+353-1-416-8900REST OF WORLD
+44-20-3973-8888REST OF WORLD
1-917-300-0470EAST COAST U.S
1-800-526-8630U.S. (TOLL FREE)
New

Subsea Umbilicals, Risers and Flowlines Market - Global Industry Size, Share, Trends, Opportunity, and Forecast, 2021-2031

  • PDF Icon

    Report

  • 185 Pages
  • January 2026
  • Region: Global
  • TechSci Research
  • ID: 6025808
Free Webex Call
10% Free customization
Free Webex Call

Speak directly to the analyst to clarify any post sales queries you may have.

10% Free customization

This report comes with 10% free customization, enabling you to add data that meets your specific business needs.

The Global Subsea Umbilicals, Risers and Flowlines Market is projected to expand from USD 11.30 billion in 2025 to USD 20.52 billion by 2031, registering a compound annual growth rate of 10.45%. Commonly known as SURF, these components form the essential underwater infrastructure linking subsea wellheads to surface facilities for hydrocarbon transport and fluid control. Market expansion is primarily propelled by escalating energy consumption and the consequent broadening of deepwater exploration to reach untapped reserves, alongside the critical need to upgrade or replace aging offshore assets to ensure safety and operational integrity.

However, the industry faces substantial hurdles, including the immense capital expenditure required for deepwater projects and commodity price volatility, both of which can postpone investment decisions, while supply chain intricacies add further risk to schedules. According to the International Energy Agency, global upstream oil and gas investment was projected to rise by 7% in 2024, reaching USD 570 billion. This significant financial commitment highlights a persistent demand for offshore development and related subsea technologies, even amidst prevailing economic difficulties.

Market Drivers

The intensification of deepwater and ultra-deepwater exploration acts as a major catalyst for the global market, driven by the depletion of accessible shallow-water resources. As major energy companies push further offshore, there is a growing requirement for advanced subsea umbilicals, risers, and flowlines designed to endure extreme hydrostatic pressures and low temperatures. This migration to deeper basins prompts significant capital spending on intricate subsea architectures to link remote wells with floating production units. According to TotalEnergies, October 2024, in the 'GranMorgu Development' press release, the company approved a USD 10.5 billion project in Suriname that depends heavily on an integrated subsea network to extract hydrocarbons, emphasizing the vital function of SURF components in opening frontier basins.

Additionally, escalating global energy demand is driving offshore production and compelling operators to accelerate the development of discovered resources. This surge translates into substantial order backlogs for manufacturers supplying the tie-back systems and transmission lines needed to bring new production online efficiently. The pressure to sustain supply levels guarantees a continuous flow of contracts for subsea hardware to support higher output. According to TechnipFMC, October 2024, in the 'Third Quarter 2024 Results' report, inbound subsea orders hit USD 2.5 billion, signaling robust commercial activity. Furthermore, according to ExxonMobil, April 2024, in the 'Whiptail Development' announcement, the firm committed USD 12.7 billion to a new offshore project, confirming the enduring capital investment in the sector.

Market Challenges

The massive capital expenditure necessary for deepwater installations constitutes a significant obstacle to the growth of the subsea market. Developing offshore reserves necessitates substantial upfront financing for sophisticated infrastructure, such as umbilicals, risers, and flowlines, rendering these projects highly susceptible to financial instability. When commodity prices fluctuate or installation costs increase, operators often delay Final Investment Decisions (FIDs) to maintain capital discipline and re-evaluate economic feasibility. This caution results in a bottleneck within the project pipeline, causing delays in contract awards for subsea equipment and stalling the progress of essential developments.

Recent industry evaluations regarding the capital needed to maintain production highlight the severity of this cost burden. According to the International Energy Forum, in 2024, the estimated annual upstream investment required to secure adequate global supply by 2030 was adjusted upward by 15% compared to the previous year's assessment, largely driven by increasing structural costs. This steep rise in the financial baseline compels operators to commit considerably more funds merely to sustain planned production levels. Consequently, the raised threshold for investment returns frequently results in the postponement of capital-intensive subsea campaigns, thereby impeding the overall expansion of the market.

Market Trends

The shift toward all-electric subsea production systems is transforming the market by eliminating reliance on hydraulic control lines, a move that substantially reduces topside weight and infrastructure complexity. This trend toward electrification facilitates longer step-outs and quicker actuator response times, which are crucial for modern carbon capture and deepwater projects where hydraulic pressure loss and signal latency are constraints. According to TechnipFMC, December 2024, in the 'TechnipFMC Receives Notice to Proceed for Northern Endurance Partnership’s Carbon Capture and Storage Project' press release, the company was awarded a contract worth between USD 500 million and USD 1 billion to provide the industry’s first integrated all-electric subsea system, minimizing the necessity for conventional hydraulic power units.

Concurrently, the utilization of Thermoplastic Composite Pipes (TCP) is increasing as operators look for corrosion-resistant alternatives to steel in harsh subsea environments. These composite solutions deliver significant weight savings and are becoming the preferred choice for high-pressure applications where standard materials face risks of fatigue and stress corrosion cracking. According to Pipeline Technology Journal, August 2025, in the 'Strohm Wins Contract to Supply TCP Jumpers for Major Exploration Project Offshore Malaysia' article, Strohm received an order to provide large-bore TCP jumpers engineered for water depths up to 1,500 meters, confirming the technology's effectiveness for deepwater hydrocarbon production.

Key Players Profiled in the Subsea Umbilicals, Risers and Flowlines Market

  • TechnipFMC PLC
  • Subsea 7 S.A
  • SAIPEM SpA
  • Oceaneering International, Inc.
  • Aker Solutions ASA
  • John Wood Group PLC
  • Bosch Rexroth AG
  • Halliburton Energy Services, Inc.
  • McDermott International, Ltd.
  • Worley Limited

Report Scope

In this report, the Global Subsea Umbilicals, Risers and Flowlines Market has been segmented into the following categories:

Subsea Umbilicals, Risers and Flowlines Market, by Product Type:

  • Subsea Umbilical's
  • Risers
  • Flowlines

Subsea Umbilicals, Risers and Flowlines Market, by Depth:

  • Shallow Water
  • Water
  • Ultra-Deep Water

Subsea Umbilicals, Risers and Flowlines Market, by Region:

  • North America
  • Europe
  • Asia-Pacific
  • South America
  • Middle East & Africa

Competitive Landscape

Company Profiles: Detailed analysis of the major companies present in the Global Subsea Umbilicals, Risers and Flowlines Market.

Available Customization

The analyst offers customization according to your specific needs. The following customization options are available for the report:
  • Detailed analysis and profiling of additional market players (up to five).

This product will be delivered within 1-3 business days.

Table of Contents

1. Product Overview
1.1. Market Definition
1.2. Scope of the Market
1.2.1. Markets Covered
1.2.2. Years Considered for Study
1.2.3. Key Market Segmentations
2. Research Methodology
2.1. Objective of the Study
2.2. Baseline Methodology
2.3. Key Industry Partners
2.4. Major Association and Secondary Sources
2.5. Forecasting Methodology
2.6. Data Triangulation & Validation
2.7. Assumptions and Limitations
3. Executive Summary
3.1. Overview of the Market
3.2. Overview of Key Market Segmentations
3.3. Overview of Key Market Players
3.4. Overview of Key Regions/Countries
3.5. Overview of Market Drivers, Challenges, Trends
4. Voice of Customer
5. Global Subsea Umbilicals, Risers and Flowlines Market Outlook
5.1. Market Size & Forecast
5.1.1. By Value
5.2. Market Share & Forecast
5.2.1. By Product Type (Subsea Umbilical's, Risers, Flowlines)
5.2.2. By Depth (Shallow Water, Water, Ultra-Deep Water)
5.2.3. By Region
5.2.4. By Company (2025)
5.3. Market Map
6. North America Subsea Umbilicals, Risers and Flowlines Market Outlook
6.1. Market Size & Forecast
6.1.1. By Value
6.2. Market Share & Forecast
6.2.1. By Product Type
6.2.2. By Depth
6.2.3. By Country
6.3. North America: Country Analysis
6.3.1. United States Subsea Umbilicals, Risers and Flowlines Market Outlook
6.3.2. Canada Subsea Umbilicals, Risers and Flowlines Market Outlook
6.3.3. Mexico Subsea Umbilicals, Risers and Flowlines Market Outlook
7. Europe Subsea Umbilicals, Risers and Flowlines Market Outlook
7.1. Market Size & Forecast
7.1.1. By Value
7.2. Market Share & Forecast
7.2.1. By Product Type
7.2.2. By Depth
7.2.3. By Country
7.3. Europe: Country Analysis
7.3.1. Germany Subsea Umbilicals, Risers and Flowlines Market Outlook
7.3.2. France Subsea Umbilicals, Risers and Flowlines Market Outlook
7.3.3. United Kingdom Subsea Umbilicals, Risers and Flowlines Market Outlook
7.3.4. Italy Subsea Umbilicals, Risers and Flowlines Market Outlook
7.3.5. Spain Subsea Umbilicals, Risers and Flowlines Market Outlook
8. Asia-Pacific Subsea Umbilicals, Risers and Flowlines Market Outlook
8.1. Market Size & Forecast
8.1.1. By Value
8.2. Market Share & Forecast
8.2.1. By Product Type
8.2.2. By Depth
8.2.3. By Country
8.3. Asia-Pacific: Country Analysis
8.3.1. China Subsea Umbilicals, Risers and Flowlines Market Outlook
8.3.2. India Subsea Umbilicals, Risers and Flowlines Market Outlook
8.3.3. Japan Subsea Umbilicals, Risers and Flowlines Market Outlook
8.3.4. South Korea Subsea Umbilicals, Risers and Flowlines Market Outlook
8.3.5. Australia Subsea Umbilicals, Risers and Flowlines Market Outlook
9. Middle East & Africa Subsea Umbilicals, Risers and Flowlines Market Outlook
9.1. Market Size & Forecast
9.1.1. By Value
9.2. Market Share & Forecast
9.2.1. By Product Type
9.2.2. By Depth
9.2.3. By Country
9.3. Middle East & Africa: Country Analysis
9.3.1. Saudi Arabia Subsea Umbilicals, Risers and Flowlines Market Outlook
9.3.2. UAE Subsea Umbilicals, Risers and Flowlines Market Outlook
9.3.3. South Africa Subsea Umbilicals, Risers and Flowlines Market Outlook
10. South America Subsea Umbilicals, Risers and Flowlines Market Outlook
10.1. Market Size & Forecast
10.1.1. By Value
10.2. Market Share & Forecast
10.2.1. By Product Type
10.2.2. By Depth
10.2.3. By Country
10.3. South America: Country Analysis
10.3.1. Brazil Subsea Umbilicals, Risers and Flowlines Market Outlook
10.3.2. Colombia Subsea Umbilicals, Risers and Flowlines Market Outlook
10.3.3. Argentina Subsea Umbilicals, Risers and Flowlines Market Outlook
11. Market Dynamics
11.1. Drivers
11.2. Challenges
12. Market Trends & Developments
12.1. Mergers & Acquisitions (If Any)
12.2. Product Launches (If Any)
12.3. Recent Developments
13. Global Subsea Umbilicals, Risers and Flowlines Market: SWOT Analysis
14. Porter's Five Forces Analysis
14.1. Competition in the Industry
14.2. Potential of New Entrants
14.3. Power of Suppliers
14.4. Power of Customers
14.5. Threat of Substitute Products
15. Competitive Landscape
15.1. TechnipFMC plc
15.1.1. Business Overview
15.1.2. Products & Services
15.1.3. Recent Developments
15.1.4. Key Personnel
15.1.5. SWOT Analysis
15.2. Subsea 7 S.A
15.3. SAIPEM SpA
15.4. Oceaneering International, Inc
15.5. Aker Solutions ASA
15.6. John Wood Group PLC
15.7. Bosch Rexroth AG
15.8. Halliburton Energy Services, Inc
15.9. McDermott International, Ltd
15.10. Worley Limited
16. Strategic Recommendations

Companies Mentioned

The key players profiled in this Subsea Umbilicals, Risers and Flowlines market report include:
  • TechnipFMC PLC
  • Subsea 7 S.A
  • SAIPEM SpA
  • Oceaneering International, Inc
  • Aker Solutions ASA
  • John Wood Group PLC
  • Bosch Rexroth AG
  • Halliburton Energy Services, Inc
  • McDermott International, Ltd
  • Worley Limited

Table Information