Data Center Construction Market By Construction Type: Global Opportunity Analysis And Industry Forecast, 2024-2032

  • PDF Icon

    Report

  • 250 Pages
  • June 2024
  • Region: Global
  • Allied Market Research
  • ID: 5994094
UP TO OFF until Jun 30th 2025
The data center construction market was valued at $212.6 billion in 2023 and is projected to reach $416.4 billion by 2032, growing at a CAGR of 7.4% from 2024 to 2032.

Data center construction refers to the building of infrastructure that houses computer systems, its servers, and other associated components such as networking devices and storage systems. The role of data center facilities is to store and manage large volumes of data, along with offering support to web hosting, cloud computing, and enterprise IT operations.

With rapid transformation toward automation and digitalization, enormous amounts of data are being generated currently. This boosts the requirement for effective data storage and management, thereby driving the growth of the data center construction market. In addition, the adoption of cloud services is compelling the construction of new data centers to support the service providers. With rising concerns pertaining to sustainability, the trend of green construction is gaining significance in the market. This involves the usage of renewable energy sources and cutting-edge cooling solutions during construction. Moreover, the obtainment of green building certifications such as Leadership in Energy and Environmental Design (LEED) is becoming a standard in several regions.

However, the expense involved with the construction of data centers is substantially high. This limits the expansion of the market, particularly in the developing regions. Furthermore, compliance with the rigorous regulations implemented for data center construction is an intricate and time-consuming process, which constrains market development. For instance, approvals for data centers in India lack a single window clearance mechanism as they require the applicants to visit different departments for various permissions.

Segment Review

The data center construction market is segmented into construction type, tier, data center size, industry vertical, and region. On the basis of construction type, the market is divided into general construction, electrical design, and mechanical design. As per tier, it is classified into tier 1, tier 2, tier 3, and tier 4. Depending on data center size, it is categorized into small data center, medium data center, and large data center. According to industry vertical, it is segmented into BFSI, IT & telecommunications, healthcare, government, manufacturing, and others. Region wise, it is analyzed across North America, Europe, Asia-Pacific, and LAMEA.

Key Findings

On the basis of construction type, the general construction segment accounted for a high market share in 2023.

As per tier, the tier 3 segment is growing at the highest CAGR during the forecast period.

Depending on data center size, the large data center segment is expected to account for the highest CAGR by 2032.

According to industry vertical, the IT & telecommunications segment was the highest shareholder in 2023.

Region wise, North America was the highest revenue generator in 2023.

Competition Analysis

The leading players operating in the global data center construction market include Cisco Systems Inc., IBM Corporation, Oracle Corporation, ABB Ltd., Hitachi Ltd., Equinix, Inc., Schneider Electric, Huawei Technologies Co., Ltd., Fujitsu, and Hewlett Packard Enterprise. These major players have adopted various key development strategies such as business expansion, new product launches, and partnerships, to strengthen their foothold in the competitive market.

Additional benefits you will get with this purchase are:

  • Quarterly Update and* (only available with a corporate license, on listed price)
  • 5 additional Company Profile of client Choice pre- or Post-purchase, as a free update.
  • Free Upcoming Version on the Purchase of Five and Enterprise User License.
  • 16 analyst hours of support* (post-purchase, if you find additional data requirements upon review of the report, you may receive support amounting to 16 analyst hours to solve questions, and post-sale queries)
  • 15% Free Customization* (in case the scope or segment of the report does not match your requirements, 15% is equivalent to 3 working days of free work, applicable once)
  • Free data Pack on the Five and Enterprise User License. (Excel version of the report)
  • Free Updated report if the report is 6-12 months old or older.
  • 24-hour priority response*
  • Free Industry updates and white papers.

Possible Customization with this report (with additional cost and timeline, please talk to the sales executive to know more)

  • End user preferences and pain points
  • Industry life cycle assessment, by region
  • Investment Opportunities
  • Product Benchmarking / Product specification and applications
  • Product Life Cycles
  • Scenario Analysis & Growth Trend Comparison
  • Technology Trend Analysis
  • Go To Market Strategy
  • Market share analysis of players by products/segments
  • New Product Development/ Product Matrix of Key Players
  • Pain Point Analysis
  • Regulatory Guidelines
  • Strategic Recommendations
  • Additional company profiles with specific to client's interest
  • Additional country or region analysis- market size and forecast
  • Brands Share Analysis
  • Criss-cross segment analysis- market size and forecast
  • Expanded list for Company Profiles
  • Historic market data
  • Market share analysis of players at global/region/country level
  • SWOT Analysis

Key Market Segments

By Construction Type

  • General Construction
  • Electrical Design
  • Mechanical Design

By Tier

  • Tier 1
  • Tier 2
  • Tier 3
  • Tier 4

By Data Center Size

  • Small Data Center
  • Medium Data Center
  • large Data Center

By Industry Vertical

  • BFSI
  • IT and Telecommunications
  • Healthcare
  • Government
  • Manufacturing
  • Others

By Region

  • North America
  • U.S.
  • Canada
  • Mexico
  • Europe
  • France
  • Germany
  • Italy
  • Spain
  • UK
  • Rest of Europe
  • Asia-Pacific
  • China
  • Japan
  • India
  • South Korea
  • Australia
  • Rest of Asia-Pacific
  • LAMEA
  • Latin America
  • Middle East
  • Africa
Key Market Players
  • Cisco Systems Inc.
  • IBM Corporation
  • Oracle Corporation
  • ABB Ltd.
  • Hitachi Ltd.
  • Equinix, Inc.
  • Schneider Electric
  • Huawei Technologies Co., Ltd.
  • Fujitsu
  • Hewlett Packard Enterprise

 

Please note:

  • Online Access price format is valid for 60 days access. Printing is not enabled.
  • PDF Single and Enterprise price formats enable printing.

 

Table of Contents

CHAPTER 1: INTRODUCTION
1.1. Report Description
1.2. Key Market Segments
1.3. Key Benefits
1.4. Research Methodology
1.4.1. Primary Research
1.4.2. Secondary Research
1.4.3. Analyst Tools and Models
CHAPTER 2: EXECUTIVE SUMMARY
2.1. CXO Perspective
CHAPTER 3: MARKET LANDSCAPE
3.1. Market Definition and Scope
3.2. Key Findings
3.2.1. Top Investment Pockets
3.2.2. Top Winning Strategies
3.3. Porter's Five Forces Analysis
3.3.1. Bargaining Power of Suppliers
3.3.2. Threat of New Entrants
3.3.3. Threat of Substitutes
3.3.4. Competitive Rivalry
3.3.5. Bargaining Power among Buyers
3.4. Market Dynamics
3.4.1. Drivers
3.4.2. Restraints
3.4.3. Opportunities
CHAPTER 4: DATA CENTER CONSTRUCTION MARKET, BY CONSTRUCTION TYPE
4.1. Market Overview
4.1.1 Market Size and Forecast, By Construction Type
4.2. General Construction
4.2.1. Key Market Trends, Growth Factors and Opportunities
4.2.2. Market Size and Forecast, By Region
4.2.3. Market Share Analysis, By Country
4.3. Electrical Design
4.3.1. Key Market Trends, Growth Factors and Opportunities
4.3.2. Market Size and Forecast, By Region
4.3.3. Market Share Analysis, By Country
4.4. Mechanical Design
4.4.1. Key Market Trends, Growth Factors and Opportunities
4.4.2. Market Size and Forecast, By Region
4.4.3. Market Share Analysis, By Country
CHAPTER 5: DATA CENTER CONSTRUCTION MARKET, BY TIER
5.1. Market Overview
5.1.1 Market Size and Forecast, By Tier
5.2. Tier 1
5.2.1. Key Market Trends, Growth Factors and Opportunities
5.2.2. Market Size and Forecast, By Region
5.2.3. Market Share Analysis, By Country
5.3. Tier 2
5.3.1. Key Market Trends, Growth Factors and Opportunities
5.3.2. Market Size and Forecast, By Region
5.3.3. Market Share Analysis, By Country
5.4. Tier 3
5.4.1. Key Market Trends, Growth Factors and Opportunities
5.4.2. Market Size and Forecast, By Region
5.4.3. Market Share Analysis, By Country
5.5. Tier 4
5.5.1. Key Market Trends, Growth Factors and Opportunities
5.5.2. Market Size and Forecast, By Region
5.5.3. Market Share Analysis, By Country
CHAPTER 6: DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER SIZE
6.1. Market Overview
6.1.1 Market Size and Forecast, By Data Center Size
6.2. Small Data Center
6.2.1. Key Market Trends, Growth Factors and Opportunities
6.2.2. Market Size and Forecast, By Region
6.2.3. Market Share Analysis, By Country
6.3. Medium Data Center
6.3.1. Key Market Trends, Growth Factors and Opportunities
6.3.2. Market Size and Forecast, By Region
6.3.3. Market Share Analysis, By Country
6.4. Large Data Center
6.4.1. Key Market Trends, Growth Factors and Opportunities
6.4.2. Market Size and Forecast, By Region
6.4.3. Market Share Analysis, By Country
CHAPTER 7: DATA CENTER CONSTRUCTION MARKET, BY INDUSTRY VERTICAL
7.1. Market Overview
7.1.1 Market Size and Forecast, By Industry Vertical
7.2. BFSI
7.2.1. Key Market Trends, Growth Factors and Opportunities
7.2.2. Market Size and Forecast, By Region
7.2.3. Market Share Analysis, By Country
7.3. IT And Telecommunications
7.3.1. Key Market Trends, Growth Factors and Opportunities
7.3.2. Market Size and Forecast, By Region
7.3.3. Market Share Analysis, By Country
7.4. Healthcare
7.4.1. Key Market Trends, Growth Factors and Opportunities
7.4.2. Market Size and Forecast, By Region
7.4.3. Market Share Analysis, By Country
7.5. Government
7.5.1. Key Market Trends, Growth Factors and Opportunities
7.5.2. Market Size and Forecast, By Region
7.5.3. Market Share Analysis, By Country
7.6. Manufacturing
7.6.1. Key Market Trends, Growth Factors and Opportunities
7.6.2. Market Size and Forecast, By Region
7.6.3. Market Share Analysis, By Country
7.7. Others
7.7.1. Key Market Trends, Growth Factors and Opportunities
7.7.2. Market Size and Forecast, By Region
7.7.3. Market Share Analysis, By Country
CHAPTER 8: DATA CENTER CONSTRUCTION MARKET, BY REGION
8.1. Market Overview
8.1.1 Market Size and Forecast, By Region
8.2. North America
8.2.1. Key Market Trends and Opportunities
8.2.2. Market Size and Forecast, By Construction Type
8.2.3. Market Size and Forecast, By Tier
8.2.4. Market Size and Forecast, By Data Center Size
8.2.5. Market Size and Forecast, By Industry Vertical
8.2.6. Market Size and Forecast, By Country
8.2.7. U.S. Data Center Construction Market
8.2.7.1. Market Size and Forecast, By Construction Type
8.2.7.2. Market Size and Forecast, By Tier
8.2.7.3. Market Size and Forecast, By Data Center Size
8.2.7.4. Market Size and Forecast, By Industry Vertical
8.2.8. Canada Data Center Construction Market
8.2.8.1. Market Size and Forecast, By Construction Type
8.2.8.2. Market Size and Forecast, By Tier
8.2.8.3. Market Size and Forecast, By Data Center Size
8.2.8.4. Market Size and Forecast, By Industry Vertical
8.2.9. Mexico Data Center Construction Market
8.2.9.1. Market Size and Forecast, By Construction Type
8.2.9.2. Market Size and Forecast, By Tier
8.2.9.3. Market Size and Forecast, By Data Center Size
8.2.9.4. Market Size and Forecast, By Industry Vertical
8.3. Europe
8.3.1. Key Market Trends and Opportunities
8.3.2. Market Size and Forecast, By Construction Type
8.3.3. Market Size and Forecast, By Tier
8.3.4. Market Size and Forecast, By Data Center Size
8.3.5. Market Size and Forecast, By Industry Vertical
8.3.6. Market Size and Forecast, By Country
8.3.7. France Data Center Construction Market
8.3.7.1. Market Size and Forecast, By Construction Type
8.3.7.2. Market Size and Forecast, By Tier
8.3.7.3. Market Size and Forecast, By Data Center Size
8.3.7.4. Market Size and Forecast, By Industry Vertical
8.3.8. Germany Data Center Construction Market
8.3.8.1. Market Size and Forecast, By Construction Type
8.3.8.2. Market Size and Forecast, By Tier
8.3.8.3. Market Size and Forecast, By Data Center Size
8.3.8.4. Market Size and Forecast, By Industry Vertical
8.3.9. Italy Data Center Construction Market
8.3.9.1. Market Size and Forecast, By Construction Type
8.3.9.2. Market Size and Forecast, By Tier
8.3.9.3. Market Size and Forecast, By Data Center Size
8.3.9.4. Market Size and Forecast, By Industry Vertical
8.3.10. Spain Data Center Construction Market
8.3.10.1. Market Size and Forecast, By Construction Type
8.3.10.2. Market Size and Forecast, By Tier
8.3.10.3. Market Size and Forecast, By Data Center Size
8.3.10.4. Market Size and Forecast, By Industry Vertical
8.3.11. UK Data Center Construction Market
8.3.11.1. Market Size and Forecast, By Construction Type
8.3.11.2. Market Size and Forecast, By Tier
8.3.11.3. Market Size and Forecast, By Data Center Size
8.3.11.4. Market Size and Forecast, By Industry Vertical
8.3.12. Rest of Europe Data Center Construction Market
8.3.12.1. Market Size and Forecast, By Construction Type
8.3.12.2. Market Size and Forecast, By Tier
8.3.12.3. Market Size and Forecast, By Data Center Size
8.3.12.4. Market Size and Forecast, By Industry Vertical
8.4. Asia-Pacific
8.4.1. Key Market Trends and Opportunities
8.4.2. Market Size and Forecast, By Construction Type
8.4.3. Market Size and Forecast, By Tier
8.4.4. Market Size and Forecast, By Data Center Size
8.4.5. Market Size and Forecast, By Industry Vertical
8.4.6. Market Size and Forecast, By Country
8.4.7. China Data Center Construction Market
8.4.7.1. Market Size and Forecast, By Construction Type
8.4.7.2. Market Size and Forecast, By Tier
8.4.7.3. Market Size and Forecast, By Data Center Size
8.4.7.4. Market Size and Forecast, By Industry Vertical
8.4.8. Japan Data Center Construction Market
8.4.8.1. Market Size and Forecast, By Construction Type
8.4.8.2. Market Size and Forecast, By Tier
8.4.8.3. Market Size and Forecast, By Data Center Size
8.4.8.4. Market Size and Forecast, By Industry Vertical
8.4.9. India Data Center Construction Market
8.4.9.1. Market Size and Forecast, By Construction Type
8.4.9.2. Market Size and Forecast, By Tier
8.4.9.3. Market Size and Forecast, By Data Center Size
8.4.9.4. Market Size and Forecast, By Industry Vertical
8.4.10. South Korea Data Center Construction Market
8.4.10.1. Market Size and Forecast, By Construction Type
8.4.10.2. Market Size and Forecast, By Tier
8.4.10.3. Market Size and Forecast, By Data Center Size
8.4.10.4. Market Size and Forecast, By Industry Vertical
8.4.11. Australia Data Center Construction Market
8.4.11.1. Market Size and Forecast, By Construction Type
8.4.11.2. Market Size and Forecast, By Tier
8.4.11.3. Market Size and Forecast, By Data Center Size
8.4.11.4. Market Size and Forecast, By Industry Vertical
8.4.12. Rest of Asia-Pacific Data Center Construction Market
8.4.12.1. Market Size and Forecast, By Construction Type
8.4.12.2. Market Size and Forecast, By Tier
8.4.12.3. Market Size and Forecast, By Data Center Size
8.4.12.4. Market Size and Forecast, By Industry Vertical
8.5. LAMEA
8.5.1. Key Market Trends and Opportunities
8.5.2. Market Size and Forecast, By Construction Type
8.5.3. Market Size and Forecast, By Tier
8.5.4. Market Size and Forecast, By Data Center Size
8.5.5. Market Size and Forecast, By Industry Vertical
8.5.6. Market Size and Forecast, By Country
8.5.7. Latin America Data Center Construction Market
8.5.7.1. Market Size and Forecast, By Construction Type
8.5.7.2. Market Size and Forecast, By Tier
8.5.7.3. Market Size and Forecast, By Data Center Size
8.5.7.4. Market Size and Forecast, By Industry Vertical
8.5.8. Middle East Data Center Construction Market
8.5.8.1. Market Size and Forecast, By Construction Type
8.5.8.2. Market Size and Forecast, By Tier
8.5.8.3. Market Size and Forecast, By Data Center Size
8.5.8.4. Market Size and Forecast, By Industry Vertical
8.5.9. Africa Data Center Construction Market
8.5.9.1. Market Size and Forecast, By Construction Type
8.5.9.2. Market Size and Forecast, By Tier
8.5.9.3. Market Size and Forecast, By Data Center Size
8.5.9.4. Market Size and Forecast, By Industry Vertical
CHAPTER 9: COMPETITIVE LANDSCAPE
9.1. Introduction
9.2. Top Winning Strategies
9.3. Product Mapping of Top 10 Player
9.4. Competitive Dashboard
9.5. Competitive Heatmap
9.6. Top Player Positioning, 2023
CHAPTER 10: COMPANY PROFILES
10.1. Cisco Systems Inc.
10.1.1. Company Overview
10.1.2. Key Executives
10.1.3. Company Snapshot
10.1.4. Operating Business Segments
10.1.5. Product Portfolio
10.1.6. Business Performance
10.1.7. Key Strategic Moves and Developments
10.2. IBM Corporation
10.2.1. Company Overview
10.2.2. Key Executives
10.2.3. Company Snapshot
10.2.4. Operating Business Segments
10.2.5. Product Portfolio
10.2.6. Business Performance
10.2.7. Key Strategic Moves and Developments
10.3. Oracle Corporation
10.3.1. Company Overview
10.3.2. Key Executives
10.3.3. Company Snapshot
10.3.4. Operating Business Segments
10.3.5. Product Portfolio
10.3.6. Business Performance
10.3.7. Key Strategic Moves and Developments
10.4. ABB Ltd.
10.4.1. Company Overview
10.4.2. Key Executives
10.4.3. Company Snapshot
10.4.4. Operating Business Segments
10.4.5. Product Portfolio
10.4.6. Business Performance
10.4.7. Key Strategic Moves and Developments
10.5. Hitachi Ltd.
10.5.1. Company Overview
10.5.2. Key Executives
10.5.3. Company Snapshot
10.5.4. Operating Business Segments
10.5.5. Product Portfolio
10.5.6. Business Performance
10.5.7. Key Strategic Moves and Developments
10.6. Equinix, Inc.
10.6.1. Company Overview
10.6.2. Key Executives
10.6.3. Company Snapshot
10.6.4. Operating Business Segments
10.6.5. Product Portfolio
10.6.6. Business Performance
10.6.7. Key Strategic Moves and Developments
10.7. Schneider Electric
10.7.1. Company Overview
10.7.2. Key Executives
10.7.3. Company Snapshot
10.7.4. Operating Business Segments
10.7.5. Product Portfolio
10.7.6. Business Performance
10.7.7. Key Strategic Moves and Developments
10.8. Huawei Technologies Co., Ltd.
10.8.1. Company Overview
10.8.2. Key Executives
10.8.3. Company Snapshot
10.8.4. Operating Business Segments
10.8.5. Product Portfolio
10.8.6. Business Performance
10.8.7. Key Strategic Moves and Developments
10.9. Fujitsu
10.9.1. Company Overview
10.9.2. Key Executives
10.9.3. Company Snapshot
10.9.4. Operating Business Segments
10.9.5. Product Portfolio
10.9.6. Business Performance
10.9.7. Key Strategic Moves and Developments
10.10. Hewlett Packard Enterprise
10.10.1. Company Overview
10.10.2. Key Executives
10.10.3. Company Snapshot
10.10.4. Operating Business Segments
10.10.5. Product Portfolio
10.10.6. Business Performance
10.10.7. Key Strategic Moves and Developments
LIST OF TABLES
Table 1. Global Data Center Construction Market, by Construction Type, 2024 - 2032 ($Billion)
Table 2. Data Center Construction Market for General Construction, by Region, 2024 - 2032 ($Billion)
Table 3. Data Center Construction Market for Electrical Design, by Region, 2024 - 2032 ($Billion)
Table 4. Data Center Construction Market for Mechanical Design, by Region, 2024 - 2032 ($Billion)
Table 5. Global Data Center Construction Market, by Tier, 2024 - 2032 ($Billion)
Table 6. Data Center Construction Market for Tier 1, by Region, 2024 - 2032 ($Billion)
Table 7. Data Center Construction Market for Tier 2, by Region, 2024 - 2032 ($Billion)
Table 8. Data Center Construction Market for Tier 3, by Region, 2024 - 2032 ($Billion)
Table 9. Data Center Construction Market for Tier 4, by Region, 2024 - 2032 ($Billion)
Table 10. Global Data Center Construction Market, by Data Center Size, 2024 - 2032 ($Billion)
Table 11. Data Center Construction Market for Small Data Center, by Region, 2024 - 2032 ($Billion)
Table 12. Data Center Construction Market for Medium Data Center, by Region, 2024 - 2032 ($Billion)
Table 13. Data Center Construction Market for Large Data Center, by Region, 2024 - 2032 ($Billion)
Table 14. Global Data Center Construction Market, by Industry Vertical, 2024 - 2032 ($Billion)
Table 15. Data Center Construction Market for Bfsi, by Region, 2024 - 2032 ($Billion)
Table 16. Data Center Construction Market for IT and Telecommunications, by Region, 2024 - 2032 ($Billion)
Table 17. Data Center Construction Market for Healthcare, by Region, 2024 - 2032 ($Billion)
Table 18. Data Center Construction Market for Government, by Region, 2024 - 2032 ($Billion)
Table 19. Data Center Construction Market for Manufacturing, by Region, 2024 - 2032 ($Billion)
Table 20. Data Center Construction Market for Others, by Region, 2024 - 2032 ($Billion)
Table 21. Data Center Construction Market, by Region, 2024 - 2032 ($Billion)
Table 22. North America Data Center Construction, by Country, 2024 - 2032 ($Billion)
Table 23. North America Data Center Construction, by Construction Type, 2024 - 2032 ($Billion)
Table 24. North America Data Center Construction, by Tier, 2024 - 2032 ($Billion)
Table 25. North America Data Center Construction, by Data Center Size, 2024 - 2032 ($Billion)
Table 26. North America Data Center Construction, by Industry Vertical, 2024 - 2032 ($Billion)
Table 27. U.S. Data Center Construction, by Construction Type, 2024 - 2032 ($Billion)
Table 28. U.S. Data Center Construction, by Tier, 2024 - 2032 ($Billion)
Table 29. U.S. Data Center Construction, by Data Center Size, 2024 - 2032 ($Billion)
Table 30. U.S. Data Center Construction, by Industry Vertical, 2024 - 2032 ($Billion)
Table 31. Canada Data Center Construction, by Construction Type, 2024 - 2032 ($Billion)
Table 32. Canada Data Center Construction, by Tier, 2024 - 2032 ($Billion)
Table 33. Canada Data Center Construction, by Data Center Size, 2024 - 2032 ($Billion)
Table 34. Canada Data Center Construction, by Industry Vertical, 2024 - 2032 ($Billion)
Table 35. Mexico Data Center Construction, by Construction Type, 2024 - 2032 ($Billion)
Table 36. Mexico Data Center Construction, by Tier, 2024 - 2032 ($Billion)
Table 37. Mexico Data Center Construction, by Data Center Size, 2024 - 2032 ($Billion)
Table 38. Mexico Data Center Construction, by Industry Vertical, 2024 - 2032 ($Billion)
Table 39. Europe Data Center Construction, by Country, 2024 - 2032 ($Billion)
Table 40. Europe Data Center Construction, by Construction Type, 2024 - 2032 ($Billion)
Table 41. Europe Data Center Construction, by Tier, 2024 - 2032 ($Billion)
Table 42. Europe Data Center Construction, by Data Center Size, 2024 - 2032 ($Billion)
Table 43. Europe Data Center Construction, by Industry Vertical, 2024 - 2032 ($Billion)
Table 44. France Data Center Construction, by Construction Type, 2024 - 2032 ($Billion)
Table 45. France Data Center Construction, by Tier, 2024 - 2032 ($Billion)
Table 46. France Data Center Construction, by Data Center Size, 2024 - 2032 ($Billion)
Table 47. France Data Center Construction, by Industry Vertical, 2024 - 2032 ($Billion)
Table 48. Germany Data Center Construction, by Construction Type, 2024 - 2032 ($Billion)
Table 49. Germany Data Center Construction, by Tier, 2024 - 2032 ($Billion)
Table 50. Germany Data Center Construction, by Data Center Size, 2024 - 2032 ($Billion)
Table 51. Germany Data Center Construction, by Industry Vertical, 2024 - 2032 ($Billion)
Table 52. Italy Data Center Construction, by Construction Type, 2024 - 2032 ($Billion)
Table 53. Italy Data Center Construction, by Tier, 2024 - 2032 ($Billion)
Table 54. Italy Data Center Construction, by Data Center Size, 2024 - 2032 ($Billion)
Table 55. Italy Data Center Construction, by Industry Vertical, 2024 - 2032 ($Billion)
Table 56. Spain Data Center Construction, by Construction Type, 2024 - 2032 ($Billion)
Table 57. Spain Data Center Construction, by Tier, 2024 - 2032 ($Billion)
Table 58. Spain Data Center Construction, by Data Center Size, 2024 - 2032 ($Billion)
Table 59. Spain Data Center Construction, by Industry Vertical, 2024 - 2032 ($Billion)
Table 60. UK Data Center Construction, by Construction Type, 2024 - 2032 ($Billion)
Table 61. UK Data Center Construction, by Tier, 2024 - 2032 ($Billion)
Table 62. UK Data Center Construction, by Data Center Size, 2024 - 2032 ($Billion)
Table 63. UK Data Center Construction, by Industry Vertical, 2024 - 2032 ($Billion)
Table 64. Rest of Europe Data Center Construction, by Construction Type, 2024 - 2032 ($Billion)
Table 65. Rest of Europe Data Center Construction, by Tier, 2024 - 2032 ($Billion)
Table 66. Rest of Europe Data Center Construction, by Data Center Size, 2024 - 2032 ($Billion)
Table 67. Rest of Europe Data Center Construction, by Industry Vertical, 2024 - 2032 ($Billion)
Table 68. Asia-Pacific Data Center Construction, by Country, 2024 - 2032 ($Billion)
Table 69. Asia-Pacific Data Center Construction, by Construction Type, 2024 - 2032 ($Billion)
Table 70. Asia-Pacific Data Center Construction, by Tier, 2024 - 2032 ($Billion)
Table 71. Asia-Pacific Data Center Construction, by Data Center Size, 2024 - 2032 ($Billion)
Table 72. Asia-Pacific Data Center Construction, by Industry Vertical, 2024 - 2032 ($Billion)
Table 73. China Data Center Construction, by Construction Type, 2024 - 2032 ($Billion)
Table 74. China Data Center Construction, by Tier, 2024 - 2032 ($Billion)
Table 75. China Data Center Construction, by Data Center Size, 2024 - 2032 ($Billion)
Table 76. China Data Center Construction, by Industry Vertical, 2024 - 2032 ($Billion)
Table 77. Japan Data Center Construction, by Construction Type, 2024 - 2032 ($Billion)
Table 78. Japan Data Center Construction, by Tier, 2024 - 2032 ($Billion)
Table 79. Japan Data Center Construction, by Data Center Size, 2024 - 2032 ($Billion)
Table 80. Japan Data Center Construction, by Industry Vertical, 2024 - 2032 ($Billion)
Table 81. India Data Center Construction, by Construction Type, 2024 - 2032 ($Billion)
Table 82. India Data Center Construction, by Tier, 2024 - 2032 ($Billion)
Table 83. India Data Center Construction, by Data Center Size, 2024 - 2032 ($Billion)
Table 84. India Data Center Construction, by Industry Vertical, 2024 - 2032 ($Billion)
Table 85. South Korea Data Center Construction, by Construction Type, 2024 - 2032 ($Billion)
Table 86. South Korea Data Center Construction, by Tier, 2024 - 2032 ($Billion)
Table 87. South Korea Data Center Construction, by Data Center Size, 2024 - 2032 ($Billion)
Table 88. South Korea Data Center Construction, by Industry Vertical, 2024 - 2032 ($Billion)
Table 89. Australia Data Center Construction, by Construction Type, 2024 - 2032 ($Billion)
Table 90. Australia Data Center Construction, by Tier, 2024 - 2032 ($Billion)
Table 91. Australia Data Center Construction, by Data Center Size, 2024 - 2032 ($Billion)
Table 92. Australia Data Center Construction, by Industry Vertical, 2024 - 2032 ($Billion)
Table 93. Rest of Asia-Pacific Data Center Construction, by Construction Type, 2024 - 2032 ($Billion)
Table 94. Rest of Asia-Pacific Data Center Construction, by Tier, 2024 - 2032 ($Billion)
Table 95. Rest of Asia-Pacific Data Center Construction, by Data Center Size, 2024 - 2032 ($Billion)
Table 96. Rest of Asia-Pacific Data Center Construction, by Industry Vertical, 2024 - 2032 ($Billion)
Table 97. LAMEA Data Center Construction, by Country, 2024 - 2032 ($Billion)
Table 98. LAMEA Data Center Construction, by Construction Type, 2024 - 2032 ($Billion)
Table 99. LAMEA Data Center Construction, by Tier, 2024 - 2032 ($Billion)
Table 100. LAMEA Data Center Construction, by Data Center Size, 2024 - 2032 ($Billion)
Table 101. LAMEA Data Center Construction, by Industry Vertical, 2024 - 2032 ($Billion)
Table 102. Latin America Data Center Construction, by Construction Type, 2024 - 2032 ($Billion)
Table 103. Latin America Data Center Construction, by Tier, 2024 - 2032 ($Billion)
Table 104. Latin America Data Center Construction, by Data Center Size, 2024 - 2032 ($Billion)
Table 105. Latin America Data Center Construction, by Industry Vertical, 2024 - 2032 ($Billion)
Table 106. Middle East Data Center Construction, by Construction Type, 2024 - 2032 ($Billion)
Table 107. Middle East Data Center Construction, by Tier, 2024 - 2032 ($Billion)
Table 108. Middle East Data Center Construction, by Data Center Size, 2024 - 2032 ($Billion)
Table 109. Middle East Data Center Construction, by Industry Vertical, 2024 - 2032 ($Billion)
Table 110. Africa Data Center Construction, by Construction Type, 2024 - 2032 ($Billion)
Table 111. Africa Data Center Construction, by Tier, 2024 - 2032 ($Billion)
Table 112. Africa Data Center Construction, by Data Center Size, 2024 - 2032 ($Billion)
Table 113. Africa Data Center Construction, by Industry Vertical, 2024 - 2032 ($Billion)
Table 114. Cisco Systems Inc.: Key Executives
Table 115. Cisco Systems Inc.: Company Snapshot
Table 116. Cisco Systems Inc.: Operating Segments
Table 117. Cisco Systems Inc.: Product Portfolio
Table 118. Cisco Systems Inc.: Key Strategic Moves and Developments
Table 119. IBM Corporation: Key Executives
Table 120. IBM Corporation: Company Snapshot
Table 121. IBM Corporation: Operating Segments
Table 122. IBM Corporation: Product Portfolio
Table 123. IBM Corporation: Key Strategic Moves and Developments
Table 124. Oracle Corporation: Key Executives
Table 125. Oracle Corporation: Company Snapshot
Table 126. Oracle Corporation: Operating Segments
Table 127. Oracle Corporation: Product Portfolio
Table 128. Oracle Corporation: Key Strategic Moves and Developments
Table 129. ABB Ltd.: Key Executives
Table 130. ABB Ltd.: Company Snapshot
Table 131. ABB Ltd.: Operating Segments
Table 132. ABB Ltd.: Product Portfolio
Table 133. ABB Ltd.: Key Strategic Moves and Developments
Table 134. Hitachi Ltd.: Key Executives
Table 135. Hitachi Ltd.: Company Snapshot
Table 136. Hitachi Ltd.: Operating Segments
Table 137. Hitachi Ltd.: Product Portfolio
Table 138. Hitachi Ltd.: Key Strategic Moves and Developments
Table 139. Equinix, Inc.: Key Executives
Table 140. Equinix, Inc.: Company Snapshot
Table 141. Equinix, Inc.: Operating Segments
Table 142. Equinix, Inc.: Product Portfolio
Table 143. Equinix, Inc.: Key Strategic Moves and Developments
Table 144. Schneider Electric: Key Executives
Table 145. Schneider Electric: Company Snapshot
Table 146. Schneider Electric: Operating Segments
Table 147. Schneider Electric: Product Portfolio
Table 148. Schneider Electric: Key Strategic Moves and Developments
Table 149. Huawei Technologies Co. Ltd.: Key Executives
Table 150. Huawei Technologies Co. Ltd.: Company Snapshot
Table 151. Huawei Technologies Co. Ltd.: Operating Segments
Table 152. Huawei Technologies Co. Ltd.: Product Portfolio
Table 153. Huawei Technologies Co. Ltd.: Key Strategic Moves and Developments
Table 154. Fujitsu: Key Executives
Table 155. Fujitsu: Company Snapshot
Table 156. Fujitsu: Operating Segments
Table 157. Fujitsu: Product Portfolio
Table 158. Fujitsu: Key Strategic Moves and Developments
Table 159. Hewlett Packard Enterprise: Key Executives
Table 160. Hewlett Packard Enterprise: Company Snapshot
Table 161. Hewlett Packard Enterprise: Operating Segments
Table 162. Hewlett Packard Enterprise: Product Portfolio
Table 163. Hewlett Packard Enterprise: Key Strategic Moves and Developments
LIST OF FIGURES
Figure 1. Global Data Center Construction Market, 2024 - 2032
Figure 2. Segmentation of Data Center Construction Market, 2024 - 2032
Figure 3. Top Investment Pocket in Data Center Construction Market
Figure 4. Moderate Bargaining Power of Buyers
Figure 5. Moderate Bargaining Power of Suppliers
Figure 6. Moderate Threat of New Entrants
Figure 7. Low Threat of Substitution
Figure 8. High Competitive Rivalry
Figure 9. Opportunities, Restraints and Drivers: Globaldata Center Construction Market
Figure 10. Global Data Center Construction Market Segmentation, by Construction Type
Figure 11. Data Center Construction Market for General Construction, by Country, 2024 - 2032 ($Billion)
Figure 12. Data Center Construction Market for Electrical Design, by Country, 2024 - 2032 ($Billion)
Figure 13. Data Center Construction Market for Mechanical Design, by Country, 2024 - 2032 ($Billion)
Figure 14. Global Data Center Construction Market Segmentation, by Tier
Figure 15. Data Center Construction Market for Tier 1, by Country, 2024 - 2032 ($Billion)
Figure 16. Data Center Construction Market for Tier 2, by Country, 2024 - 2032 ($Billion)
Figure 17. Data Center Construction Market for Tier 3, by Country, 2024 - 2032 ($Billion)
Figure 18. Data Center Construction Market for Tier 4, by Country, 2024 - 2032 ($Billion)
Figure 19. Global Data Center Construction Market Segmentation, by Data Center Size
Figure 20. Data Center Construction Market for Small Data Center, by Country, 2024 - 2032 ($Billion)
Figure 21. Data Center Construction Market for Medium Data Center, by Country, 2024 - 2032 ($Billion)
Figure 22. Data Center Construction Market for Large Data Center, by Country, 2024 - 2032 ($Billion)
Figure 23. Global Data Center Construction Market Segmentation, by Industry Vertical
Figure 24. Data Center Construction Market for Bfsi, by Country, 2024 - 2032 ($Billion)
Figure 25. Data Center Construction Market for IT and Telecommunications, by Country, 2024 - 2032 ($Billion)
Figure 26. Data Center Construction Market for Healthcare, by Country, 2024 - 2032 ($Billion)
Figure 27. Data Center Construction Market for Government, by Country, 2024 - 2032 ($Billion)
Figure 28. Data Center Construction Market for Manufacturing, by Country, 2024 - 2032 ($Billion)
Figure 29. Data Center Construction Market for Others, by Country, 2024 - 2032 ($Billion)
Figure 30. Top Winning Strategies, by Year, 2021-2023*
Figure 31. Top Winning Strategies, by Development, 2021-2023*
Figure 32. Top Winning Strategies, by Company, 2021-2023*
Figure 33. Product Mapping of Top 10 Players
Figure 34. Competitive Dashboard
Figure 35. Competitive Heatmap: Data Center Construction Market
Figure 36. Top Player Positioning, 2023
Figure 37. Cisco Systems Inc.: Net Sales, 2021-2023 ($Billion)
Figure 38. Cisco Systems Inc.: Revenue Share, by Segment, 2023 (%)
Figure 39. Cisco Systems Inc.: Revenue Share, by Region, 2023 (%)
Figure 40. IBM Corporation: Net Sales, 2021-2023 ($Billion)
Figure 41. IBM Corporation: Revenue Share, by Segment, 2023 (%)
Figure 42. IBM Corporation: Revenue Share, by Region, 2023 (%)
Figure 43. Oracle Corporation: Net Sales, 2021-2023 ($Billion)
Figure 44. Oracle Corporation: Revenue Share, by Segment, 2023 (%)
Figure 45. Oracle Corporation: Revenue Share, by Region, 2023 (%)
Figure 46. ABB Ltd.: Net Sales, 2021-2023 ($Billion)
Figure 47. ABB Ltd.: Revenue Share, by Segment, 2023 (%)
Figure 48. ABB Ltd.: Revenue Share, by Region, 2023 (%)
Figure 49. Hitachi Ltd.: Net Sales, 2021-2023 ($Billion)
Figure 50. Hitachi Ltd.: Revenue Share, by Segment, 2023 (%)
Figure 51. Hitachi Ltd.: Revenue Share, by Region, 2023 (%)
Figure 52. Equinix, Inc.: Net Sales, 2021-2023 ($Billion)
Figure 53. Equinix, Inc.: Revenue Share, by Segment, 2023 (%)
Figure 54. Equinix, Inc.: Revenue Share, by Region, 2023 (%)
Figure 55. Schneider Electric: Net Sales, 2021-2023 ($Billion)
Figure 56. Schneider Electric: Revenue Share, by Segment, 2023 (%)
Figure 57. Schneider Electric: Revenue Share, by Region, 2023 (%)
Figure 58. Huawei Technologies Co. Ltd.: Net Sales, 2021-2023 ($Billion)
Figure 59. Huawei Technologies Co. Ltd.: Revenue Share, by Segment, 2023 (%)
Figure 60. Huawei Technologies Co. Ltd.: Revenue Share, by Region, 2023 (%)
Figure 61. Fujitsu: Net Sales, 2021-2023 ($Billion)
Figure 62. Fujitsu: Revenue Share, by Segment, 2023 (%)
Figure 63. Fujitsu: Revenue Share, by Region, 2023 (%)
Figure 64. Hewlett Packard Enterprise: Net Sales, 2021-2023 ($Billion)
Figure 65. Hewlett Packard Enterprise: Revenue Share, by Segment, 2023 (%)
Figure 66. Hewlett Packard Enterprise: Revenue Share, by Region, 2023 (%)

Companies Mentioned

Key Market Players in the Data Center Construction Market include:
  • Cisco Systems Inc.
  • IBM Corporation
  • Oracle Corporation
  • ABB Ltd.
  • Hitachi Ltd.
  • Equinix, Inc.
  • Schneider Electric
  • Huawei Technologies Co., Ltd.
  • Fujitsu
  • Hewlett Packard Enterprise

Methodology

The analyst offers exhaustive research and analysis based on a wide variety of factual inputs, which largely include interviews with industry participants, reliable statistics, and regional intelligence. The in-house industry experts play an instrumental role in designing analytic tools and models, tailored to the requirements of a particular industry segment. The primary research efforts include reaching out participants through mail, tele-conversations, referrals, professional networks, and face-to-face interactions.

They are also in professional corporate relations with various companies that allow them greater flexibility for reaching out to industry participants and commentators for interviews and discussions.

They also refer to a broad array of industry sources for their secondary research, which typically include; however, not limited to:

  • Company SEC filings, annual reports, company websites, broker & financial reports, and investor presentations for competitive scenario and shape of the industry
  • Scientific and technical writings for product information and related preemptions
  • Regional government and statistical databases for macro analysis
  • Authentic news articles and other related releases for market evaluation
  • Internal and external proprietary databases, key market indicators, and relevant press releases for market estimates and forecast

Furthermore, the accuracy of the data will be analyzed and validated by conducting additional primaries with various industry experts and KOLs. They also provide robust post-sales support to clients.

Loading
LOADING...

Table Information