+353-1-416-8900REST OF WORLD
+44-20-3973-8888REST OF WORLD
1-917-300-0470EAST COAST U.S
1-800-526-8630U.S. (TOLL FREE)

South America Data Center Construction - Market Share Analysis, Industry Trends & Statistics, Growth Forecasts (2026-2031)

  • PDF Icon

    Report

  • 120 Pages
  • August 2026
  • Mordor Intelligence
  • ID: 5937631
The South America data center construction market size in 2026 is estimated at USD 5.72 billion, growing from 2025 value of USD 5.24 billion with 2031 projections showing USD 8.88 billion, growing at 9.18% CAGR over 2026-2031. This report is segmented by Tier Type (Tier 1 and 2, Tier 3 and Tier 4), Data Center Type(Colocation, Self-Built Hyperscalers (CSPs), Enterprise, and Edge), and Infrastructure (Electrical Infrastructure, Mechanical Infrastructure). The Market Forecasts are Provided in Terms of Value (USD).

South America Data Center Construction Market Trends and Insights

Cloud-first Enterprise Digitalization Wave

Enterprise adoption of hybrid cloud is reshaping construction priorities as organizations exit legacy on-premises environments. Secondary cities such as Fortaleza have emerged as strategic hubs because sixteen submarine cables deliver global connectivity that rivals major metros. Colombia illustrates the trend, with internet penetration surpassing two-thirds of the population and e-commerce surging, which increases demand for carrier-neutral facilities. Brazil-based Patria committed USD 1 billion to a new platform targeting these enterprise workloads, signalling the scale of opportunity. Data sovereignty rules across the region further accelerate colocation uptake as enterprises seek compliant environments. Providers able to deliver hybrid cloud gateways and robust compliance frameworks are gaining share in the South America data center construction market.

Hyperscale and Colocation Capex Build-out Acceleration

Cloud majors have announced more than USD 8 billion in new sites through 2030, compressing traditional build schedules to as little as 18 months. AWS’s USD 4 billion Chile region and USD 1.8 billion Brazil expansion, along with V.tal’s USD 1 billion Fortaleza campus, are catalyzing regional supply chains. Scala Data Centers’ USD 50 billion AI City proposal targeting 4.7 GW exemplifies superscale ambition. Modular designs and prefabricated power rooms are now mainstream to meet hyperscale timelines. Smaller operators are consolidating or partnering with construction specialists to remain competitive in the South America data center construction market.

Escalating Power and Real-estate Costs

Land suitable for hyperscale campuses in São Paulo now commands premium valuations, pushing developers toward secondary zones such as Campinas that offer larger parcels and improved power headroom. Brazil sources 85% of its electricity from renewables, yet drought cycles reduce hydropower output and raise electricity prices, affecting facility operating costs. Public concern about grid stress has grown as citizens fear data centers may jeopardize the residential supply. Developers respond with on-site solar, battery storage, and power purchase agreements that shape construction blueprints in the South America data center construction market.

Other drivers and restraints analyzed in the detailed report include:
  • AI / GPU-dense Workloads Driving High-density Designs
  • Government “Neutral Host” Tax Incentives in Brazil and Chile
  • Long Lead-time for Utility Grid Interconnects

Segment Analysis

Tier 3 sites captured 54.12% of overall revenue in 2025, reflecting enterprise preference for resilient yet cost-balanced designs. Within this category, banks and digital-first retailers account for the majority of spend on redundant power trains and multi-path fibre. The South America data center construction market size for Tier 3 facilities is projected to expand steadily as cloud regions seek adjacent interconnection space. Tier 4 capacity, while smaller today, shows an 11.24% CAGR through 2031 as AI model training, government public-cloud mandates, and fintech platforms demand 99.995% uptime. The South America data center construction market share associated with Tier 4 builds is therefore positioned to rise, intensifying competition for contractors able to deliver concurrent maintainability and fault tolerance.

Higher tiers require dual utility feeds, active-active power architectures, and stringent certification audits that lengthen commissioning cycles. Contractors specialising in complex mechanical, electrical, and plumbing systems thus command price premiums. HostDime’s ISO 27701 achievement in Brazil illustrates how compliance certifications intersect with tiering decisions

Colocation retained 55.63% of 2025 revenue as enterprises sought scalable alternatives to on-premises servers while maintaining network diversity and regulatory compliance. Carrier-neutral sites in major metros recorded near-full occupancy, pushing new builds toward suburbs and secondary cities. Simultaneously, self-built hyperscale sites register a 11.76% CAGR to 2031, elevating the South America data center construction market size for proprietary campuses. AWS, Microsoft, and Google expand footprints to support cloud regions and edge nodes tuned for sub-1 ms latency critical to gaming and fintech transactions.

Hyperscalers deploy repeatable design templates that compress schedule risk and simplify vendor qualification, leading to bulk procurement of switchgear, generators, and prefabricated modules. This standardisation cascades through local supply chains, incentivising parts manufacturers to align with global specifications. Colocation operators respond with ecosystem-rich campuses offering cross-connect fabrics and cloud on-ramps to differentiate in the South America data center construction market.

Complete Report Scope:

  • By Tier Type
    • Tier 1 and 2
      • Tier 3
      • Tier 4
    • By Data Center Type
      • Colocation
      • Self-build Hyperscalers (CSPs)
      • Enterprise and Edge
    • By Infrastructure
      • By Electrical Infrastructure
        • Power Distribution Solution
        • Power Backup Solutions
      • By Mechanical Infrastructure
        • Cooling Systems
        • Racks and Cabinets
        • Servers and Storage
        • Other Mechanical Infrastructure
      • General Construction
      • Service - Design and Consulting, Integration, Support and Maintenance

List of Companies Covered in this Report:

  • AECOM
  • Turner Construction Company
  • Jacobs Solutions Inc.
  • DPR Construction
  • Fluor Corporation
  • Constructora Andrade Gutierrez
  • Sonda Ingeniería e Implementación
  • Mercury Engineering
  • Hensel Phelps
  • Gilbane Building Company
  • McCarthy Building Companies
  • Balfour Beatty US
  • Rider Levett Bucknall
  • Fonseca Mercadante Constructor
  • GSI Ingenieria & Construcción
  • Quark Datacenter Solutions
  • ACECO TI
  • Whiting-Turner Contracting Company
  • Synergy Engenharia
  • Constructora Sudamericana

Additional Benefits:

  • The market estimate (ME) sheet in Excel format
  • 3 months of analyst support

Table of Contents

1 INTRODUCTION
1.1 Study Assumptions and Market Definition
1.2 Scope of the Study
2 RESEARCH METHODOLOGY3 EXECUTIVE SUMMARY
4 MARKET LANDSCAPE
4.1 Market Overview
4.2 Market Drivers
4.2.1 Cloud-first enterprise digitalization wave
4.2.2 Hyperscale and colocation capex build-out acceleration
4.2.3 AI / GPU-dense workloads driving high-density designs
4.2.4 Government neutral host tax incentives in Brazil and Chile
4.2.5 Green financing access for Tier III+ energy-efficient builds
4.2.6 Sub-1 ms latency demand from fintech and gaming hubs
4.3 Market Restraints
4.3.1 Escalating power and real-estate costs
4.3.2 Long lead-time for utility grid interconnects
4.3.3 Skilled labor shortages for complex MEP installations
4.3.4 Water-stress regulations limiting evaporative cooling adoption
4.4 Supply-Chain Analysis
4.5 Regulatory Landscape
4.6 Technological Outlook
4.7 Porter's Five Forces Analysis
4.7.1 Bargaining Power of Suppliers
4.7.2 Bargaining Power of Consumers
4.7.3 Threat of New Entrants
4.7.4 Threat of Substitutes
4.7.5 Intensity of Competitive Rivalry
4.8 Key Data Center Statistics
4.8.1 Exhaustive Data Center Operators in South America(in MW)
4.8.2 List of Major Upcoming Data Center Projects in South America (2025-2030)
4.8.3 CAPEX and OPEX For South AmericaData Center Construction
4.8.4 Data Center Power Capacity Absorption In MW, Selected Cities, South America, 2023 and 2024
4.9 Artificial Intelligence (AI) Inclusion in Data Center Construction in South America
4.10 Regulatory and Compliance Framework
5 MARKET SIZE AND GROWTH FORECASTS (VALUE)
5.1 By Tier Type
5.1.1 Tier 1 and 2
5.1.1.1 Tier 3
5.1.1.2 Tier 4
5.1.2 By Data Center Type
5.1.2.1 Colocation
5.1.2.2 Self-build Hyperscalers (CSPs)
5.1.2.3 Enterprise and Edge
5.1.3 By Infrastructure
5.1.3.1 By Electrical Infrastructure
5.1.3.1.1 Power Distribution Solution
5.1.3.1.2 Power Backup Solutions
5.1.3.2 By Mechanical Infrastructure
5.1.3.2.1 Cooling Systems
5.1.3.2.2 Racks and Cabinets
5.1.3.2.3 Servers and Storage
5.1.3.2.4 Other Mechanical Infrastructure
5.1.3.3 General Construction
5.1.3.4 Service - Design and Consulting, Integration, Support and Maintenance
6 COMPETITIVE LANDSCAPE
6.1 Market Concentration
6.2 Strategic Moves
6.3 Market Share Analysis
6.4 Data Center Infrastructure Investment Based on Megawatt (MW) Capacity, 2024 vs 2030
6.5 Data Center Construction Landscape (Key Vendors Listings)
6.6 Company Profiles (includes Global level Overview, Market level overview, Core Segments, Financials as available, Strategic Information, Market Rank/Share for key companies, Products and Services, Recent Developments)
6.6.1 AECOM
6.6.2 Turner Construction Company
6.6.3 Jacobs Solutions Inc.
6.6.4 DPR Construction
6.6.5 Fluor Corporation
6.6.6 Constructora Andrade Gutierrez
6.6.7 Sonda Ingeniería e Implementación
6.6.8 Mercury Engineering
6.6.9 Hensel Phelps
6.6.10 Gilbane Building Company
6.6.11 McCarthy Building Companies
6.6.12 Balfour Beatty US
6.6.13 Rider Levett Bucknall
6.6.14 Fonseca Mercadante Constructor
6.6.15 GSI Ingenieria & Construcción
6.6.16 Quark Datacenter Solutions
6.6.17 ACECO TI
6.6.18 Whiting-Turner Contracting Company
6.6.19 Synergy Engenharia
6.6.20 Constructora Sudamericana
7 MARKET OPPORTUNITIES AND FUTURE OUTLOOK
7.1 White-space and Unmet-need Assessment

Companies Mentioned (Partial List)

A selection of companies mentioned in this report includes, but is not limited to:

  • AECOM
  • Turner Construction Company
  • Jacobs Solutions Inc.
  • DPR Construction
  • Fluor Corporation
  • Constructora Andrade Gutierrez
  • Sonda Ingeniería e Implementación
  • Mercury Engineering
  • Hensel Phelps
  • Gilbane Building Company
  • McCarthy Building Companies
  • Balfour Beatty US
  • Rider Levett Bucknall
  • Fonseca Mercadante Constructor
  • GSI Ingenieria & Construcción
  • Quark Datacenter Solutions
  • ACECO TI
  • Whiting-Turner Contracting Company
  • Synergy Engenharia
  • Constructora Sudamericana