+353-1-416-8900REST OF WORLD
+44-20-3973-8888REST OF WORLD
1-917-300-0470EAST COAST U.S
1-800-526-8630U.S. (TOLL FREE)
New

Israel Hyperscale Data Center - Market Share Analysis, Industry Trends & Statistics, Growth Forecasts (2025-2030)

  • PDF Icon

    Report

  • 160 Pages
  • July 2026
  • Region: Israel
  • Mordor Intelligence
  • ID: 6260781
The israel hyperscale data center market size is estimated at USD 1.54 billion in 2025, and is expected to reach USD 3.38 billion by 2030, at a CAGR of 17.02% during the forecast period (2025-2030). This report is Segmented by Data Center Type (Hyperscale Colocation, Enterprise/Hyperscale Self Build), Service Type (IaaS (Infrastructure-As-A-Service), Paas (Platform-As-A-Service), Saas (Software-As-A-Service)), End User (Cloud and IT, Telecom, Media and Entertainment, Government, BFSI, Manufacturing and More). The Market Forecasts are Provided in Terms of Value (USD).

Israel Hyperscale Data Center Market Trends and Insights

Blue-Raman and Trans-Med cable landings elevate Israel as an intercontinental hub

Submarine systems that land on Israel’s Mediterranean coast give Israel a hyperscale data center market, direct 250 Tbps routes to Europe and Asia. Latency falls by up to 30%, which attracts cloud providers that need fast east-west traffic. Coastal interconnection sites are emerging, and operators now prioritise Tel Aviv and Haifa plots that sit within 5 km of the landing stations. Network density is rising, creating fresh revenue streams for cross-connect and peering services.

Sovereign-cloud and cyber-compliance mandates intensify in-country capacity demand

The Cyber Directorate’s 2024 framework obliges critical data to reside on domestic infrastructure. Microsoft introduced an isolated Azure region with local key management and air-gapped control planes to meet those rules. Global hyperscalers therefore build or lease Israeli floorspace instead of serving traffic from Frankfurt or Paris, which lifts baseline utilisation for the Israel hyperscale data center market.

Land scarcity and high real-estate costs in Tel Aviv metro

Commercial plots suitable for multi-MW projects are scarce, and prices in Tel Aviv have climbed 35% since 2020. Operators, therefore, pivot to vertical campuses or shift 15 km east to Petah Tikva, where land is 40% cheaper. Global Technical Realty’s 10.5 MW Petah Tikva build exemplifies this migration and helps balance supply across the Israel hyperscale data center market.

Other drivers and restraints analyzed in the detailed report include:

  • AI/ML start-up ecosystem requires GPU-rich footprints
  • Solar + storage PPAs lower carbon and OPEX profiles
  • Rising water tariffs constraining liquid-cooling adoption

Segment Analysis

Hyperscale colocation contributed 60% to the Israel hyperscale data center market in 2025 as third-party campuses allow cloud firms and enterprises to go live within 9-12 months. MedOne added 8 MW at Petah Tikva, which filled 70% pre-lease before mechanical completion, illustrating the appeal of turnkey capacity. Operators with fibre rings and municipal permits in place continue to win anchor tenants rapidly.

Enterprise self-builds captured the remaining share but are growing at a 25% CAGR. Defence contractors and banks pursue purpose-built bunkers that fulfill classified or payment-card rules, boosting Israel's hyperscale data center market size for this niche. Modular designs shorten construction schedules, and dedicated security zoning aligns with the Cyber Directorate’s guidance, encouraging further private investment.

Complete Report Scope:

  • By Data Center Type
    • Hyperscale Colocation
    • Enterprise/Hyperscale Self Build
  • By Service Type
    • IaaS (Infrastructure-as-a-Service)
    • PaaS (Platform-as-a-Service)
    • SaaS (Software-as-a-Service)
  • By End User
    • Cloud and IT
    • Telecom
    • Media and Entertainment
    • Government
    • BFSI
    • Manufacturing
    • E-Commerce
    • Other End User

List of Companies Covered in this Report:

  • Amazon Web Services (AWS)
  • Google LLC
  • Microsoft Corporation
  • Oracle Corporation
  • MedOne Ltd.
  • EdgeConneX
  • Compass Datacenters
  • Serverfarm
  • Bynet Data Communications
  • Bezeq International
  • NED Data Centers

Additional Benefits:

  • The market estimate (ME) sheet in Excel format
  • 3 months of analyst support

Table of Contents

1 INTRODUCTION
1.1 Study Assumptions And Market Definition
1.2 Scope of the Study
2 RESEARCH METHODOLOGY
2.1 Research Framework
2.2 Secondary Research
2.3 Primary Research
2.4 Data Triangulation and Insight Generation
3 EXECUTIVE SUMMARY
4 MARKET INSIGHT
4.1 Market Overview
4.2 Market Dynamics
4.2.1 Market Drivers
4.2.1.1 Blue-Raman and Trans-Med Cable Landings Elevate Israel as Inter-continental Hub
4.2.1.2 Sovereign Cloud and Cyber-Compliance Mandates Intensify In-Country Capacity Demand
4.2.1.3 Thriving AI/ML Start-Up Ecosystem Requiring GPU-Rich Hyperscale Footprints
4.2.1.4 Renewable Power PPA Incentives (Solar + Storage) Lower Carbon and OPEX Profiles
4.2.1.5 National E-Health and Digital Banking Programs Driving Low-Latency Workloads
4.2.1.6 5G Stand-Alone Roll-out Accelerating Edge-to-Core Traffic Density
4.2.2 Market Restraints
4.2.2.1 Land Scarcity and High Real-Estate Costs in Tel-Aviv Metro
4.2.2.2 Limited Grid Redundancy North/South of Coastal Load-Centers
4.2.2.3 Rising Water Tariffs Constraining Liquid-Cooling Adoption
4.2.2.4 Uncertain Cross-Border Data Transfer Regulations Raising Compliance Costs
4.3 Value Chain / Supply Chain Analysis
4.4 PESTLE Analysis
5 ARTIFICIAL INTELLIGENCE (AI) INCLUSION IN HYPERSCALE DATA CENTER (Sub-segments are subject to change depending on Availability of Data)
5.1 AI Workload Impact: Rise of GPU-Packed Racks and High Thermal Load Management
5.2 Rapid Shift toward 400G and 800G Ethernet - Local OEM Integration and Compatibility Demands
5.3 Innovations in Liquid Cooling: Immersion and Cold Plate Trends
5.4 AI-Based Data Center Management (DCIM) Adoption - Role of Cloud Providers
6 REGULATORY AND COMPLIANCE FRAMEWORK
7 KEY DATA CENTER STATISTICS
7.1 Existing Data Center Facilities in Region/Country (in MW) (Hyperscale Self build VS Colocation)
7.2 List of Upcoming Hyperscale Data Center (Region/Country)
7.3 List of Hyperscale Data Center Operators in the (Region/Country)
7.4 Analysis on Data Center CAPEX in (Region/Country)
8 HYPERSCALE DATA CENTER INFRASTRUCTURE INVESTMENT ANALYSIS
8.1 IT Infrastructure
8.2 Electrical Infrastructure
8.3 Mechanical Infrastructure
9 MARKET SEGMENTATION
9.1 By Data Center Type
9.1.1 Hyperscale Colocation
9.1.2 Enterprise/Hyperscale Self Build
9.2 By Service Type
9.2.1 IaaS ( Infrastructure-as-a-Service)
9.2.2 PaaS ( Platform-as-a-Service)
9.2.3 SaaS( Software-as-a-Service)
9.3 By End User
9.3.1 Cloud and IT
9.3.2 Telecom
9.3.3 Media and Entertainment
9.3.4 Government
9.3.5 BFSI
9.3.6 Manufacturing
9.3.7 E-Commerce
9.3.8 Other End User
10 COMPETITIVE LANDSCAPE
10.1 Market Share Analysis ( Value and Volume)
10.2 Company Landscape (MW of top 15 hyperscale operator)
10.3 Company Profiles
10.3.1 Amazon Web Services (AWS)
10.3.2 Google LLC
10.3.3 Microsoft Corporation
10.3.4 Oracle Corporation
10.3.5 MedOne Ltd.
10.3.6 EdgeConneX
10.3.7 Compass Datacenters
10.3.8 Serverfarm
10.3.9 Bynet Data Communications
10.3.10 Bezeq International
10.3.11 NED Data Centers
11 INVESTMENTS ANALYSIS12 MARKET OPPORTUNITIES AND FUTURE TRENDS
13 ABOUT US
13.1 Industries Covered
13.2 Illustrative List of Clients in the Industry
13.3 Our Customized Research Capabilities

Companies Mentioned (Partial List)

A selection of companies mentioned in this report includes, but is not limited to:

  • Amazon Web Services (AWS)
  • Google LLC
  • Microsoft Corporation
  • Oracle Corporation
  • MedOne Ltd.
  • EdgeConneX
  • Compass Datacenters
  • Serverfarm
  • Bynet Data Communications
  • Bezeq International
  • NED Data Centers