+353-1-416-8900REST OF WORLD
+44-20-3973-8888REST OF WORLD
1-917-300-0470EAST COAST U.S
1-800-526-8630U.S. (TOLL FREE)
New

Colombia Data Center Market - Investment Analysis & Growth Opportunities 2026-2031

  • PDF Icon

    Report

  • 106 Pages
  • March 2026
  • Region: Colombia
  • Arizton
  • ID: 5743987
1h Free Analyst Time
1h Free Analyst Time

Speak directly to the analyst to clarify any post sales queries you may have.

The Colombia Data Center Market was valued at USD 450 Million in 2025, and is projected to reach USD 1.44 Billion by 2031, rising at a CAGR of 21.46%.

COLOMBIA DATA CENTER MARKET - KEY HIGHLIGHTS

  • Colombia is the fourth largest economy in Latin America, playing an important role in the expansion of data centers across the region (after Brazil, Mexico, and Chile). The increasing demand for cloud computing services and data storage is expected to drive the construction of new data center facilities in the country.
  • Bogota is the top data center destination in the country. The government actively supports digital growth by implementing measures such as Trade Free Zones (FTZs), tax incentives, and simplified permit processes for data centers, creating a favorable environment for digital economy. There are 19 existing and 9 upcoming data centers in the city, as of September 2025.
  • Colombia plans to achieve carbon neutral by 2050, with hydroelectric sources responsible for almost 60% of electricity generation. The country has a diverse array of renewable energy sources, including wind, hydropower, biomass, geothermal, and solar energy. The country aims to produce 70% of energy through renewable sources by 2030
  • The Colombian government is accelerating AI adoption across infrastructure, education, and governance. In April 2024, it invested $12.6 billion in an AI data center in Bogotá to be operated by SENA.

WHY SHOULD YOU BUY THIS RESEARCH?

  • Market size available in the investment, area, power capacity, and Colombia colocation market revenue.
  • An assessment of the data center investment in Colombia by colocation, hyperscale, and enterprise operators.
  • Data center investments in the area (square feet) and power capacity (MW) across cities in the country.
  • A detailed study of the existing Colombia data center market landscape, an in-depth industry analysis, and insightful predictions about the Colombia data center market size during the forecast period.
  • Snapshot of existing and upcoming third-party data center facilities in Colombia
    • Facilities Covered (Existing): 25
    • Facilities Identified (Upcoming): 9
    • Coverage: 4+ Cities
    • Existing vs. Upcoming (Data Center Area)
    • Existing vs. Upcoming (IT Load Capacity)
  • Data center colocation market in Colombia
    • Colocation Market Revenue & Forecast (2022-2031)
    • Retail & Wholesale Colocation Revenue (2022-2031)
    • Retail & Wholesale Colocation Pricing
  • Colombia data center landscape market investments are classified into IT, power, cooling, and general construction services with sizing and forecast.
  • A comprehensive analysis of the latest trends, growth rate, potential opportunities, growth restraints, and prospects for the industry.
  • Business overview and product offerings of prominent IT infrastructure providers, construction contractors, support infrastructure providers, and investors operating in the industry.
  • A transparent research methodology and the analysis of the demand and supply aspect of the market.

COLOMBIA DATA CENTER MARKET VENDOR LANDSCAPE

  • In the current landscape of colocation investors, several established companies play a significant role. Notable players include ODATA (Aligned Data Centers), Equinix, Cirion Technologies, Claro, KIO Networks, DHAmericas among others.
  • The market has witnessed several new players emerge over the past few years. The notable entrants include Ascenty, Scala Data Centers, EdgeConnex, among others.
  • In October 2024, ODATA (Aligned Data Centers) announced its decision to invest $1.3 billion to build two data centers, BG02 and BG03, in Bogota. Out of which, the first facility, BG02 is expected to start operations by the end of 2026.
  • In February 2025, Colombia and the United Arab Emirates (UAE) agreed to build three major data centers in Santa Marta under the BioNube initiative. The project will cost over $80 million and include up to 30MW of energy capacity and support a sovereign cloud and advanced AI infrastructure.

EXISTING VS. UPCOMING DATA CENTERS

  • Existing Facilities in the region (Area and Power Capacity)
    • Bogota
    • Other Cities
  • List of Upcoming Facilities in the region (Area and Power Capacity)
    • Bogota
    • Other Cities

REPORT COVERAGE

This report analyses the Colombia data center market share. It elaboratively analyses the existing and upcoming facilities and investments in IT, electrical, mechanical infrastructure, cooling systems, general construction, and tier standards. It discusses market sizing and investment estimation for different segments. The segmentation includes:
  • IT Infrastructure
    • Server Infrastructure
    • Storage Infrastructure
    • Network Infrastructure
  • Electrical Infrastructure
    • UPS Systems
    • Generators
    • Transfer Switches & Switchgears
    • PDUs
    • Other Electrical Infrastructure
  • Mechanical Infrastructure
    • Cooling Systems
    • Rack Cabinets
    • Other Mechanical Infrastructure
  • Cooling Systems
    • CRAC and CRAH Units
    • Chiller Units
    • Cooling Towers, Condensers and Dry Coolers
    • Other Cooling Units
  • General Construction
    • Core & Shell Development
    • Installation & commissioning Services
    • Building & Engineering Design
    • Fire Detection & Suppression Systems
    • Physical Security
    • Data Center Infrastructure Management (DCIM)
  • Tier Standard
    • Tier I & Tier II
    • Tier III
    • Tier IV

TARGET AUDIENCE

  • Data center Real Estate Investment Trusts (REIT)
  • Data center Construction Contractors
  • Data center Infrastructure Providers
  • New Entrants
  • Consultants/Consultancies/Advisory Firms
  • Corporate and Governments Agencies

IT Infrastructure Providers

  • Arista Networks
  • Broadcom
  • Cisco
  • Dell Technologies
  • Hewlett Packard Enterprise
  • Huawei Technologies
  • IBM
  • Lenovo
  • NetApp
  • NVIDIA
  • Oracle
  • Pure Storage

Data Center Construction Contractors & Sub-Contractors

  • AECOM
  • Fluor Corporation
  • Quark
  • ZFB Group

Support Infrastructure Providers

  • ABB
  • Alfa Laval
  • Assa Abloy
  • Bosch Security & Safety Systems
  • Caterpillar
  • Cummins
  • Daikin Applied
  • Delta Electronics
  • Eaton
  • Generac Power Systems
  • Honeywell
  • Johnson Controls
  • Legrand
  • Mitsubishi Electric
  • Piller Power Systems
  • Panduit
  • Rittal
  • Schneider Electric
  • Siemens
  • STULZ
  • Vertiv

Data Center Investors

  • Claro
  • Cirion Technologies
  • Etix Everywhere
  • Edge Uno
  • Equinix
  • DHAmericas
  • GlobeNet International Corp
  • Gtd Colombia
  • HostDime
  • IPXON Networks
  • KIO Networks
  • ODATA (Aligned Data Centers)
  • Tecto Data Centers

New Entrants

  • Ascenty
  • EdgeConneX
  • Scala Data Centers

KEY QUESTIONS ANSWERED

1. How big is the Colombia data center market?
2. How much MW of power capacity will be added across Colombia in 2031?
3. What factors are driving the Colombia data center market?

Table of Contents

Chapter 1: Existing and Upcoming Third-Party Data Centers in Colombia
  • Data Center Snapshot
  • Data Center Snapshot by Cities
  • Existing and Upcoming Data Center Supply
  • List of Upcoming Data Center Projects in Colombia
Chapter 2: Investment Opportunities in Colombia
  • Microeconomic & Macroeconomic Factors for Colombia Market
  • Impact of AI in Data Center Industry in Colombia
  • Investment Opportunities in Colombia
  • Digital Data in Colombia
  • Market Investments by Area
  • Market Investments by Power Capacity
Chapter 3: Data Center Colocation Market in Colombia
  • Colocation Services Market in Colombia
  • Retail vs Wholesale Data Center Colocation
  • Industry Demand Share
  • Colocation Pricing (Quarter Rack, Half Rack, and Full Rack) and Addons
Chapter 4: Market Dynamics
  • Market Enablers
  • Market Trends
  • Market Restraints
Chapter 5: Market Segmentation
  • IT Infrastructure: Market Size & Forecast
  • Electrical Infrastructure: Market Size & Forecast
  • Mechanical Infrastructure: Market Size & Forecast
  • General Construction: Market Size & Forecast
Chapter 6: Tier Standards Investment
  • Tier I & II
  • Tier III
  • Tier IV
Chapter 7: Key Market Participants
  • IT Infrastructure Providers
  • Construction Contractors & Sub-Contractors
  • Support Infrastructure Providers
  • Data Center Investors
  • New Entrants
Chapter 8: Appendix
  • Market Derivation
  • Site Selection Criteria
  • Quantitative Summary

Companies Mentioned

  • Arista Networks
  • Broadcom
  • Cisco
  • Dell Technologies
  • Hewlett Packard Enterprise
  • Huawei Technologies
  • IBM
  • Lenovo
  • NetApp
  • NVIDIA
  • Oracle
  • Pure Storage
  • AECOM
  • Fluor Corporation
  • Quark
  • ZFB Group
  • ABB
  • Alfa Laval
  • Assa Abloy
  • Bosch Security & Safety Systems
  • Caterpillar
  • Cummins
  • Daikin Applied
  • Delta Electronics
  • Eaton
  • Generac Power Systems
  • Honeywell
  • Johnson Controls
  • Legrand
  • Mitsubishi Electric
  • Piller Power Systems
  • Panduit
  • Rittal
  • Schneider Electric
  • Siemens
  • STULZ
  • Vertiv
  • Claro
  • Cirion Technologies
  • Etix Everywhere
  • Edge Uno
  • Equinix
  • DHAmericas
  • GlobeNet International Corp
  • Gtd Colombia
  • HostDime
  • IPXON Networks
  • KIO Networks
  • ODATA (Aligned Data Centers)
  • Tecto Data Centers
  • Ascenty
  • EdgeConneX
  • Scala Data Centers

Methodology


Our research comprises a mix of primary and secondary research. The secondary research sources that are typically referred to include, but are not limited to, company websites, annual reports, financial reports, company pipeline charts, broker reports, investor presentations and SEC filings, journals and conferences, internal proprietary databases, news articles, press releases, and webcasts specific to the companies operating in any given market.

Primary research involves email interactions with the industry participants across major geographies. The participants who typically take part in such a process include, but are not limited to, CEOs, VPs, business development managers, market intelligence managers, and national sales managers. We primarily rely on internal research work and internal databases that we have populated over the years. We cross-verify our secondary research findings with the primary respondents participating in the study.



 

Loading
LOADING...

Table Information