Data Center Construction - Global Strategic Business Report

  • PDF Icon

    Report

  • 907 Pages
  • October 2025
  • Region: Global
  • Market Glass, Inc. (formerly Global Industry Analysts, Inc.)
  • ID: 5139751
The global market for Data Center Construction was valued at US$245.4 Billion in 2024 and is projected to reach US$371.7 Billion by 2030, growing at a CAGR of 7.2% from 2024 to 2030. This comprehensive report provides an in-depth analysis of market trends, drivers, and forecasts, helping you make informed business decisions. The report includes the most recent global tariff developments and how they impact the Data Center Construction market.

Global Data Center Construction Market - Key Drivers and Trends Summarized

Data center construction involves the planning, design, and building of facilities that house computer systems, including their associated components such as telecommunications and storage systems. These facilities provide the necessary infrastructure for IT operations and enable businesses and organizations to manage, store, and disseminate data efficiently. Key elements of a data center include physical security, power supplies, data communication connections, environmental controls, and various IT equipment. Modern data centers range from micro data centers that serve smaller businesses to massive installations for global cloud service providers. They are meticulously designed to ensure high availability, optimal performance, and scalability, accommodating future technology advancements and changes in IT demand.

The market for data center construction is heavily influenced by the rapid growth in data consumption and the shift towards cloud-based technology solutions. As businesses generate and rely on larger volumes of data, the need for robust, scalable, and secure storage solutions escalates. This demand drives the expansion of existing facilities and the construction of new ones. Technological advancements are also key, with trends towards energy-efficient and environmentally sustainable designs becoming prevalent. Innovations such as liquid cooling systems and the use of renewable energy sources help in optimizing the operational costs and environmental impact of data centers. Furthermore, the geographical distribution of data centers is becoming more strategic, focusing not only on major economic centers but also on regions with favorable regulations, lower risks of natural disasters, and availability of renewable energy resources.

The growth in the data center construction market is driven by several factors, particularly the expansion of digital transformation strategies across industries. The widespread adoption of Internet of Things (IoT) devices, big data analytics, and artificial intelligence (AI) technologies necessitates more advanced and larger data centers to handle increased workloads with high efficiency. Consumer behavior trends, such as increased online shopping, remote work, and video streaming, further amplify the demand for data processing and storage capabilities. Regulatory requirements around data sovereignty and privacy also contribute to the construction of new data centers, as businesses must ensure their data handling practices comply with local laws. Moreover, the rise of edge computing, which requires data to be processed closer to the end-user, prompts the development of regional data centers. These trends, combined with the ongoing need to upgrade older facilities to newer technologies and standards, continue to propel the growth and evolution of the data center construction industry.

Report Scope

The report analyzes the Data Center Construction market, presented in terms of market value (USD). The analysis covers the key segments and geographic regions outlined below.
  • Segments: Tier Type (Tier 3, Tier 2, Other Tier Types); Infrastructure Type (IT Infrastructure, Power Distribution & Cooling, Other Infrastructure Types); End-Use (IT & Telecom, BFSI, Healthcare, Government & Defense, Energy, Other End-Uses).
  • Geographic Regions/Countries: World; USA; Canada; Japan; China; Europe; France; Germany; Italy; UK; Spain; Russia; Rest of Europe; Asia-Pacific; Australia; India; South Korea; Rest of Asia-Pacific; Latin America; Argentina; Brazil; Mexico; Rest of Latin America; Middle East; Iran; Israel; Saudi Arabia; UAE; Rest of Middle East; Africa.

Key Insights:

  • Market Growth: Understand the significant growth trajectory of the Tier 3 Data Center segment, which is expected to reach US$201.4 Billion by 2030 with a CAGR of 8.2%. The Tier 2 Data Center segment is also set to grow at 6.5% CAGR over the analysis period.
  • Regional Analysis: Gain insights into the U.S. market, valued at $85.8 Billion in 2024, and China, forecasted to grow at an impressive 11.2% CAGR to reach $40.9 Billion by 2030. Discover growth trends in other key regions, including Japan, Canada, Germany, and the Asia-Pacific.

Why You Should Buy This Report:

  • Detailed Market Analysis: Access a thorough analysis of the Global Data Center Construction Market, covering all major geographic regions and market segments.
  • Competitive Insights: Get an overview of the competitive landscape, including the market presence of major players across different geographies.
  • Future Trends and Drivers: Understand the key trends and drivers shaping the future of the Global Data Center Construction Market.
  • Actionable Insights: Benefit from actionable insights that can help you identify new revenue opportunities and make strategic business decisions.

Key Questions Answered:

  • How is the Global Data Center Construction Market expected to evolve by 2030?
  • What are the main drivers and restraints affecting the market?
  • Which market segments will grow the most over the forecast period?
  • How will market shares for different regions and segments change by 2030?
  • Who are the leading players in the market, and what are their prospects?

Report Features:

  • Comprehensive Market Data: Independent analysis of annual sales and market forecasts in US$ Million from 2024 to 2030.
  • In-Depth Regional Analysis: Detailed insights into key markets, including the U.S., China, Japan, Canada, Europe, Asia-Pacific, Latin America, Middle East, and Africa.
  • Company Profiles: Coverage of players such as ABB Ltd., Aecom, Ascenty, Cisco Systems, Inc., Clayco, Inc. and more.
  • Complimentary Updates: Receive free report updates for one year to keep you informed of the latest market developments.

Some of the 208 companies featured in this Data Center Construction market report include:

  • ABB Ltd.
  • Aecom
  • Ascenty
  • Cisco Systems, Inc.
  • Clayco, Inc.
  • Dell Inc.
  • DPR Construction
  • Fujitsu Ltd.
  • Hewlett Packard Enterprise Development LP
  • HITT Contracting, Inc.
  • Hoffman Construction
  • Holder Construction Group, LLC
  • HostDime Global Corp.
  • Huawei Technologies Co., Ltd.
  • IBM Corp.
  • M. A. Mortenson Company
  • Schneider Electric SE
  • STO Building Group
  • Turner Construction
  • Vertiv Group Corp.

This edition integrates the latest global trade and economic shifts into comprehensive market analysis. Key updates include:

  • Tariff and Trade Impact: Insights into global tariff negotiations across 180+ countries, with analysis of supply chain turbulence, sourcing disruptions, and geographic realignment. Special focus on 2025 as a pivotal year for trade tensions, including updated perspectives on the Trump-era tariffs.
  • Adjusted Forecasts and Analytics: Revised global and regional market forecasts through 2030, incorporating tariff effects, economic uncertainty, and structural changes in globalization. Includes historical analysis from 2015 to 2023.
  • Strategic Market Dynamics: Evaluation of revised market prospects, regional outlooks, and key economic indicators such as population and urbanization trends.
  • Innovation & Technology Trends: Latest developments in product and process innovation, emerging technologies, and key industry drivers shaping the competitive landscape.
  • Competitive Intelligence: Updated global market share estimates for 2025, competitive positioning of major players (Strong/Active/Niche/Trivial), and refined focus on leading global brands and core players.
  • Expert Insight & Commentary: Strategic analysis from economists, trade experts, and domain specialists to contextualize market shifts and identify emerging opportunities.

Table of Contents

I. METHODOLOGYII. EXECUTIVE SUMMARY
1. MARKET OVERVIEW
  • Data Centers as the Backbone of Modern Digital Economy Provides the Foundation for the Growth in Data Center Construction Projects
  • Digital Transformation Ignites a Construction Boom for Data Centers: Global Spending on Digital Transformation (In US$ Billion) for Years 2023, 2025, 2027, 2029 and 2031
  • Global Economic Update
  • How Trump's Tariffs Impact the Market? The Big Question on Everyone's Mind
  • Competition
  • Data Center Construction - Global Key Competitors Percentage Market Share in 2025 (E)
  • Competitive Market Presence - Strong/Active/Niche/Trivial for Players Worldwide in 2025 (E)
  • World Brands
  • Recent Market Activity
  • Innovations
2. FOCUS ON SELECT PLAYERS
3. MARKET TRENDS & DRIVERS
  • Explosive Growth of E-Commerce Drives Demand for Data Centers. Here's Why
  • Bridging Growing E-Commerce Bytes With Bricks, New Data Center Construction Takes Center Stage in the Exploding E-Commerce Industry: Global E-Commerce Market (In US$ Trillion) for Years 2023, 2025, 2027, 2029 and 2031
  • The Rise of On-Demand Streaming Drives the Need for New Data Centers
  • On-Demand Streaming Surge Sparks New Opportunities for Data Center Construction: Global Opportunity for Video On-Demand (In US$ Billion) for Years 2023, 2025, 2027, 2029 and 2031
  • Growing IoT Ecosystem Exerts Pressure on Data Center Capacity, Driving the Need for New Data Center Construction
  • IoT Expansions Meet Stone and Steel as New Data Centers Emerge for a Better Connected Tomorrow: Global M2M/IoT Connections (In Billion) for Years 2022, 2024, 2026, 2028 and 2030
  • Rising Adoption of Digital Banking & Financial Services Push Up the Need for Additional Data Center Infrastructure
  • Navigating the Surge in Data Center Needs Amidst Financial Digitization Through New Construction Projects: Global Market for Digital Banking (In US$ Million) for Years 2023, 2025 and 2027
  • As Plug & Play Data Centers Emerge to be the Future of Data Centers, Prefabricated & Modular Construction Strategies Rise in Parallel Popularity
  • Supported by Speed-to-Market Benefits, Data Center Construction Shifts to Pre-Fabricated Designs
  • Edge Computing Induced Rise in Micro Data Centers Makes Modular Construction Ideas Attractive
  • With Computing Moving to the Edge, Data centers are also Moving to the Edge at Faster Time-to-Market Velocity, Giving the Concept of Modularity a Shot in the Arm: Global Opportunity for Edge Computing (In US$ Million) for Years 2021, 2023, 2025 and 2027
  • The Skyward Surge. Cloud Computing Catalyzes Data Center Demand
  • There's a Symbiotic Surge Between Cloud Computing Demands and Data Center Developments: Global Market for Cloud Computing Services (In US$ Billion) for Years 2022, 2024, 2026, 2028 and 2030
  • AI Emerges as a Gamechanger in Data Center Construction. Here's How
  • Sustainability in Data Center Construction Takes the Spotlight
  • Sustainable Building Materials for Data Center Construction Grows in Prominence
  • Stringent Regulations Drive Up the Importance of Due Diligence in Data Center Construction
  • Applying LEED to Data Center Projects Becomes Mission Critical. Here's Why
  • Decision to Use Renewable Energy in Data Centers Begins at the Construction Stage
4. GLOBAL MARKET PERSPECTIVE
  • Table 1: World Data Center Construction Market Analysis of Annual Sales in US$ Million for Years 2015 through 2030
  • Table 2: World Recent Past, Current & Future Analysis for Data Center Construction by Geographic Region - USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa Markets - Independent Analysis of Annual Revenues in US$ Million for Years 2024 through 2030 and % CAGR
  • Table 3: World Historic Review for Data Center Construction by Geographic Region - USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa Markets - Independent Analysis of Annual Revenues in US$ Million for Years 2015 through 2023 and % CAGR
  • Table 4: World 15-Year Perspective for Data Center Construction by Geographic Region - Percentage Breakdown of Value Revenues for USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa Markets for Years 2015, 2025 & 2030
  • Table 5: World Recent Past, Current & Future Analysis for Tier 3 by Geographic Region - USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa Markets - Independent Analysis of Annual Revenues in US$ Million for Years 2024 through 2030 and % CAGR
  • Table 6: World Historic Review for Tier 3 by Geographic Region - USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa Markets - Independent Analysis of Annual Revenues in US$ Million for Years 2015 through 2023 and % CAGR
  • Table 7: World 15-Year Perspective for Tier 3 by Geographic Region - Percentage Breakdown of Value Revenues for USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa for Years 2015, 2025 & 2030
  • Table 8: World Recent Past, Current & Future Analysis for Tier 2 by Geographic Region - USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa Markets - Independent Analysis of Annual Revenues in US$ Million for Years 2024 through 2030 and % CAGR
  • Table 9: World Historic Review for Tier 2 by Geographic Region - USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa Markets - Independent Analysis of Annual Revenues in US$ Million for Years 2015 through 2023 and % CAGR
  • Table 10: World 15-Year Perspective for Tier 2 by Geographic Region - Percentage Breakdown of Value Revenues for USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa for Years 2015, 2025 & 2030
  • Table 11: World Recent Past, Current & Future Analysis for Other Tier Types by Geographic Region - USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa Markets - Independent Analysis of Annual Revenues in US$ Million for Years 2024 through 2030 and % CAGR
  • Table 12: World Historic Review for Other Tier Types by Geographic Region - USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa Markets - Independent Analysis of Annual Revenues in US$ Million for Years 2015 through 2023 and % CAGR
  • Table 13: World 15-Year Perspective for Other Tier Types by Geographic Region - Percentage Breakdown of Value Revenues for USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa for Years 2015, 2025 & 2030
  • Table 14: World Recent Past, Current & Future Analysis for IT Infrastructure by Geographic Region - USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa Markets - Independent Analysis of Annual Revenues in US$ Million for Years 2024 through 2030 and % CAGR
  • Table 15: World Historic Review for IT Infrastructure by Geographic Region - USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa Markets - Independent Analysis of Annual Revenues in US$ Million for Years 2015 through 2023 and % CAGR
  • Table 16: World 15-Year Perspective for IT Infrastructure by Geographic Region - Percentage Breakdown of Value Revenues for USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa for Years 2015, 2025 & 2030
  • Table 17: World Recent Past, Current & Future Analysis for Power Distribution & Cooling by Geographic Region - USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa Markets - Independent Analysis of Annual Revenues in US$ Million for Years 2024 through 2030 and % CAGR
  • Table 18: World Historic Review for Power Distribution & Cooling by Geographic Region - USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa Markets - Independent Analysis of Annual Revenues in US$ Million for Years 2015 through 2023 and % CAGR
  • Table 19: World 15-Year Perspective for Power Distribution & Cooling by Geographic Region - Percentage Breakdown of Value Revenues for USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa for Years 2015, 2025 & 2030
  • Table 20: World Recent Past, Current & Future Analysis for Other Infrastructure Types by Geographic Region - USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa Markets - Independent Analysis of Annual Revenues in US$ Million for Years 2024 through 2030 and % CAGR
  • Table 21: World Historic Review for Other Infrastructure Types by Geographic Region - USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa Markets - Independent Analysis of Annual Revenues in US$ Million for Years 2015 through 2023 and % CAGR
  • Table 22: World 15-Year Perspective for Other Infrastructure Types by Geographic Region - Percentage Breakdown of Value Revenues for USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa for Years 2015, 2025 & 2030
  • Table 23: World Recent Past, Current & Future Analysis for IT & Telecom by Geographic Region - USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa Markets - Independent Analysis of Annual Revenues in US$ Million for Years 2024 through 2030 and % CAGR
  • Table 24: World Historic Review for IT & Telecom by Geographic Region - USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa Markets - Independent Analysis of Annual Revenues in US$ Million for Years 2015 through 2023 and % CAGR
  • Table 25: World 15-Year Perspective for IT & Telecom by Geographic Region - Percentage Breakdown of Value Revenues for USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa for Years 2015, 2025 & 2030
  • Table 26: World Recent Past, Current & Future Analysis for BFSI by Geographic Region - USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa Markets - Independent Analysis of Annual Revenues in US$ Million for Years 2024 through 2030 and % CAGR
  • Table 27: World Historic Review for BFSI by Geographic Region - USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa Markets - Independent Analysis of Annual Revenues in US$ Million for Years 2015 through 2023 and % CAGR
  • Table 28: World 15-Year Perspective for BFSI by Geographic Region - Percentage Breakdown of Value Revenues for USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa for Years 2015, 2025 & 2030
  • Table 29: World Recent Past, Current & Future Analysis for Healthcare by Geographic Region - USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa Markets - Independent Analysis of Annual Revenues in US$ Million for Years 2024 through 2030 and % CAGR
  • Table 30: World Historic Review for Healthcare by Geographic Region - USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa Markets - Independent Analysis of Annual Revenues in US$ Million for Years 2015 through 2023 and % CAGR
  • Table 31: World 15-Year Perspective for Healthcare by Geographic Region - Percentage Breakdown of Value Revenues for USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa for Years 2015, 2025 & 2030
  • Table 32: World Recent Past, Current & Future Analysis for Government & Defense by Geographic Region - USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa Markets - Independent Analysis of Annual Revenues in US$ Million for Years 2024 through 2030 and % CAGR
  • Table 33: World Historic Review for Government & Defense by Geographic Region - USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa Markets - Independent Analysis of Annual Revenues in US$ Million for Years 2015 through 2023 and % CAGR
  • Table 34: World 15-Year Perspective for Government & Defense by Geographic Region - Percentage Breakdown of Value Revenues for USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa for Years 2015, 2025 & 2030
  • Table 35: World Recent Past, Current & Future Analysis for Energy by Geographic Region - USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa Markets - Independent Analysis of Annual Revenues in US$ Million for Years 2024 through 2030 and % CAGR
  • Table 36: World Historic Review for Energy by Geographic Region - USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa Markets - Independent Analysis of Annual Revenues in US$ Million for Years 2015 through 2023 and % CAGR
  • Table 37: World 15-Year Perspective for Energy by Geographic Region - Percentage Breakdown of Value Revenues for USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa for Years 2015, 2025 & 2030
  • Table 38: World Recent Past, Current & Future Analysis for Other End-Uses by Geographic Region - USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa Markets - Independent Analysis of Annual Revenues in US$ Million for Years 2024 through 2030 and % CAGR
  • Table 39: World Historic Review for Other End-Uses by Geographic Region - USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa Markets - Independent Analysis of Annual Revenues in US$ Million for Years 2015 through 2023 and % CAGR
  • Table 40: World 15-Year Perspective for Other End-Uses by Geographic Region - Percentage Breakdown of Value Revenues for USA, Canada, Japan, China, Europe, Asia-Pacific, Latin America, Middle East and Africa for Years 2015, 2025 & 2030
III. MARKET ANALYSIS
UNITED STATES
  • Data Center Construction Market Presence - Strong/Active/Niche/Trivial - Key Competitors in the United States for 2025 (E)
CANADA
JAPAN
  • Data Center Construction Market Presence - Strong/Active/Niche/Trivial - Key Competitors in Japan for 2025 (E)
CHINA
  • Data Center Construction Market Presence - Strong/Active/Niche/Trivial - Key Competitors in China for 2025 (E)
EUROPE
  • Data Center Construction Market Presence - Strong/Active/Niche/Trivial - Key Competitors in Europe for 2025 (E)
FRANCE
GERMANY
ITALY
UNITED KINGDOM
SPAIN
RUSSIA
REST OF EUROPE
ASIA-PACIFIC
  • Data Center Construction Market Presence - Strong/Active/Niche/Trivial - Key Competitors in Asia-Pacific for 2025 (E)
AUSTRALIA
INDIA
SOUTH KOREA
REST OF ASIA-PACIFIC
LATIN AMERICA
ARGENTINA
BRAZIL
MEXICO
REST OF LATIN AMERICA
MIDDLE EAST
IRAN
ISRAEL
SAUDI ARABIA
UNITED ARAB EMIRATES
REST OF MIDDLE EAST
AFRICA
IV. COMPETITION

Companies Mentioned (Partial List)

A selection of companies mentioned in this report includes, but is not limited to:

  • ABB Ltd.
  • Aecom
  • Ascenty
  • Cisco Systems, Inc.
  • Clayco, Inc.
  • Dell Inc.
  • DPR Construction
  • Fujitsu Ltd.
  • Hewlett Packard Enterprise Development LP
  • HITT Contracting, Inc.
  • Hoffman Construction
  • Holder Construction Group, LLC
  • HostDime Global Corp.
  • Huawei Technologies Co., Ltd.
  • IBM Corp.
  • M. A. Mortenson Company
  • Schneider Electric SE
  • STO Building Group
  • Turner Construction
  • Vertiv Group Corp.

Table Information