The romania power market size was valued at 25.29 gigawatt in 2025 and estimated to grow from 27.17 gigawatt in 2026 to reach 38.86 gigawatt by 2031, at a CAGR of 7.42% during the forecast period (2026-2031). This report is Segmented by Power Source (Thermal, Nuclear, and Renewables) and End-User (Utilities, Commercial and Industrial, and Residential). The Market Sizes and Forecasts are Provided in Terms of Installed Capacity (GW).

Romania Power Market Trends and Insights

EU Green Deal Decarbonisation Targets Drive Capacity Additions

Romania’s pledge to supply 38% of electricity from renewables by 2030 has reoriented national planning toward wind, solar, and hydropower build-out. Approval of a EUR 3 billion CfD program in November 2024 allocated 5 GW at winning strike prices of EUR 65/MWh for wind and EUR 51/MWh for solar, well below the 2024 day-ahead wholesale average. Utility-scale solar installations jumped by 2 GW in 2024 alone, illustrating how quickly projects move once grid links and land permits are secured. Wind growth lags due to longer environmental assessments, yet Dobrogea’s 7 m/s resource remains attractive for developers with seasoned local partners. The upcoming carbon border adjustment mechanism further encourages domestic manufacturers to switch to low-carbon electricity, reinforcing demand certainty for new plants.

Rising Corporate PPA Demand from Energy-Intensive Exporters

Romanian automotive, steel, and chemicals groups now favor multi-year PPAs to hedge OPCOM price swings and satisfy Scope 2 reporting under the Corporate Sustainability Reporting Directive. NextE’s 42.9 MW on-site solar deal signed in 2024 priced power near EUR 50/MWh, beating the prior year’s EUR 90-120/MWh wholesale range. This differential triggered fresh tenders in Timiș and Argeș and pushed local lenders to refine credit benchmarks for long-term offtakes. An EIB survey found 81% of firms rating energy costs a top competitiveness threat, with 57% spending on on-site efficiency upgrades and 90% on greenhouse-gas measures. As the PPA ban lifted in 2022, bankable offtakes became feasible, transferring volume risk away from utilities and into bilateral contracts.

High Upfront CAPEX & Permitting Lead-Times

Utility-scale PV typically clears permits within three years, yet wind projects average 6.5 years because multi-agency reviews include environment, heritage, and land-use approvals. Archaeological rules require digs within 500 m of ancient sites, impacting roughly 30% of planned Dobrogea wind locations. Developers also shoulder substation costs that can exceed EUR 50 million before grid access is guaranteed. ANRE’s proposal for capacity auctions adds further uncertainty, potentially pushing smaller independent power producers out of contention, given higher carrying costs.

Other drivers and restraints analyzed in the detailed report include:

  • EU-Funded Grid-Modernisation Grants Unlock Transmission Capacity
  • Newly-Approved Black Sea Offshore Wind Framework
  • Ageing Grid Causes Renewable Curtailment Risk

Segment Analysis

Renewables contributed 68.02% of 2025 capacity, and their 8.48% growth pace keeps the Romania power market size expansion aligned with EU emission goals. Hydropower alone held a 33.12% share, courtesy of Hidroelectrica’s 6.5 GW fleet that supports peak shaving and frequency response. Wind capacity reached 3 GW, with 2.5 GW more awarded in the CfD auction at EUR 65/MWh, pricing that underlines a maturing cost curve. Solar jumped past 5.3 GW after 2 GW was connected in 2024, helped by modules priced below USD 0.18/W and fast-track permits for projects under 10 MW. The Black Sea offshore framework could add 3-7 GW by 2035, giving Romania a fresh nucleus for high-factor generation and bolstering energy-security margins. Gas-fired capacity rises modestly as flexible CCGTs linked to Neptun Deep output replace retiring coal. Nuclear remains vital; Cernavoda Units 1-2 generate one-fifth of supply, while Units 3-4 plus the 462 MW Doicești SMR will anchor firm, low-carbon baseload later in the decade.

The shift reshapes asset economics, as capacity-weighted average LCOE for new projects reaches EUR 48/MWh for solar and EUR 56/MWh for onshore wind, both below 2024 wholesale prices. Curtailment risk tempers enthusiasm in congestion-prone southern counties, yet co-located storage can secure higher balancing fees. Accordingly, project sponsors aggregate PV with 4-hour batteries sized at 25% of nameplate capacity to capture arbitrage spreads.

Complete Report Scope:

  • By Power Source
    • Thermal (Coal, Natural Gas, Oil and Diesel)
    • Nuclear
    • Renewables (Solar, Wind, Hydro, Geothermal, Biomass & Waste, Tidal)
  • By End User
    • Utilities
    • Commercial and Industrial
    • Residential
  • By T&D Voltage Level (Qualitative Analysis only)
    • High-Voltage Transmission (Above 230 kV)
    • Sub-Transmission (69 to 161 kV)
    • Medium-Voltage Distribution (13.2 to 34.5 kV)
    • Low-Voltage Distribution (Up to 1 kV)

List of Companies Covered in this Report:

  • Romelectro SA
  • SGS SA
  • Enel (PPC) Romania
  • Siemens Gamesa Renewable Energy SA
  • Vestas Wind Systems AS
  • Electroalfa
  • Sunshine Solar Energy SRL
  • Danagroup.hu
  • NIVUS GmbH
  • CEZ Romania
  • Hidroelectrica SA
  • OMV Petrom SA
  • Nuclearelectrica SA
  • Transelectrica SA
  • Electrica SA
  • Engie Romania
  • E.ON Delgaz Grid
  • Tinmar Energy
  • Verbund (Black-Sea Wind)
  • PPC Renewables Romania

Additional Benefits:

  • The market estimate (ME) sheet in Excel format
  • 3 months of analyst support

Table of Contents

1 Introduction
1.1 Study Assumptions & Market Definition
1.2 Scope of the Study
2 Research Methodology3 Executive Summary
4 Market Landscape
4.1 Market Overview
4.2 Market Drivers
4.2.1 EU Green-Deal decarbonisation targets
4.2.2 Rising corporate PPA demand from energy-intensive exporters
4.2.3 EU-funded grid-modernisation grants (RRF, Modernisation Fund)
4.2.4 Newly-approved Black-Sea offshore-wind framework
4.2.5 Smart-meter roll-out enabling prosumers & VPPs
4.2.6 Cross-border interconnector upgrades to SEE hubs
4.3 Market Restraints
4.3.1 High upfront CAPEX & permitting lead-times
4.3.2 Ageing grid causes renewable curtailment risk
4.3.3 Wholesale-price caps undermine PPA bankability
4.3.4 Biodiversity pushback against on-shore wind repowering
4.4 Supply-Chain Analysis
4.5 Regulatory Landscape
4.6 Technological Outlook (Grid Digitalisation & Storage)
4.7 Porter's Five Forces
4.7.1 Bargaining Power of Suppliers
4.7.2 Bargaining Power of Buyers
4.7.3 Threat of New Entrants
4.7.4 Threat of Substitutes
4.7.5 Competitive Rivalry
4.8 PESTLE Analysis
5 Market Size & Growth Forecasts
5.1 By Power Source
5.1.1 Thermal (Coal, Natural Gas, Oil and Diesel)
5.1.2 Nuclear
5.1.3 Renewables (Solar, Wind, Hydro, Geothermal, Biomass & Waste, Tidal)
5.2 By End User
5.2.1 Utilities
5.2.2 Commercial and Industrial
5.2.3 Residential
5.3 By T&D Voltage Level (Qualitative Analysis only)
5.3.1 High-Voltage Transmission (Above 230 kV)
5.3.2 Sub-Transmission (69 to 161 kV)
5.3.3 Medium-Voltage Distribution (13.2 to 34.5 kV)
5.3.4 Low-Voltage Distribution (Up to 1 kV)
6 Competitive Landscape
6.1 Market Concentration
6.2 Strategic Moves (M&A, Partnerships, PPAs)
6.3 Market Share Analysis (Market Rank/Share for key companies)
6.4 Company Profiles (includes Global level Overview, Market level overview, Core Segments, Financials as available, Strategic Information, Products & Services, and Recent Developments)
6.4.1 Romelectro SA
6.4.2 SGS SA
6.4.3 Enel (PPC) Romania
6.4.4 Siemens Gamesa Renewable Energy SA
6.4.5 Vestas Wind Systems AS
6.4.6 Electroalfa
6.4.7 Sunshine Solar Energy SRL
6.4.8 Danagroup.hu
6.4.9 NIVUS GmbH
6.4.10 CEZ Romania
6.4.11 Hidroelectrica SA
6.4.12 OMV Petrom SA
6.4.13 Nuclearelectrica SA
6.4.14 Transelectrica SA
6.4.15 Electrica SA
6.4.16 Engie Romania
6.4.17 E.ON Delgaz Grid
6.4.18 Tinmar Energy
6.4.19 Verbund (Black-Sea Wind)
6.4.20 PPC Renewables Romania
7 Market Opportunities & Future Outlook
7.1 White-space & Unmet-Need Assessment

Companies Mentioned (Partial List)

A selection of companies mentioned in this report includes, but is not limited to:

  • Romelectro SA
  • SGS SA
  • Enel (PPC) Romania
  • Siemens Gamesa Renewable Energy SA
  • Vestas Wind Systems AS
  • Electroalfa
  • Sunshine Solar Energy SRL
  • Danagroup.hu
  • NIVUS GmbH
  • CEZ Romania
  • Hidroelectrica SA
  • OMV Petrom SA
  • Nuclearelectrica SA
  • Transelectrica SA
  • Electrica SA
  • Engie Romania
  • E.ON Delgaz Grid
  • Tinmar Energy
  • Verbund (Black-Sea Wind)
  • PPC Renewables Romania