Australia Data Centre Construction Market Size, Share, Growth Analysis Report and Forecast Trends (2025-2034)

  • PDF Icon

    Report

  • 110 Pages
  • October 2025
  • Region: Australia
  • Expert Market Research
  • ID: 6189993
The Australia Data Centre Construction Market was valued at AUD 3.64 Billion in 2025, and is projected to reach AUD 6.24 Billion by 2034, rising at a CAGR of 5.54%.

Based on infrastructure, mechanical systems led the Australia data centreconstruction marketby driving the development of advanced power distribution solutions, such as modular power distribution units, ensuring reliable power supply to servers.

Advanced mechanical systems like HVAC (Heating, Ventilation, and Air Conditioning) and cooling systems are essential for data Centres, ensuring efficient operation and reliability to maintain optimal conditions for servers and equipment. Sophisticated electrical systems, such as power distribution units (PDUs) and uninterruptible power supply (UPS) systems, allow data Centres to increase their capacity in response to rising needs for computing and storage.

The Australia data centre construction market development is driven by several factors. To reduce environmental impact, there is a rising trend towards sustainable data Centres featuring energy-efficient designs and renewable energy resources. Additionally, the integration of security systems, such as encryption technologies and biometric access controls, is increasing to mitigate cyber threats to data Centres. Moreover, for rapid deployment in diverse locations, containerized data Centres install IT infrastructure within shipping containers. Furthermore, to meet data processing demands and enhance connectivity, the usage of 5G networks in data Centres is increasing. On May 2024, OVHcloud, a European cloud provider launched its third data Centre in Sydney, Australia.

This report offers a detailed analysis of the market based on the following segments:

Market Breakup by Infrastructure

  • Electrical Infrastructure
  • UPS Systems
  • Others
  • Mechanical Infrastructure
  • Cooling Systems
  • Racks
  • Others
  • General Infrastructure

Market Breakup by Size

  • Small and Medium Size Data Centre
  • Large Data Centre

Market Breakup by Tier Type

  • Tier I and II
  • Tier III
  • Tier IV

Market Breakup by End Use

  • BFSI
  • IT and Telecom
  • Healthcare
  • Government and Defence
  • Others

Market Breakup by Region

  • New South Wales
  • Victoria
  • Queensland
  • Australian Capital Territory
  • Western Australia
  • Others

Australia Data Centre Construction Market Share

The BFSI sector holds a significant share of the Australia data centre construction market due to its large data volumes necessitating secure storage, compliance with stringent regulations, meeting high-security standards, supporting digital banking and AI innovations, and providing robust risk management solutions.

Leading Companies in the Australia Data Centre Construction Market

The growth of data centre construction market is fuelled by the rising digital transformation, cloud adoption, edge computing, increase in internet usage, and renewable energy initiatives.
  • AirTrunk Operating Pty Ltd.
  • Multiplex Constructions Pty Limited
  • Fujitsu Australia Limited
  • Procore Technologies, Inc.
  • Kapitol Ltd.
  • Nilsen Pty Ltd.
  • Kajima Australia Pty Ltd. (ICON)
  • DXN Limited
  • Others

Table of Contents

1 Preface2 Report Coverage - Key Segmentation and Scope
3 Report Description
3.1 Market Definition and Outlook
3.2 Properties and Applications
3.3 Market Analysis
3.4 Key Players
4 Key Assumptions
5 Executive Summary
5.1 Overview
5.2 Key Drivers
5.3 Key Developments
5.4 Competitive Structure
5.5 Key Industrial Trends
6 Market Snapshot7 Opportunities and Challenges in the Market
8 Asia-Pacific Data Centre Construction Market Overview
8.1 Key Industry Highlights
8.2 Asia-Pacific Data Centre Construction Historical Market (2018-2024)
8.3 Asia-Pacific Data Centre Construction Market Forecast (2025-2034)
9 Australia Data Centre Construction Market Overview
9.1 Key Industry Highlights
9.2 Australia Data Centre Construction Historical Market (2018-2024)
9.3 Australia Data Centre Construction Market Forecast (2025-2034)
10 Australia Data Centre Construction Market by Infrastructure
10.1 Electrical Infrastructure
10.1.3 Breakup by Type
10.1.3.1 UPS Systems
10.1.3.2 Others
10.2 Mechanical Infrastructure
10.2.3 Breakup by Type
10.2.3.1 Cooling Systems
10.2.3.2 Racks
10.2.3.3 Others
10.3 General Infrastructure
11 Australia Data Centre Construction Market by Size
11.1 Small and Medium Size Data Centre
11.2 Large Data Centre
12 Australia Data Centre Construction Market by Tier Type
12.1 Tier I and II
12.2 Tier III
12.3 Tier IV
13 Australia Data Centre Construction Market by End Use
13.1 BFSI
13.2 IT and Telecom
13.3 Healthcare
13.4 Government and Defence
13.5 Others
14 Australia Data Centre Construction Market by Region
14.1 New South Wales
14.2 Victoria
14.3 Queensland
14.4 Australian Capital Territory
14.5 Western Australia
14.6 Others
15 Market Dynamics
15.1 SWOT Analysis
15.1.1 Strengths
15.1.2 Weaknesses
15.1.3 Opportunities
15.1.4 Threats
15.2 Porter’s Five Forces Analysis
15.2.1 Supplier’s Power
15.2.2 Buyer’s Power
15.2.3 Threat of New Entrants
15.2.4 Degree of Rivalry
15.2.5 Threat of Substitutes
15.3 Key Indicators for Demand
15.4 Key Indicators for Price
16 Competitive Landscape
16.1 Market Structure
16.2 Company Profiles
16.2.1 AirTrunk Operating Pty Ltd.
16.2.1.1 Company Overview
16.2.1.2 Product Portfolio
16.2.1.3 Demographic Reach and Achievements
16.2.1.4 Certifications
16.2.2 Multiplex Constructions Pty Limited
16.2.2.1 Company Overview
16.2.2.2 Product Portfolio
16.2.2.3 Demographic Reach and Achievements
16.2.2.4 Certifications
16.2.3 Fujitsu Australia Limited
16.2.3.1 Company Overview
16.2.3.2 Product Portfolio
16.2.3.3 Demographic Reach and Achievements
16.2.3.4 Certifications
16.2.4 Procore Technologies, Inc.
16.2.4.1 Company Overview
16.2.4.2 Product Portfolio
16.2.4.3 Demographic Reach and Achievements
16.2.4.4 Certifications
16.2.5 Kapitol Ltd.
16.2.5.1 Company Overview
16.2.5.2 Product Portfolio
16.2.5.3 Demographic Reach and Achievements
16.2.5.4 Certifications
16.2.6 Nilsen Pty Ltd.
16.2.6.1 Company Overview
16.2.6.2 Product Portfolio
16.2.6.3 Demographic Reach and Achievements
16.2.6.4 Certifications
16.2.7 Kajima Australia Pty Ltd. (ICON)
16.2.7.1 Company Overview
16.2.7.2 Product Portfolio
16.2.7.3 Demographic Reach and Achievements
16.2.7.4 Certifications
16.2.8 DXN Limited
16.2.8.1 Company Overview
16.2.8.2 Product Portfolio
16.2.8.3 Demographic Reach and Achievements
16.2.8.4 Certifications
16.2.9 Others
17 Key Trends and Developments in the Market

Companies Mentioned

  • AirTrunk Operating Pty Ltd.
  • Multiplex Constructions Pty Limited
  • Fujitsu Australia Limited
  • Procore Technologies, Inc.
  • Kapitol Ltd.
  • Nilsen Pty Ltd.
  • Kajima Australia Pty Ltd. (ICON)
  • DXN Limited

Table Information