Worldwide Data Center Construction Market - Focused Insights 2023-2028

  • PDF Icon

    Report

  • 122 Pages
  • May 2023
  • Region: Global
  • Arizton
  • ID: 5805849
UP TO OFF until Sep 30th 2026
1h Free Analyst Time
1h Free Analyst Time

Speak directly to the analyst to clarify any post sales queries you may have.

The data center market is witnessing growth in several new investments aided by the rapid expansion of cloud service providers, content providers, and on-premises migration to cloud/colocation facilities. The availability of tax incentives, free cooling, and renewable energy will likely attract more market investors. The increasing investment from colocation and hyperscale operators will likely continue during the forecast period.



The market considers a detailed scenario of the present data center construction market and its market dynamics for 2023−2028 worldwide. It covers a detailed overview of several market growth enablers, restraints, and trends. The report covers the market by facility type, electrical infrastructure, mechanical infrastructure, and general construction. It profiles and examines leading companies and other prominent players operating in the market.

KEY HIGHLIGHTS

  • Digitalization across businesses will continue to grow data center investments from colocation, cloud, internet, and telecommunication providers.
  • From a business perspective, the demand for data center space will grow among sectors, namely, BFSI, healthcare, technology, transportation, and heavy industries.
  • Many data center operators will equip their new data centers with efficient power solutions to reduce carbon emissions and the OPEX of their facilities.
  • Mega data center projects are facing difficult-to-get approvals for the use of water to cool down facilities. This prompts operators and vendors to collaborate and develop systems that can save up to 50% of water consumption in data centers.
  • The adoption of liquid immersion cooling will likely grow as organizations increasingly deploy artificial intelligence and machine learning workloads. Liquid immersion and direct-to-chip cooling are experiencing over 30% YOY market growth.
  • Submarine cable investments will improve in-land connectivity and reduce latency, boosting market growth worldwide.
  • The government’s interest in promoting data center investments through the land for development, reducing electricity tariffs, and renewable energy procurement will drive the market during the forecast period.
  • The market is impacted due to an increase in inflation rates across the world followed by supply chain disruptions which is leading to delays in the opening of data centers.

SEGMENTAL ANALYSIS

  • In 2022, over 31.5% of the overall power capacity addition in the worldwide data center market was carried out by hyper scalers such as Meta (Facebook), Google, Microsoft, and Amazon Web Services.
  • The adoption of lithium-ion batteries will significantly grow YoY during the forecast period. A continued price decline will continue to fuel battery adoption among data centers. The contribution from colocation providers will be high regarding lithium-ion UPS solutions.
  • < UNK> Increased carbon emission is one of the major challenges identified worldwide. To overcome the challenge, fuel cells are being installed to improve the efficiency of data centers. Fuel cells can be used to support significant loads for energy reliability, safety, stability, and reduced costs.
  • Several innovations in data centers have been implemented in recent years: for instance, switching from diesel to vegetable oil-based generators. Hydrotreated Vegetable Oil (HVO) is an oil that is synthesized from vegetable oils.
  • In data center projects, the investment in cooling systems is expected to be 15−20% of the overall cost, depending on the facility design and IT load. The selection of cooling systems is based on the location, i.e., whether the climatic conditions favor free cooling and have abundant water resources.
  • The importance of monitoring is growing with the adoption of intelligent real-time monitoring software with automation, and AI features that can predict maintenance requirements, component failures, and automatic switchovers for uninterrupted operations.
  • Supply chain constraints have increased the data center construction and procurement cost, averaging $2-$3 million per MW.

GEOGRAPHICAL ANALYSIS

  • The Americas region is among the world’s most mature data center markets. The North American region led the market in terms of investment, white floor addition, and power capacity addition.
  • The presence of data protection laws such as the implementation of GDPR, availability of free cooling solutions, district heating systems, availability of renewable energy, and others are among the major factors that will attract data center operators to invest in the European region.
  • The Nordic region is among the preferred regions in the European region by hyper scalers owing to the availability of free cooling solutions throughout the year and the availability of renewable energy sources.
  • Middle East & Africa (MEA) region is among the emerging data center markets, aided by increased internet & social media penetration, digitalization initiatives, migration from on-premises to cloud, colocation, and managed services.
  • The APAC region is among the world's most dynamic and fastest-growing data center markets. The region has several developed & established markets along with several emerging locations.
  • The APAC region is the most exciting market and will provide ample opportunities for support infrastructure providers and contractors.

Support Infrastructure Vendors

  • ABB
  • Caterpillar
  • Cummins
  • Delta Electronics
  • Eaton
  • Legrand
  • Rolls-Royce
  • Schneider Electric
  • STULZ
  • Vertiv
  • 3M
  • Airedale
  • Alfa Laval Asetek
  • Assa Abloy
  • Bloom Energy
  • Carrier
  • Condair
  • Cormant
  • Cyber Power Systems
  • Daikin Applied
  • Data Aire
  • Enlogic
  • FNT Software
  • Generac Power Systems
  • Green Revolution Cooling (GRC)
  • HITEC Power Protection
  • Honeywell
  • Johnson Controls
  • KOHLER
  • KyotoCooling
  • Mitsubishi Electric
  • Munters
  • Natron Energy
  • NetZoom
  • Nlyte Software
  • Panduit
  • Piller Power Systems
  • Rittal
  • Siemens
  • Trane
  • Tripp Lite
  • Yanmar (HIMOINSA) 
  • ZincFive.

Data Center Contractors:

  • AECOM
  • Arup
  • Corgan
  • DPR Construction
  • Fortis Construction
  • Holder Construction
  • Jacobs
  • Mercury
  • Red Engineering
  • Rogers-O’Brien Construction
  • Syska Hennessy Group
  • Turner Construction
  • Turner & Townsend
  • AlfaTech
  • Atkins
  • Aurecon
  • Basler & Hofmann
  • BlueScope Construction
  • Brasfield & Gorrie
  • CallisonRTKL
  • Cap Ingelec
  • Clark Construction Group
  • Climatec
  • Clune Construction
  • COWI
  • DC PRO Engineering
  • Dornan
  • Edarat Group
  • EMCOR Group
  • EYP MCF
  • Gensler
  • Fluor Corporation
  • Gilbane Building Company
  • HDR
  • HITT Contracting
  • Hoffman Construction
  • ISG
  • JE Dunn Construction
  • Kirby Group Engineering
  • kW Engineering
  • kW Mission Critical Engineering
  • Laing O’Rourke
  • Linesight
  • M+W Group (Exyte)
  • McLaren Construction Group
  • Morrison Hershfield
  • Mortenson
  • PM Group
  • Quark
  • Rosendin
  • Royal HaskoningDHV
  • Salute Mission Critical
  • Sheehan Nagle Hartray Architects
  • Skanska
  • Southland Industries
  • Sturgeon Electric Company
  • Structure Tone
  • Sweco
  • The Mulhern Group
  • The Walsh Group
  • The Weitz Company and TRINITY Group Construction.

Data Center Operators:

  • 21Vianet Group (VNET)
  • Amazon Web Services (AWS)
  • Apple
  • China Telecom
  • Colt Data Centre Services (Colt DCS)
  • Compass Datacenters
  • CyrusOne
  • Digital Realty
  • EdgeConneX (EQT Infrastructure)
  • Equinix
  • GDS Services
  • Global Switch
  • Google
  • Iron Mountain
  • Meta (Facebook)
  • Microsoft
  • NTT Global Data Centers
  • QTS Realty Trust
  • STACK Infrastructure
  • ST Telemedia Global Data Centres

Vantage Data Centers

  • 3data
  • Africa Data Centres
  • AirTrunk
  • Aligned
  • American Tower
  • AQ Compute
  • Aruba
  • AtlasEdge
  • atNorth
  • AT TOKYO
  • BDx (Big Data Exchange)
  • Bulk Infrastructure
  • Bridge Data Centres
  • CDC Data Centres
  • Chayora
  • China Mobile
  • Chindata
  • CloudHQ
  • Cologix
  • COPT Data Center Solutions
  • CtrlS Datacenters
  • Cyxtera Technologies
  • Data4
  • DataBank
  • DC BLOX
  • Element Critical
  • ePLDT
  • eStruxture Data Centers
  • fifteenfortyseven Critical Systems Realty (1547)
  • Flexential
  • Green Mountain
  • H5 Data Centers
  • HostDime
  • KDDI (Telehouse)
  • Keppel Data Centres
  • LG Uplus
  • maincubes one
  • MainOne (Equinix)
  • Milicom (Tigo)
  • NEXTDC
  • ODATA
  • Orange Business Services
  • Prime Data Centers
  • Princeton Digital Group (PDG)
  • Proximity Data Centres
  • Raxio Group
  • Rostelecom Data Centers
  • Sabey Data Centers
  • Scala Data Centers
  • Sify Technologies
  • Skybox Datacenters
  • Stream Data Centers
  • SUNeVision (iAdvantage)
  • Switch
  • T5 Data Centers
  • Tenglong Holdings Group
  • Teraco (Digital Realty)
  • TierPoint
  • Turkcell
  • Urbacon Data Centre Solutions
  • Wingu
  • Yondr and Yotta Infrastructure (Hiranandani Group).
  • New Entrants
  • AdaniConneX AUBix
  • Cloudoon
  • ClusterPower
  • Corscale Data Centers
  • Damac Data Centres (EDGNEX)
  • Data Center First
  • DHAmericas
  • Edge Centres
  • Evolution Data Centres
  • Global Technical Realty
  • Hickory
  • iMCritical
  • Infinity
  • Kasi Cloud
  • MettaDC
  • Open Access Data Centres (OADC)
  • PowerHouse Data Centers
  • Pure Data Centres Group
  • Quantum Loophole
  • Quantum Switch Tamasuk (QST)
  • Stratus DC Management
  • YCO Cloud
  • YTL Data Center
  • ZeroPoint DC.

Table of Contents


1. ABOUT2. ABOUT OUR DATA CENTER CAPABILITIES3. WHAT’S INCLUDED4. SEGMENTS INCLUDED5. RESEARCH METHODOLOGY6. MARKET AT GLANCE7. PREMIUM INSIGHTS
8. INVESTMENT OPPORTUNITIES
8.1. INVESTMENT: MARKET SIZE & FORECAST
8.2. AREA: MARKET SIZE & FORECAST
8.3. POWER CAPACITY: MARKET SIZE & FORECAST
9. MARKET DYNAMICS
9.1. MARKET OPPORTUNITIES & TRENDS
9.2. MARKET GROWTH ENABLERS
9.3. MARKET RESTRAINTS
9.4. SITE SELECTION CRITERIA
10. FACILITY TYPE SEGMENTATION
10.1. HYPERSCALE DATA CENTERS
10.2. COLOCATION DATA CENTERS
10.3. ENTERPRISE DATA CENTERS
11. INFRASTRUCTURE SEGMENTATION
11.1. ELECTRICAL INFRASTRUCTURE
11.2. MECHANICAL INFRASTRUCTURE
11.3. COOLING SYSTEMS
11.4. COOLING TECHNIQUES
11.5. GENERAL CONSTRUCTION

12. TIER STANDARDS SEGMENTATION13. GEOGRAPHY SEGMENTATION
14. NORTH AMERICA
14.1. MARKET SNAPSHOT & KEY HIGHLIGHTS
14.2. DATA CENTER CONSTRUCTION MARKET BY INVESTMENT
14.3. DATA CENTER CONSTRUCTION MARKET BY AREA
14.4. DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY
14.5. DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE
15. LATIN AMERICA
15.1. MARKET SNAPSHOT & KEY HIGHLIGHTS
15.2. DATA CENTER CONSTRUCTION MARKET BY INVESTMENT
15.3. DATA CENTER CONSTRUCTION MARKET BY AREA
15.4. DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY
15.5. DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE
16. WESTERN EUROPE
16.1. MARKET SNAPSHOT & KEY HIGHLIGHTS
16.2. DATA CENTER CONSTRUCTION MARKET BY INVESTMENT
16.3. DATA CENTER CONSTRUCTION MARKET BY AREA
16.4. DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY
16.5. DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE
17. NORDICS
17.1. MARKET SNAPSHOT & KEY HIGHLIGHTS
17.2. DATA CENTER CONSTRUCTION MARKET BY INVESTMENT
17.3. DATA CENTER CONSTRUCTION MARKET BY AREA
17.4. DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY
17.5. DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE
18. CENTRAL & EASTERN EUROPE
18.1. MARKET SNAPSHOT & KEY HIGHLIGHTS
18.2. DATA CENTER CONSTRUCTION MARKET BY INVESTMENT
18.3. DATA CENTER CONSTRUCTION MARKET BY AREA
18.4. DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY
18.5. DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE
19. MIDDLE EAST
19.1. MARKET SNAPSHOT & KEY HIGHLIGHTS
19.2. DATA CENTER CONSTRUCTION MARKET BY INVESTMENT
19.3. DATA CENTER CONSTRUCTION MARKET BY AREA
19.4. DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY
19.5. DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE
20. AFRICA
20.1. MARKET SNAPSHOT & KEY HIGHLIGHTS
20.2. DATA CENTER CONSTRUCTION MARKET BY INVESTMENT
20.3. DATA CENTER CONSTRUCTION MARKET BY AREA
20.4. DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY
20.5. DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE
21. APAC
21.1. MARKET SNAPSHOT & KEY HIGHLIGHTS
21.2. DATA CENTER CONSTRUCTION MARKET BY INVESTMENT
21.3. DATA CENTER CONSTRUCTION MARKET BY AREA
21.4. DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY
21.5. DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE
22. SOUTHEAST ASIA
22.1. MARKET SNAPSHOT & KEY HIGHLIGHTS
22.2. DATA CENTER CONSTRUCTION MARKET BY INVESTMENT
22.3. DATA CENTER CONSTRUCTION MARKET BY AREA
22.4. DATA CENTER CONSTRUCTION MARKET BY POWER CAPACITY
22.5. DATA CENTER CONSTRUCTION MARKET BY INFRASTRUCTURE
23. MARKET PARTICIPANTS
23.1. SUPPORT INFRASTRUCTURE PROVIDERS
23.2. DATA CENTER CONTRACTORS & SUBCONTRACTORS
23.3. DATA CENTER INVESTORS
23.4. NEW ENTRANTS
24. QUANTITATIVE SUMMARY
25. APPENDIX
25.1. ABBREVIATIONS
25.2. DEFINITIONS
25.3. SEGMENTAL COVERAGE

Companies Mentioned

  • 3M
  • 3data
  • ABB
  • AQ Compute
  • AT TOKYO
  • Africa Data Centres
  • AirTrunk
  • Airedale
  • Alfa Laval Asetek
  • AlfaTech
  • Aligned
  • Amazon Web Services (AWS)
  • American Tower
  • Apple
  • Aruba
  • Arup
  • Assa Abloy
  • Atkins
  • AtlasEdge
  • Aurecon
  • BDx (Big Data Exchange)
  • Basler & Hofmann
  • Bloom Energy
  • BlueScope Construction
  • Brasfield & Gorrie
  • Bridge Data Centres
  • Bulk Infrastructure
  • CDC Data Centres
  • COPT Data Center Solutions
  • COWI
  • CallisonRTKL
  • Cap Ingelec
  • Caterpillar
  • Chayora
  • China Mobile
  • China Telecom
  • Chindata
  • Clark Construction Group
  • Climatec
  • CloudHQ
  • Cloudoon
  • Clune Construction
  • ClusterPower
  • Cologix
  • Colt Data Centre Services (Colt DCS)
  • Compass Datacenters
  • Condair
  • Corgan
  • Cormant
  • Corscale Data Centers
  • CtrlS Datacenters
  • Cummins
  • Cyber Power Systems
  • CyrusOne
  • Cyxtera Technologies
  • DC BLOX
  • DC PRO Engineering
  • DHAmericas
  • DPR Construction
  • Daikin Applied
  • Damac Data Centres (EDGNEX)
  • Data Aire
  • Data Center First
  • Data4
  • DataBank
  • Delta Electronics
  • Digital Realty
  • Dornan
  • EMCOR Group
  • EYP MCF
  • Eaton
  • Edarat Group
  • Edge Centres
  • EdgeConneX (EQT Infrastructure)
  • Element Critical
  • Enlogic
  • Equinix
  • Evolution Data Centres
  • FNT Software
  • Flexential
  • Fluor Corporation
  • Fortis Construction
  • GDS Services
  • Generac Power Systems
  • Gensler
  • Gilbane Building Company
  • Global Switch
  • Global Technical Realty
  • Google
  • Green Mountain
  • Green Revolution Cooling (GRC)
  • H5 Data Centers
  • HDR
  • HITEC Power Protection
  • HITT Contracting
  • Hickory
  • Hoffman Construction
  • Holder Construction
  • Honeywell
  • HostDime
  • ISG
  • Infinity
  • Iron Mountain
  • JE Dunn Construction
  • Jacobs
  • Johnson Controls
  • KDDI (Telehouse)
  • KOHLER
  • Kasi Cloud
  • Keppel Data Centres
  • Kirby Group Engineering
  • KyotoCooling
  • LG Uplus
  • Laing O’Rourke
  • Legrand
  • Linesight
  • M+W Group (Exyte)
  • MainOne (Equinix)
  • McLaren Construction Group
  • Mercury
  • Meta (Facebook)
  • MettaDC
  • Microsoft
  • Milicom (Tigo)
  • Mitsubishi Electric
  • Morrison Hershfield
  • Mortenson
  • Munters
  • NEXTDC
  • NTT Global Data Centers
  • Natron Energy
  • NetZoom
  • Nlyte Software
  • ODATA
  • Open Access Data Centres (OADC)
  • Orange Business Services
  • PM Group
  • Panduit
  • Piller Power Systems
  • PowerHouse Data Centers
  • Prime Data Centers
  • Princeton Digital Group (PDG)
  • Proximity Data Centres
  • Pure Data Centres Group
  • QTS Realty Trust
  • Quantum Loophole
  • Quantum Switch Tamasuk (QST)
  • Quark
  • Raxio Group
  • Red Engineering
  • Rittal
  • Rogers-O’Brien Construction
  • Rolls-Royce
  • Rosendin
  • Rostelecom Data Centers
  • Royal HaskoningDHV
  • ST Telemedia Global Data Centres
  • STACK Infrastructure
  • STULZ
  • SUNeVision (iAdvantage)
  • Sabey Data Centers
  • Salute Mission Critical
  • Scala Data Centers
  • Schneider Electric
  • Sheehan Nagle Hartray Architects
  • Siemens
  • Sify Technologies
  • Skanska
  • Skybox Datacenters
  • Southland Industries
  • Stratus DC Management
  • Stream Data Centers
  • Structure Tone
  • Sturgeon Electric Company
  • Sweco
  • Switch
  • Syska Hennessy Group
  • T5 Data Centers
  • Tenglong Holdings Group
  • Teraco (Digital Realty)
  • The Mulhern Group
  • The Walsh Group
  • The Weitz Company and TRINITY Group Construction.
  • TierPoint
  • Trane
  • Tripp Lite
  • Turkcell
  • Turner & Townsend
  • Turner Construction
  • Urbacon Data Centre Solutions
  • Vantage Data Centers
  • Vertiv
  • Wingu
  • YCO Cloud
  • YTL Data Center
  • Yanmar (HIMOINSA)
  • Yondr and Yotta Infrastructure (Hiranandani Group).
  • ZeroPoint DC."
  • atNorth
  • ePLDT
  • eStruxture Data Centers
  • fifteenfortyseven Critical Systems Realty (1547)
  • iMCritical
  • kW Engineering
  • kW Mission Critical Engineering
  • maincubes one
  • 21Vianet Group (VNET)
  • AECOM
  • AdaniConneX AUBix
  • ZincFive.

Methodology


Our research comprises a mix of primary and secondary research. The secondary research sources that are typically referred to include, but are not limited to, company websites, annual reports, financial reports, company pipeline charts, broker reports, investor presentations and SEC filings, journals and conferences, internal proprietary databases, news articles, press releases, and webcasts specific to the companies operating in any given market.

Primary research involves email interactions with the industry participants across major geographies. The participants who typically take part in such a process include, but are not limited to, CEOs, VPs, business development managers, market intelligence managers, and national sales managers. We primarily rely on internal research work and internal databases that we have populated over the years. We cross-verify our secondary research findings with the primary respondents participating in the study.



 

Loading
LOADING...

Table Information