Saudi Arabia Power EPC - Market Share Analysis, Industry Trends & Statistics, Growth Forecasts (2026-2031)

  • PDF Icon

    Report

  • 90 Pages
  • July 2026
  • Region: Saudi Arabia
  • Mordor Intelligence
  • ID: 5120385
The saudi arabia power ePC market size is expected to grow from USD 13.49 billion in 2025 to USD 14.20 billion in 2026 and is forecast to reach USD 17.84 billion by 2031 at 4.67% CAGR over 2026-2031. This report is Segmented by Power Generation EPC [Technology (Thermal, Nuclear, and Renewables), Capacity Band (Up To 100 MW, 100 To 499 MW, and Above 500 MW), and End-User (Regulated Utilities, Independent Power Producers, Industrial Captive Power, and Public Sector and SOE)], and Power Transmission and Distribution (T&D) EPC. The Market Sizes and Forecasts are Provided in Terms of Value (USD).

Saudi Arabia Power EPC Market Trends and Insights

Vision 2030 Capacity-Addition Roadmap

Saudi Arabia raised its renewable target to 100-130 gigawatts by 2030, a leap that requires more than 20 gigawatts of fresh capacity each year, a rate triple the cumulative 6.55 gigawatts installed before 2025. The Public Investment Fund-backed ACWA Power secured seven PPAs in July 2025 totaling 15 gigawatts, proving that sovereign balance sheets can absorb large awards without auction delays. Record solar bids of USD 0.0129 per kilowatt-hour at the 2-gigawatt Al-Sadawi plant illustrate continuing cost deflation. Yet with only 14.4 gigawatts tendered to date, policymakers must contract at least 70 gigawatts in five years to meet the low end of the target range, underscoring the urgency for streamlined permitting.

National Renewable Energy Program Pipeline

Round 5 of the National Renewable Energy Program pre-qualified 33 bidders for a 2-gigawatt battery-storage tender, bundling storage and solar into one EPC scope that favors integrated suppliers. PowerChina alone won 1.75 gigawatts of solar EPC in January 2025, while China Energy Engineering Corporation secured the 2-gigawatt Haden plant for USD 976 million in 2024, confirming Chinese dominance in price-competitive utility-scale projects. The phased auction schedule mitigates execution risk, but parallel construction of multiple sites strains welders, electricians, and logistically critical crane operators.

Lengthy Permitting & Approval Cycles

Environmental assessments, land leases, and interconnection sign-offs can stretch 12-18 months. The 2025 Investment Law promises streamlined dispute resolution, but developers have yet to record faster approvals. While the Etimad e-procurement portal pays 83% of invoices within 15 days, licensing delays continue to slow multi-gigawatt auctions.

Other drivers and restraints analyzed in the detailed report include:

  • Rapid Industrial-Sector Electricity Demand Growth
  • Grid-Modernisation & Inter-Connection Investments
  • Shortage of Specialised EPC Labor & Skills

Segment Analysis

Renewables took 100% of new capacity awards in 2025, and the segment is forecast to rise at a 4.8% CAGR to 2031. This dominance stems from a policy that channels Saudi Power Procurement Company auctions solely to solar and wind, while thermal plants proceed under direct awards. ACWA Power alone commissioned 2.79 gigawatts of solar in 2025 across Al Kahfah, Ar Rass 2, and Saad 2. Although excluded from competitive tenders, combined-cycle gas turbine builds such as the 3.6-gigawatt Rumah 2 project ensure reserve margin stability. Siemens Energy booked USD 1.6 billion of orders for Rumah 2 and Nairiyah 2 in March 2025, bolstering the Saudi Arabia power EPC industry’s thermal backlog.

Second-order effects include rising demand for grid-connected batteries, with Round 5 bundling 2 gigawatts of storage across four sites. Competitive tariffs below USD 0.013 per kilowatt-hour indicate that integrated solar-plus-storage EPC achieves economies that non-integrated vendors cannot match. If execution stays on schedule, renewables will continue to shape the Saudi Arabia power generation EPC market size over the forecast period.

Projects above 500 megawatts captured 61.5% of 2025 power generation EPC spending, led by ACWA Power’s 1.425-gigawatt Al Kahfah solar farm. High capacity factors and centralized procurement cut levelized costs, favoring mega-scale plants. The 100-499 megawatt bracket serves regional utilities and industrial clusters, often integrating 250-megawatt storage blocks.

The up-to-100 megawatt segment, though smaller in absolute value, is the fastest-growing at 6.1% through 2031. NEOM’s hydrogen facility uses modular sub-100 megawatt arrays aligned with electrolyzer ramps. The Red Sea Development Company operates a 400-megawatt microgrid with 1.3 gigawatt-hours of batteries, proving that distributed resources can power isolated assets. These projects confirm that microgrids will steadily enlarge their Saudi Arabia power generation EPC market share.

Complete Report Scope:

  • Power Generation EPC
    • By Technology
      • Thermal
      • Nuclear
      • Renewables
    • By Capacity Band
      • Up to 100 MW (DER, micro-grid)
      • 100 to 499 MW
      • Above 500 MW
    • By End-User
      • Regulated Utilities
      • Independent Power Producers
      • Industrial Captive Power
      • Public Sector and SOE
  • Power Transmission and Distribution (T&D) EPC

List of Companies Covered in this Report:

  • ACWA Power
  • Saudi Electricity Company - National Contracting Co.
  • Larsen & Toubro
  • PowerChina
  • Doosan Enerbility
  • Alfanar
  • Hyundai Engineering & Construction
  • GE Vernova
  • Hitachi Energy
  • Siemens Energy
  • Sepco III
  • Elsewedy Electric
  • China Energy Engineering Co. (CEEC)
  • Fluor Corp.
  • Bechtel
  • SNC-Lavalin
  • Worley
  • Samsung C&T
  • Al-Toukhi
  • Nesma & Partners

Additional Benefits:

  • The market estimate (ME) sheet in Excel format
  • 3 months of analyst support

Table of Contents

1 Introduction
1.1 Study Assumptions & Market Definition
1.2 Scope of the Study
2 Research Methodology3 Executive Summary
4 Market Landscape
4.1 Market Overview
4.2 Installed Capacity Outlook
4.3 Primary-Energy Consumption Snapshot
4.4 Market Drivers
4.4.1 Vision 2030 capacity-addition roadmap
4.4.2 National Renewable Energy Program (NREP) project pipeline
4.4.3 Rapid industrial-sector electricity demand growth
4.4.4 Grid-modernisation & inter-connection investments
4.4.5 Local-content mandates for EPC contractors
4.4.6 Green-hydrogen mega-projects driving new power build-outs
4.5 Market Restraints
4.5.1 Lengthy permitting & approval cycles
4.5.2 Shortage of specialised EPC labour & skills
4.5.3 Volatile steel & equipment prices
4.5.4 Cooling-water scarcity for thermal plants
4.6 Supply-Chain Analysis
4.7 Regulatory Landscape
4.8 Technological Outlook
4.9 Porter’s Five Forces
4.9.1 Bargaining Power of Suppliers
4.9.2 Bargaining Power of Consumers
4.9.3 Threat of New Entrants
4.9.4 Threat of Substitutes
4.9.5 Intensity of Competitive Rivalry
4.10 PESTLE Analysis
5 Market Size & Growth Forecasts
5.1 Power Generation EPC
5.1.1 By Technology
5.1.1.1 Thermal
5.1.1.2 Nuclear
5.1.1.3 Renewables
5.1.2 By Capacity Band
5.1.2.1 Up to 100 MW (DER, micro-grid)
5.1.2.2 100 to 499 MW
5.1.2.3 Above 500 MW
5.1.3 By End-User
5.1.3.1 Regulated Utilities
5.1.3.2 Independent Power Producers
5.1.3.3 Industrial Captive Power
5.1.3.4 Public Sector and SOE
5.2 Power Transmission and Distribution (T&D) EPC
6 Competitive Landscape
6.1 Market Concentration
6.2 Strategic Moves (M&A, Partnerships, PPAs)
6.3 Market Share Analysis (Market Rank/Share for key companies)
6.4 Company Profiles (includes Global level Overview, Market level overview, Core Segments, Financials as available, Strategic Information, Products & Services, and Recent Developments)
6.4.1 ACWA Power
6.4.2 Saudi Electricity Company - National Contracting Co.
6.4.3 Larsen & Toubro
6.4.4 PowerChina
6.4.5 Doosan Enerbility
6.4.6 Alfanar
6.4.7 Hyundai Engineering & Construction
6.4.8 GE Vernova
6.4.9 Hitachi Energy
6.4.10 Siemens Energy
6.4.11 Sepco III
6.4.12 Elsewedy Electric
6.4.13 China Energy Engineering Co. (CEEC)
6.4.14 Fluor Corp.
6.4.15 Bechtel
6.4.16 SNC-Lavalin
6.4.17 Worley
6.4.18 Samsung C&T
6.4.19 Al-Toukhi
6.4.20 Nesma & Partners
7 Market Opportunities & Future Outlook
7.1 White-space & Unmet-Need Assessment

Companies Mentioned (Partial List)

A selection of companies mentioned in this report includes, but is not limited to:

  • ACWA Power
  • Saudi Electricity Company – National Contracting Co.
  • Larsen & Toubro
  • PowerChina
  • Doosan Enerbility
  • Alfanar
  • Hyundai Engineering & Construction
  • GE Vernova
  • Hitachi Energy
  • Siemens Energy
  • Sepco III
  • Elsewedy Electric
  • China Energy Engineering Co. (CEEC)
  • Fluor Corp.
  • Bechtel
  • SNC-Lavalin
  • Worley
  • Samsung C&T
  • Al-Toukhi
  • Nesma & Partners