evaporative Coolers Market 2019-2025 ($ million)
Exhibit 57 Nordic Data Center Construction Evaporative Cooler Market by Country
Exhibit 58 Nordic Data Center Construction Other Cooling Market 2019-2025 ($ million)
Exhibit 59 Nordic Data Center Construction Other Cooling Market by Country
Exhibit 60 Incremental Growth by Cooling Technique 2019-2025
Exhibit 61 Nordic Data Center Construction Air-based Cooling Market 2019-2025 ($ million)
Exhibit 62 Nordic Data Center Construction Air-Based Cooling Market by Country
Exhibit 63 Nordic Data Center Construction Liquid-based Cooling Market 2019-2025 ($ million)
Exhibit 64 Nordic Data Center Construction Liquid-Based Cooling Market by Country
Exhibit 65 Incremental Growth by General Construction 2019-2025
Exhibit 66 Nordic Data Center Construction Building Development Market 2019–2025 ($ million)
Exhibit 67 Nordic Data Center Construction Building Development Market by Country
Exhibit 68 Nordic Data Center Construction Installation & Commissioning Market 2019–2025 ($ million)
Exhibit 69 Nordic Data Center Construction Installation & Commissioning Market by Country
Exhibit 70 Nordic Data Center Construction Building Design Market 2019–2025 ($ million)
Exhibit 71 Nordic Data Center Construction Building Design Market by Country
Exhibit 72 Nordic Data Center Construction Physical Security Market 2019–2025 ($ million)
Exhibit 73 Nordic Data Center Construction Physical Security Market by Country
Exhibit 74 Nordic Data Center Construction DCIM Market 2019–2025 ($ million)
Exhibit 75 Nordic Data Center Construction DCIM/BMS Market by Country
Exhibit 76 Incremental Growth by Tier Standards 2019-2025
Exhibit 77 Overview of Tier Standards
Exhibit 78 Nordic Tier I & II Data Center Construction Market 2019–2025 ($ million)
Exhibit 79 Nordic Tier III Data Center Construction Market 2019–2025 ($ million)
Exhibit 80 Nordic Tier IV Data Center Construction Market 2019-2025 ($ million)
Exhibit 81 Incremental Growth in Nordic Countries by Investment 2019-2025 ($ billion)
Exhibit 82 Incremental Growth in Nordics by Area 2019-2025 (million square feet)
Exhibit 83 Incremental Growth in Nordics by Power Capacity 2019-2025 (MW)
Exhibit 84 Snapshot – Data Center Construction Market in Denmark 2019-2025
Exhibit 85 Data Center Construction Market in Denmark 2019-2025 ($ million)
Exhibit 86 Data Center Construction Market in Denmark by Area 2019-2025 (Million Square Feet)
Exhibit 87 Renewable Energy Generation in Denmark 2019
Exhibit 88 Data Center Construction Market in Denmark by Power Capacity 2019-2025 (MW)
Exhibit 89 Data Center Construction Infrastructure Market in Denmark 2019-2025 ($ million)
Exhibit 90 Snapshot – Data Center Construction Market in Norway 2019-2025
Exhibit 91 Data Center Construction Market in Norway 2019-2025 ($ million)
Exhibit 92 Data Center Construction Market in Norway by Area 2019-2025 (Million Square Feet)
Exhibit 93 Data Center Construction Market in Norway by Power Capacity 2019-2025 (MW)
Exhibit 94 Data Center Construction Infrastructure Market in Norway 2019-2025 ($ million)
Exhibit 95 Snapshot – Data Center Construction Market in Sweden 2019-2025
Exhibit 96 Data Center Construction Market in Sweden 2019-2025 ($ million)
Exhibit 97 Data Center Construction Market in Sweden by Area 2019-2025 (Million Square Feet)
Exhibit 98 Data Center Construction Market in Sweden by Power Capacity 2019-2025 (MW)
Exhibit 99 Data Center Construction Infrastructure Market in Sweden 2019-2025 ($ million)
Exhibit 100 Snapshot – Data Center Construction Market in Finland & Iceland 2019-2025
Exhibit 101 Data Center Construction Market in Finland & Iceland 2019-2025 ($ million)
Exhibit 102 Data Center Construction Market in Finland & Iceland by Area 2019-2025 (Million Square Feet)
Exhibit 103 Data Center Construction Market in Finland & Iceland by Power Capacity 2019-2025 (MW)
Exhibit 104 Data Center Construction Infrastructure Market in Finland & Iceland 2019-2025 ($ million)
Exhibit 105 Nordic Data Center Construction Market 2019-2025
List of Tables
Table 1 Key Caveats
Table 2 Currency Conversion 2014-2019
Table 3 Data Center Site Selection Criteria
Table 4 List of Submarine Fiber Cable Projects
Table 5 Data Center Market in Nordics 2019-2025
Table 6 Impact of COVID-19 on Data Center Power Market ($ million) 2020
Table 7 Comparison of Traditional & Prefabricated Module Approaches
Table 8 PUE vs Efficiency vs DCIE
Table 9 Nordic Data Center Construction Market by Infrastructure 2019-2025 ($ million)
Table 10 Nordic Data Center Construction Electrical Infrastructure Market 2019-2025 ($ million)
Table 11 Nordic Data Center Construction Mechanical Infrastructure Market 2019-2025 ($ million)
Table 12 Nordic Data Center Construction Cooling System Market 2019-2025 ($ million)
Table 13 Nordic Data Center Construction Cooling Technique Market 2019-2025 ($ million)
Table 14 Nordic Data Center General Construction Market 2019-2025 ($ million)
Table 15 Nordic Data Center Market by Geography 2019-2025 ($ million)
Table 16 Nordic Data Center Construction Market by Area 2019-2025 (million square feet)
Table 17 Nordic Data Center Construction Market by Power Capacity 2019-2025 (MW)
Table 18 Denmark Data Center Construction Market 2019-2025
Table 19 Denmark Data Center Construction Infrastructure Market 2019-2025 ($ million)
Table 20 Sweden Data Center Construction Market 2019-2025
Table 21 Sweden Data Center Construction Infrastructure Market 2019-2025 ($ million)
Table 22 Norway Data Center Construction Market 2019-2025
Table 23 Norway Data Center Construction Infrastructure Market 2019-2025 ($ million)
Table 24 Finland & Iceland Data Center Construction Market 2019-2025
Table 25 Finland & Iceland Data Center Construction Infrastructure 2019-2025 ($ million)

Companies Mentioned

  • ABB
  • Airedale Air Conditioning
  • Alfa Laval
  • Asetek
  • Bosch Security Systems (Robert Bosch)
  • Caterpillar
  • Cummins
  • Delta Group
  • Eaton
  • KINOLT (Euro-Diesel)
  • Hitech Power Protection
  • KOHLER (SDMO)
  • Legrand
  • Piller Power Systems
  • Riello UPS
  • Rittal
  • MTU On Site Energy (Rolls-Royce Power Systems AG)
  • Schneider Electric
  • Socomec Group
  • STULZ
  • Trane (Ingersoll Rand)
  • Vertiv
  • AECOM
  • Arup Group
  • Bravida
  • COWI
  • Dornan
  • DPR Construction
  • ENACO
  • Etix Everywhere (VANTAGE DATA CENTER)
  • Fortis Construction
  • Granlund
  • HDR Architecture
  • KMCS
  • Mace Group
  • Mercury Engineering
  • MTH GROUP
  • NCC
  • Ramboll
  • Royal HaskoningDHV
  • Skanska
  • SRV Group
  • Sweco
  • Bahnhof
  • BorderLight AB (GoGreenHost)
  • Bulf Infrastructure
  • Digiplex
  • Equinix
  • Facebook
  • GlobalConnect
  • Interxion
  • Microsoft
  • Multigrid
  • Green Mountain AS
  • EcoDataCenter

Methodology


Our research comprises a mix of primary and secondary research. The secondary research sources that are typically referred to include, but are not limited to, company websites, annual reports, financial reports, company pipeline charts, broker reports, investor presentations and SEC filings, journals and conferences, internal proprietary databases, news articles, press releases, and webcasts specific to the companies operating in any given market.

Primary research involves email interactions with the industry participants across major geographies. The participants who typically take part in such a process include, but are not limited to, CEOs, VPs, business development managers, market intelligence managers, and national sales managers. We primarily rely on internal research work and internal databases that we have populated over the years. We cross-verify our secondary research findings with the primary respondents participating in the study.



 

Loading
LOADING...