The future of the global data center system & infrastructure market looks promising with opportunities in the IT & telecom, energy & utility, media & entertainment, retail & E-commerce, government & defense, manufacturing, and healthcare markets.
- Within the infrastructure type category, cooling systems is expected to witness the highest growth over the forecast period due to superior thermal management preferred in cooling system infrastructure.
- Within the end use category, healthcare is expected to witness the highest growth over the forecast period due to expanding healthcare requiring data center system infrastructure.
- In terms of regions, APAC is expected to witness the highest growth over the forecast period due to growing healthcare digitalization and data center infrastructure demand.
Emerging Trends in Data Center System & Infrastructure Market
Lucintel predicts the data center infrastructure market will be power-first and software-defined in the 2025 to 2027 time frame. Ai workloads drive rack density, and along with constraints of the electric grid and certain rules of sovereignty, reshape where data centers are built. Lucintel believes to be successful, suppliers will need an integrated approach to infrastructure rather than selling hardware in silos.- Power-first Infrastructure: The International Energy Agency’s Electricity 2025 report forecasts data center energy demand will increase to 945 TWh by 2030 from 415 TWh in 2024. Being located on the grid will be more important than being located near the source of cheap energy and/or renewables. Energy scarcity will change where and how capacity is built through 2030.
- Liquid Cooling: NVIDIA’s 2025 GB200 NVL72 rack will support a 120 kW load, and drive the need for direct to chip cooling. Cooling capacity and modular racks will become more integrated. Thermal budgets will drive an increase in the use of liquid cooling over air cooling through 2030.
- Modular Deployment: Microsoft’s 2025 sustainability goals and targets report describes their goals of a standardized data center design. Premanufactured, standardized, power and cooling modules reduce onsite construction by 30-50%. Incremental capacity will win where permitting, or the availability of labor and the grid constraint conventional data center campuses.
- AI-enabled Operations: The forecast for 2025 focuses on tying AI-ready facilities to DCIM and predictive controls. Automation will help improve facility uptime and performance. The increase in facility rack density will further test the limits of power and cooling.
- Regional Supply-chain Diversification: By 2026, India’s data center capacity is anticipated to reach about 2,000 MW. Meanwhile, the EU is implementing sovereignty rules to favor more local colocation ecosystems. While increases in regional supply will reduce transformer and network bottlenecks, design for compliance will increase.
Recent Developments in the Data Center System & Infrastructure Market
The data center system and infrastructure market will shift focus from capacity expansion to AI-led redesign. Although activity has already picked up in 2025, the next few years are expected to be especially busy as hyperscalers make reservations for power, networking and cooling capacity. While there is expected to be a continued focus on data center investments, access to the grid and long lead times for equipment will shape the deployment schedule.- AI Infrastructure Program: With the planned $500 billion US investment in AI infrastructure (stated by OpenAI, SoftBank and Oracle in January 2025) construction budgets will be redirected to expand computing and networking infrastructure to support AI in the data center over the next five years.
- Hyperscale Capital Expansion: In February 2025, Alphabet (Google) announced a $75 billion capital expenditure budget for 2025 to support its AI and data center infrastructure. This capital expenditure budget will drive increased demand for power, networking and cooling infrastructure, as well as advanced IT and facilities equipment.
- AI Platform Launch: In March 2025, NVIDIA announced the development of 6 chips in its Vera Rubin platform and the planned production for 2026. The chips are expected to further increase the power and cooling density of data center racks.
- Nuclear Power Agreement: Amazon and Energy Northwest announced plans to construct 4 small modular reactors at 320 MW, with the potential to expand to 960 MW (June 2025). Firm generation gives data center developers the ability to circumvent grid constraints.
- 800 VDC Reference Design: Schneider Electric and NVIDIA released 800 VDC AI data center reference designs (March 2025). Conversion loss architecture increases the rack load, challenging traditional limits of busways and power electronics. The design innovations will affect facility engineering.
Strategic Growth Opportunities in the Data Center System & Infrastructure Market
Starting in 2024 and continuing through 2026, AI workloads and sovereign cloud policies will drive more investment toward data centers with denser facilities. Operators will procure more integrated infrastructure, resulting in larger revenue pools for the cooling, power, software and lifecycle solutions providers. Lucintel’s market perspective indicates that the sector will experience a shift toward specialized systems, regional presence and efficiency.- AI-ready Power and Cooling: Google’s $75B capital expenditure announcement for 2025 (February 2025) increased the demand for high-voltage distribution and liquid cooling. This will continue as rack densities increase and make conventional air systems uneconomical.
- Energy-efficient Infrastructure: The IEA projected that data center electricity demand could reach 945 TWh by 2030 from 415 TWh in 2024 (April 2025). This will drive the demand for renewable energy procurement, storage and systems to improve data center operating costs through heat reuse and other controls.
- Regional and Sovereign Capacity: Amazon’s $11B data center commitment to Indiana (January 2025) illustrates the AI demand and incentives are drawing data center capacity to secondary markets. This will continue to favor developers that secure land and permits outside established data center hubs.
- Modular Deployment: Microsoft announced in January 2025 its plans to spend $80 billion on data centers in 2025, hastening the adoption of factory-built modular deployment and standardized commissioning. This creates an opportunity to shorten time to build, and help customers add capacity in smaller, more frequent increments.
- Lifecycle Intelligence Services: The Uptime Institute reported in May 2025 that 54% of the major data center outages were attributed to power issues. This creates an opportunity to advance digital twins, and performance contracts. Operators will prioritize these services to ensure uptime and avoid large, up-front capital expenses.
Data Center System & Infrastructure Market Drivers and Challenges
Growth in digital workloads, adoption of AI and cloud, availability of energy, sustainability, and regulations will influence the growth of the data center system and infrastructure market. According to Lucintel, in the short to medium term, the market will be competitive based on the convergence of technological advances, economic cycles, customer requirements, and market infrastructure.The factors responsible for driving this market include:
- Artificial Intelligence and High Performance Computing: In January 2025, Microsoft announced that it would invest approximately 80 billion USD in fiscal 2025 for developing Artificial Intelligence Data centers. Adoption of Artificial Intelligence, Machine Learning, and analytics will increase the load on the data centers and will create an opportunity for the data center operators to invest in modernizing power and cooling infrastructure of the data centers.
- Rising Cloud Computing and Digital Services: Increased consumption of cloud computing and digital services, such as software as a service (SaaS), streaming, online transactions, and other applications, is pushing hyperscale and colocation service providers to further enhance their capacity. The International Energy Agency reported in April 2025 that the global consumption of data center electricity was 415 terawatt-hours in 2024, and was estimated to double by 2030. This growing trend is attributed to the continuous shift from on-premises/privately managed infrastructure to scalable cloud platforms. It is anticipated that cloud platforms will continue to accommodate growing demands for server and storage infrastructure and other components such as power distribution and security in data center locations, both established and up-and-coming, for the next 3 to 5 years.
- Infrastructure Upgrades and Innovation: Modular designs, increased power and battery storage, and better monitoring and control systems are being integrated into data center infrastructure. In March 2025, NVIDIA announced its Blackwell Ultra platform, which is designed to deliver power-dense computing for accelerated computing workloads. The platform forced NVIDIA to redesign rack architectures, networking, and cooling. Similar innovations are likely to affect data center trends for the next 3 to 5 years.
- Sustainability and Energy Efficiency: There is increasing pressure to decrease carbon emissions and operating costs, particularly for water use. These trends encourage investment in renewable energy, more efficient systems for power and heating, as well as approaches to optimize workloads. The International Energy Agency (IEA) projected in April 2025 that renewable sources would meet a growing share of the additional electricity demand from data centers through 2030, though significant regional variation would continue to exist. Sustainability will increasingly be part of procurement rather than a public relations effort. Suppliers that provide demonstrable improvements in environmental performance will be favored in the site selection process for new data centers, including financing, customer contracts, permitting and purchasing of equipment, in the next three to five years.
- Colocation and Infrastructure Investment: There is growing preference for colocation and managed services for IT infrastructure because these models require less up-front capital expenditures, speed up time to deployment, and offer improved resilient power and network connectivity. In June 2025, the Uptime Institute reported data center operators prioritized expansion, particularly for more resilient and redundant systems. Meanwhile, colocation providers continue to improve their services through the use of standardized modules and construct regional campuses. It is anticipated that in the next three to five years, investment in data center and infrastructure projects will increase to serve organizations currently unable to build and operate their own data centers because of a lack of land, access to low cost and reliable electricity, and/or the required capital.
The challenges facing this market include:
- Electricity Availability: The data center industry faces challenges with the reliability and cost of the electricity needed for continued growth. Transmission and distribution constraints, long and expensive interconnection processes, limited generation, and community opposition to new infrastructure can impact the development of electric transmission and distribution infrastructure. The International Energy Agency reported in April 2025 that between 10 and 20 percent of planned data centers would face delays due to lack of reliable electricity. This can impact other types of data centers, but particularly impacts AI data centers, where a single campus can require hundreds of MWs. Power, especially reliable and affordable renewable energy, will likely impact data center location over the next three to five years.
- Capital Costs: Expanding data center facilities remains challenging due to equipment costs, long construction cycles, and unreliable project economics. In April 2025, the International Energy Agency reported that supply-chain constraints impacted not only equipment for data centers, but also other components of the power-grid, such as cables and transformers. This forces developers to adopt more flexible project designs and adapt to equipment that is available. The next three to five years are likely to require stronger supplier relationships and other more rigid planning to balance costs and reduce exposure to geopolitical disruption.
- Regulatory, Environmental, and Operational Complexity: As of January 2025, the EU began to impose additional obligations under the revised Energy Efficiency Directive. This included the requirement for larger data centers to reduce their energy consumption and carbon footprint or face increased scrutiny. If they fail to comply, this could drive up data center costs due to the use of more water-intensive or carbon-intensive cooling. In the next three to five years, regulatory complexity will favor[u]r operators with transparent reporting of energy consumption, water use, and other environmental impacts; efficient cooling; and other flexibilities, including cyber security.
List of Data Center System & Infrastructure Market Companies
Companies in the market compete on the basis of product quality offered. Major players in this market focus on expanding their manufacturing facilities, R&D investments, infrastructural development, and leverage integration opportunities across the value chain. Through these strategies data center system & infrastructure market companies cater increasing demand, ensure competitive effectiveness, develop innovative products & technologies, reduce production costs, and expand their customer base.Some of the data center system & infrastructure market companies profiled in this report include:
- Amazon Web Services
- Dell Technologies
- Microsoft
- Broadcom
- Oracle
- Meta
- IBM
- Equinix
- Huawei Technologies
Data Center System & Infrastructure Market by Segment
The study includes a forecast for the global data center system & infrastructure market by infrastructure type, deployment mode, organization size, end use, and region.Infrastructure Type [Value ($B) from 2019 to 2035]:
- Power Systems
- Cooling Systems
- Networking Equipment
- Storage Systems
- Racks & Enclosures
- Cabling Infrastructure
- Monitoring & Management Systems
Deployment Mode [Value ($B) from 2019 to 2035]:
- On-Premises
- Cloud-Based
Organization Size [Value ($B) from 2019 to 2035]:
- Small & Medium Enterprises
- Large Enterprises
End Use [Value ($B) from 2019 to 2035]:
- IT & Telecom
- Energy & Utilities
- Media & Entertainment
- Retail & E-commerce
- Government & Defense
- Manufacturing
- Healthcare
- Others
Region [Value ($B) from 2019 to 2035]:
- North America
- Europe
- Asia Pacific
- The Rest of the World
Country Wise Outlook for the Data Center System & Infrastructure Market
The hyperscaler capital, sovereign-compute programs, and localization policies are altering the data center system & infrastructure market. Construction of AI campuses is expected between 2025 and 2027. According to Lucintel, this should broaden the market beyond servers to other systems in a data center.- United States: As a part of the Stargate partnership, an intention to spend $500 billion on AI infrastructure over four years, with the first $100 billion spent in year one, was announced in January 2025. Microsoft announced a commitment of $80 billion to AI data centers in their FY2025. Servers and related system infrastructure will be acquired and installed in data centers over the next three to five years.
- China: Cloud and AI Capacity: Alibaba announced they will spend a minimum of RMB380 billion on Cloud and AI infrastructure in the next three years (February 2025), and the Chinese government’s 2025 work report calls for the implementation of “artificial intelligence plus”. The spending should enhance supply chains and boost demand for computing, storage and power systems in the next decade.
- Germany: Regional Capacity - In March 2025, STACKIT and Deutsche Telekom signed an agreement to develop sovereign cloud services, and integrate Telekom’s network and security services with STACKIT’s infrastructure. In the near-term, the partnership is expected to support regional workloads. The collaboration is expected to promote additional investments in facilities, racks and compliant infrastructure through 2030.
- India: National compute - The IndiaAI compute initiative announced access to 18,693 GPUs in May 2025. The Indian government also approved the IndiaAI Mission, and allocated a budget of ₹10,371.92 crore (USD 1.315 billion) in March 2024. This compute layer is expected to anchor AI workloads and stimulate deployment of server, network and data center infrastructure in the country in the next 3-5 years.
- Japan: Sovereign AI infrastructure - In February 2025, SoftBank and OpenAI announced a joint venture to develop domestic AI infrastructure and services in Japan. SoftBank also announced it will bring OpenAI’s enterprise services to the group companies. This is expected to stimulate investment in data centers and other supporting infrastructure in the country in the next 3-5 years.
Features of the Global Data Center System & Infrastructure Market
- Market Size Estimates: Data center system & infrastructure market size estimation in terms of value ($B).
- Trend and Forecast Analysis: Market trends (2019 to 2026) and forecast (2027 to 2035) by various segments and regions.
- Segmentation Analysis: Data center system & infrastructure market size by various segments, such as by infrastructure type, deployment mode, organization size, end use, and region in terms of value ($B).
- Regional Analysis: Data center system & infrastructure market breakdown by North America, Europe, Asia Pacific, and Rest of the World.
- Growth Opportunities: Analysis of growth opportunities in different infrastructure types, deployment modes, organization sizes, end uses, and regions for the data center system & infrastructure market.
- Strategic Analysis: This includes M&A, new product development, and competitive landscape of the data center system & infrastructure market.- Analysis of competitive intensity of the industry based on Porter’s Five Forces model.
This report answers the following 11 key questions:
Q.1. What are some of the most promising, high-growth opportunities for the data center system & infrastructure market by infrastructure type (power systems, cooling systems, networking equipment, storage systems, racks & enclosures, cabling infrastructure, and monitoring & management systems), deployment mode (on-premises and cloud-based), organization size (small & medium enterprises and large enterprises), end use (IT & telecom, energy & utilities, media & entertainment, retail & e-commerce, government & defense, manufacturing, healthcare, and others), and region (North America, Europe, Asia Pacific, and the Rest of the World)?Q.2. Which segments will grow at a faster pace and why?
Q.3. Which region will grow at a faster pace and why?
Q.4. What are the key factors affecting market dynamics? What are the key challenges and business risks in this market?
Q.5. What are the business risks and competitive threats in this market?
Q.6. What are the emerging trends in this market and the reasons behind them?
Q.7. What are some of the changing demands of customers in the market?
Q.8. What are the new developments in the market? Which companies are leading these developments?
Q.9. Who are the major players in this market? What strategic initiatives are key players pursuing for business growth?
Q.10. What are some of the competing products in this market and how big of a threat do they pose for loss of market share by material or product substitution?
Q.11. What M&A activity has occurred in the last 8 years and what has its impact been on the industry?
This product will be delivered within 1-3 business days.
Table of Contents
Companies Mentioned
- Amazon Web Services
- Dell Technologies
- Microsoft
- Broadcom
- Oracle
- Meta
- IBM
- Equinix
- Huawei Technologies
Methodology
The analyst has been in the business of market research and management consulting since 2000 and has published over 600 market intelligence reports in various markets/applications and served over 1,000 clients worldwide. Each study is a culmination of four months of full-time effort performed by the analyst team. The analysts used the following sources for the creation and completion of this valuable report:
- In-depth interviews of the major players in the market
- Detailed secondary research from competitors’ financial statements and published data
- Extensive searches of published works, market, and database information pertaining to industry news, company press releases, and customer intentions
- A compilation of the experiences, judgments, and insights of professionals, who have analyzed and tracked the market over the years.
Extensive research and interviews are conducted in the supply chain of the market to estimate market share, market size, trends, drivers, challenges and forecasts.
Thus, the analyst compiles vast amounts of data from numerous sources, validates the integrity of that data, and performs a comprehensive analysis. The analyst then organizes the data, its findings, and insights into a concise report designed to support the strategic decision-making process.

LOADING...

