+353-1-416-8900REST OF WORLD
+44-20-3973-8888REST OF WORLD
1-917-300-0470EAST COAST U.S
1-800-526-8630U.S. (TOLL FREE)
New

Nigeria Data Center Market - Investment Analysis & Growth Opportunities 2025-2030

  • PDF Icon

    Report

  • 99 Pages
  • May 2025
  • Region: Nigeria
  • Arizton
  • ID: 5714622
1h Free Analyst Time
1h Free Analyst Time

Speak directly to the analyst to clarify any post sales queries you may have.

The Nigeria Data Center Market was valued at USD 278 Million in 2024, and is projected to reach USD 671 Million by 2030, rising at a CAGR of 15.82%.

KEY HIGHLIGHTS

  • As of December 2024, the total core and shell power capacity of third-party data centers in Nigeria was approximately 65.8 MW. Additionally, around 327.8 MW is currently under construction or in the planned stages. Once all these data centers become operational within the next 4-5 years, the total power capacity is expected to increase fivefold.
  • The government is significantly contributing to the advancement of digital infrastructure throughout the nation. One of the initiatives is Nigeria's National Digital Economy Policy and Strategy (NDEPS 2020-2030), which aims to enhance the digital landscape of the country.
  • There has been a considerable shift from on-premises data centers to cloud and colocation data centers in Nigeria, which has been further accelerated over the last two years, owing to increased digitalization. Nigerian enterprises depend on managed service offerings than on standalone colocation services.
  • In the coming two to three years, significant investments in data centers are anticipated in Nigeria, driven by the entry of multiple operators in the Nigeria data center market. It is estimated that the total investment in this sector can cross the USD 2.94 billion mark from 2025 to 2030.

WHY SHOULD YOU BUY THIS RESEARCH?

  • Market size available in the investment, area, power capacity, and the Nigeria colocation market revenue.
  • An assessment of the data center investment in Nigeria by colocation, hyperscale, and enterprise operators.
  • Data center investments in the area (square feet) and power capacity (MW) across cities in the country.
  • A detailed study of the existing Nigeria data center market landscape, an in-depth market analysis, and insightful predictions about the Nigeria data center market size during the forecast period.
  • Snapshot of existing and upcoming third-party data center facilities in Nigeria
    • Facilities Covered (Existing): 16
    • Facilities Identified (Upcoming): 17
    • Coverage: 2 Cities
    • Existing vs. Upcoming (Data Center Area)
    • Existing vs. Upcoming (IT Load Capacity)
  • Data center colocation market in Nigeria
    • Colocation Market Revenue & Forecast (2021-2030)
    • Retail Colocation Pricing
  • The Nigeria data center landscape market investments are classified into IT, power, cooling, and general construction services with sizing and forecast.
  • A comprehensive analysis of the latest trends, growth rate, potential opportunities, growth restraints, and prospects for the industry.
  • Business overview and product offerings of prominent IT infrastructure providers, construction contractors, support infrastructure providers, and investors operating in the industry.
  • A transparent research methodology and the analysis of the demand and supply aspects of the market.

NIGERIA DATA CENTER MARKET VENDOR LANDSCAPE

  • Some of the leading colocation operators in the Nigeria data center market include Africa Data Centres, Open Access Data Centres, 21st Century Technologies, Nxtra by Airtel, Equinix (MainOne), Digital Realty, and Rack Centre. The possible new entrant in the Nigeria data center market is Kasi Cloud.
  • Several global colocation providers are entering the Nigeria data center market by forming strategic partnerships with local enterprises or acquiring local companies. For example, in 2022, Equinix entered the market by acquiring data center facilities from MainOne. Likewise, Digital Realty acquired the data center facilities of Medallion Data Centres to establish its market presence.
  • In March 2025, Open Access Data Centres announced its plan to develop a new data center in Lagos with a power capacity of around 24 MW. The data center will be developed in two stages, with the first phase of 12 MW likely to come online by 2026.
  • In December 2024, Huawei Technologies launched a local cloud service in Nigeria. This launch ensures data residency within Nigeria, thereby aligning with the data protection regulations and significantly reducing latency from over 80 milliseconds to approximately 15 milliseconds for local customers.
  • Telecom operators such as MTN, Airtel Africa PLC, and Globacom are the major telecom operators that have launched commercial 5G services across the country.

EXISTING VS. UPCOMING DATA CENTERS

  • Existing Facilities in the Region (Area and Power Capacity)
    • Lagos
    • Other Cities
  • List of Upcoming Facilities in the Region (Area and Power Capacity)
    • Lagos
    • Other Cities

IT Infrastructure Providers

  • Arista Networks
  • Broadcom
  • Dell Technologies
  • Hewlett Packard Enterprise
  • Huawei Technologies
  • IBM
  • Lenovo
  • NetApp

Data Center Construction Contractors & Sub-Contractors

  • Arup
  • BlueSun DC
  • Edarat Group
  • Interkel Group
  • GREA (Gateway Real Estate Africa)
  • Future-tech

Support Infrastructure Providers

  • ABB
  • Caterpillar
  • Cummins
  • Eaton
  • Envicool
  • KSTAR
  • Rehlko (Kohler)
  • Legrand
  • Rittal
  • Schneider Electric
  • STULZ
  • Vertiv

Data Center Investors

  • 21st Century Technologies
  • Africa Data Centres
  • Digital Realty
  • Equinix (MainOne)
  • MTN
  • Nxtra by Airtel
  • Open Access Data Centres
  • Rack Centre

New Entrants

  • Kasi Cloud

REPORT COVERAGE

This report analyses the Nigerian data center market share. It elaborately analyses the existing and upcoming facilities and investments in IT, electrical, mechanical infrastructure, general construction, and tier standards. It discusses market sizing and investment estimation for different segments. The segmentation includes:

The report includes the investment in the following areas:

  • IT Infrastructure
    • Server Infrastructure
    • Storage Infrastructure
    • Network Infrastructure
  • Electrical Infrastructure
    • UPS Systems
    • Generators
    • Transfer Switches & Switchgears
    • PDUs
    • Other Electrical Infrastructure
  • Mechanical Infrastructure
    • Cooling Systems
    • Rack Cabinets
    • Other Mechanical Infrastructure
  • Cooling Systems
    • CRAC and CRAH Units
    • Chillers Units
    • Cooling Towers, Condensers, and Dry Coolers
    • Other Cooling Units
  • General Construction
    • Core & Shell Development
    • Installation & Commissioning Services
    • Building & Engineering Design
    • Fire Detection & Suppression Systems
    • Physical Security
    • Data Center Infrastructure Management (DCIM)
  • Tier Standard
    • Tier I & Tier II
    • Tier III
    • Tier IV

KEY QUESTIONS ANSWERED

1. How big is the Nigeria data center market?
2. How much MW of power capacity will be added across Nigeria during 2025-2030?
3. What is the growth rate of the Nigeria data center market?
4. What factors are driving the Nigeria data center market?

Table of Contents

1. Existing & Upcoming Third-Party Data Centers in Nigeria
1.1. Historical Market Scenario
1.2. 16 Unique Data Center Properties
1.3. Data Center IT Load Capacity
1.4. Data Center White Floor Area Space
1.5. Existing Vs Upcoming Data Center Capacity by Cities
1.6. Cities Covered
1.6.1. Lagos
1.6.2. Other Cities
1.7. List of Upcoming Data Center Projects
2. Investment Opportunities in Nigeria
2.1. Microeconomic and Macroeconomic factors for Nigeria Market
2.2. Impact of the Ongoing Tariff War
2.3. Investment Opportunities in Nigeria
2.4. Digital Data in Nigeria
2.5. Investment by Area
2.6. Investment by Power Capacity
3. Data Center Colocation Market in Nigeria
3.1. Colocation Services Market in Nigeria
3.2. Colocation Pricing
3.3. Navigating Digital Landscape in Nigeria
3.4. Colocation Pricing (Quarter Rack, Half Rack, Full Rack) & Add-ons
4. Market Dynamics
4.1. Market Enablers
4.2. Market Trends
4.3. Market Restraints
5. Market Segmentation
5.1. IT Infrastructure: Market Size & Forecast
5.2. Electrical Infrastructure: Market Size & Forecast
5.3. Mechanical Infrastructure: Market Size & Forecast
5.4. General Construction Services: Market Size & Forecast
6. Tier Standards Investment
6.1. Tier I & II
6.2. Tier III
6.3. Tier IV
7. Key Market Participants
7.1. IT Infrastructure Providers
7.2. Construction Contractors & Sub-contractors
7.3. Support Infrastructure Providers
7.4. Data Center Investors
7.5. New Entrants
8. Appendix
8.1. Market Derivation
8.2. Site Selection Criteria
8.3. Quantitative Summary
8.4. List of Abbreviations
List of Exhibits
Exhibit 1 Third-Party Data Centers Snapshot
Exhibit 2 Third-Party Data Center Snapshot by Cities
Exhibit 3 Area Developed by Cities (Thousand Square Feet)
Exhibit 4 Power Capacity by Cities (Mw)
Exhibit 5 Data Center Market Size & Forecast by Investment ($ Million)
Exhibit 6 Data Center Market Size & Forecast by Area 2021-2030 (Thousand Square Feet)
Exhibit 7 Data Center Market Size & Forecast by Power Capacity 2021-2030 (Mw)
Exhibit 8 Data Center Colocation Service Revenue: Market Size & Forecast by 2021-2030 ($ Million)
Exhibit 9 Retail Colocation Pricing 2024
Exhibit 10 Market Size & Forecast by IT Infrastructure 2021-2030 ($ Million)
Exhibit 11 Market Size & Forecast by Electrical Infrastructure 2021-2030 ($ Million)
Exhibit 12 Market Size & Forecast by Mechanical Infrastructure 2021-2030 ($ Million)
Exhibit 13 Market Size & Forecast by Cooling Systems 2021-2030 ($ Million)
Exhibit 14 Market Size & Forecast by General Construction 2021-2030 ($ Million)
Exhibit 15 Market Size & Forecast by Tier Standards 2021-2030 ($ Million)
List of Tables
Table 1 List of Upcoming Data Center Projects
Table 2 Data Center Site Selection Criteria
Table 3 Overall Market Size & Forecast 2021-2030
Table 4 Market Size & Forecast by Infrastructure 2021-2030 ($ Million)
Table 5 Market Size & Forecast by IT Infrastructure 2021-2030 ($ Million)
Table 6 Market Size & Forecast by Electrical Infrastructure 2021-2030 ($ Million)
Table 7 Market Size & Forecast by Mechanical Infrastructure 2021-2030 ($ Million)
Table 8 Market Size & Forecast by Cooling Systems 2021-2030 ($ Million)
Table 9 Market Size & Forecast by General Construction 2021-2030 ($ Million)
Table 10 Market Size & Forecast by Tier Standards 2021-2030 ($ Million).

Companies Mentioned

  • Arista Networks
  • Broadcom
  • Dell Technologies
  • Hewlett Packard Enterprise
  • Huawei Technologies
  • IBM
  • Lenovo
  • NetApp
  • Arup
  • BlueSun DC
  • Edarat Group
  • Interkel Group
  • GREA (Gateway Real Estate Africa)
  • Future-tech
  • ABB
  • Caterpillar
  • Cummins
  • Eaton
  • Envicool
  • KSTAR
  • Rehlko (Kohler)
  • Legrand
  • Rittal
  • Schneider Electric
  • STULZ
  • Vertiv
  • 21st Century Technologies
  • Africa Data Centres
  • Digital Realty
  • Equinix (MainOne)
  • MTN
  • Nxtra by Airtel
  • Open Access Data Centres
  • Rack Centre
  • Kasi Cloud

Methodology


Our research comprises a mix of primary and secondary research. The secondary research sources that are typically referred to include, but are not limited to, company websites, annual reports, financial reports, company pipeline charts, broker reports, investor presentations and SEC filings, journals and conferences, internal proprietary databases, news articles, press releases, and webcasts specific to the companies operating in any given market.

Primary research involves email interactions with the industry participants across major geographies. The participants who typically take part in such a process include, but are not limited to, CEOs, VPs, business development managers, market intelligence managers, and national sales managers. We primarily rely on internal research work and internal databases that we have populated over the years. We cross-verify our secondary research findings with the primary respondents participating in the study.



 

Loading
LOADING...

Table Information